By
.Ali Hyder Gadhi
ANALYSIS OF RATES
• To determine the rate of a particular item
of work from a quantities of materials and
labours required and their costs
• The rates of materials and labour are
changing from place to place, therefore the
rates o different items of work also
changes from place to place
ANALYSIS OF RATES
• Every Estimate should be accompanied
by the analysis of rates of the items
provided in it .
• Analysis of rates comprises of
1. Cost of Material
2. Cost of Labour
3. T and P , and Sundries
4. Carriage
5. Contractor’s Profit
ANALYSIS OF RATES
• Tools and Plants ( T & P ) = 2.5 to 3 % of
the labour cost
• Transportation cost more than 8 km is
considered
• Water charges = 1.5 to 2 % 0f total cost
• Contractor ‘ s profit = 10 %
ANALYSIS OF RATES
• Rates of Materials and Labours :
• 1st
class bricks = Rs 4500 per 1000 Nos.
• 2nd
class bricks = Rs 4000 per 1000 Nos.
• Brick Ballast = Rs 800 per cum
• Coarse sand = Rs 800 per cum
• Cement 50 kg bag = Rs 270 per bag
• Twisted bars = Rs 5000 per Quintel
• Bitumen = Rs 10 per kg
ANALYSIS OF RATES
• Mason = Rs 450 per day
• Plaster = Rs 400 per day
• Carpenter = Rs 400 per day
• Bhishti = Rs 250 per day
• Mazdoor = Rs 250 per day
• Painter = Rs 300 per day
ANALYSIS OF RATES
• Earth work in excavation: Mazdoor = 33
(% cum) Mason = 1.5
• Earth work in Filling : Mazdoor = 18
(% cum) Mason = 0.5
• Cement concrete : Mazdoor = 15
in foundation Mason =1.5
Bhishti = 2
ANALYSIS OF RATES
• Cement concrete : Mazdoor = 15
Mason = 1
Bhishti = 2.5
• R. Cement concrete : Mazdoor = 40
(10 cum ) Mason = 2.5
Bhishti = 5
Blacksmith = 4
Carpenter = 4
ANALYSIS OF RATES
• DPC : Mazdoor = 2.5
(10 cum ) Mason = 1.5
Bhishti = 0.5
• 1st
class brick work : Mazdoor = 15
Mason = 8
Bhishti = 2
ANALYSIS OF RATES
• Plastering work : Mazdoor = 10
( 100 sqm) Mason = 10
Bhishti = 2
• Distempering/painting/white washing :
Mazdoor = 5
( 100 sqm) Painter = 4
ANALYSIS OF RATES
Example 1. Find out dry materials required
for 1 cu m. C. concrete 1:4:8 in foundation.
Solution.
Ratio = 1:4:8 (cement,sand and aggregate)
Sum = 1+4+8=13
cont..
Total dry mortar for 1 cu m cement concrete
=1.54 cu m
Therefore the following materials are
required:
Cement = (1*1.54*28.8)/13
= 3.41 bags
Sand = (4*1.54)/13
= 0.47 cu m
cont..
Aggregate (Brick ballast) = (8*1.57)/13
= 0.94 cu m
so materials for 1 cu m cement concrete
1:4:8.
Cement 3.41 bags
Sand 0.47 cu m Ans.
Brick ballast 0.94 cu m
Example 2. Find out dry materials for 1
cu m lime concrete.
Solution:
Ratio = 1:2 (lime,surkhi)
Sum = 1+2
= 3
Total dry mortar for 1 cu m lime concrete
= 0.40 (lime, surkhi mortar)
Therefore the following materials are
required.
Lime = (1*0.40)/3
= 0.13 cu m
Surkhi = (2*0.40)/3
= 0.27 cu m
Aggregate (brick ballast) = 1.00 cu m
