VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
Bukit Bintang Site Analysis Checklist
1. SITE ANALYSIS CHECK LIST
Part B Check List Bukit Bintang (ZONE A)
General Facts About The Area
1. Site location details (road names, address, major
landmarks etc)
2. Current context – existing buildings, car parking,
roads.
*better be famous one
3. Access to the site – car parking, bus routes, train
stations, cycle routes, pedestrian walkways.
4. Accessibility for the disabled
*car park for disable
Site & Surrounding
1. 5 senses (SMELL,TASTE,HEAR,SIGHT,TOUCH)
2. tangible and intangible
2. 3. Function & type of building
4. Circulation – infrastructure, road systems and transportation
5. Vegetation – landscaping, greenery, shrubs and trees, open
spaces.
6. Views – where are the best views to and from the site. Which
is the most likely feature aspect?
Sunlight direction- How it effect people/ environment?
7. Weather – how does the weather affect the site? Is it well
shaded, exposed?
8. Building context – what style, period, state of repair are the
surrounding buildings?
9. It is a historical/heritage/conservation area?
3. 10. Is the site close to listed buildings? How is it effect the area?
11. Surfaces and materials around the site.
12. Site levels. How will this affect your design process?
13. How does the site drainage work, would there be any potential
problems with drainage?
(optional to observe the drain, is it blocked by rubbish/ clean?)
Part C
Select A BUILDING
1. Function
2. layout
3. design
4. history
5. services
4. 6. architectural elements and spaces of the building ( through
photos and diagrammatic plan and sketches)
SWOT Analysis
-SWOT analysis
S W
O T