SlideShare a Scribd company logo
1 of 28
Download to read offline
SERVICE
SHAFT
FIRE SAFETY
SHAFT
2100 X 1200
UP
DN
CUTOUT SOFT U.G.
TANK
BELOW
PUMP ROOM
BELOW
FIRE + RAW
U.G. TANK
BELOW
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
PLUMBING
SHAFT
OFFICE
FOYER
CUT-OUT
ABOVE
ELE. SHAFT
TOILET
PLUMBING
SHAFT
TOILET
PLUMBING
SHAFT
HOTEL FOYER
CUT-OUT ABOVE
SHOWROOM -8
SHOWROOM -7
SHOWROOM -6
SHOWROOM -5
SHOWROOM - 4
SHOWROOM - 3
SHOWROOM - 2
FOYER
TOILET
ELEC.
SHAFT
PLU.
SHAFT
OFFICE LIFT
LOADING & UNLOADING
TOILET
1.56M WIDE PASSAGE
BORE WELL LOCATION
PROPOSED
4000
5109
4921
2867
2.37M
WIDE
PASSAGE
TOILET
2M
WIDE
PASSAGE
SERVICE
SHAFT
GUEST
LIFT-01
GUEST
LIFT-02
SERVICE
LIFT-02
SERVICE
LIFT-01
OFFICE
LIFT-01
OFFICE
LIFT-02
CUTOUT
RISER-27
TREAD-26
SUB-STATION AS
PER DETAIL
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
RISER-27
TREAD-26
CUT-OUT IN
FLOOR
2000 X 500
PROJECTION IN
FABRICATION
CCTV ROOM
TOILET
SHOWROOM - 1
TOILET TOILET
FABRICATED ROOF
@FIRST FLOOR LVL.
BACK OFFICE
2.40X2.40
LLR
2.40X1.86
HANDBAG
SCANNING
LUGGAGE SCANNER
FOR GROUP CHK.IN
METAL
DETECTOR
CONCIERGE
RECEPTION
TOILET
TIME CHECK &
RECEIVING staff entry
STORE
PROJECT:
DRAWING TITLE:
SITE PLAN THE FERN_NAKSHATRA HOTEL- SARGASAN
CAR DROP OFF
CAFE
6.92X6.30
43.28 SQ.MTR
HOTEL
ENTRY
HOTEL
EXIT
3.11 MTR. WIDE RAMP DOWN TO BASEMENT
±00 LVL.
+150MM FFL.
SECURITY
CABIN
ENTRANCE LOBBY
SERVICES
BELOW
LANDSCAPE
BOOM BARRIER
ARCHITECTURAL
SEATING
5.00M WIDE DRIVEWAY
5515
5515
6810
5885
WAITING AREA
+150MM FFL.
HOTEL ENTRY/EXIT
RAMP UP
1
STEP UP
CAFE
ENTRY
STEP UP 1
3.00
MTR
WIDE
DRIVE
WAY
BOOM BARRIER
3.00
MTR
WIDE
DRIVE
WAY
5.00M WIDE DRIVEWAY
3.11 MTR. WIDE RAMP UP FROM BASEMENT
FOM
2.40X2.40
2.40X1.70
SERVICE ENTRY
LVL +150MM
LVL +950MM
LVL +150MM
LVL ±00MM
LVL ±00MM
LVL +1050MM
LVL +1050MM LVL +400MM
LVL +300MM
LVL +300MM
LVL +1050MM
FIRE SAFETY
SHAFT
2100 X 1200
UP
11
12
13
14
-16
1
0 2 3 4 5 6 7 8 9
-15
10
DN
-17
-18
-19
-20
-21
-22
-23
-24
-25
-26
CUTOUT
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
KEY PLAN
GROUND
FLOOR
PLUMBING
SHAFT
OFFICE
FOYER
CUTOUT ABOVE
26'-9"X14'-4"
ELEC. SHAFT
TOILET
5'0"X 6'6"
PLUMBING
SHAFT
TOILET
5'0"X 7'7"
PLUMBING
SHAFT
HOTEL FOYER
56'0" X 29'2"
ABOVE CUT-OUT
SHOWROOM -8
33'4"X 61'7"
SHOWROOM -7
13'0"X 55'4"
SHOWROOM -6
13'0"X 58'4"
SHOWROOM -5
14'6"X 60'0"
SHOWROOM - 4
14'6"X 60'9"
SHOWROOM - 3
14'6"X 60'0"
SHOWROOM - 2
14'6"X 58'0"
FOYER
6'10"X 14'0"
TOILET
6'9"X 6'3"
LADIES/GENTS
TOILET
7'6"x 12'6"
TOILET
3'4"x 3'0"
TOILET
3'4"x 3'0"
TOILET
3'4"x 3'0"
TOILET
3'4"x 3'0"
6.0 MT WIDE RAMP DOWN TO 1ST BASEMENT
ELEC.
SHAFT
PLU.
SHAFT
OFFICE LIFT
6'7"X6'7"
EXHAUST AIR
WATER BODY
4500.0
LOADING & UNLOADING
34'0"x 12'6"
BORE WELL LOCATION
PROPOSED
4000
5109
4921
2867
5'-2" WIDE PASSAGE
7'-3" WIDE
PASSAGE
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7" TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
7'-3" WIDE
PASSAGE
LINEN SHAFT
6'10"X3'0"
SERVICE SHAFT
6'10"X2'3"
CUTOUT
GUEST
LIFT-01
2000X2000
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
RISER-27
TREAD-26
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
SUB-STATION AS
PER DETAIL
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
RISER-27
TRADE-26
EDGE OF
PROJECTION
ABOVE
EDGE OF
PROJECTION
ABOVE
FABRICATED
ROOF ABOVE
1
1
2
2
3
3
SERVICE
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
CUT-OUT IN
FLOOR
2000 X 500
CUT-OUT IN
FLOOR
NAKSHATRA HOTEL- SARGASAN
GROUND FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
SOFT U.G.
TANK
PUMP ROOM
BELOW
FIRE + RAW
U.G. TANK
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+
57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
KEY PLAN
BASEMENT
-1,2
&
3
PLAN
NAKSHATRA HOTEL- SARGASAN
BASMENT - 1, 2 & 3 FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
KEY PLAN
PLUMBING
SHAFT
PLUMBING
SHAFT
PLUMBING
SHAFT
OFFICE LIFT
6'7"X6'7"
ELEC.
SHAFT
PLU.
SHAFT
SHOWROOM -8
33'4"X 38'8"
SHOWROOM -7
13'0"X 46'10"
SHOWROOM -6
13'0"X 50'0"
SHOWROOM -5
14'6"X 52'0"
SHOWROOM - 4
14'6"X 52'7"
SHOWROOM - 3
14'6"X 51'10"
SHOWROOM - 2
14'6"X 49'8"
SHOWROOM - 1
26'3"X 52'3"
OFFICE-9
19'3"X 22'0"
TOILET
5'0"X 7'0"
4'-3"
PASSAGE
PURCHASE
MANAGER
14'-6" X 10'-0"
SALES CABIN
10'-0" X 11'-0"
UNIFORM ROOM
11'-0'' X8'-3''
LINEN ROOM
10'-9'' X 12'-9''
EHK OFFICE
7'-9'' X 9'-3''
HK CONTROL
7'-9'' X 6'-0''
TRAINING ROOM
9'9''X20'9''
4'-9'' WIDE
PASSAGE
5'-3'' WIDE
PASSAGE
MALE STAFF
CHANGING ROOM
10'-6'' X16'-6''
FEMALE STAFF
CHANGING ROOM
10'-6'' X 7'-9''
EXEC. MALE
CHANGING ROOM
14'-9'' X8'-9''
11'-0'' X8'-9''
CHANGING
ROOM
CHANGING
ROOM
11'-0'' X7'-9''
CHANGING
ROOM
11'-0'' X17'-0''
CUT-OUT
40'3" X 20'-5"
CUTOUT
18'-0"X14'-0"
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
12'-0"X10'-0"
6'-7"
WIDE
PASSAGE
7'-3" WIDE
PASSAGE
7'-3" WIDE
PASSAGE
8'-2" WIDE PASSAGE
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
LINEN SHAFT
6'10"X3'0"
SERVICE SHAFT
6'10"X2'3"
PLUMBING
SHAFT
ELEC.
SHAFT
SERVICE SHAFT
AC ODU /
PLUMBING
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
AC ODU /
SERVICE SHAFT
13'9"X9'8"
RISER-24
TREAD-23
RISER-24
TREAD-23
SERVICE
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
FIRST
FLOOR
PLAN
FABRICATION
GRILL AS PER
DETAIL
FABRICATION
GRILL AS PER
DETAIL
FABRICATION
GRILL AS PER
DETAIL
FABRICATION
GRILL AS PER
DETAIL
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
1
1
2
2
3
3
FABRICATED
PLATFORM AS
PER DETAIL
NAKSHATRA HOTEL- SARGASAN
FIRST FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
KEY PLAN
PLUMBING
SHAFT
PLUMBING
SHAFT
PLUMBING
SHAFT
OFFICE LIFT
6'7"X6'7"
SHOWROOM -8
33'4"X 38'8"
SHOWROOM -7
13'0"X 46'10"
SHOWROOM -6
13'0"X 50'0"
SHOWROOM -5
14'6"X 52'0"
SHOWROOM - 4
14'6"X 52'7"
SHOWROOM - 3
14'6"X 51'10"
SHOWROOM - 2
14'6"X 49'8"
SHOWROOM - 1
26'3"X 52'3"
OFFICE-13
29'6"X 21'8"
OFFICE-12
14'6"X 21'8"
TOILET
7'0"X 5'0"
TOILET
7'0"X 5'0"
PLUMBING
SHAFT
FOYER
11'-0"X18'-4"
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
12'-0"X10'-0"
6'-7"
WIDE
PASSAGE
7'-3" WIDE
PASSAGE
7'-3" WIDE
PASSAGE
8'-2" WIDE PASSAGE
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
6'7"X 7'0"
TOILET
6'7"X 7'0"
AC ODU/
SERVICE SHAFT
CUT-OUT ABOVE
14'-3"X5'9''
OFFICE-9
19'3"X 22'0"
TOILET
5'0"X 7'0"
OFFICE-11
36'-7" X 26'-7"
OFFICE-10
19'3"X 34'0"
SERVICE
SHAFT
AC ODU
LINEN SHAFT
6'10"X3'0"
SERVICE SHAFT
6'10"X2'3"
PLUMBING
SHAFT
ELEC.
SHAFT
SERVICE SHAFT
AC ODU /
PLUMBING
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
AC ODU /
SERVICE SHAFT
13'9"X9'8"
RISER-24
TREAD-23
RISER-24
TREAD-23
ELEC.
SHAFT
PLU.
SHAFT
SERVICE
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
SECOND
FLOOR
PLAN
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
CIRCULAR COLUMN
(DIA. 450MM) IN M.S.
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
1
1
2
2
3
3
FABRICATED
PLATFORM AS
PER DETAIL
NAKSHATRA HOTEL- SARGASAN
SECOND FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
LINEN SHAFT
6'10"X3'0"
SERVICE SHAFT
6'10"X2'3"
KEY PLAN
PLUMBING
SHAFT
PLUMBING
SHAFT
PLUMBING
SHAFT
3rd
FLOOR
PLAN
OFFICE-1
26'3"X40'0"
OFFICE-2
14'6"X 40'0"
OFFICE-4
14'6"X 40'0"
OFFICE-6
13'0"X 40'0"
OFFICE-3
14'6"X 40'0"
OFFICE-5
14'6"X 40'0"
OFFICE-7
13'0" X 40'0"
6'-7" WIDE PASSAGE
OFFICE-8
33'4"X 25'8"
OFFICE LIFT
6'7"X6'7"
TERRACE
25'4"X 15'9"
TERRACE
15'6"X 17'6"
TERRACE
14'6"X 19'6"
TERRACE
14'6"X 20'4"
TERRACE
14'6"X 19'6"
TERRACE
14'6"X 17'9"
TERRACE
13'0"X 14'0"
TERRACE
33'3"X 12'3"
OFFICE-11
37'0''X 26'-7"
OFFICE-10
19'3"X 34'0"
FOYER
11'-0"X18'-4"
OFFICE-13
29'6"X 21'8"
OFFICE-12
14'6"X 21'8"
TOILET
7'0"X 5'0"
TOILET
7'0"X 5'0"
PLUMBING
SHAFT
7'-3" WIDE
PASSAGE
7'-3" WIDE
PASSAGE
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
6'-7" WIDE PASSAGE
AC ODU /
PLUMBING
SHAFT
TOILET
6'7"X 7'0"
TOILET
6'7"X 7'0"
14'-3"X5'9'' AC ODU/
SERVICE SHAFT
OFFICE-9
19'3"X 22'0"
SERVICE
SHAFT
AC ODU
TOILET
5'0"X 7'0"
PLUMBING
SHAFT
ELEC.
SHAFT
SERVICE SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
AC ODU /
SERVICE SHAFT
13'9"X9'8"
RISER-21
TREAD-20
ELEC.
SHAFT
PLU.
SHAFT
RISER-21
TREAD-20
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
1
1
2
2
3
3
SERVICE
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
ALUMINUM
FRAME FOR
GLAZING
ALUMINUM
FRAME FOR
GLAZING
ALUMINUM
FRAME FOR
GLAZING
ALUMINUM
FRAME FOR
GLAZING
FABRICATED
PLATFORM AS
PER DETAIL
NAKSHATRA HOTEL- SARGASAN
THIRD FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+
6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
KEY PLAN
PLUMBING
SHAFT
PLUMBING
SHAFT
PLUMBING
SHAFT
4th
FLOOR
PLAN
OFFICE-1
26'3"X40'0"
OFFICE-2
14'6"X 40'0"
OFFICE-4
14'6"X 40'0"
OFFICE-6
13'0"X 40'0"
OFFICE-3
14'6"X 40'0"
OFFICE-5
14'6"X 40'0"
OFFICE-7
13'0" X 40'0"
OFFICE-8
33'4"X 25'8"
OFFICE-13
29'6"X 21'8"
OFFICE-12
14'6"X 21'8"
TOILET
7'0"X 5'0"
TOILET
7'0"X 5'0"
PLUMBING
SHAFT
FOYER
15'0"X 14'4"
LIFT SHAFT
ELEC.
SHAFT
PLU.
SHAFT
7'-3" WIDE
PASSAGE
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
AC ODU /
PLUMBING
SHAFT
TOILET
6'7"X 7'0"
TOILET
6'7"X 7'0"
14'-3"X5'9'' AC ODU/
SERVICE SHAFT
OFFICE-11
37'0''X 26'-7"
OFFICE-10
19'3"X 34'0"
OFFICE-9
19'3"X 22'0"
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
12'-0"X10'-0"
6'-7"
WIDE
PASSAGE
7'-3" WIDE
PASSAGE
FOYER
11'-0"X18'-4"
SERVICE
SHAFT
TOILET
AC ODU
PLUMBING
SHAFT
ELEC.
SHAFT
SERVICE SHAFT
LINEN SHAFT
6'10"X3'0"
SERVICE SHAFT
6'10"X2'3"
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
AC ODU /
SERVICE SHAFT
13'9"X9'8"
RISER-21
TREAD-20
RISER-21
TREAD-20
1
1
2
2
3
3
SERVICE
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
ALUMINUM
GLAZING
ALUMINUM
GLAZING
ALUMINUM
FRAME FOR
GLAZING
ALUMINUM
GLAZING
NAKSHATRA HOTEL- SARGASAN
FOURTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
KEY PLAN
PLUMBING
SHAFT
PLUMBING
SHAFT
PLUMBING
SHAFT
5th
FLOOR
PLAN
OFFICE-1
26'3"X39'7"
OFFICE-2
14'6"X 39'7"
OFFICE-4
14'6"X 39'7"
OFFICE-6
13'0"X 39'7"
OFFICE-3
14'6"X 39'7"
OFFICE-13
29'6"X 21'8"
OFFICE-5
14'6"X 39'7"
OFFICE-7
13'0" X 39'7"
OFFICE-12
14'6"X 21'8"
OFFICE-8
33'4"X 38'8"
TOILET
7'0"X 5'0"
TOILET
7'0"X 5'0"
PLUMBING
SHAFT
ELEC.
SHAFT
PLU.
SHAFT
7'-3" WIDE
PASSAGE
7'-3" WIDE
PASSAGE
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
AC ODU /
PLUMBING
SHAFT
TOILET
6'7"X 7'0"
TOILET
6'7"X 7'0"
14'-3"X5'9'' AC ODU/
SERVICE SHAFT
OFFICE-11
37'0''X 26'-7"
OFFICE-10
19'3"X 34'0"
OFFICE-9
19'3"X 22'0"
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
12'-0"X10'-0"
6'-7"
WIDE
PASSAGE
FOYER
11'-0"X18'-4"
SERVICE
SHAFT
AC
ODU
REFUGE SPACE
27'-3" X 6'-0"
@5th floor
TOILET
5'0"X 7'0"
PLUMBING
SHAFT
ELEC.
SHAFT
SERVICE SHAFT
SERVICE SHAFT
6'10"X2'3"
AC ODU /
SERVICE SHAFT
13'9"X9'8"
RISER-21
TREAD-20
RISER-21
TREAD-20
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+
16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
1
1
2
2
3
3
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
LINEN SHAFT
1780X725
ALUMINUM
FRAME FOR
GLAZING
NAKSHATRA HOTEL- SARGASAN
FIFTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
6th
FLOOR
PLAN
KEY PLAN
PLUMBING
SHAFT
PLUMBING
SHAFT
PLUMBING
SHAFT
OFFICE-1
26'3"X39'7"
OFFICE-2
14'6"X 39'7"
OFFICE-4
14'6"X 39'7"
OFFICE-6
13'0"X 39'7"
OFFICE-3
14'6"X 39'7"
OFFICE-13
29'6"X 21'8"
OFFICE-5
14'6"X 39'7"
OFFICE-7
13'0" X 39'7"
OFFICE-12
14'6"X 21'8"
OFFICE-8
33'4"X 38'8"
TOILET
7'0"X 5'0"
TOILET