Materials required for1 cu m lime cocrete 1:2
Lime 0.13 cu m
Surkhi 0.27 cu m Ans.
Brick ballast 1.00 cu m
ANALYSIS OF RATES OF
DIFFERENT ITEMS OF
WORK.
1. Excavation for foundation: payment
% cu m
(a)Materials at the site for % cu m nil
No material is required Rs. P.
(b)labour for % cu m
Mazdoor 33 nos.@ 250.00/day = 8250.00
Mason 1 no. @ 450.00 = 450.00
Sundries and Tand P 3%
on labour = 261.00
Total = 8961.00
(c)Add 10% contractor’s profit = 896.10
grand total =9857.10
say Rs. = 9857.00
Rate per % cu m = Rs. 9857.00
2.Earth filling under floors payment % cu m
(a)Materials at site for %cu m Rs.P.
No material is required nil
(b) Labour for % cu m
Majdoor18nos.@250.00/day =4500.00
Bhishti 1/2no.@250.00/day = 125.00
Sundries and Tand P3% on
labour 465.00 = 123.75
total = 4748.75
Add 10% contractor’s profit = 474.87
G.Total= 5223.62 say Rs.=5224.00
Rate per % cu m = Rs. 5224.00
3. Cement concrete 1:4:8 in foundations
(a) Materials at site for 1 cu m payment
per cu m
Cement 3.41 bags @270 bag = 929.70
Sand 0.47 cu m @800.00 per cu m=376.00
Brick ballast 0.94 cu m @ 800.00
= 752.00
Cost of labour for 10 cu m = 7520.00
(b)Labour for 10 cu m Rs. P
Mason 1@ 400.00/ day = 400.00
Mazdoors 15@ 250.00/ day = 3750.00
Bhishti 2@ 250.oo/ day = 500.00
Sundries and Tand P @ 3%
on labour = 139.50
• Cost of for 10 cu m = 12309.50
• Cost of for 1 cu m =12309.50/10
• =1230.95
• PROBLEM: Conglomerate floor 4 cm thick
of cement concrete 1:2:4 over 10 cm thick
cement concrete 1:6:18 over 10 cm sand
filling.
calculation of material for 10 sq m
(1) Wet mortar for cement concrete
1:2:4= 10 sq m*4cm
= 10*4/100
=0.40cu m
Dry mortar = 0.40*1.54=0.616+0.62 cu m
Ratio = 1:2:4 Sum =1+2+4=7
Cement = 1*0.62*28.8/7 =2.55 bags
Sand = 2*0.62/7 = 0.18 cu m
Crusher = 4*0.62/7=0.36 cu m
(2)Wet mortar for cement concrete 1:6:18
= 10 sq m*10 cm
=10*10/100
=1 cu m
Dry mortar 1*1.54 =1.54cu m
Ratio =1:6:18=1+6+18
= 25
Cement = 1*1.54*28.8/25
= 1.78 bags
Sand =6*1.54/25
= 0.37 cu m
Brick ballast = 18*1.54/2
= 1.11 cu m
(3) Sand for 10 sq m = 10 sq m* 10 cm
= 10*10/10
= 1 cu m
Total dry mortar for 10 sq m conglomerate
flooring.
Cement = 2.55+1.78
Sand = 0.18+0.37+1.00
Crusher = 0.46
(a) Materials at site for 10 sq m Rs.P
Cement 4.33 bags @ 270.00/bag = 1170.00
sand 1.55 cum@ 800.00 per cu m = 1240.00
Crusher 0.36 cu m @1200 /cu m = 432.00
Brick ballast 1.11 cu m@ 800 / cu m = 888.00
Cost of material for 10 sq m =3730.00
(b) Labour for 10 sq m Rs. P
Mason 2@ 400.00/ day = 900.00
Mazdoor 3@ 250.00/day = 750.00
Bhishti 1@ 250.00 / day = 250.00
Sundries T and P 3% on labour
= 57.00
Cost of labour for 10 sq m = 1957.00
Cost of material and labour for 10 sq m
=5687.00
Add 10% contractor’s profit =
568.70
and total = 6255.70
Rate for 10 sq m = Rs.6256.00
Rate per sq m = Rs.625.60

