SlideShare a Scribd company logo
1 of 3
NITIN TYAGI
31st
Dec 1984,
ADRESS OPP POWERGRID GATE,NEW
COLONY ,VILL-PATHROTA,ITARSI
(M.P.)-461111
TELEPHONE 8234882870
MOBILE 9174874480
EMAIL nitin.tyagi214@gmail.com
nitin_tyagi32@yahoo.co.in
CAREER OBJECTIVE
Electrical engineer with 5 year experience in electrical project and maintenance, I am looking career that is both
challenging and reward. To do a project work or job in an organization and apply my skills and knowledge for
accomplishment of the organizational goals.
ACADEMIC BACKGROUND
M.tech (control system) Rgpv university 82% LNCT Bhopal Year completed 2015
B.E.(ElectricalEngineering) Rgpv university 70% G.E.C. Ujjain Year completed 2006
Class 12th M.P. board 78% G.H.S.S. itarsi Year completed 2001
Class 10th M.P. board 78% G.H.S.S.itarsi Year completed 1999
EMPLOYMENT SUMMARY (Total 08 years experience)
Sr.
No.
COMPANY NAME FROM TO DURATION DEPARTMENT/DESIGNATION
01 UTTAM GALVA STEEL
LTD,KHOPOLI(MAHARASHTRA)
03-08-2006 03-01-2008 1.5 Year ELECTRICAL PROJECT(SERVICE
CENTRE)
As GET, SHIFT ENGINEER
02 TORRENT POWER
LTD,GUJRAT(SURAT)
03-01-2008 04-10-2008 10 Month EHV O&M (220KV/66KV
&66KV/11KV)
As EXECUTIVE-I
03 GTL URJA
LTD,AURANGABAD(MAHARASH
TRA)
15-10-2008 15-06-2011 2 Year 08
Month
DISTRIBUTION FRANCHISEE (O&M)
As SENIOR ENGINEER
WORK EXPERIENCE IN DETAIL
GTL URJA LTD,AURANGABAD (distribution
franchisee)
Job title :senior engineer
Dec 2008 To Dec 2011 ( 3 years)
• I worked in HT/LT special department .as senior engineer.
• I worked for HT survey, load sanction, estimate for consumers.
• Load sanction ,estimate calculation.
• I also worked CT/PT testing, new connection for HT consumer.
• Operationalized systems for planning, monitoring, reporting and cross learning among for substation work.
• Electrical maintenance work for team to expert in this field.
• Experience in Power sector, O&M substation work, Load monitoring, Involving in training for O&M maintenance,
Electrical equipment energy management system developed & implemented for saving in energy.
• Institutionalized the process of regular interactions between district level govt. functionaries and partner meetings for
progress in project work
TORRENT POWER LTD, SURAT
Job title :Executive engineer
Jan 2008 To Dec 2008 (1 year)
• Handling of electrical load as per requirement.
• Erection HT & LT transmission line & sub-station (33KV).
• To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
• To provide the entire electrical solutions as per requirement.
To maintain the DPR.
• To check the entire work as according to approved drawings.
• Keep track of all jobs in their area of operation.
• Prioritize the jobs on hand and allocate manpower to it depending on the priority.
• Ensure optimal loading of manpower.
• Keep track of network and its loading of loading of transformers for optimal distribution; suggest
modifications to HT Cell if required.
• Be primarily responsible for all equipment for which they are accountable. This includes safety, operational,
maintenance and up gradation aspects of the hardware and network under their preview.
• Be primarily responsible for all job responsibilities of their respective stations.
• Make station visits and ensure that there no discrepancies creep into the system.
• Ensure that the works are being carried out as defined in the SOPs.
• Ensure all required preparation inputs are available to workers before they leave for site.
UTTAM GALVA STEEL LTD KHOPOLI,PUNE
Job title :shift engineer
Aug 2006 To Jan 2008 ( 1 year and 6 month)
• Overall responsibility for the company’s electrical project and maintenance
• Company comprise of various department like ,SMS (Steel melting shop),Rolling mill, HRM(Hot Rolling Mill),
CRM(Cold Rolling Mill),CPP(Captive Power Plant),Gas Plant for Oxygen, Nitrogen, Argon.
• I worked for drives used for motor speed control.which was from siemens,Rockwell ,ABB.Totally automation done
from Rockwell automation team.
• My duty was in project from starting to ending help the team which was coming to commission our project .The
automation done from Rockwell team. I have seen erection.testing, commissioning, of motors,transformer.,control
panels etc. Commissioning & maintenance of Transformers,
• HT& LT Circuit Breakers,
• AC Drives, RIO Panels
• Credited for completion of project .
PROFESSIONAL DEVELOPMENT
MS WORLD, EXCEL, COMPUTER KNOWLEDGE, PLC, SCADA,
MAJOR / MINOR PROJECT :
I have submitted my Thesis on topic “performance analysis of 5-level h-bridge multilevel inverter” Detailed description
given below. This thesis presents with the simulation and testing by using matlab of 5-level H-bridge multilevel inverter.
This report presents 5-level inverter with harmonics reduction along with the reduction in number of switches. . In this
paper modeling and evaluation of 5-level PWM inverter is carried out & also a evaluation with conventional 2-level
inverter is made. The percentage (%) total harmonic distortion is intended for 5-level inverter. The harmonic reduction is
achieved by PWM method. The functionality confirmation of the 5-level inverter is done using MATLAB.
WORKSHOPS ATTENDED / PAPER PRESENTATION
I attended 2 workshop and published 3 papers in international journal. I also attended national level conferences.
OTHER INFORMATION
Name-Nitin Tyagi,
Nationality-Indian
Marital status-No
Date of Birth—31 December 1984
Passport Details issued at Bhopal.
Passport Number—G456697
Issued At—BHOPAL
Valid Till—2020
I hereby declare that above written particulars are best of my knowledge and belief.
Date : SEP 2015
Place : ITARSI(M.P) NITIN TYAGI