7'0"X 5'0"
PLUMBING
SHAFT
ELEC.
SHAFT
PLU.
SHAFT
7'-3" WIDE
PASSAGE
7'-3" WIDE
PASSAGE
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
TOILET
5'0"X 7'7"
AC ODU /
PLUMBING
SHAFT
TOILET
6'7"X 7'0"
TOILET
6'7"X 7'0"
OFFICE-11
37'0''X 26'-7"
OFFICE-10
19'3"X 34'0"
OFFICE-9
19'3"X 22'0"
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
12'-0"X10'-0"
6'-7"
WIDE
PASSAGE
FOYER
11'-0"X18'-4"
SERVICE
SHAFT
AC
ODU
TOILET
5'0"X 7'0"
PLUMBING
SHAFT
ELEC.
SHAFT
SERVICE SHAFT
SERVICE SHAFT
6'10"X2'3"
10'-7"X11'-0"
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
AC ODU /
SERVICE SHAFT
13'9"X9'8"
RISER-21
TREAD-20
RISER-21
TREAD-20
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
1
1
2
2
3
3
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
LINEN SHAFT
1780X725
ALUMINUM
FRAME FOR
GLAZING
ALUMINUM
FRAME FOR
GLAZING
NAKSHATRA HOTEL- SARGASAN
SIXTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
KEY PLAN
HALL-2
29'9"X 47'-3"
HALL-1
26'-9" X 47'-3"
OPEN TERRACE
58'3"X 11'-3"
HALL-3
29'-9"X 47'-3"
RESTAURANT
60'-3" X 58'-6"
PRE FUNCTION
26'-0" X 21'-5"
6'-7" WIDE PASSAGE
29'9" X 33'11"
60 SQ. MT.
KITCHEN
26'-3" X 56'-4"
12.68 SQ.MT.
SPC. KITCHEN
ELEC.
SHAFT
PLU.
SHAFT
7'-3" WIDE
PASSAGE
7'-3" WIDE
PASSAGE
AC ODU /
PLUMBING
SHAFT
TOILET/
WASH
LADIES
TOILET
14'-6"X 21'-9"
GENTS
TOILET
14'-6"X 21'9"
LOCKER
REFUGE SPACE
27'-3" X 6'-0"
@7th floor
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
OFFICE
LIFT-01
2000X2000
OFFICE
LIFT-02
2000X2000
SHAFT
6'10"X3'0"
PLUMBING
SHAFT
ELEC.
SHAFT
SERVICE SHAFT
10'-7"X11'-0"
AC ODU /
SERVICE SHAFT
13'9"X9'8"
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-20
TREAD-19
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-20
TREAD-19
2
1
3
1
2 3
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
7th
FLOOR
PLAN
NAKSHATRA HOTEL- SARGASAN
SEVENTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
HOTEL SERVICES
22'9"X21'0"
TOILET
10'-0"x6'6"
TOILET
10'0"x6'6"
SITTING AREA
11'0"X18'-4"
TOILET
6'6"x9'4"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
TOILET
6'6"x11'0"
ROOM-04
14'-6"X21'8"
TOILET
5'0"x8'-6"
ROOM-05
14'-6"X21'8"
6'-7"
WIDE
PASSAGE
10'-4" X 6'-9"
TOILET
10'-0" X 6'6"
TOILET
10'-0" X 6'6"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
TOILET
10'-0" X 6'5"
10'-4" X 5'-7"
10'-4" X 5'-7"
6'-7" X 12'-6"
SALES CABIN
14'-6"X21'-8"
ROOM-14
26'3"X18'0"
ROOM-12
26'3"X12'-6"
ROOM-15
26'3"X19'-6"
ROOM-10
26'3"X12'-6"
ROOM-11
26'3"X12'-6"
ROOM-13
26'3"X12'-6"
ROOM-9
26'3"X12'-6"
ROOM-8
26'3"X12'-6"
ROOM-7
26'3"X12'-6"
ROOM-6
22'9"X12'-6"
ROOM-03
26'3"X13'-8"
ROOM-01
33'4"X12'-6"
ROOM-02
26'3"X12'-6"
6'-7"
WIDE
PASSAGE
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
6'-7"
WIDE
PASSAGE
SERVICE
SHAFT
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'0"x6'6"
TOILET
5'0"x8'-6"
TOILET
5'0"x8'-6"
ELEC.
SHAFT
PLU.
SHAFT
AC ODU /
PLUMBING
SHAFT
SHAFT
6'10"X3'0"
OPEN-TERRACE
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
10'-4" X 5'-7"
TREE-
PLANTER
BOX
TREE-
PLANTER
BOX
PLANTER
BOX
PLANTER
BOX
PLANTATION
PLANTER
BOX
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
PLUMBING
SHAFT
ELEC.
SHAFT
KEY PLAN
10'-7"X11'-0"
AC ODU /
SERVICE SHAFT
13'9"X9'8"
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
2
1
3
1
2 3
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
8th
FLOOR
PLAN
NAKSHATRA HOTEL- SARGASAN
EIGHTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
KEY PLAN
ELEC.
SHAFT
PLU.
SHAFT
CUTOUT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
HOTEL SERVICES
22'9"X21'0"
10'-7"X11'-0"
TOILET
10'-0"x6'6"
TOILET
10'0"x6'6"
SITTING AREA
11'0"X18'-4"
TOILET
6'6"x9'4"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
TOILET
6'6"x11'0"
ROOM-04
14'-6"X21'8"
TOILET
5'0"x8'-6"
ROOM-05
14'-6"X21'8"
6'-7"
WIDE
PASSAGE
10'-4" X 6'-9"
TOILET
10'-0" X 6'6"
TOILET
10'-0" X 6'6"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
TOILET
10'-0" X 6'5"
10'-4" X 5'-7"
10'-4" X 5'-7"
6'-7" X 12'-6"
SALES CABIN
14'-6"X21'-8"
ROOM-14
26'3"X18'0"
ROOM-12
26'3"X12'-6"
ROOM-15
26'3"X19'-6"
ROOM-10
26'3"X12'-6"
ROOM-11
26'3"X12'-6"
ROOM-13
26'3"X12'-6"
ROOM-16
26'3"X12'-6"
ROOM-17
26'3"X13'-8"
ROOM-9
26'3"X12'-6"
ROOM-8
26'3"X12'-6"
ROOM-7
26'3"X12'-6"
ROOM-6
22'9"X12'-6"
ROOM-03
26'3"X13'-8"
ROOM-01
33'4"X12'-6"
ROOM-02
26'3"X12'-6"
6'-7"
WIDE
PASSAGE
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
6'-7"
WIDE
PASSAGE
SERVICE
SHAFT
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
TOILET
10'0"x6'6"
TOILET
5'0"x8'-6"
TOILET
5'0"x8'-6"
ELEC.
SHAFT
PLU.
SHAFT
TOILET
10'-0"x6'6"
TOILET
10'-0"x6'6"
10'-4" X 5'-7"
TERRACE
PLUMBING
SHAFT
ELEC.
SHAFT
ROOM-2
16'9"X24'-0"
ROOM-1
16'0"X23'-9"
10'-7"X11'-0"
AC ODU /
SERVICE SHAFT
13'9"X9'8"
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
2
1
3
1
2 3
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
9th
FLOOR
PLAN
NAKSHATRA HOTEL- SARGASAN
NINTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
KEY PLAN
TOILET
6'6"x10'-0"
ELEC.
SHAFT
PLU.
SHAFT
TOILET
7'9"x6'6"
ROOM-3
26'3"X12'-6"
ROOM-14
26'3"X12'-6"
ROOM-8
22'9"X12'-6"
HOTEL SERVICES
22'9"X21'0"
ROOM-15
26'3"X12'-6"
ROOM-19
26'3"X12'-6"
ROOM-12
26'3"X12'-6"
ROOM-18
26'3"X12'-6"
ROOM-9
26'3"X12'-6"
6'-7"
WIDE
PASSAGE
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
TOILET
10'-0"x6'6"
TOILET
6'6"x10'-0"
FOYER
11'-0"X18'-4"
ROOM-13
26'3"X12'-6"
ROOM-4
26'3"X13'-9"
ROOM-16
26'3"X18'0"
ROOM-20
26'3"X13'-9"
ROOM-17
26'3"X17'-0"
ROOM-10
26'3"X12'-6"
ROOM-11
26'3"X12'-6"
6'-7"
WIDE
PASSAGE
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
TOILET
10'0"x6'6"
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
ROOM-2
16'9"X23'-6"
ROOM-1
16'0"X23'-9"
TOILET
11'-0" X 5'6"
TOILET
8'0"x6'6"
PLUMBING
SHAFT
3'3"X3'0"
TOILET
9'4"x8'-0"
PLUMBING
SHAFT
3'3"X3'0"
TOILET
11'-0" X 5'6"
TOILET
10'-0"x6'6"
6'-7" X 12'-4"
6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE
ROOM-5
14'-6"X21'9"
TOILET
5'0"x8'-6"
9'-0" X 9'-0"
6'-7"
WIDE
PASSAGE
8'-4" X 5'-7"
CUTOUT
6'-7" X 11'9"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 6'-9"
10'-4" X 5'-7" 10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
TOILET
5'0"x8'-6"
9'-0" X 9'-0"
ROOM-06
14'-6"X21'8"
ROOM-07
14'-6"X21'8"
PLUMBING
SHAFT
TOILET
7'0"x8'-6"
7'-3" X 9'-0"
PLUMBING
SHAFT
ELEC.
SHAFT
PLUMBING
SHAFT
ELEC.
SHAFT
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
PLUMBING
SHAFT
3'3"X3'0"
10'-7"X11'-0"
AC ODU /
SERVICE SHAFT
13'9"X9'8"
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
2
1
3
1
2 3
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
10th
FLOOR
PLAN
NAKSHATRA HOTEL- SARGASAN
TENTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
KEY PLAN
TOILET
6'6"x10'-0"
ELEC.
SHAFT
PLU.
SHAFT
ROOM-3
26'3"X12'-6"
ROOM-14
26'3"X12'-6"
HOTEL SERVICES
22'9"X21'0"
ROOM-15
26'3"X12'-6"
ROOM-12
26'3"X12'-6"
ROOM-9
26'3"X12'-6"
6'-7"
WIDE
PASSAGE
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
TOILET
10'-0"x6'6"
ROOM-13
26'3"X12'-6"
ROOM-4
26'3"X13'-9"
ROOM-16
26'3"X18'0"
ROOM-17
26'3"X17'-0"
ROOM-10
26'3"X12'-6"
ROOM-11
26'3"X12'-6"
6'-7"
WIDE
PASSAGE
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
TOILET
10'0"x6'6"
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
ROOM-2
16'9"X23'-6"
ROOM-1
16'0"X23'-9"
TOILET
11'-0" X 5'6"
TOILET
8'0"x6'6"
TOILET
9'4"x8'-0"
TOILET
11'-0" X 5'6"
TOILET
10'-0"x6'6"
6'-7" X 12'-4"
10'-7"X11'-0"
6'-7" WIDE PASSAGE
6'-7"
WIDE
PASSAGE
CUTOUT
6'-7" X 11'9"
12'-0"X11'-0"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 6'-9"
10'-4" X 5'-7" 10'-4" X 5'-7"
10'-4" X 5'-7"
10'-4" X 5'-7"
ROOM-5
14'-6"X21'9"
TOILET
5'0"x8'-6"
9'-0" X 9'-0"
TOILET
5'0"x8'-6"
9'-0" X 9'-0"
ROOM-06
14'-6"X21'8"
ROOM-07
14'-6"X21'8"
PLUMBING
SHAFT
TOILET
7'0"x8'-6"
7'-3" X 9'-0"
FOYER
11'-0"X18'-4"
PLUMBING
SHAFT
3'3"X3'0"
27'-3" X 6'-0"
@11th floor
6'-7" WIDE PASSAGE
6'-7" X 12'-4"
ROOM-18
26'3"X12'-6"
CUTOUT
FABRICATION BRIDGE ABOVE
TOILET
7'9"x6'6"
ROOM-8
22'9"X12'-6"
ROOM-19
26'3"X12'-6"
TOILET
6'6"x10'-0"
TOILET
6'6"x10'-0"
ROOM-20
26'3"X13'-9"
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
PLUMBING
SHAFT
ELEC.
SHAFT
10'-7"X11'-0"
AC ODU /
SERVICE SHAFT
13'9"X9'8"
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
UP
DN
FIRE SAFETY
SHAFT
2100 X 1200
RISER-21
TREAD-20
2
1
3
1
2 3
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
11th
FLOOR
PLAN
NAKSHATRA HOTEL- SARGASAN
ELEVENTH FLOOR PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
KEY PLAN
GUEST
LIFT-01
2000X2000
GUEST
LIFT-02
2000X2000
SERVICE
LIFT-02
2000X2100
SERVICE
LIFT-01
2000X2100
PLUMBING
SHAFT
ELEC.
SHAFT
OPEN TERRACE
56'-8" X 115'-2"
OPEN TERRACE
33'4"X63'7"
STAIR CABIN
22'-2"X18'-0"
OPEN TERRACE
CUTOUT
10'-0" WIDE FABRICATION BRIDGE
CUTOUT
CONNECTING
BRIDGE
MEPF SERVICE AREA
9'0" WIDE PASSAGE
SERVICE TERRACE
56'9" X 27'3"
56'0" X 29'5"
6'-6"
WIDE
PASSAGE
7'6" WIDE PASSAGE
PAVER AREA
(KITCHEN)
33'3" X 26'0"
AC ODU /
PLUMBING
SHAFT
SHAFT
6'10"X3'0"
10'-7"X11'-0"
AC ODU /
SERVICE SHAFT
13'9"X9'8"
DN
FIRE SAFETY
SHAFT
2100 X 1200
DN
FIRE SAFETY
SHAFT
2100 X 1200
2
1
3
1
2 3
BM
1
2
3
4
5
6
7
8
BM
A
B
C
D
E
F
6300 7696 9375 9375
1145
6555 10375 6225
6300 44521 (C/C) 6225
6000 (C/O) 45046 (O/O) 6000 (O/C)
6225
10490
5955
3155
7570
3900
6225
31070
(C/C)
6948
6948
6000
(O/C)
31745
(O/O)
0.000
+6.225
+16.600
+23.155
+24.300
+23675
+43050
+50746
+57.046
0.000
+6.225
+16.715
+22.670
+25.825
+33.395
+37.295
ROOF
PLAN
NAKSHATRA HOTEL- SARGASAN
ROOF PLAN
PROJECT DETAILS:
Total Plot Area - 2889 sq. m
Built up area - 1345 sq.m
Landscape Area - 20 sq. m
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
ROAD L.V.L [±0.0 mm]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
1000.0
General Notes:
FRONT ELEVATION
FRONT SIDE ELEVATION
GLAZING
FABRICATION WORK
GRC PANEL
DIGITAL SCREEN
100X50MM ALUMINUM
SECTION-VERTICAL
GROOVE BETWEEN
GLASS-HORIZONTAL
GRC PANEL
GRC
PANEL
GLAZING AS PER THE
DETAIL
PROJECTION AT BEAM
BOTTOM LVL
300X150MM ALUMINUM
SECTION- VERTICAL
300X150MM ALUMINUM
SECTION- HORIZONTAL
PROJECTION AT SILL LVL
300
FABRICATION GRILL AS
PER THE DETAIL
150MM THK. PARDI -
VERTICAL
75X50MM ALUMINUM
SECTION
PROJECTION AT
BEAM BOTTOM LVL.
TINTED GLASS
75X50MM ALUMINUM
SECTION
GRC PANEL
GRC PANEL
GRC PANEL
GRC
PANEL
GRC
PANEL
GRC
PANEL
GRC
PANEL
GRC
PANEL
FABRICATION BRIDGE
RCC PARDI
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
ROAD L.V.L [±0.0 mm]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
1000.0
BACK SIDE ELEVATION
BACK SIDE ELEVATION
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
General Notes:
GLAZING
FABRICATION WORK
GRC PANEL
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
ROAD L.V.L [±0.0 mm]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
1000.0
General Notes:
LEFT SIDE ELEVATION
100X50MM ALUMINUM SECTION-VERTICAL
GROOVE BETWEEN GLASS-HORIZONTAL
GRC PANEL
GRC PANEL
GRC
PANEL
GRC
PANEL
GRC
PANEL
GLAZING AS PER THE DETAIL
PROJECTION AT BEAM BOTTOM LVL
300X150MM ALUMINUM SECTION- VERTICAL
300X150MM ALUMINUM SECTION- HORIZONTAL
100X50MM ALUMINUM SECTION- HORIZONTAL
PROJECTION AT SILL LVL
300
FABRICATION GRILL AS PER THE DETAIL
150MM THK. PARDI - VERTICAL
75X50MM ALUMINUM SECTION
PROJECTION AT BEAM BOTTOM LVL.
FABRICATION
GRILL
AS
PER
THE
DETAIL
TINTED GLASS
GROOVE BETWEEN GLASS
75X50MM ALUMINUM SECTION
REFUGE
AREA
REFUGE
AREA