More Related Content

What's hot

Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building ConstructionAdnan. Ali
 
Compressive strength of cement concrete cubes
Compressive strength of cement concrete cubesCompressive strength of cement concrete cubes
Compressive strength of cement concrete cubesShubham Gautam
 
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyJameel Academy
 
Normal Consistency of Hydraulic Cement | Jameel Academy
Normal Consistency of Hydraulic Cement | Jameel AcademyNormal Consistency of Hydraulic Cement | Jameel Academy
Normal Consistency of Hydraulic Cement | Jameel AcademyJameel Academy
 
concrete mix design
concrete mix designconcrete mix design
concrete mix designroyce fakeh
 
Consolidation of Soil Test | Jameel Academy
Consolidation of Soil Test | Jameel AcademyConsolidation of Soil Test | Jameel Academy
Consolidation of Soil Test | Jameel AcademyJameel Academy
 
6. study of production cost of rose
6. study of production cost of rose6. study of production cost of rose
6. study of production cost of roseiubat student
 
Standard Compaction Test | Jameel Academy
Standard Compaction Test | Jameel AcademyStandard Compaction Test | Jameel Academy
Standard Compaction Test | Jameel AcademyJameel Academy
 
Break even-point
Break even-point Break even-point
Break even-point Aditi Gadia
 

What's hot (15)

Odev 13
Odev 13Odev 13
Odev 13
 
Concrete production
Concrete productionConcrete production
Concrete production
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
 
Compressive strength of cement concrete cubes
Compressive strength of cement concrete cubesCompressive strength of cement concrete cubes
Compressive strength of cement concrete cubes
 
Presentation1
Presentation1Presentation1
Presentation1
 
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel AcademyCompressive Strength of Hydraulic Cement Mortar | Jameel Academy
Compressive Strength of Hydraulic Cement Mortar | Jameel Academy
 
Normal Consistency of Hydraulic Cement | Jameel Academy
Normal Consistency of Hydraulic Cement | Jameel AcademyNormal Consistency of Hydraulic Cement | Jameel Academy
Normal Consistency of Hydraulic Cement | Jameel Academy
 
Fresh concrete tests
Fresh concrete testsFresh concrete tests
Fresh concrete tests
 
concrete mix design
concrete mix designconcrete mix design
concrete mix design
 
Consolidation of Soil Test | Jameel Academy
Consolidation of Soil Test | Jameel AcademyConsolidation of Soil Test | Jameel Academy
Consolidation of Soil Test | Jameel Academy
 
6. study of production cost of rose
6. study of production cost of rose6. study of production cost of rose
6. study of production cost of rose
 
Standard Compaction Test | Jameel Academy
Standard Compaction Test | Jameel AcademyStandard Compaction Test | Jameel Academy
Standard Compaction Test | Jameel Academy
 
Presentaion last
Presentaion lastPresentaion last
Presentaion last
 
SOIL CV
SOIL CVSOIL CV
SOIL CV
 
Break even-point
Break even-point Break even-point
Break even-point
 

Similar to Rates Analysis of Construction Works

ANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.pptANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.pptRijuDasgupta
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works ALI HYDER GADHI
 
Estimation and costing pdf
Estimation and costing pdfEstimation and costing pdf
Estimation and costing pdfSaqib Imran
 
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.pptHimani762003
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imranSaqib Imran
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imranSaqib Imran
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxRajnishKumar916873
 
estimating and costing (1).pdf
estimating and costing (1).pdfestimating and costing (1).pdf
estimating and costing (1).pdfRoshani Shahi
 
Bill of Quantity Tabulation
Bill of Quantity TabulationBill of Quantity Tabulation
Bill of Quantity TabulationLamaJassim1
 
Notes on Estimation.ppt
Notes on Estimation.pptNotes on Estimation.ppt
Notes on Estimation.pptashoklalwani6
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfAvin Kharel
 
Eqs unit 3 final
Eqs unit 3 finalEqs unit 3 final
Eqs unit 3 finaldhanapal143
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculationZIyeeTan
 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimatorimaduddin91
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and CostingGanesh Tatikonda
 

Similar to Rates Analysis of Construction Works (20)

ANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.pptANALYSIS_OF_RATES.ppt
ANALYSIS_OF_RATES.ppt
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
EQS - RATE ANALYSIS.pdf
EQS -  RATE ANALYSIS.pdfEQS -  RATE ANALYSIS.pdf
EQS - RATE ANALYSIS.pdf
 
Estimation and costing pdf
Estimation and costing pdfEstimation and costing pdf
Estimation and costing pdf
 
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
2170610_PPV_GTU_Study_Material_Presentations_Unit-4_31072020050116AM.ppt
 
Quantity notes by engineer saqib imran
Quantity notes by engineer saqib imranQuantity notes by engineer saqib imran
Quantity notes by engineer saqib imran
 
Quantity notes by engineer saqb imran
Quantity notes by engineer saqb imranQuantity notes by engineer saqb imran
Quantity notes by engineer saqb imran
 
QUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptxQUANTITY SURVEYING PORTFOLIO.pptx
QUANTITY SURVEYING PORTFOLIO.pptx
 
estimating and costing (1).pdf
estimating and costing (1).pdfestimating and costing (1).pdf
estimating and costing (1).pdf
 