More Related Content

What's hot

What's hot (20)

SYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUMESYED OMER LIAQUAT RESUME
SYED OMER LIAQUAT RESUME
 
CV_Ashok Jain
CV_Ashok JainCV_Ashok Jain
CV_Ashok Jain
 
HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)
 
Aliasgar Parekh_0115
Aliasgar Parekh_0115Aliasgar Parekh_0115
Aliasgar Parekh_0115
 
Electrical Control Panels by Gvl Electro Controls Pvt Ltd, Pune
Electrical Control Panels by Gvl Electro Controls Pvt Ltd, PuneElectrical Control Panels by Gvl Electro Controls Pvt Ltd, Pune
Electrical Control Panels by Gvl Electro Controls Pvt Ltd, Pune
 
Resume
ResumeResume
Resume
 
Sharma Resume
Sharma ResumeSharma Resume
Sharma Resume
 
CV_Suresh Pillai
CV_Suresh PillaiCV_Suresh Pillai
CV_Suresh Pillai
 
RESUME - Copy
RESUME - CopyRESUME - Copy
RESUME - Copy
 
Yousuf Resume
Yousuf ResumeYousuf Resume
Yousuf Resume
 
Resume
ResumeResume
Resume
 
Resume_L&T
Resume_L&TResume_L&T
Resume_L&T
 
Mohamed Azzouz C.V
Mohamed  Azzouz C.VMohamed  Azzouz C.V
Mohamed Azzouz C.V
 
IRJET- Modified Perturb and Observe MPPT Algorithm for Drift Avoidance using ...
IRJET- Modified Perturb and Observe MPPT Algorithm for Drift Avoidance using ...IRJET- Modified Perturb and Observe MPPT Algorithm for Drift Avoidance using ...
IRJET- Modified Perturb and Observe MPPT Algorithm for Drift Avoidance using ...
 
ahmed amer
ahmed amerahmed amer
ahmed amer
 
Sandeep cv
Sandeep cvSandeep cv
Sandeep cv
 
IRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic Controller
IRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic ControllerIRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic Controller
IRJET- Maximum Power Point Tracking from Pv Panel using Fuzzy Logic Controller
 
Dhiru singh
Dhiru singhDhiru singh
Dhiru singh
 
Abbas fadhil resume
Abbas fadhil resumeAbbas fadhil resume
Abbas fadhil resume
 
KALAISELVAN-CV
KALAISELVAN-CVKALAISELVAN-CV
KALAISELVAN-CV
 

Viewers also liked

Abhishek_Resume (11) - Copy
Abhishek_Resume (11) - CopyAbhishek_Resume (11) - Copy
Abhishek_Resume (11) - CopyAbhishek Singh
 
Acróstico Mario de Andrade
Acróstico Mario de AndradeAcróstico Mario de Andrade
Acróstico Mario de AndradeTati Duarte
 
Add Class to Your Style with Pandora bracelets
Add Class to Your Style with Pandora braceletsAdd Class to Your Style with Pandora bracelets
Add Class to Your Style with Pandora braceletsSOU FEEL
 
Faberlic Public Realtion august_2010 (Ru)
Faberlic Public Realtion august_2010 (Ru)Faberlic Public Realtion august_2010 (Ru)
Faberlic Public Realtion august_2010 (Ru)Eva
 
Creating your blog
Creating your blogCreating your blog
Creating your blogmargydlp
 