REFUGE
AREA
LEFT SIDE ELEVATION
GLAZING
FABRICATION WORK
GRC PANEL
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
ROAD L.V.L [±0.0 mm]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
1000.0
General Notes:
RIGHT SIDE ELEVATION
100X50MM ALUMINUM SECTION-VERTICAL
GROOVE BETWEEN GLASS-HORIZONTAL
GRC PANEL GRC PANEL
GRC PANEL GRC PANEL
GRC PANEL GRC PANEL
GRC
PANEL
GRC
PANEL
GRC
PANEL
GRC
PANEL
GLAZING AS PER THE DETAIL
PROJECTION AT BEAM BOTTOM LVL
300X150MM ALUMINUM SECTION- VERTICAL
300X150MM ALUMINUM SECTION- HORIZONTAL
100X50MM ALUMINUM SECTION- HORIZONTAL
PROJECTION AT SILL LVL
300
FABRICATION GRILL AS PER THE DETAIL
150MM THK. PARDI - VERTICAL
75X50MM ALUMINUM SECTION
PROJECTION AT BEAM BOTTOM LVL.
RIGHT SIDE ELEVATION
GLAZING
FABRICATION WORK
GRC PANEL
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
600mm
DIAPHRAGM
WALL
600mm
DIAPHRAGM
WALL
G
U
E
S
T
L
I
F
T
S
H
A
F
T
O
F
F
I
C
E
L
I
F
T
S
H
A
F
T
sand
filling
compound wall
compound wall
sand
filling
SERVICE
SHAFT
RISER-24
TRADE-23
RISER-24
TRADE-23
RISER-21
TRADE-20
RISER-20
TRADE-19
RISER-20
TRADE-19
RISER-28
TRADE-27
RISER-28
TRADE-27
RISER-24
TRADE-23
RISER-24
TRADE-23
RISER-21
TRADE-20
RISER-20
TRADE-19
RISER-20
TRADE-19
RISER-28
TRADE-27
RISER-24
TRADE-23
FOYER
FOYER
FOYER
FOYER
FOYER
PASSAGE
PASSAGE
PASSAGE
PASSAGE
OPEN TERRACE
PASSAGE PASSAGE
G
U
E
S
T
L
I
F
T
S
H
A
F
T
G
U
E
S
T
L
I
F
T
S
H
A
F
T
O
F
F
I
C
E
L
I
F
T
S
H
A
F
T
OFFICE-12 FOYER
TOILET
OFFICE-13
RISER-20
TRADE-19
OFFICE-12 FOYER
TOILET
OFFICE-13
OFFICE-12 FOYER
TOILET
OFFICE-13
OFFICE-12 FOYER
TOILET
OFFICE-13
OFFICE-12 FOYER
TOILET
OFFICE-13
SALES CABIN FOYER
TOILET
ROOM-4 ROOM-5 TOILET
TOILET
FOYER
TOILET
ROOM-5 ROOM-6 TOILET
TOILET ROOM-7
FOYER
TOILET
ROOM-5 ROOM-6 TOILET
TOILET ROOM-7
FOYER
TOILET
ROOM-5 ROOM-6 TOILET
TOILET ROOM-7
TOILET
TOILET
TOILET
TOILET
ROOM-10
ROOM-12
ROOM-12
ROOM-12
WATER TANK
WATER TANK
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
150
11
RISER-21
TRADE-20
RISER-21
TRADE-20
OPEN TERRACE
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
RISER-21
TRADE-20
FEBRICATION FLOOR FEBRICATION FLOOR
SECTION-(1-1)
RISER-28
TRADE-27
RISER-28
TRADE-27
1
2
3
4
5
6
7
8
9
10
11
12
13
14
0
15
16
17
18
19
20
21
22
23
0
3
2
1
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
0
3
2
1
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
0
1
2
2
3
4
5
6
7
8
9
10
11
12
13
14
16
17
18
19
20
21
22
0
15
23
1
2
2
3
4
5
6
7
8
9
10
11
12
13
14
16
17
18
19
20
21
22
15
23
0
2000
2400
2070
4082
4500
4318
3900
3600
3179
150
1618
150
1618
150
2250
150
300
161
300
161
300
150
300
300
150
1350
2732
1768
2732
1768
2550
1650
2250
1350
2250
1350
1829
1371
900
1357
893
1350
1607
1125
1768
1607
1125
1768
1500
1050
1650
1357
893
1350
1350
900
1350
1371
457
1371
1371
1500
2000
2700
2070
2000
2700
2070
2000
2700
2070
2000
2400
2370
2000
2400
2370
152
300
2000
2400
2370
0
3
2
1
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
0
1
2
2
3
4
5
6
7
8
9
10
11
12
13
14
16
17
18
19
20
21
22
0
15
23
1
2
2
3
4
5
6
7
8
9
10
11
12
13
14
16
17
18
19
20
21
22
15
23
0
1607
1275
1368
1750
1200
1500
1350
900
1350
1350
900
1350
1371
457
1371
1371
457
1371
1371
457
1371
1371
457
1371
1350
300
1350
1350
1607
2643
1750
2700
1350
2250
1350
1371
1829
1371
1829
1371
1829
1371
1829
1350
1650
1350
1650
4700 1866
161
300
2000 2700 1866
2000 2400 2166
2000 2400 2166 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
150
300
150
300
3
300
0
1
2
4
1829
5
6
7
8
9
10
13
12
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
152
300
152
300
3200
150
300
2000
2400
2370
1866
2700
2000
2166
2400
2000
2166
2400
2000
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
300
1350
1371
457
1371
1371
457
1371
1371
457
1371
1371
457
1371
2400
1371
1829
1371
1829
1371
1829
2400
2166
2400
2000
2166
2400
2000
2166
2400
1930
2166
2400
1930
2166
2400
2000
2166
2400
2000
2166
2400
2000
152
300
152
300
150
300
150
300
152
300
152
300
152
300
152
1371
161
150
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
2370 2400 2000
2370 2400 2000
2370 2400 2000
300
152
300
152
3200
457
1371
1371
457
1371
1371
457
1371
1350
300
2700
300
2721
457
2743
457
2743
457
2743
457
1371
2400
2400
2370
300
152
2400 2000
300
150
2370 2400 2000
300
150
2370 2400 2000
300
152
2370 2400 2000
300
152
300
152
300
152
2370 2400 2000
2370 2000
3200
3021
3000
3179
3200
3200
3200
3771
1829
1371
1829
1371
1829
1371
1650
1350
1650
1350
1829
1371
1829
1371
1829
1371
1829
2000
2000 2400 2166
HOTEL
FOYER
HOTEL
FOYER
G
U
E
S
T
L
I
F
T
S
H
A
F
T
KEY PLAN
4500.0
3300.0
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
BASEMENT-1 L.V.L [-3300.0 mm]
BASEMENT-2 L.V.L [-7800.0 mm]
BASEMENT-3 L.V.L [-12300.0 mm]
4500.0
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
12300.0
1200.0
49000.0
AS PER
STAIRCASE
DETAIL
NAKSHATRA HOTEL-
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
4500.0
3300.0
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
BASEMENT-1 L.V.L [-3300.0 mm]
BASEMENT-2 L.V.L [-7800.0 mm]
BASEMENT-3 L.V.L [-12300.0 mm]
4500.0
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
12300.0
1200.0
49000.0
ROOM-15 ROOM-16 ROOM-17
ROOM-15 ROOM-16 ROOM-17
ROOM-15 ROOM-16 ROOM-17
600mm
DIAPHRAGM
WALL
600mm DIAPHRAGM WALL
115MM THK MASONRY WALL
BEAM
600mm
DIAPHRAGM
WALL
SHOWROOM -06 HOTEL FOYER
compound wall
compound wall
FINANCE
MANAGER RECORD ROOM
F&B MANAGER
SECURITY
MANAGER
SHOWROOM -06
PASSAGE LADIES TOILET
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
MEZANNINE FLOOR
SHOWROOM -06
OFFICE -06
RESTAURANT
OFFICE-13
ROOM-05
ROOM-06
ROOM-15 ROOM-16 ROOM-17
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
ROOM-06
ROOM-06
OFFICE -06
OFFICE -06
OFFICE -06
KEY PLAN
SECTION-2
1400
WELL
COMPACTED
EARTH FILLING
1500
250
1000
LVL +1200MM
150
230MM THK RCC WALL
compound
wall
150
PLANTER
580
FILLING
LVL +1050MM
FOYER
1050
TERRACE
NAKSHATRA HOTEL-
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
SL. + 1200
compound wall
150
PASSAGE
PASSAGE
FOYER
SL. + 1050
TERRACE: 150MM SUNK
SHOWROOM
300
950
150
450
1700
1000
600
150
3375
1000
GLASS RAILING
AS PER DETAIL
600
SHOWROOM
SHOWROOM
CIRCULAR M.S.
COLUMN (DIA. 450MM)
FABRICATION GRILL
AS PER DETAIL
1045
OFFICE
150
750
1700
RESTAURANT
OFFICE
OFFICE
OFFICE
FABRICATION GRILL
AS PER DETAIL
SECTION A-A
SECTION - A
THIRD
FLOOR L.V.L
[+12600 MM]
300
800
150
450
GLASS RAILING
AS PER DETAIL
600
FABRICATION
GRILL AS
PER DETAIL
1045
600
150
RAILING
RAILING
FEBRICATION
M.S RAILING
2395
150
1500
50
1500
50
1525
50
1575
50
1475
50
1475
150
1150
150
750
230
DIGITAL SCREEN
GLASS RAILING
GLAZING AS PER
DETAIL
GLAZING AS PER
DETAIL
GLAZING AS PER
DETAIL
750 450
1200
750
5850
6250
ROOM
ROOM
TERRACE
TERRACE
150MM BEDDING
2400
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
OFFICE
HOTEL FOYER
3600
600
3000
600
3000
600
1100
1500
600
2600
600
2600
600
2750
450
7350
FABRICATION GRILL AS PER DETAIL
INSERT PLATE FOR CANOPY
300
REFUGE AREA
REFUGE AREA
OFFICE
OFFICE
OFFICE
OFFICE
compound wall
6400
FABRICATED
PLATFORM FOR
OUTDOOR UNIT
MEZZANINE FLOOR
LADIES TOILET
300MM RAISED AREA
SECTION B-B
600
1100
FABRICATION
GRILL AS PER
DETAIL
300
600
THIRD
FLOOR L.V.L
[+12600 MM]
SECTION - B
CANOPY AS PER DETAIL
750
150
2400
TOILET ROOM- 05
TOILET ROOM- 06
TOILET ROOM- 06
TOILET ROOM- 06
TERRACE
GLAZING AS PER DETAIL
GLAZING AS PER DETAIL
GLAZING AS PER DETAIL
600
450
150
150MM THK. R.C.C. PARDI
900
1500
900
1500
900
1500
600
600
800
900
1500
800
900
1500
800
900
1500
800
50
1100
50
50
50
1100
50
1800
50
50
1250
50
1600
50
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
FOYER
FOYER
FOYER
FOYER
FOYER
O
F
F
I
C
E
L
I
F
T
S
H
A
F
T
FOYER
GRC PANEL AS PER
DETAIL
FABRICATION
GRILL AS PER
DETAIL
300
600
2300
300
600
2600
600
2600
600
1500
1100
600
3450
150
3000
600
3525
300
950
3600
PASSAGE
PASSAGE
GRC PANEL AS PER
DETAIL
FABRICATION
GRILL AS PER
DETAIL
600
900
150MM RCC PARDI
ROOM-10
TOILET
2.00mt wide
passage
ROOM-12
TOILET
2.00mt wide
passage
ROOM-12
TOILET
2.00mt wide
passage
ROOM-10
TOILET
2.00mt wide
passage
1500
slab
thk
2000
150
HOTEL KITCHEN
300MM RAISED AREA
SECTION C-C
THIRD
FLOOR L.V.L
[+12600 MM]
1100
600
300
450
50X50MM M.S.
BOX SECTION
GLAZING AS
PER DETAIL
SECTION - C
150
3750
150
3233
150
4700
150
3050
2300
900
5250
900
2300
900
2300
900
2300
900
5000
150
750
750
230
2400
150MM RCC PARDI
GRC PANEL AS PER
DETAIL
GRC PANEL AS PER
DETAIL
150MM THK. R.C.C. PARDI
TERRACE
2940
900
600
450
450
450
1500
3750
CANOPY AS PER DETAIL
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
PASSAGE
3600
2600
50X50MM M.S.
BOX SECTION
75X75MM M.S.L-ANGLE
100X100MM
M.S.BOX-SECTION
150X100MM C-SECTION
3000
600
3000
600
1100
1500
600
2600
600
REFUGE AREA
REFUGE AREA
compound wall
SPACE
FOR O.D.U.
1800
1500
600
1800
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
1200
2600
600
M.S. CHECKERED
PLATE
600
50X50MM M.S.
BOX SECTION
SPACE
FOR O.D.U.
FIXED
GLASS
600
DOOR
DOOR
FIXED
GLASS
FIXED
GLASS
DOOR
DOOR
DOOR
FIRE TANK DOMESTIC WATER TANK
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE
PASSAGE AT TERRACE LVL.
fire door
fire door
fire door
fire door
fire door
fire door
fire door
fire door
fire door
fire door
fire door
fire door
fire door
SECTION D-D
THIRD
FLOOR L.V.L
[+12600 MM]
1100
600
300
450
50X50MM M.S.
BOX SECTION
GLAZING AS
PER DETAIL
SECTION - D
6405
1200
750
300
600
2400
600
2550
450
600
REFUGE AREA
1800
1200
2750
450
2750
450
2750
450
1950
450
2600 NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
FABRICATION GRILL AS
PER DETAIL
ALUMINUM LOUVERS
AS PER DETAIL
ALUMINUM LOUVERS
AS PER DETAIL
ALUMINUM LOUVERS
AS PER DETAIL
MEZZANINE FLOOR
SECTION E-E
SECTION - E
600
150
8450
300
4700
150
25200
150
2550
150
600
1150
1850
1150
1850
1150
1450
1150
1450
1150
1450
1150
1450
1150
1700
1150
1600
1150
1600
1150
1600
1150
1600
1100
600
600
1800
TERRACE
OFFICE
AC
ODU/
PLUMBING
SHAFT
OFFICE
OFFICE
OFFICE
OFFICE
PASSAGE
OFFICE
UNIFORM ROOM
PASSAGE
PASSAGE
PASSAGE
600
600
600
600
600
600
150
2550
450
450
450
450
450
1950
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
ROAD L.V.L [±0.0 MM]
PLINTH L.V.L [+1200 mm]
GROUND L.V.L [-1000 mm]
FIRST FLOOR L.V.L [+5400 MM]
4200.0
SECOND FLOOR L.V.L [+9000 MM]
THIRD FLOOR L.V.L [+12600 MM]
FOURTH FLOOR L.V.L [+15800 MM]
FIFTH FLOOR L.V.L [+19000 MM]
SIXTH FLOOR L.V.L [+22200 MM]
SEVENTH FLOOR L.V.L [+25400 MM]
EIGHTH FLOOR L.V.L [+31400 MM]
NINTH FLOOR L.V.L [+34600 MM]
TENTH FLOOR L.V.L [+37800 MM]
ELEVENTH FLOOR L.V.L [+41000 MM]
TERRACE FLOOR L.V.L [+44200 MM]
STAIR CABIN LVL. [+46600 MM]
WATER TANK LVL. [+49000 MM]
3600.0
3600.0
3200.0
3200.0
3200.0
3200.0
6000.0
3200.0
3200.0
3200.0
3200.0
2400.0
2400.0
1200.0
49000.0
SECTION F-F
SECTION - F
150
5000
900
2300
900
2150
900
11100
150
950
300
10950
600
1250
150
1860
600
450
2340
2400
750
230
TERRACE
600
450
600
SHOWROOM
SHOWROOM
SHOWROOM
TERRACE
150MM SUNK OFFICE
OFFICE
OFFICE
OFFICE
HALL
ROOM
ROOM
ROOM
ROOM
GLAZING AS
PER DETAIL
GLAZING AS PER
DETAIL
GLAZING AS PER
DETAIL
GRC PANEL AS
PER DETAIL
GRC PANEL AS
PER DETAIL
150MM THK.
R.C.C. PARDI
GLASS RAILING
AS PER DETAIL
5925
7490
3200
900
TERRACE
1200
TERRACE
150MM
BEDDING
150
NAKSHATRA HOTEL
SARGASAN
GANDHINAGAR
Total Plot Area - 2889 sq. m
PROJECT DETAILS:
Neel Shah | UCT20102 Faculty of Technology
CT3009: MEPF
Drawings.pdf