Bill of Quantity Tabulation
Bill of Quantity TabulationBill of Quantity Tabulation
Bill of Quantity Tabulation
 
Notes on Estimation.ppt
Notes on Estimation.pptNotes on Estimation.ppt
Notes on Estimation.ppt
 
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdfFarm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
 
Eqs unit 3 final
Eqs unit 3 finalEqs unit 3 final
Eqs unit 3 final
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
Section 6
Section 6Section 6
Section 6
 
80623277 cost-estimator
80623277 cost-estimator80623277 cost-estimator
80623277 cost-estimator
 
Fundamentals of Estimating and Costing
 Fundamentals of Estimating and Costing Fundamentals of Estimating and Costing
Fundamentals of Estimating and Costing
 

Recently uploaded

chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 

Rates Analysis of Construction Works

  • 2. ANALYSIS OF RATES • To determine the rate of a particular item of work from a quantities of materials and labours required and their costs • The rates of materials and labour are changing from place to place, therefore the rates o different items of work also changes from place to place
  • 3. ANALYSIS OF RATES • Every Estimate should be accompanied by the analysis of rates of the items provided in it . • Analysis of rates comprises of 1. Cost of Material 2. Cost of Labour 3. T and P , and Sundries 4. Carriage 5. Contractor’s Profit
  • 4. ANALYSIS OF RATES • Tools and Plants ( T & P ) = 2.5 to 3 % of the labour cost • Transportation cost more than 8 km is considered • Water charges = 1.5 to 2 % 0f total cost • Contractor ‘ s profit = 10 %
  • 5. ANALYSIS OF RATES • Rates of Materials and Labours : • 1st class bricks = Rs 4500 per 1000 Nos. • 2nd class bricks = Rs 4000 per 1000 Nos. • Brick Ballast = Rs 800 per cum • Coarse sand = Rs 800 per cum • Cement 50 kg bag = Rs 270 per bag • Twisted bars = Rs 5000 per Quintel • Bitumen = Rs 10 per kg
  • 6. ANALYSIS OF RATES • Mason = Rs 450 per day • Plaster = Rs 400 per day • Carpenter = Rs 400 per day • Bhishti = Rs 250 per day • Mazdoor = Rs 250 per day • Painter = Rs 300 per day
  • 7. ANALYSIS OF RATES • Earth work in excavation: Mazdoor = 33 (% cum) Mason = 1.5 • Earth work in Filling : Mazdoor = 18 (% cum) Mason = 0.5 • Cement concrete : Mazdoor = 15 in foundation Mason =1.5 Bhishti = 2
  • 8. ANALYSIS OF RATES • Cement concrete : Mazdoor = 15 Mason = 1 Bhishti = 2.5 • R. Cement concrete : Mazdoor = 40 (10 cum ) Mason = 2.5 Bhishti = 5 Blacksmith = 4 Carpenter = 4
  • 9. ANALYSIS OF RATES • DPC : Mazdoor = 2.5 (10 cum ) Mason = 1.5 Bhishti = 0.5 • 1st class brick work : Mazdoor = 15 Mason = 8 Bhishti = 2
  • 10. ANALYSIS OF RATES • Plastering work : Mazdoor = 10 ( 100 sqm) Mason = 10 Bhishti = 2 • Distempering/painting/white washing : Mazdoor = 5 ( 100 sqm) Painter = 4
  • 11. ANALYSIS OF RATES Example 1. Find out dry materials required for 1 cu m. C. concrete 1:4:8 in foundation. Solution. Ratio = 1:4:8 (cement,sand and aggregate) Sum = 1+4+8=13 cont..
  • 12. Total dry mortar for 1 cu m cement concrete =1.54 cu m Therefore the following materials are required: Cement = (1*1.54*28.8)/13 = 3.41 bags Sand = (4*1.54)/13 = 0.47 cu m cont..
  • 13. Aggregate (Brick ballast) = (8*1.57)/13 = 0.94 cu m so materials for 1 cu m cement concrete 1:4:8. Cement 3.41 bags Sand 0.47 cu m Ans. Brick ballast 0.94 cu m
