SlideShare a Scribd company logo
1 of 4
NILANJAN PODDARNILANJAN PODDAR
Handheld: 09614347605; 09732080754; Land: 0343-2544461
E-mail id: poddarnilanjan@gmail.com / poddarnilanjan@rediffmail.com
In quest of mid-level position in Operation & Maintenance / Safety Assurance / Project Management /
Process Improvement with a value driven organization.
PROFESSIONAL PROFILE
 An Operation & Maintenance professional with more than 12 years of experience in Drilling
Operations, Maintenance, Safety Assurance, Process Improvement, Project Management, Installation
& Commissioning.
 Presently functioning with Niko Resources India Ltd., as Drilling and Completion Engineer.
 Proficient in managing maintenance operations with proven abilities in reducing downtime and
enhancing operational efficiencies of the same.
 Adroit at synergizing operations to facilitate organizational effectiveness, institution building and
strengthening organizational culture through enabling leadership.
 Pivotal in planning, execution and establishing critical processes for efficient utilization of
resources.
 Proven ability to motivate a large workforce with myriad technical skill sets and create work eco
system that enables people to deliver beyond their measured potential.
 Detail oriented with an analytical bent of mind and a positive attitude.
 An enterprising leader with excellent technical, analytical, problem solving & man management
skills.
 My Ethic is “I NEVER NEGLECTED AN OPPORTUNITY FOR MY IMPROVEMENT".
ORGANIZATIONAL EXPERIENCE
Since 2005
Growth Path:
2005-2008 Drilling Engineer (Field Operation) Essar Oil Ltd.
2008-2011 Drilling (Company Man) Essar Oil Ltd.
2011-2012 Drilling (Project Manager) Asian Oilfield Services Ltd.
2012-2014 Manager (Oil and Gas pipelines) I.E. Ispat Pvt. Ltd.
2014-2015 Drilling (Company Man) Essar Oil Ltd.
2015-Present Drilling and Completion Engineer Niko Resources India Ltd.
Significant Achievements
 Demonstrated abilities in Anchoring, Commissioning Activities of 02 nos. of Drilling Rigs Kores-
2000 of 650 H.P. & RD 20 III of 750 H.P.
 Dynamically took part in successful completion of 47 nos. of 12-1/4” Wells of an average of 850
m & 27 nos. of 8-1/2” Wells of an average of 1850 m & 29 nos. of Coring Wells of an average of
1200 m.
 Part of the team drilling Deepest Drilled well & Drilling Core well of Essar Oil Ltd. at Ranigunj
Project.
 Individually handled Safe mud Drilling Operation up to 1560 m and air Drilling upto 1650 m & its
casing.
 Energetic Part of the team for Successful Completion of Hydro Fracturing Activities of 15 nos. of
Wells.
 Assisted in Safe Work Over Operation of 12 nos. of Wells & their P.C. Pump Installation.
 Individually handled different field as well as Control Room Operations safely.
 Very Active Part of the team (Got Appreciation letter from Essar Ruia’s).
 Got appreciation from Niko Resources India Ltd.
Team Management/ Training & Development
 Identifying and Implementing Strategies for building team Effectiveness by promoting a spirit of
cooperation between team members.
 Conceptualizing & developing need based training modules for Developing Technical Work Force
for cross utilization within sub processes for Optimum Efficiency.
Organizational Responsibilities:
Project Planning/ Execution
 Techno-commercial Review of Contract, Understand Project Scope, Clarify terms and Conditions.
 Prepare detailed implementation schedule, co-ordinate with internal departments. Monitor and
Review the progress of the project.
 Planning for appropriate accessories & consumables in time & accordance with the need of
uninterrupted & economical Operation.
 Review of Punch Lists of Drilling Rigs & Auxiliaries & fill up of Commissioning Formats.