More Related Content

Similar to Drawings.pdf

Shri padmavati industries ppt strlng
Shri padmavati industries ppt strlngShri padmavati industries ppt strlng
Shri padmavati industries ppt strlngShreyan Jadhav
 
PRODUCTION MACHINES WITH LPS / MPS / PMG
PRODUCTION MACHINES WITH LPS / MPS / PMGPRODUCTION MACHINES WITH LPS / MPS / PMG
PRODUCTION MACHINES WITH LPS / MPS / PMGJacques Viau
 
gf plan fern_merged.pdf
gf plan fern_merged.pdfgf plan fern_merged.pdf
gf plan fern_merged.pdfNeelShah809576
 
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad ProComputer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad ProIRJET Journal
 
Cosmic 140 sector ..
Cosmic 140 sector ..Cosmic 140 sector ..
Cosmic 140 sector ..9599139966
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio ShortNick Ivill
 
MQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec Sheet
MQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec SheetMQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec Sheet
MQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec SheetThorne & Derrick UK
 
Mechsys Presentation 1
Mechsys Presentation 1Mechsys Presentation 1
Mechsys Presentation 1Rohan Kalbhor
 
many projects shoring
many projects shoringmany projects shoring
many projects shoringSamir Salman
 
Document for Handing over the building
Document for Handing over the buildingDocument for Handing over the building
Document for Handing over the buildingVj NiroSh
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsJonathan Flanagan
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawingsYeeQun
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMLuciano D'Amico Rebord
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsMohamed Azzam
 

Similar to Drawings.pdf (20)

Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 
Shri padmavati industries ppt strlng
Shri padmavati industries ppt strlngShri padmavati industries ppt strlng
Shri padmavati industries ppt strlng
 
PRODUCTION MACHINES WITH LPS / MPS / PMG
PRODUCTION MACHINES WITH LPS / MPS / PMGPRODUCTION MACHINES WITH LPS / MPS / PMG
PRODUCTION MACHINES WITH LPS / MPS / PMG
 
gf plan fern_merged.pdf
gf plan fern_merged.pdfgf plan fern_merged.pdf
gf plan fern_merged.pdf
 
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad ProComputer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
Computer Aided Analysis and Design of Multi-Storeyed Building using Staad Pro
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Cosmic 140 sector ..
Cosmic 140 sector ..Cosmic 140 sector ..
Cosmic 140 sector ..
 