De kruisweg met overwegingen van de heilige Jozefmaria
De kruisweg met overwegingen van de heilige JozefmariaDe kruisweg met overwegingen van de heilige Jozefmaria
De kruisweg met overwegingen van de heilige JozefmariaOpus Dei Nederland
 
Harga hpo maika etnik
Harga hpo maika etnikHarga hpo maika etnik
Harga hpo maika etnikwujaya miha
 
Competency Based Selection System Pub
Competency Based Selection System PubCompetency Based Selection System Pub
Competency Based Selection System Pubomarterani
 

Viewers also liked (11)

International trade
International tradeInternational trade
International trade
 
Abhishek_Resume (11) - Copy
Abhishek_Resume (11) - CopyAbhishek_Resume (11) - Copy
Abhishek_Resume (11) - Copy
 
Acróstico Mario de Andrade
Acróstico Mario de AndradeAcróstico Mario de Andrade
Acróstico Mario de Andrade
 
Add Class to Your Style with Pandora bracelets
Add Class to Your Style with Pandora braceletsAdd Class to Your Style with Pandora bracelets
Add Class to Your Style with Pandora bracelets
 
Faberlic Public Realtion august_2010 (Ru)
Faberlic Public Realtion august_2010 (Ru)Faberlic Public Realtion august_2010 (Ru)
Faberlic Public Realtion august_2010 (Ru)
 
Tec Tor institucional- (English)
Tec Tor institucional- (English)Tec Tor institucional- (English)
Tec Tor institucional- (English)
 
Creating your blog
Creating your blogCreating your blog
Creating your blog
 
De kruisweg met overwegingen van de heilige Jozefmaria
De kruisweg met overwegingen van de heilige JozefmariaDe kruisweg met overwegingen van de heilige Jozefmaria
De kruisweg met overwegingen van de heilige Jozefmaria
 
Harga hpo maika etnik
Harga hpo maika etnikHarga hpo maika etnik
Harga hpo maika etnik
 
Competency Based Selection System Pub
Competency Based Selection System PubCompetency Based Selection System Pub
Competency Based Selection System Pub
 
Project
ProjectProject
Project
 

Similar to Nitin CV sept 2

Similar to Nitin CV sept 2 (20)

Resume of Dileep K 2017
Resume of Dileep K 2017Resume of Dileep K 2017
Resume of Dileep K 2017
 
ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
venkatCV
venkatCVvenkatCV
venkatCV
 
Tanaji Update new
Tanaji Update newTanaji Update new
Tanaji Update new
 
Commission resume
Commission resumeCommission resume
Commission resume
 
deo@dipankar.doc
deo@dipankar.docdeo@dipankar.doc
deo@dipankar.doc
 
Engr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSAEngr. Zeeshan's resume KSA
Engr. Zeeshan's resume KSA
 
Resume GM (2)
Resume GM (2)Resume GM (2)
Resume GM (2)
 
ARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_UpdtdARITRA_GHOSH_Resume_Updtd
ARITRA_GHOSH_Resume_Updtd
 
Arun resume
Arun resumeArun resume
Arun resume
 
Liyong CV
Liyong CVLiyong CV
Liyong CV
 
RESUME Kashyap
RESUME KashyapRESUME Kashyap
RESUME Kashyap
 
RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016RESUME_MJU_04.07.2016
RESUME_MJU_04.07.2016
 
Resume_MJU_04.07.2016
Resume_MJU_04.07.2016Resume_MJU_04.07.2016
Resume_MJU_04.07.2016
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
Power Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin KhantePower Electronics Engineer Resume - Sachin Khante
Power Electronics Engineer Resume - Sachin Khante
 