 Spot decision for modification of Mechanical & Instrumentation equipments, developing Plans &
Schedules for the same in sync with Project Budgets.
 Unique in Maintaining Proper Records of C.B.M. Well Drilling, Cementation & Testing, Casing
Tally, Well Consumption Reports, Rig Performance Chart, M.I.S. and Well Completion Reports.
Have Knowledge about MWD and LWD system.
 Preparing Well Cost.
 Ensuring adherence to Safety practices & compliance of Safety policy for each & every job.
Installation and Commissioning
 Conducting Pre-Engineering site reviews.
 Identification & rectification of Performance Bottlenecks for various activities at field site.
 Ensuring effective Site Management and Setting up Standards for Safe Operations.
 Effective Supervision of Coring & Drilling Operations of Pilot (Starting) Wells of Virgin blocks.
 Anchoring Commissioning Activities of Drilling Rigs.
Operations
 Developing and Implementing Plans & Schedules for Maintenance Operations & Annual
turnarounds with focus on Optimum Utilization of Manpower and Material.
 Looking after Field Activities for Hydro-Fracturing & Work Over activities.
 Assisting in a gamut of tasks pertaining to:
 47 nos. of wells of 12-1/4” hole of more than 850 m 9-5/8” Casing lowering. Annulus
Cementation of 12-1/4” to 9-5/8” casing.
 27 nos. of wells of 8-1/2” hole of more than 1850 m 5-1/2” casing lowering. Annulus
Cementation of 8-1/2” to 5-1/2” casing.
 29 nos. of Core hole, Drilling upto completion.
 Field trial of auxiliaries, (like Mud Pumps, Compressors, Boosters, Gensets etc.)
 Troubleshooting and preventive / breakdown maintenance of Mechanical Systems to reduce
downtime to minimum.
 Undertaking regular inspections to prevent accidents and adherence to safety norms.
 Basic Working Knowledge about Directional Drilling, MWD and LWD system.
 Field support for smooth Wire line Survey of wells.
Process Improvement
 Analyzing various processes / applications and recommending process modifications and
equipment calibrations to enhance operational efficiency & quality.
 Implementing major cost savings strategies on contractor drilling, productivity enhancements.
 Foreseeing performance bottlenecks and taking corrective measures to avoid the same.
ACADEMIC CREDENTIALS
 B-Tech in Mechanical from R.V.U.
 Diploma in Safety Engineering from W.B.S.C.T.E.
 Power Plant Engineering from N.P.T.I.
COMPUTER PROFICIENCY
 Window 98, 2000, XP.
 Microsoft Office Pack.
 Basic knowledge of SAP (Codification, P.R. Generation & SES).
PROFESSIONAL TRAINING
 Vacation training at Durgapur Steel Plant (SAIL) from Aug’03-Sep’03. Subject: Foundry, C.C.P.,
Power Plant, Coke Oven, Blast Furnace.
 Specialized Training at Durgapur Steel Plant (SAIL) in Sep’04. Subject: C.N.C. Lathe Machine.
 Training on 210 M.W. Thermal Unit operations on Simulator, Conducted by the National Power
training Institute (N.R.), Badarpur, New Delhi in May’05.
 Training for Skill development on solar energy service devices at West Bengal Renewable Energy
Development Agency from Jun’05-Jul’05.
Relevant Skills
Ability to work with minimum supervision.
Good communication skills.
Positive Attitude.
Ability to work in team.
Ability to work in interdisciplinary team.
Extra Curricular Activities
 Actively participated in various cultural programs from school onwards.
 Took karate and yoga classes at Sub-Division level.
 Won prize in athletic competition at Sub-Division level.
 Participated in TV show competition at State level.
PERSONAL DOSSIER
Date of Birth : 4th
October 1979
Passport Number : J9609967
Languages Known : English, Hindi and Bengali
Address : M -14/1, City Park, Housing, City Centre, Durgapur, District-Burdwan, West
Bengal, Pin –713216.