Africa Avantu Lodge
Africa Avantu LodgeAfrica Avantu Lodge
Africa Avantu Lodge
 
NJI Portfolio Short
NJI Portfolio ShortNJI Portfolio Short
NJI Portfolio Short
 
Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
Measure drawing
Measure drawing Measure drawing
Measure drawing
 
Jumbo boart longyear
Jumbo boart longyearJumbo boart longyear
Jumbo boart longyear
 
MQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec Sheet
MQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec SheetMQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec Sheet
MQ-BQ - FEAM ATEX & GOST-R Hazardous Area Axial Fan - Spec Sheet
 
Mechsys Presentation 1
Mechsys Presentation 1Mechsys Presentation 1
Mechsys Presentation 1
 
many projects shoring
many projects shoringmany projects shoring
many projects shoring
 
Document for Handing over the building
Document for Handing over the buildingDocument for Handing over the building
Document for Handing over the building
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment Drawings
 
sem 2.5 measured drawings
sem 2.5 measured drawingssem 2.5 measured drawings
sem 2.5 measured drawings
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
 
Haram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposalsHaram complementary projects temporary feeding proposals
Haram complementary projects temporary feeding proposals
 

Recently uploaded

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxpritamlangde
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesRashidFaridChishti
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfsumitt6_25730773
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxhublikarsn
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...manju garg
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 

Recently uploaded (20)

AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
👉 Yavatmal Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top Class Call Girl S...
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 