  • 14. Example 2. Find out dry materials for 1 cu m lime concrete. Solution: Ratio = 1:2 (lime,surkhi) Sum = 1+2 = 3 Total dry mortar for 1 cu m lime concrete = 0.40 (lime, surkhi mortar)
  • 15. Therefore the following materials are required. Lime = (1*0.40)/3 = 0.13 cu m Surkhi = (2*0.40)/3 = 0.27 cu m Aggregate (brick ballast) = 1.00 cu m
  • 16. Materials required for1 cu m lime cocrete 1:2 Lime 0.13 cu m Surkhi 0.27 cu m Ans. Brick ballast 1.00 cu m
  • 17. ANALYSIS OF RATES OF DIFFERENT ITEMS OF WORK. 1. Excavation for foundation: payment % cu m (a)Materials at the site for % cu m nil No material is required Rs. P. (b)labour for % cu m Mazdoor 33 nos.@ 250.00/day = 8250.00
  • 18. Mason 1 no. @ 450.00 = 450.00 Sundries and Tand P 3% on labour = 261.00 Total = 8961.00 (c)Add 10% contractor’s profit = 896.10 grand total =9857.10 say Rs. = 9857.00 Rate per % cu m = Rs. 9857.00
  • 19. 2.Earth filling under floors payment % cu m (a)Materials at site for %cu m Rs.P. No material is required nil (b) Labour for % cu m Majdoor18nos.@250.00/day =4500.00 Bhishti 1/2no.@250.00/day = 125.00 Sundries and Tand P3% on labour 465.00 = 123.75 total = 4748.75 Add 10% contractor’s profit = 474.87
  • 20. G.Total= 5223.62 say Rs.=5224.00 Rate per % cu m = Rs. 5224.00 3. Cement concrete 1:4:8 in foundations (a) Materials at site for 1 cu m payment per cu m Cement 3.41 bags @270 bag = 929.70 Sand 0.47 cu m @800.00 per cu m=376.00
  • 21. Brick ballast 0.94 cu m @ 800.00 = 752.00 Cost of labour for 10 cu m = 7520.00 (b)Labour for 10 cu m Rs. P Mason 1@ 400.00/ day = 400.00 Mazdoors 15@ 250.00/ day = 3750.00 Bhishti 2@ 250.oo/ day = 500.00 Sundries and Tand P @ 3% on labour = 139.50
  • 22. • Cost of for 10 cu m = 12309.50 • Cost of for 1 cu m =12309.50/10 • =1230.95 • PROBLEM: Conglomerate floor 4 cm thick of cement concrete 1:2:4 over 10 cm thick cement concrete 1:6:18 over 10 cm sand filling.
  • 23. calculation of material for 10 sq m (1) Wet mortar for cement concrete 1:2:4= 10 sq m*4cm = 10*4/100 =0.40cu m
  • 24. Dry mortar = 0.40*1.54=0.616+0.62 cu m Ratio = 1:2:4 Sum =1+2+4=7 Cement = 1*0.62*28.8/7 =2.55 bags Sand = 2*0.62/7 = 0.18 cu m
  • 25. Crusher = 4*0.62/7=0.36 cu m (2)Wet mortar for cement concrete 1:6:18 = 10 sq m*10 cm =10*10/100 =1 cu m
  • 26. Dry mortar 1*1.54 =1.54cu m Ratio =1:6:18=1+6+18 = 25 Cement = 1*1.54*28.8/25 = 1.78 bags
  • 27. Sand =6*1.54/25 = 0.37 cu m Brick ballast = 18*1.54/2 = 1.11 cu m (3) Sand for 10 sq m = 10 sq m* 10 cm = 10*10/10
  • 28. = 1 cu m Total dry mortar for 10 sq m conglomerate flooring. Cement = 2.55+1.78 Sand = 0.18+0.37+1.00 Crusher = 0.46
  • 29. (a) Materials at site for 10 sq m Rs.P Cement 4.33 bags @ 270.00/bag = 1170.00 sand 1.55 cum@ 800.00 per cu m = 1240.00 Crusher 0.36 cu m @1200 /cu m = 432.00 Brick ballast 1.11 cu m@ 800 / cu m = 888.00
  • 30. Cost of material for 10 sq m =3730.00 (b) Labour for 10 sq m Rs. P Mason 2@ 400.00/ day = 900.00 Mazdoor 3@ 250.00/day = 750.00 Bhishti 1@ 250.00 / day = 250.00
  • 31. Sundries T and P 3% on labour = 57.00 Cost of labour for 10 sq m = 1957.00 Cost of material and labour for 10 sq m =5687.00
  • 32. Add 10% contractor’s profit = 568.70 and total = 6255.70 Rate for 10 sq m = Rs.6256.00 Rate per sq m = Rs.625.60