1. NITIN TYAGI
31st
Dec 1984,
ADRESS OPP POWERGRID GATE,NEW
COLONY ,VILL-PATHROTA,ITARSI
(M.P.)-461111
TELEPHONE 8234882870
MOBILE 9174874480
EMAIL nitin.tyagi214@gmail.com
nitin_tyagi32@yahoo.co.in
CAREER OBJECTIVE
Electrical engineer with 5 year experience in electrical project and maintenance, I am looking career that is both
challenging and reward. To do a project work or job in an organization and apply my skills and knowledge for
accomplishment of the organizational goals.
ACADEMIC BACKGROUND
M.tech (control system) Rgpv university 82% LNCT Bhopal Year completed 2015
B.E.(ElectricalEngineering) Rgpv university 70% G.E.C. Ujjain Year completed 2006
Class 12th M.P. board 78% G.H.S.S. itarsi Year completed 2001
Class 10th M.P. board 78% G.H.S.S.itarsi Year completed 1999
EMPLOYMENT SUMMARY (Total 08 years experience)
Sr.
No.
COMPANY NAME FROM TO DURATION DEPARTMENT/DESIGNATION
01 UTTAM GALVA STEEL
LTD,KHOPOLI(MAHARASHTRA)
03-08-2006 03-01-2008 1.5 Year ELECTRICAL PROJECT(SERVICE
CENTRE)
As GET, SHIFT ENGINEER
02 TORRENT POWER
LTD,GUJRAT(SURAT)
03-01-2008 04-10-2008 10 Month EHV O&M (220KV/66KV
&66KV/11KV)
As EXECUTIVE-I
03 GTL URJA
LTD,AURANGABAD(MAHARASH
TRA)
15-10-2008 15-06-2011 2 Year 08
Month
DISTRIBUTION FRANCHISEE (O&M)
As SENIOR ENGINEER
WORK EXPERIENCE IN DETAIL
GTL URJA LTD,AURANGABAD (distribution
franchisee)
Job title :senior engineer
Dec 2008 To Dec 2011 ( 3 years)
• I worked in HT/LT special department .as senior engineer.
• I worked for HT survey, load sanction, estimate for consumers.
• Load sanction ,estimate calculation.
• I also worked CT/PT testing, new connection for HT consumer.
2. • Operationalized systems for planning, monitoring, reporting and cross learning among for substation work.
• Electrical maintenance work for team to expert in this field.
• Experience in Power sector, O&M substation work, Load monitoring, Involving in training for O&M maintenance,
Electrical equipment energy management system developed & implemented for saving in energy.
• Institutionalized the process of regular interactions between district level govt. functionaries and partner meetings for
progress in project work
TORRENT POWER LTD, SURAT
Job title :Executive engineer
Jan 2008 To Dec 2008 (1 year)
• Handling of electrical load as per requirement.
• Erection HT & LT transmission line & sub-station (33KV).
• To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
• To provide the entire electrical solutions as per requirement.
To maintain the DPR.
• To check the entire work as according to approved drawings.
• Keep track of all jobs in their area of operation.
• Prioritize the jobs on hand and allocate manpower to it depending on the priority.
• Ensure optimal loading of manpower.
• Keep track of network and its loading of loading of transformers for optimal distribution; suggest
modifications to HT Cell if required.
• Be primarily responsible for all equipment for which they are accountable. This includes safety, operational,
maintenance and up gradation aspects of the hardware and network under their preview.
• Be primarily responsible for all job responsibilities of their respective stations.
• Make station visits and ensure that there no discrepancies creep into the system.
• Ensure that the works are being carried out as defined in the SOPs.
• Ensure all required preparation inputs are available to workers before they leave for site.
UTTAM GALVA STEEL LTD KHOPOLI,PUNE
Job title :shift engineer
Aug 2006 To Jan 2008 ( 1 year and 6 month)
• Overall responsibility for the company’s electrical project and maintenance
• Company comprise of various department like ,SMS (Steel melting shop),Rolling mill, HRM(Hot Rolling Mill),
CRM(Cold Rolling Mill),CPP(Captive Power Plant),Gas Plant for Oxygen, Nitrogen, Argon.
• I worked for drives used for motor speed control.which was from siemens,Rockwell ,ABB.Totally automation done
from Rockwell automation team.
• My duty was in project from starting to ending help the team which was coming to commission our project .The
automation done from Rockwell team. I have seen erection.testing, commissioning, of motors,transformer.,control
panels etc. Commissioning & maintenance of Transformers,
• HT& LT Circuit Breakers,
• AC Drives, RIO Panels
• Credited for completion of project .
3. PROFESSIONAL DEVELOPMENT
MS WORLD, EXCEL, COMPUTER KNOWLEDGE, PLC, SCADA,
MAJOR / MINOR PROJECT :
I have submitted my Thesis on topic “performance analysis of 5-level h-bridge multilevel inverter” Detailed description
given below. This thesis presents with the simulation and testing by using matlab of 5-level H-bridge multilevel inverter.
This report presents 5-level inverter with harmonics reduction along with the reduction in number of switches. . In this
paper modeling and evaluation of 5-level PWM inverter is carried out & also a evaluation with conventional 2-level
inverter is made. The percentage (%) total harmonic distortion is intended for 5-level inverter. The harmonic reduction is
achieved by PWM method. The functionality confirmation of the 5-level inverter is done using MATLAB.
WORKSHOPS ATTENDED / PAPER PRESENTATION
I attended 2 workshop and published 3 papers in international journal. I also attended national level conferences.
OTHER INFORMATION
Name-Nitin Tyagi,
Nationality-Indian
Marital status-No
Date of Birth—31 December 1984
Passport Details issued at Bhopal.
Passport Number—G456697
Issued At—BHOPAL
Valid Till—2020
I hereby declare that above written particulars are best of my knowledge and belief.
Date : SEP 2015
Place : ITARSI(M.P) NITIN TYAGI