Drawings.pdf

  • 1. SERVICE SHAFT FIRE SAFETY SHAFT 2100 X 1200 UP DN CUTOUT SOFT U.G. TANK BELOW PUMP ROOM BELOW FIRE + RAW U.G. TANK BELOW UP DN FIRE SAFETY SHAFT 2100 X 1200 PLUMBING SHAFT OFFICE FOYER CUT-OUT ABOVE ELE. SHAFT TOILET PLUMBING SHAFT TOILET PLUMBING SHAFT HOTEL FOYER CUT-OUT ABOVE SHOWROOM -8 SHOWROOM -7 SHOWROOM -6 SHOWROOM -5 SHOWROOM - 4 SHOWROOM - 3 SHOWROOM - 2 FOYER TOILET ELEC. SHAFT PLU. SHAFT OFFICE LIFT LOADING & UNLOADING TOILET 1.56M WIDE PASSAGE BORE WELL LOCATION PROPOSED 4000 5109 4921 2867 2.37M WIDE PASSAGE TOILET 2M WIDE PASSAGE SERVICE SHAFT GUEST LIFT-01 GUEST LIFT-02 SERVICE LIFT-02 SERVICE LIFT-01 OFFICE LIFT-01 OFFICE LIFT-02 CUTOUT RISER-27 TREAD-26 SUB-STATION AS PER DETAIL CIRCULAR COLUMN (DIA. 450MM) IN M.S. CIRCULAR COLUMN (DIA. 450MM) IN M.S. RISER-27 TREAD-26 CUT-OUT IN FLOOR 2000 X 500 PROJECTION IN FABRICATION CCTV ROOM TOILET SHOWROOM - 1 TOILET TOILET FABRICATED ROOF @FIRST FLOOR LVL. BACK OFFICE 2.40X2.40 LLR 2.40X1.86 HANDBAG SCANNING LUGGAGE SCANNER FOR GROUP CHK.IN METAL DETECTOR CONCIERGE RECEPTION TOILET TIME CHECK & RECEIVING staff entry STORE PROJECT: DRAWING TITLE: SITE PLAN THE FERN_NAKSHATRA HOTEL- SARGASAN CAR DROP OFF CAFE 6.92X6.30 43.28 SQ.MTR HOTEL ENTRY HOTEL EXIT 3.11 MTR. WIDE RAMP DOWN TO BASEMENT ±00 LVL. +150MM FFL. SECURITY CABIN ENTRANCE LOBBY SERVICES BELOW LANDSCAPE BOOM BARRIER ARCHITECTURAL SEATING 5.00M WIDE DRIVEWAY 5515 5515 6810 5885 WAITING AREA +150MM FFL. HOTEL ENTRY/EXIT RAMP UP 1 STEP UP CAFE ENTRY STEP UP 1 3.00 MTR WIDE DRIVE WAY BOOM BARRIER 3.00 MTR WIDE DRIVE WAY 5.00M WIDE DRIVEWAY 3.11 MTR. WIDE RAMP UP FROM BASEMENT FOM 2.40X2.40 2.40X1.70 SERVICE ENTRY
  • 2. LVL +150MM LVL +950MM LVL +150MM LVL ±00MM LVL ±00MM LVL +1050MM LVL +1050MM LVL +400MM LVL +300MM LVL +300MM LVL +1050MM FIRE SAFETY SHAFT 2100 X 1200 UP 11 12 13 14 -16 1 0 2 3 4 5 6 7 8 9 -15 10 DN -17 -18 -19 -20 -21 -22 -23 -24 -25 -26 CUTOUT UP DN FIRE SAFETY SHAFT 2100 X 1200 KEY PLAN GROUND FLOOR PLUMBING SHAFT OFFICE FOYER CUTOUT ABOVE 26'-9"X14'-4" ELEC. SHAFT TOILET 5'0"X 6'6" PLUMBING SHAFT TOILET 5'0"X 7'7" PLUMBING SHAFT HOTEL FOYER 56'0" X 29'2" ABOVE CUT-OUT SHOWROOM -8 33'4"X 61'7" SHOWROOM -7 13'0"X 55'4" SHOWROOM -6 13'0"X 58'4" SHOWROOM -5 14'6"X 60'0" SHOWROOM - 4 14'6"X 60'9" SHOWROOM - 3 14'6"X 60'0" SHOWROOM - 2 14'6"X 58'0" FOYER 6'10"X 14'0" TOILET 6'9"X 6'3" LADIES/GENTS TOILET 7'6"x 12'6" TOILET 3'4"x 3'0" TOILET 3'4"x 3'0" TOILET 3'4"x 3'0" TOILET 3'4"x 3'0" 6.0 MT WIDE RAMP DOWN TO 1ST BASEMENT ELEC. SHAFT PLU. SHAFT OFFICE LIFT 6'7"X6'7" EXHAUST AIR WATER BODY 4500.0 LOADING & UNLOADING 34'0"x 12'6" BORE WELL LOCATION PROPOSED 4000 5109 4921 2867 5'-2" WIDE PASSAGE 7'-3" WIDE PASSAGE TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" 7'-3" WIDE PASSAGE LINEN SHAFT 6'10"X3'0" SERVICE SHAFT 6'10"X2'3" CUTOUT GUEST LIFT-01 2000X2000 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 RISER-27 TREAD-26 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 SUB-STATION AS PER DETAIL CIRCULAR COLUMN (DIA. 450MM) IN M.S. CIRCULAR COLUMN (DIA. 450MM) IN M.S. RISER-27 TRADE-26 EDGE OF PROJECTION ABOVE EDGE OF PROJECTION ABOVE FABRICATED ROOF ABOVE 1 1 2 2 3 3 SERVICE SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 CUT-OUT IN FLOOR 2000 X 500 CUT-OUT IN FLOOR NAKSHATRA HOTEL- SARGASAN GROUND FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 3. SOFT U.G. TANK PUMP ROOM BELOW FIRE + RAW U.G. TANK BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 + 57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 KEY PLAN BASEMENT -1,2 & 3 PLAN NAKSHATRA HOTEL- SARGASAN BASMENT - 1, 2 & 3 FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 4. KEY PLAN PLUMBING SHAFT PLUMBING SHAFT PLUMBING SHAFT OFFICE LIFT 6'7"X6'7" ELEC. SHAFT PLU. SHAFT SHOWROOM -8 33'4"X 38'8" SHOWROOM -7 13'0"X 46'10" SHOWROOM -6 13'0"X 50'0" SHOWROOM -5 14'6"X 52'0" SHOWROOM - 4 14'6"X 52'7" SHOWROOM - 3 14'6"X 51'10" SHOWROOM - 2 14'6"X 49'8" SHOWROOM - 1 26'3"X 52'3" OFFICE-9 19'3"X 22'0" TOILET 5'0"X 7'0" 4'-3" PASSAGE PURCHASE MANAGER 14'-6" X 10'-0" SALES CABIN 10'-0" X 11'-0" UNIFORM ROOM 11'-0'' X8'-3'' LINEN ROOM 10'-9'' X 12'-9'' EHK OFFICE 7'-9'' X 9'-3'' HK CONTROL 7'-9'' X 6'-0'' TRAINING ROOM 9'9''X20'9'' 4'-9'' WIDE PASSAGE 5'-3'' WIDE PASSAGE MALE STAFF CHANGING ROOM 10'-6'' X16'-6'' FEMALE STAFF CHANGING ROOM 10'-6'' X 7'-9'' EXEC. MALE CHANGING ROOM 14'-9'' X8'-9'' 11'-0'' X8'-9'' CHANGING ROOM CHANGING ROOM 11'-0'' X7'-9'' CHANGING ROOM 11'-0'' X17'-0'' CUT-OUT 40'3" X 20'-5" CUTOUT 18'-0"X14'-0" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 12'-0"X10'-0" 6'-7" WIDE PASSAGE 7'-3" WIDE PASSAGE 7'-3" WIDE PASSAGE 8'-2" WIDE PASSAGE TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" LINEN SHAFT 6'10"X3'0" SERVICE SHAFT 6'10"X2'3" PLUMBING SHAFT ELEC. SHAFT SERVICE SHAFT AC ODU / PLUMBING SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 AC ODU / SERVICE SHAFT 13'9"X9'8" RISER-24 TREAD-23 RISER-24 TREAD-23 SERVICE SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 FIRST FLOOR PLAN FABRICATION GRILL AS PER DETAIL FABRICATION GRILL AS PER DETAIL FABRICATION GRILL AS PER DETAIL FABRICATION GRILL AS PER DETAIL CIRCULAR COLUMN (DIA. 450MM) IN M.S. CIRCULAR COLUMN (DIA. 450MM) IN M.S. UP DN FIRE SAFETY SHAFT 2100 X 1200 UP DN FIRE SAFETY SHAFT 2100 X 1200 1 1 2 2 3 3 FABRICATED PLATFORM AS PER DETAIL NAKSHATRA HOTEL- SARGASAN FIRST FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 5. KEY PLAN PLUMBING SHAFT PLUMBING SHAFT PLUMBING SHAFT OFFICE LIFT 6'7"X6'7" SHOWROOM -8 33'4"X 38'8" SHOWROOM -7 13'0"X 46'10" SHOWROOM -6 13'0"X 50'0" SHOWROOM -5 14'6"X 52'0" SHOWROOM - 4 14'6"X 52'7" SHOWROOM - 3 14'6"X 51'10" SHOWROOM - 2 14'6"X 49'8" SHOWROOM - 1 26'3"X 52'3" OFFICE-13 29'6"X 21'8" OFFICE-12 14'6"X 21'8" TOILET 7'0"X 5'0" TOILET 7'0"X 5'0" PLUMBING SHAFT FOYER 11'-0"X18'-4" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 12'-0"X10'-0" 6'-7" WIDE PASSAGE 7'-3" WIDE PASSAGE 7'-3" WIDE PASSAGE 8'-2" WIDE PASSAGE TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 6'7"X 7'0" TOILET 6'7"X 7'0" AC ODU/ SERVICE SHAFT CUT-OUT ABOVE 14'-3"X5'9'' OFFICE-9 19'3"X 22'0" TOILET 5'0"X 7'0" OFFICE-11 36'-7" X 26'-7" OFFICE-10 19'3"X 34'0" SERVICE SHAFT AC ODU LINEN SHAFT 6'10"X3'0" SERVICE SHAFT 6'10"X2'3" PLUMBING SHAFT ELEC. SHAFT SERVICE SHAFT AC ODU / PLUMBING SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 AC ODU / SERVICE SHAFT 13'9"X9'8" RISER-24 TREAD-23 RISER-24 TREAD-23 ELEC. SHAFT PLU. SHAFT SERVICE SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 SECOND FLOOR PLAN CIRCULAR COLUMN (DIA. 450MM) IN M.S. CIRCULAR COLUMN (DIA. 450MM) IN M.S. UP DN FIRE SAFETY SHAFT 2100 X 1200 UP DN FIRE SAFETY SHAFT 2100 X 1200 1 1 2 2 3 3 FABRICATED PLATFORM AS PER DETAIL NAKSHATRA HOTEL- SARGASAN SECOND FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 6. LINEN SHAFT 6'10"X3'0" SERVICE SHAFT 6'10"X2'3" KEY PLAN PLUMBING SHAFT PLUMBING SHAFT PLUMBING SHAFT 3rd FLOOR PLAN OFFICE-1 26'3"X40'0" OFFICE-2 14'6"X 40'0" OFFICE-4 14'6"X 40'0" OFFICE-6 13'0"X 40'0" OFFICE-3 14'6"X 40'0" OFFICE-5 14'6"X 40'0" OFFICE-7 13'0" X 40'0" 6'-7" WIDE PASSAGE OFFICE-8 33'4"X 25'8" OFFICE LIFT 6'7"X6'7" TERRACE 25'4"X 15'9" TERRACE 15'6"X 17'6" TERRACE 14'6"X 19'6" TERRACE 14'6"X 20'4" TERRACE 14'6"X 19'6" TERRACE 14'6"X 17'9" TERRACE 13'0"X 14'0" TERRACE 33'3"X 12'3" OFFICE-11 37'0''X 26'-7" OFFICE-10 19'3"X 34'0" FOYER 11'-0"X18'-4" OFFICE-13 29'6"X 21'8" OFFICE-12 14'6"X 21'8" TOILET 7'0"X 5'0" TOILET 7'0"X 5'0" PLUMBING SHAFT 7'-3" WIDE PASSAGE 7'-3" WIDE PASSAGE TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" 6'-7" WIDE PASSAGE AC ODU / PLUMBING SHAFT TOILET 6'7"X 7'0" TOILET 6'7"X 7'0" 14'-3"X5'9'' AC ODU/ SERVICE SHAFT OFFICE-9 19'3"X 22'0" SERVICE SHAFT AC ODU TOILET 5'0"X 7'0" PLUMBING SHAFT ELEC. SHAFT SERVICE SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 AC ODU / SERVICE SHAFT 13'9"X9'8" RISER-21 TREAD-20 ELEC. SHAFT PLU. SHAFT RISER-21 TREAD-20 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 UP DN FIRE SAFETY SHAFT 2100 X 1200 UP DN FIRE SAFETY SHAFT 2100 X 1200 1 1 2 2 3 3 SERVICE SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 ALUMINUM FRAME FOR GLAZING ALUMINUM FRAME FOR GLAZING ALUMINUM FRAME FOR GLAZING ALUMINUM FRAME FOR GLAZING FABRICATED PLATFORM AS PER DETAIL NAKSHATRA HOTEL- SARGASAN THIRD FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 7. UP DN FIRE SAFETY SHAFT 2100 X 1200 UP DN FIRE SAFETY SHAFT 2100 X 1200 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 + 6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 KEY PLAN PLUMBING SHAFT PLUMBING SHAFT PLUMBING SHAFT 4th FLOOR PLAN OFFICE-1 26'3"X40'0" OFFICE-2 14'6"X 40'0" OFFICE-4 14'6"X 40'0" OFFICE-6 13'0"X 40'0" OFFICE-3 14'6"X 40'0" OFFICE-5 14'6"X 40'0" OFFICE-7 13'0" X 40'0" OFFICE-8 33'4"X 25'8" OFFICE-13 29'6"X 21'8" OFFICE-12 14'6"X 21'8" TOILET 7'0"X 5'0" TOILET 7'0"X 5'0" PLUMBING SHAFT FOYER 15'0"X 14'4" LIFT SHAFT ELEC. SHAFT PLU. SHAFT 7'-3" WIDE PASSAGE TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" AC ODU / PLUMBING SHAFT TOILET 6'7"X 7'0" TOILET 6'7"X 7'0" 14'-3"X5'9'' AC ODU/ SERVICE SHAFT OFFICE-11 37'0''X 26'-7" OFFICE-10 19'3"X 34'0" OFFICE-9 19'3"X 22'0" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 12'-0"X10'-0" 6'-7" WIDE PASSAGE 7'-3" WIDE PASSAGE FOYER 11'-0"X18'-4" SERVICE SHAFT TOILET AC ODU PLUMBING SHAFT ELEC. SHAFT SERVICE SHAFT LINEN SHAFT 6'10"X3'0" SERVICE SHAFT 6'10"X2'3" GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 AC ODU / SERVICE SHAFT 13'9"X9'8" RISER-21 TREAD-20 RISER-21 TREAD-20 1 1 2 2 3 3 SERVICE SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 ALUMINUM GLAZING ALUMINUM GLAZING ALUMINUM FRAME FOR GLAZING ALUMINUM GLAZING NAKSHATRA HOTEL- SARGASAN FOURTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 8. UP DN FIRE SAFETY SHAFT 2100 X 1200 UP DN FIRE SAFETY SHAFT 2100 X 1200 KEY PLAN PLUMBING SHAFT PLUMBING SHAFT PLUMBING SHAFT 5th FLOOR PLAN OFFICE-1 26'3"X39'7" OFFICE-2 14'6"X 39'7" OFFICE-4 14'6"X 39'7" OFFICE-6 13'0"X 39'7" OFFICE-3 14'6"X 39'7" OFFICE-13 29'6"X 21'8" OFFICE-5 14'6"X 39'7" OFFICE-7 13'0" X 39'7" OFFICE-12 14'6"X 21'8" OFFICE-8 33'4"X 38'8" TOILET 7'0"X 5'0" TOILET 7'0"X 5'0" PLUMBING SHAFT ELEC. SHAFT PLU. SHAFT 7'-3" WIDE PASSAGE 7'-3" WIDE PASSAGE TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" AC ODU / PLUMBING SHAFT TOILET 6'7"X 7'0" TOILET 6'7"X 7'0" 14'-3"X5'9'' AC ODU/ SERVICE SHAFT OFFICE-11 37'0''X 26'-7" OFFICE-10 19'3"X 34'0" OFFICE-9 19'3"X 22'0" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 12'-0"X10'-0" 6'-7" WIDE PASSAGE FOYER 11'-0"X18'-4" SERVICE SHAFT AC ODU REFUGE SPACE 27'-3" X 6'-0" @5th floor TOILET 5'0"X 7'0" PLUMBING SHAFT ELEC. SHAFT SERVICE SHAFT SERVICE SHAFT 6'10"X2'3" AC ODU / SERVICE SHAFT 13'9"X9'8" RISER-21 TREAD-20 RISER-21 TREAD-20 GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 + 16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 1 1 2 2 3 3 GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 LINEN SHAFT 1780X725 ALUMINUM FRAME FOR GLAZING NAKSHATRA HOTEL- SARGASAN FIFTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 9. UP DN FIRE SAFETY SHAFT 2100 X 1200 UP DN FIRE SAFETY SHAFT 2100 X 1200 6th FLOOR PLAN KEY PLAN PLUMBING SHAFT PLUMBING SHAFT PLUMBING SHAFT OFFICE-1 26'3"X39'7" OFFICE-2 14'6"X 39'7" OFFICE-4 14'6"X 39'7" OFFICE-6 13'0"X 39'7" OFFICE-3 14'6"X 39'7" OFFICE-13 29'6"X 21'8" OFFICE-5 14'6"X 39'7" OFFICE-7 13'0" X 