Nitin CV sept 2

  • 1. NITIN TYAGI 31st Dec 1984, ADRESS OPP POWERGRID GATE,NEW COLONY ,VILL-PATHROTA,ITARSI (M.P.)-461111 TELEPHONE 8234882870 MOBILE 9174874480 EMAIL nitin.tyagi214@gmail.com nitin_tyagi32@yahoo.co.in CAREER OBJECTIVE Electrical engineer with 5 year experience in electrical project and maintenance, I am looking career that is both challenging and reward. To do a project work or job in an organization and apply my skills and knowledge for accomplishment of the organizational goals. ACADEMIC BACKGROUND M.tech (control system) Rgpv university 82% LNCT Bhopal Year completed 2015 B.E.(ElectricalEngineering) Rgpv university 70% G.E.C. Ujjain Year completed 2006 Class 12th M.P. board 78% G.H.S.S. itarsi Year completed 2001 Class 10th M.P. board 78% G.H.S.S.itarsi Year completed 1999 EMPLOYMENT SUMMARY (Total 08 years experience) Sr. No. COMPANY NAME FROM TO DURATION DEPARTMENT/DESIGNATION 01 UTTAM GALVA STEEL LTD,KHOPOLI(MAHARASHTRA) 03-08-2006 03-01-2008 1.5 Year ELECTRICAL PROJECT(SERVICE CENTRE) As GET, SHIFT ENGINEER 02 TORRENT POWER LTD,GUJRAT(SURAT) 03-01-2008 04-10-2008 10 Month EHV O&M (220KV/66KV &66KV/11KV) As EXECUTIVE-I 03 GTL URJA LTD,AURANGABAD(MAHARASH TRA) 15-10-2008 15-06-2011 2 Year 08 Month DISTRIBUTION FRANCHISEE (O&M) As SENIOR ENGINEER WORK EXPERIENCE IN DETAIL GTL URJA LTD,AURANGABAD (distribution franchisee) Job title :senior engineer Dec 2008 To Dec 2011 ( 3 years) • I worked in HT/LT special department .as senior engineer. • I worked for HT survey, load sanction, estimate for consumers. • Load sanction ,estimate calculation. • I also worked CT/PT testing, new connection for HT consumer.
  • 2. • Operationalized systems for planning, monitoring, reporting and cross learning among for substation work. • Electrical maintenance work for team to expert in this field. • Experience in Power sector, O&M substation work, Load monitoring, Involving in training for O&M maintenance, Electrical equipment energy management system developed & implemented for saving in energy. • Institutionalized the process of regular interactions between district level govt. functionaries and partner meetings for progress in project work TORRENT POWER LTD, SURAT Job title :Executive engineer Jan 2008 To Dec 2008 (1 year) • Handling of electrical load as per requirement. • Erection HT & LT transmission line & sub-station (33KV). • To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning. • To provide the entire electrical solutions as per requirement. To maintain the DPR. • To check the entire work as according to approved drawings. • Keep track of all jobs in their area of operation. • Prioritize the jobs on hand and allocate manpower to it depending on the priority. • Ensure optimal loading of manpower. • Keep track of network and its loading of loading of transformers for optimal distribution; suggest modifications to HT Cell if required. • Be primarily responsible for all equipment for which they are accountable. This includes safety, operational, maintenance and up gradation aspects of the hardware and network under their preview. • Be primarily responsible for all job responsibilities of their respective stations. • Make station visits and ensure that there no discrepancies creep into the system. • Ensure that the works are being carried out as defined in the SOPs. • Ensure all required preparation inputs are available to workers before they leave for site. UTTAM GALVA STEEL LTD KHOPOLI,PUNE Job title :shift engineer Aug 2006 To Jan 2008 ( 1 year and 6 month) • Overall responsibility for the company’s electrical project and maintenance • Company comprise of various department like ,SMS (Steel melting shop),Rolling mill, HRM(Hot Rolling Mill), CRM(Cold Rolling Mill),CPP(Captive Power Plant),Gas Plant for Oxygen, Nitrogen, Argon. • I worked for drives used for motor speed control.which was from siemens,Rockwell ,ABB.Totally automation done from Rockwell automation team. • My duty was in project from starting to ending help the team which was coming to commission our project .The automation done from Rockwell team. I have seen erection.testing, commissioning, of motors,transformer.,control panels etc. Commissioning & maintenance of Transformers, • HT& LT Circuit Breakers, • AC Drives, RIO Panels • Credited for completion of project .
  • 3. PROFESSIONAL DEVELOPMENT MS WORLD, EXCEL, COMPUTER KNOWLEDGE, PLC, SCADA, MAJOR / MINOR PROJECT : I have submitted my Thesis on topic “performance analysis of 5-level h-bridge multilevel inverter” Detailed description given below. This thesis presents with the simulation and testing by using matlab of 5-level H-bridge multilevel inverter. This report presents 5-level inverter with harmonics reduction along with the reduction in number of switches. . In this paper modeling and evaluation of 5-level PWM inverter is carried out & also a evaluation with conventional 2-level inverter is made. The percentage (%) total harmonic distortion is intended for 5-level inverter. The harmonic reduction is achieved by PWM method. The functionality confirmation of the 5-level inverter is done using MATLAB. WORKSHOPS ATTENDED / PAPER PRESENTATION I attended 2 workshop and published 3 papers in international journal. I also attended national level conferences. OTHER INFORMATION Name-Nitin Tyagi, Nationality-Indian Marital status-No Date of Birth—31 December 1984 Passport Details issued at Bhopal. Passport Number—G456697 Issued At—BHOPAL Valid Till—2020 I hereby declare that above written particulars are best of my knowledge and belief. Date : SEP 2015 Place : ITARSI(M.P) NITIN TYAGI