More Related Content

Viewers also liked

SINET_EdNexus_BeyondTeacherEvaluations_071614
SINET_EdNexus_BeyondTeacherEvaluations_071614SINET_EdNexus_BeyondTeacherEvaluations_071614
SINET_EdNexus_BeyondTeacherEvaluations_071614Kathleen T. Hayes, Ed.D.
 
Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...
Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...
Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...NOMENSAUNICA
 
Pheonix-Design-Studio
Pheonix-Design-StudioPheonix-Design-Studio
Pheonix-Design-StudioSudhir Rao
 
Marlon mendoza c.i. 25140613
Marlon mendoza c.i. 25140613Marlon mendoza c.i. 25140613
Marlon mendoza c.i. 25140613marlon mendoza
 
Proposta c.c. n. 2 2016
Proposta c.c. n. 2 2016Proposta c.c. n. 2 2016
Proposta c.c. n. 2 2016NOMENSAUNICA
 
Linea de tiempo/ time line
Linea de tiempo/ time line Linea de tiempo/ time line
Linea de tiempo/ time line Paola Abrego
 
Tipologia de viviendas venezuela
Tipologia de viviendas venezuelaTipologia de viviendas venezuela
Tipologia de viviendas venezuelaNeyda Viana
 
Residential Bungalows in Ahmedabad
Residential Bungalows in AhmedabadResidential Bungalows in Ahmedabad
Residential Bungalows in AhmedabadSuryam Developers
 
Rural service delivery. framin draft1
Rural service delivery. framin draft1Rural service delivery. framin draft1
Rural service delivery. framin draft1Elias Elwai Williams
 

Viewers also liked (18)

SINET_EdNexus_BeyondTeacherEvaluations_071614
SINET_EdNexus_BeyondTeacherEvaluations_071614SINET_EdNexus_BeyondTeacherEvaluations_071614
SINET_EdNexus_BeyondTeacherEvaluations_071614
 
Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...
Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...
Regolamento per l'organizzazione ed il funzionamento della mensa scolastica e...
 
Pheonix-Design-Studio
Pheonix-Design-StudioPheonix-Design-Studio
Pheonix-Design-Studio
 
Dinusha CV with project
Dinusha CV with projectDinusha CV with project
Dinusha CV with project
 
teacher-evaluations-and-local-flexibility
teacher-evaluations-and-local-flexibilityteacher-evaluations-and-local-flexibility
teacher-evaluations-and-local-flexibility
 
Actividad tecnologica
Actividad tecnologicaActividad tecnologica
Actividad tecnologica
 
gopi_cv
gopi_cvgopi_cv
gopi_cv
 
Especialidad rr.pp cs
Especialidad rr.pp csEspecialidad rr.pp cs
Especialidad rr.pp cs
 
Eng.Khawaja ghulam muhammad-CV--new
Eng.Khawaja ghulam muhammad-CV--newEng.Khawaja ghulam muhammad-CV--new
Eng.Khawaja ghulam muhammad-CV--new
 
Marlon mendoza c.i. 25140613
Marlon mendoza c.i. 25140613Marlon mendoza c.i. 25140613
Marlon mendoza c.i. 25140613
 
SME Concept. Draft1
SME Concept. Draft1SME Concept. Draft1
SME Concept. Draft1
 
Proposta c.c. n. 2 2016
Proposta c.c. n. 2 2016Proposta c.c. n. 2 2016
Proposta c.c. n. 2 2016
 
Linea de tiempo/ time line
Linea de tiempo/ time line Linea de tiempo/ time line
Linea de tiempo/ time line
 
Tipologia de viviendas venezuela
Tipologia de viviendas venezuelaTipologia de viviendas venezuela
Tipologia de viviendas venezuela
 
vidéosurveillance IP et HD a Marrakech
vidéosurveillance  IP et HD a Marrakech vidéosurveillance  IP et HD a Marrakech
vidéosurveillance IP et HD a Marrakech
 
Residential Bungalows in Ahmedabad
Residential Bungalows in AhmedabadResidential Bungalows in Ahmedabad
Residential Bungalows in Ahmedabad
 