39'7" OFFICE-12 14'6"X 21'8" OFFICE-8 33'4"X 38'8" TOILET 7'0"X 5'0" TOILET 7'0"X 5'0" PLUMBING SHAFT ELEC. SHAFT PLU. SHAFT 7'-3" WIDE PASSAGE 7'-3" WIDE PASSAGE TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" TOILET 5'0"X 7'7" AC ODU / PLUMBING SHAFT TOILET 6'7"X 7'0" TOILET 6'7"X 7'0" OFFICE-11 37'0''X 26'-7" OFFICE-10 19'3"X 34'0" OFFICE-9 19'3"X 22'0" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 12'-0"X10'-0" 6'-7" WIDE PASSAGE FOYER 11'-0"X18'-4" SERVICE SHAFT AC ODU TOILET 5'0"X 7'0" PLUMBING SHAFT ELEC. SHAFT SERVICE SHAFT SERVICE SHAFT 6'10"X2'3" 10'-7"X11'-0" GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 AC ODU / SERVICE SHAFT 13'9"X9'8" RISER-21 TREAD-20 RISER-21 TREAD-20 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 1 1 2 2 3 3 GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 LINEN SHAFT 1780X725 ALUMINUM FRAME FOR GLAZING ALUMINUM FRAME FOR GLAZING NAKSHATRA HOTEL- SARGASAN SIXTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 10. KEY PLAN HALL-2 29'9"X 47'-3" HALL-1 26'-9" X 47'-3" OPEN TERRACE 58'3"X 11'-3" HALL-3 29'-9"X 47'-3" RESTAURANT 60'-3" X 58'-6" PRE FUNCTION 26'-0" X 21'-5" 6'-7" WIDE PASSAGE 29'9" X 33'11" 60 SQ. MT. KITCHEN 26'-3" X 56'-4" 12.68 SQ.MT. SPC. KITCHEN ELEC. SHAFT PLU. SHAFT 7'-3" WIDE PASSAGE 7'-3" WIDE PASSAGE AC ODU / PLUMBING SHAFT TOILET/ WASH LADIES TOILET 14'-6"X 21'-9" GENTS TOILET 14'-6"X 21'9" LOCKER REFUGE SPACE 27'-3" X 6'-0" @7th floor GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 OFFICE LIFT-01 2000X2000 OFFICE LIFT-02 2000X2000 SHAFT 6'10"X3'0" PLUMBING SHAFT ELEC. SHAFT SERVICE SHAFT 10'-7"X11'-0" AC ODU / SERVICE SHAFT 13'9"X9'8" UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-20 TREAD-19 UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-20 TREAD-19 2 1 3 1 2 3 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 7th FLOOR PLAN NAKSHATRA HOTEL- SARGASAN SEVENTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 11. HOTEL SERVICES 22'9"X21'0" TOILET 10'-0"x6'6" TOILET 10'0"x6'6" SITTING AREA 11'0"X18'-4" TOILET 6'6"x9'4" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" TOILET 6'6"x11'0" ROOM-04 14'-6"X21'8" TOILET 5'0"x8'-6" ROOM-05 14'-6"X21'8" 6'-7" WIDE PASSAGE 10'-4" X 6'-9" TOILET 10'-0" X 6'6" TOILET 10'-0" X 6'6" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" TOILET 10'-0" X 6'5" 10'-4" X 5'-7" 10'-4" X 5'-7" 6'-7" X 12'-6" SALES CABIN 14'-6"X21'-8" ROOM-14 26'3"X18'0" ROOM-12 26'3"X12'-6" ROOM-15 26'3"X19'-6" ROOM-10 26'3"X12'-6" ROOM-11 26'3"X12'-6" ROOM-13 26'3"X12'-6" ROOM-9 26'3"X12'-6" ROOM-8 26'3"X12'-6" ROOM-7 26'3"X12'-6" ROOM-6 22'9"X12'-6" ROOM-03 26'3"X13'-8" ROOM-01 33'4"X12'-6" ROOM-02 26'3"X12'-6" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE SERVICE SHAFT TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'0"x6'6" TOILET 5'0"x8'-6" TOILET 5'0"x8'-6" ELEC. SHAFT PLU. SHAFT AC ODU / PLUMBING SHAFT SHAFT 6'10"X3'0" OPEN-TERRACE TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" 10'-4" X 5'-7" TREE- PLANTER BOX TREE- PLANTER BOX PLANTER BOX PLANTER BOX PLANTATION PLANTER BOX GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 PLUMBING SHAFT ELEC. SHAFT KEY PLAN 10'-7"X11'-0" AC ODU / SERVICE SHAFT 13'9"X9'8" UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 2 1 3 1 2 3 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 8th FLOOR PLAN NAKSHATRA HOTEL- SARGASAN EIGHTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 12. KEY PLAN ELEC. SHAFT PLU. SHAFT CUTOUT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 HOTEL SERVICES 22'9"X21'0" 10'-7"X11'-0" TOILET 10'-0"x6'6" TOILET 10'0"x6'6" SITTING AREA 11'0"X18'-4" TOILET 6'6"x9'4" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" TOILET 6'6"x11'0" ROOM-04 14'-6"X21'8" TOILET 5'0"x8'-6" ROOM-05 14'-6"X21'8" 6'-7" WIDE PASSAGE 10'-4" X 6'-9" TOILET 10'-0" X 6'6" TOILET 10'-0" X 6'6" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" TOILET 10'-0" X 6'5" 10'-4" X 5'-7" 10'-4" X 5'-7" 6'-7" X 12'-6" SALES CABIN 14'-6"X21'-8" ROOM-14 26'3"X18'0" ROOM-12 26'3"X12'-6" ROOM-15 26'3"X19'-6" ROOM-10 26'3"X12'-6" ROOM-11 26'3"X12'-6" ROOM-13 26'3"X12'-6" ROOM-16 26'3"X12'-6" ROOM-17 26'3"X13'-8" ROOM-9 26'3"X12'-6" ROOM-8 26'3"X12'-6" ROOM-7 26'3"X12'-6" ROOM-6 22'9"X12'-6" ROOM-03 26'3"X13'-8" ROOM-01 33'4"X12'-6" ROOM-02 26'3"X12'-6" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE SERVICE SHAFT TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" TOILET 10'0"x6'6" TOILET 5'0"x8'-6" TOILET 5'0"x8'-6" ELEC. SHAFT PLU. SHAFT TOILET 10'-0"x6'6" TOILET 10'-0"x6'6" 10'-4" X 5'-7" TERRACE PLUMBING SHAFT ELEC. SHAFT ROOM-2 16'9"X24'-0" ROOM-1 16'0"X23'-9" 10'-7"X11'-0" AC ODU / SERVICE SHAFT 13'9"X9'8" UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 2 1 3 1 2 3 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 9th FLOOR PLAN NAKSHATRA HOTEL- SARGASAN NINTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 13. KEY PLAN TOILET 6'6"x10'-0" ELEC. SHAFT PLU. SHAFT TOILET 7'9"x6'6" ROOM-3 26'3"X12'-6" ROOM-14 26'3"X12'-6" ROOM-8 22'9"X12'-6" HOTEL SERVICES 22'9"X21'0" ROOM-15 26'3"X12'-6" ROOM-19 26'3"X12'-6" ROOM-12 26'3"X12'-6" ROOM-18 26'3"X12'-6" ROOM-9 26'3"X12'-6" 6'-7" WIDE PASSAGE TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" TOILET 10'-0"x6'6" TOILET 6'6"x10'-0" FOYER 11'-0"X18'-4" ROOM-13 26'3"X12'-6" ROOM-4 26'3"X13'-9" ROOM-16 26'3"X18'0" ROOM-20 26'3"X13'-9" ROOM-17 26'3"X17'-0" ROOM-10 26'3"X12'-6" ROOM-11 26'3"X12'-6" 6'-7" WIDE PASSAGE TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" TOILET 10'0"x6'6" TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" ROOM-2 16'9"X23'-6" ROOM-1 16'0"X23'-9" TOILET 11'-0" X 5'6" TOILET 8'0"x6'6" PLUMBING SHAFT 3'3"X3'0" TOILET 9'4"x8'-0" PLUMBING SHAFT 3'3"X3'0" TOILET 11'-0" X 5'6" TOILET 10'-0"x6'6" 6'-7" X 12'-4" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE ROOM-5 14'-6"X21'9" TOILET 5'0"x8'-6" 9'-0" X 9'-0" 6'-7" WIDE PASSAGE 8'-4" X 5'-7" CUTOUT 6'-7" X 11'9" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 6'-9" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" TOILET 5'0"x8'-6" 9'-0" X 9'-0" ROOM-06 14'-6"X21'8" ROOM-07 14'-6"X21'8" PLUMBING SHAFT TOILET 7'0"x8'-6" 7'-3" X 9'-0" PLUMBING SHAFT ELEC. SHAFT PLUMBING SHAFT ELEC. SHAFT GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 PLUMBING SHAFT 3'3"X3'0" 10'-7"X11'-0" AC ODU / SERVICE SHAFT 13'9"X9'8" UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 2 1 3 1 2 3 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 10th FLOOR PLAN NAKSHATRA HOTEL- SARGASAN TENTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 14. KEY PLAN TOILET 6'6"x10'-0" ELEC. SHAFT PLU. SHAFT ROOM-3 26'3"X12'-6" ROOM-14 26'3"X12'-6" HOTEL SERVICES 22'9"X21'0" ROOM-15 26'3"X12'-6" ROOM-12 26'3"X12'-6" ROOM-9 26'3"X12'-6" 6'-7" WIDE PASSAGE TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" TOILET 10'-0"x6'6" ROOM-13 26'3"X12'-6" ROOM-4 26'3"X13'-9" ROOM-16 26'3"X18'0" ROOM-17 26'3"X17'-0" ROOM-10 26'3"X12'-6" ROOM-11 26'3"X12'-6" 6'-7" WIDE PASSAGE TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" TOILET 10'0"x6'6" TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" ROOM-2 16'9"X23'-6" ROOM-1 16'0"X23'-9" TOILET 11'-0" X 5'6" TOILET 8'0"x6'6" TOILET 9'4"x8'-0" TOILET 11'-0" X 5'6" TOILET 10'-0"x6'6" 6'-7" X 12'-4" 10'-7"X11'-0" 6'-7" WIDE PASSAGE 6'-7" WIDE PASSAGE CUTOUT 6'-7" X 11'9" 12'-0"X11'-0" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 6'-9" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" 10'-4" X 5'-7" ROOM-5 14'-6"X21'9" TOILET 5'0"x8'-6" 9'-0" X 9'-0" TOILET 5'0"x8'-6" 9'-0" X 9'-0" ROOM-06 14'-6"X21'8" ROOM-07 14'-6"X21'8" PLUMBING SHAFT TOILET 7'0"x8'-6" 7'-3" X 9'-0" FOYER 11'-0"X18'-4" PLUMBING SHAFT 3'3"X3'0" 27'-3" X 6'-0" @11th floor 6'-7" WIDE PASSAGE 6'-7" X 12'-4" ROOM-18 26'3"X12'-6" CUTOUT FABRICATION BRIDGE ABOVE TOILET 7'9"x6'6" ROOM-8 22'9"X12'-6" ROOM-19 26'3"X12'-6" TOILET 6'6"x10'-0" TOILET 6'6"x10'-0" ROOM-20 26'3"X13'-9" GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 PLUMBING SHAFT ELEC. SHAFT 10'-7"X11'-0" AC ODU / SERVICE SHAFT 13'9"X9'8" UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 UP DN FIRE SAFETY SHAFT 2100 X 1200 RISER-21 TREAD-20 2 1 3 1 2 3 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 11th FLOOR PLAN NAKSHATRA HOTEL- SARGASAN ELEVENTH FLOOR PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 15. KEY PLAN GUEST LIFT-01 2000X2000 GUEST LIFT-02 2000X2000 SERVICE LIFT-02 2000X2100 SERVICE LIFT-01 2000X2100 PLUMBING SHAFT ELEC. SHAFT OPEN TERRACE 56'-8" X 115'-2" OPEN TERRACE 33'4"X63'7" STAIR CABIN 22'-2"X18'-0" OPEN TERRACE CUTOUT 10'-0" WIDE FABRICATION BRIDGE CUTOUT CONNECTING BRIDGE MEPF SERVICE AREA 9'0" WIDE PASSAGE SERVICE TERRACE 56'9" X 27'3" 56'0" X 29'5" 6'-6" WIDE PASSAGE 7'6" WIDE PASSAGE PAVER AREA (KITCHEN) 33'3" X 26'0" AC ODU / PLUMBING SHAFT SHAFT 6'10"X3'0" 10'-7"X11'-0" AC ODU / SERVICE SHAFT 13'9"X9'8" DN FIRE SAFETY SHAFT 2100 X 1200 DN FIRE SAFETY SHAFT 2100 X 1200 2 1 3 1 2 3 BM 1 2 3 4 5 6 7 8 BM A B C D E F 6300 7696 9375 9375 1145 6555 10375 6225 6300 44521 (C/C) 6225 6000 (C/O) 45046 (O/O) 6000 (O/C) 6225 10490 5955 3155 7570 3900 6225 31070 (C/C) 6948 6948 6000 (O/C) 31745 (O/O) 0.000 +6.225 +16.600 +23.155 +24.300 +23675 +43050 +50746 +57.046 0.000 +6.225 +16.715 +22.670 +25.825 +33.395 +37.295 ROOF PLAN NAKSHATRA HOTEL- SARGASAN ROOF PLAN PROJECT DETAILS: Total Plot Area - 2889 sq. m Built up area - 1345 sq.m Landscape Area - 20 sq. m Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 16. ROAD L.V.L [±0.0 mm] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 1000.0 General Notes: FRONT ELEVATION FRONT SIDE ELEVATION GLAZING FABRICATION WORK GRC PANEL DIGITAL SCREEN 100X50MM ALUMINUM SECTION-VERTICAL GROOVE BETWEEN GLASS-HORIZONTAL GRC PANEL GRC PANEL GLAZING AS PER THE DETAIL PROJECTION AT BEAM BOTTOM LVL 300X150MM ALUMINUM SECTION- VERTICAL 300X150MM ALUMINUM SECTION- HORIZONTAL PROJECTION AT SILL LVL 300 FABRICATION GRILL AS PER THE DETAIL 150MM THK. PARDI - VERTICAL 75X50MM ALUMINUM SECTION PROJECTION AT BEAM BOTTOM LVL. TINTED GLASS 75X50MM ALUMINUM SECTION GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL FABRICATION BRIDGE RCC PARDI NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS:
  • 17. ROAD L.V.L [±0.0 mm] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 1000.0 BACK SIDE ELEVATION BACK SIDE ELEVATION NAKSHATRA HOTEL SARGASAN GANDHINAGAR General Notes: GLAZING FABRICATION WORK GRC PANEL Total Plot Area - 2889 sq. m PROJECT DETAILS:
  • 18. ROAD L.V.L [±0.0 mm] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 1000.0 General Notes: LEFT SIDE ELEVATION 100X50MM ALUMINUM SECTION-VERTICAL GROOVE BETWEEN GLASS-HORIZONTAL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GLAZING AS PER THE DETAIL PROJECTION AT BEAM BOTTOM LVL 300X150MM ALUMINUM SECTION- VERTICAL 300X150MM ALUMINUM SECTION- HORIZONTAL 100X50MM ALUMINUM SECTION- HORIZONTAL PROJECTION AT SILL LVL 300 FABRICATION GRILL AS PER THE DETAIL 150MM THK. PARDI - VERTICAL 75X50MM ALUMINUM SECTION PROJECTION AT BEAM BOTTOM LVL. FABRICATION GRILL AS PER THE DETAIL TINTED GLASS GROOVE BETWEEN GLASS 75X50MM ALUMINUM SECTION REFUGE AREA REFUGE AREA REFUGE AREA LEFT SIDE ELEVATION GLAZING FABRICATION WORK GRC PANEL NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS:
  • 19. ROAD L.V.L [±0.0 mm] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 1000.0 General Notes: RIGHT SIDE ELEVATION 100X50MM ALUMINUM SECTION-VERTICAL GROOVE BETWEEN GLASS-HORIZONTAL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GRC PANEL GLAZING AS PER THE DETAIL PROJECTION AT BEAM BOTTOM LVL 300X150MM ALUMINUM SECTION- VERTICAL 300X150MM ALUMINUM SECTION- HORIZONTAL 100X50MM ALUMINUM SECTION- HORIZONTAL PROJECTION AT SILL LVL 300 FABRICATION GRILL AS PER THE DETAIL 150MM THK. PARDI - VERTICAL 75X50MM ALUMINUM SECTION PROJECTION AT BEAM BOTTOM LVL. RIGHT SIDE ELEVATION GLAZING FABRICATION WORK GRC PANEL NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS:
  • 20. 600mm DIAPHRAGM WALL 600mm DIAPHRAGM WALL G U E S T L I F T S H A F T O F F I C E L I F T S H A F T sand filling compound wall compound wall sand filling SERVICE SHAFT RISER-24 TRADE-23 RISER-24 TRADE-23 RISER-21 TRADE-20 RISER-20 TRADE-19 RISER-20 TRADE-19 RISER-28 TRADE-27 RISER-28 TRADE-27 RISER-24 TRADE-23 RISER-24 TRADE-23 RISER-21 TRADE-20 RISER-20 TRADE-19 RISER-20 TRADE-19 RISER-28 TRADE-27 RISER-24 TRADE-23 FOYER FOYER FOYER FOYER FOYER PASSAGE PASSAGE PASSAGE PASSAGE OPEN TERRACE PASSAGE PASSAGE G U E S T L I F T S H A F T G U E S T L I F T S H A F T O F F I C E L I F T S H A F T OFFICE-12 FOYER TOILET OFFICE-13 RISER-20 TRADE-19 OFFICE-12 FOYER TOILET OFFICE-13 OFFICE-12 FOYER TOILET OFFICE-13 OFFICE-12 FOYER TOILET OFFICE-13 OFFICE-12 FOYER TOILET OFFICE-13 SALES CABIN FOYER TOILET ROOM-4 ROOM-5 TOILET TOILET FOYER TOILET ROOM-5 ROOM-6 TOILET TOILET ROOM-7 FOYER TOILET ROOM-5 ROOM-6 TOILET TOILET ROOM-7 FOYER TOILET ROOM-5 ROOM-6 TOILET TOILET ROOM-7 TOILET TOILET TOILET TOILET ROOM-10 ROOM-12 ROOM-12 ROOM-12 WATER TANK WATER TANK RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 150 11 RISER-21 TRADE-20 RISER-21 TRADE-20 OPEN TERRACE RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 RISER-21 TRADE-20 FEBRICATION FLOOR FEBRICATION FLOOR SECTION-(1-1) RISER-28 TRADE-27 RISER-28 TRADE-27 1 2 3 4 5 6 7 8 9 10 11 12 13 14 0 15 16 17 18 19 20 21 22 23 0 3 2 1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0 3 2 1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0 1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 0 15 23 1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 15 23 0 2000 2400 2070 4082 4500 4318 3900 3600 3179 150 1618 150 1618 150 2250 150 300 161 300 161 300 150 300 300 150 1350 2732 1768 2732 1768 2550 1650 2250 1350 2250 1350 1829 1371 900 1357 893 1350 1607 1125 1768 1607 1125 1768 1500 1050 1650 1357 893 1350 1350 900 1350 1371 457 1371 1371 1500 2000 2700 2070 2000 2700 2070 2000 2700 2070 2000 2400 2370 2000 2400 2370 152 300 2000 2400 2370 0 3 2 1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 0 1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 0 15 23 1 2 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 15 23 0 1607 1275 1368 1750 1200 1500 1350 900 1350 1350 900 1350 1371 457 1371 1371 457 1371 1371 457 1371 1371 457 1371 1350 300 1350 1350 1607 2643 1750 2700 1350 2250 1350 1371 1829 1371 1829 1371 1829 1371 1829 1350 1650 1350 1650 4700 1866 161 300 2000 2700 1866 2000 2400 2166 2000 2400 2166 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 150 300 150 300 3 300 0 1 2 4 1829 5 6 7 8 9 10 13 12 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 152 300 152 300 3200 150 300 2000 2400 2370 1866 2700 2000 2166 2400 2000 2166 2400 2000 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 300 1350 1371 457 1371 1371 457 1371 1371 457 1371 1371 457 1371 2400 1371 1829 1371 1829 1371 1829 2400 2166 2400 2000 2166 2400 2000 2166 2400 1930 2166 2400 1930 2166 2400 2000 2166 2400 2000 2166 2400 2000 152 300 152 300 150 300 150 300 152 300 152 300 152 300 152 1371 161 150 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE 2370 2400 2000 2370 2400 2000 2370 2400 2000 300 152 300 152 3200 457 1371 1371 457 1371 1371 457 1371 1350 300 2700 300 2721 457 2743 457 2743 457 2743 457 1371 2400 2400 2370 300 152 2400 2000 300 150 2370 2400 2000 300 150 2370 2400 2000 300 152 2370 2400 2000 300 152 300 152 300 152 2370 2400 2000 2370 2000 3200 3021 3000 3179 3200 3200 3200 3771 1829 1371 1829 1371 1829 1371 1650 1350 1650 1350 1829 1371 1829 1371 1829 1371 1829 2000 2000 2400 2166 HOTEL FOYER HOTEL FOYER G U E S T L I F T S H A F T KEY PLAN 4500.0 3300.0 ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] BASEMENT-1 L.V.L [-3300.0 mm] BASEMENT-2 L.V.L [-7800.0 mm] BASEMENT-3 L.V.L [-12300.0 mm] 4500.0 GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 12300.0 1200.0 49000.0 AS PER STAIRCASE DETAIL NAKSHATRA HOTEL- SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m
  • 21. 4500.0 3300.0 ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] BASEMENT-1 L.V.L [-3300.0 mm] BASEMENT-2 L.V.L [-7800.0 mm] BASEMENT-3 L.V.L [-12300.0 mm] 4500.0 GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 12300.0 1200.0 49000.0 ROOM-15 ROOM-16 ROOM-17 ROOM-15 ROOM-16 ROOM-17 ROOM-15 ROOM-16 ROOM-17 600mm DIAPHRAGM WALL 600mm DIAPHRAGM WALL 115MM THK MASONRY WALL BEAM 600mm DIAPHRAGM WALL SHOWROOM -06 HOTEL FOYER compound wall compound wall FINANCE MANAGER RECORD ROOM F&B MANAGER SECURITY MANAGER SHOWROOM -06 PASSAGE LADIES TOILET PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE MEZANNINE FLOOR SHOWROOM -06 OFFICE -06 RESTAURANT OFFICE-13 ROOM-05 ROOM-06 ROOM-15 ROOM-16 ROOM-17 PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE ROOM-06 ROOM-06 OFFICE -06 OFFICE -06 OFFICE -06 KEY PLAN SECTION-2 1400 WELL COMPACTED EARTH FILLING 1500 250 1000 LVL +1200MM 150 230MM THK RCC WALL compound wall 150 PLANTER 580 FILLING LVL +1050MM FOYER 1050 TERRACE NAKSHATRA HOTEL- SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m
  • 22. ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 SL. + 1200 compound wall 150 PASSAGE PASSAGE FOYER SL. + 1050 TERRACE: 150MM SUNK SHOWROOM 300 950 150 450 1700 1000 600 150 3375 1000 GLASS RAILING AS PER DETAIL 600 SHOWROOM SHOWROOM CIRCULAR M.S. COLUMN (DIA. 450MM) FABRICATION GRILL AS PER DETAIL 1045 OFFICE 150 750 1700 RESTAURANT OFFICE OFFICE OFFICE FABRICATION GRILL AS PER DETAIL SECTION A-A SECTION - A THIRD FLOOR L.V.L [+12600 MM] 300 800 150 450 GLASS RAILING AS PER DETAIL 600 FABRICATION GRILL AS PER DETAIL 1045 600 150 RAILING RAILING FEBRICATION M.S RAILING 2395 150 1500 50 1500 50 1525 50 1575 50 1475 50 1475 150 1150 150 750 230 DIGITAL SCREEN GLASS RAILING GLAZING AS PER DETAIL GLAZING AS PER DETAIL GLAZING AS PER DETAIL 750 450 1200 750 5850 6250 ROOM ROOM TERRACE TERRACE 150MM BEDDING 2400 NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS: Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 23. ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 OFFICE HOTEL FOYER 3600 600 3000 600 3000 600 1100 1500 600 2600 600 2600 600 2750 450 7350 FABRICATION GRILL AS PER DETAIL INSERT PLATE FOR CANOPY 300 REFUGE AREA REFUGE AREA OFFICE OFFICE OFFICE OFFICE compound wall 6400 FABRICATED PLATFORM FOR OUTDOOR UNIT MEZZANINE FLOOR LADIES TOILET 300MM RAISED AREA SECTION B-B 600 1100 FABRICATION GRILL AS PER DETAIL 300 600 THIRD FLOOR L.V.L [+12600 MM] SECTION - B CANOPY AS PER DETAIL 750 150 2400 TOILET ROOM- 05 TOILET ROOM- 06 TOILET ROOM- 06 TOILET ROOM- 06 TERRACE GLAZING AS PER DETAIL GLAZING AS PER DETAIL GLAZING AS PER DETAIL 600 450 150 150MM THK. R.C.C. PARDI 900 1500 900 1500 900 1500 600 600 800 900 1500 800 900 1500 800 900 1500 800 50 1100 50 50 50 1100 50 1800 50 50 1250 50 1600 50 NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS: Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 24. ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 FOYER FOYER FOYER FOYER FOYER O F F I C E L I F T S H A F T FOYER GRC PANEL AS PER DETAIL FABRICATION GRILL AS PER DETAIL 300 600 2300 300 600 2600 600 2600 600 1500 1100 600 3450 150 3000 600 3525 300 950 3600 PASSAGE PASSAGE GRC PANEL AS PER DETAIL FABRICATION GRILL AS PER DETAIL 600 900 150MM RCC PARDI ROOM-10 TOILET 2.00mt wide passage ROOM-12 TOILET 2.00mt wide passage ROOM-12 TOILET 2.00mt wide passage ROOM-10 TOILET 2.00mt wide passage 1500 slab thk 2000 150 HOTEL KITCHEN 300MM RAISED AREA SECTION C-C THIRD FLOOR L.V.L [+12600 MM] 1100 600 300 450 50X50MM M.S. BOX SECTION GLAZING AS PER DETAIL SECTION - C 150 3750 150 3233 150 4700 150 3050 2300 900 5250 900 2300 900 2300 900 2300 900 5000 150 750 750 230 2400 150MM RCC PARDI GRC PANEL AS PER DETAIL GRC PANEL AS PER DETAIL 150MM THK. R.C.C. PARDI TERRACE 2940 900 600 450 450 450 1500 3750 CANOPY AS PER DETAIL NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS: Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 25. ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 PASSAGE 3600 2600 50X50MM M.S. BOX SECTION 75X75MM M.S.L-ANGLE 100X100MM M.S.BOX-SECTION 150X100MM C-SECTION 3000 600 3000 600 1100 1500 600 2600 600 REFUGE AREA REFUGE AREA compound wall SPACE FOR O.D.U. 1800 1500 600 1800 PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE 1200 2600 600 M.S. CHECKERED PLATE 600 50X50MM M.S. BOX SECTION SPACE FOR O.D.U. FIXED GLASS 600 DOOR DOOR FIXED GLASS FIXED GLASS DOOR DOOR DOOR FIRE TANK DOMESTIC WATER TANK PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE PASSAGE AT TERRACE LVL. fire door fire door fire door fire door fire door fire door fire door fire door fire door fire door fire door fire door fire door SECTION D-D THIRD FLOOR L.V.L [+12600 MM] 1100 600 300 450 50X50MM M.S. BOX SECTION GLAZING AS PER DETAIL SECTION - D 6405 1200 750 300 600 2400 600 2550 450 600 REFUGE AREA 1800 1200 2750 450 2750 450 2750 450 1950 450 2600 NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS: Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 26. ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 FABRICATION GRILL AS PER DETAIL ALUMINUM LOUVERS AS PER DETAIL ALUMINUM LOUVERS AS PER DETAIL ALUMINUM LOUVERS AS PER DETAIL MEZZANINE FLOOR SECTION E-E SECTION - E 600 150 8450 300 4700 150 25200 150 2550 150 600 1150 1850 1150 1850 1150 1450 1150 1450 1150 1450 1150 1450 1150 1700 1150 1600 1150 1600 1150 1600 1150 1600 1100 600 600 1800 TERRACE OFFICE AC ODU/ PLUMBING SHAFT OFFICE OFFICE OFFICE OFFICE PASSAGE OFFICE UNIFORM ROOM PASSAGE PASSAGE PASSAGE 600 600 600 600 600 600 150 2550 450 450 450 450 450 1950 NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS: Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF
  • 27. ROAD L.V.L [±0.0 MM] PLINTH L.V.L [+1200 mm] GROUND L.V.L [-1000 mm] FIRST FLOOR L.V.L [+5400 MM] 4200.0 SECOND FLOOR L.V.L [+9000 MM] THIRD FLOOR L.V.L [+12600 MM] FOURTH FLOOR L.V.L [+15800 MM] FIFTH FLOOR L.V.L [+19000 MM] SIXTH FLOOR L.V.L [+22200 MM] SEVENTH FLOOR L.V.L [+25400 MM] EIGHTH FLOOR L.V.L [+31400 MM] NINTH FLOOR L.V.L [+34600 MM] TENTH FLOOR L.V.L [+37800 MM] ELEVENTH FLOOR L.V.L [+41000 MM] TERRACE FLOOR L.V.L [+44200 MM] STAIR CABIN LVL. [+46600 MM] WATER TANK LVL. [+49000 MM] 3600.0 3600.0 3200.0 3200.0 3200.0 3200.0 6000.0 3200.0 3200.0 3200.0 3200.0 2400.0 2400.0 1200.0 49000.0 SECTION F-F SECTION - F 150 5000 900 2300 900 2150 900 11100 150 950 300 10950 600 1250 150 1860 600 450 2340 2400 750 230 TERRACE 600 450 600 SHOWROOM SHOWROOM SHOWROOM TERRACE 150MM SUNK OFFICE OFFICE OFFICE OFFICE HALL ROOM ROOM ROOM ROOM GLAZING AS PER DETAIL GLAZING AS PER DETAIL GLAZING AS PER DETAIL GRC PANEL AS PER DETAIL GRC PANEL AS PER DETAIL 150MM THK. R.C.C. PARDI GLASS RAILING AS PER DETAIL 5925 7490 3200 900 TERRACE 1200 TERRACE 150MM BEDDING 150 NAKSHATRA HOTEL SARGASAN GANDHINAGAR Total Plot Area - 2889 sq. m PROJECT DETAILS: Neel Shah | UCT20102 Faculty of Technology CT3009: MEPF