Rural service delivery. framin draft1
Rural service delivery. framin draft1Rural service delivery. framin draft1
Rural service delivery. framin draft1
 
Michael RESUME
Michael RESUMEMichael RESUME
Michael RESUME
 

Recently uploaded

Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemSampad Kar
 
1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load designAshishSingh1301
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.MdManikurRahman
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksIJECEIAES
 
Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoAbhimanyu Sangale
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxMustafa Ahmed
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.benjamincojr
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfAshrafRagab14
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Nitin Sonavane
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdfKamal Acharya
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...drjose256
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docxrahulmanepalli02
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfragupathi90
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...IJECEIAES
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...josephjonse
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxKarpagam Institute of Teechnology
 

Recently uploaded (20)

Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
 
1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design1893-part-1-2016 for Earthquake load design
1893-part-1-2016 for Earthquake load design
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of Arduino
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...Fuzzy logic method-based stress detector with blood pressure and body tempera...
Fuzzy logic method-based stress detector with blood pressure and body tempera...
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
analog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptxanalog-vs-digital-communication (concept of analog and digital).pptx
analog-vs-digital-communication (concept of analog and digital).pptx
 

Drillind Supervisor and Engineer with 12 years of experience

  • 1. NILANJAN PODDARNILANJAN PODDAR Handheld: 09614347605; 09732080754; Land: 0343-2544461 E-mail id: poddarnilanjan@gmail.com / poddarnilanjan@rediffmail.com In quest of mid-level position in Operation & Maintenance / Safety Assurance / Project Management / Process Improvement with a value driven organization. PROFESSIONAL PROFILE  An Operation & Maintenance professional with more than 12 years of experience in Drilling Operations, Maintenance, Safety Assurance, Process Improvement, Project Management, Installation & Commissioning.  Presently functioning with Niko Resources India Ltd., as Drilling and Completion Engineer.  Proficient in managing maintenance operations with proven abilities in reducing downtime and enhancing operational efficiencies of the same.  Adroit at synergizing operations to facilitate organizational effectiveness, institution building and strengthening organizational culture through enabling leadership.  Pivotal in planning, execution and establishing critical processes for efficient utilization of resources.  Proven ability to motivate a large workforce with myriad technical skill sets and create work eco system that enables people to deliver beyond their measured potential.  Detail oriented with an analytical bent of mind and a positive attitude.  An enterprising leader with excellent technical, analytical, problem solving & man management skills.  My Ethic is “I NEVER NEGLECTED AN OPPORTUNITY FOR MY IMPROVEMENT". ORGANIZATIONAL EXPERIENCE Since 2005 Growth Path: 2005-2008 Drilling Engineer (Field Operation) Essar Oil Ltd. 2008-2011 Drilling (Company Man) Essar Oil Ltd. 2011-2012 Drilling (Project Manager) Asian Oilfield Services Ltd. 2012-2014 Manager (Oil and Gas pipelines) I.E. Ispat Pvt. Ltd. 2014-2015 Drilling (Company Man) Essar Oil Ltd. 2015-Present Drilling and Completion Engineer Niko Resources India Ltd. Significant Achievements  Demonstrated abilities in Anchoring, Commissioning Activities of 02 nos. of Drilling Rigs Kores- 2000 of 650 H.P. & RD 20 III of 750 H.P.  Dynamically took part in successful completion of 47 nos. of 12-1/4” Wells of an average of 850 m & 27 nos. of 8-1/2” Wells of an average of 1850 m & 29 nos. of Coring Wells of an average of 1200 m.  Part of the team drilling Deepest Drilled well & Drilling Core well of Essar Oil Ltd. at Ranigunj Project.  Individually handled Safe mud Drilling Operation up to 1560 m and air Drilling upto 1650 m & its casing.  Energetic Part of the team for Successful Completion of Hydro Fracturing Activities of 15 nos. of Wells.  Assisted in Safe Work Over Operation of 12 nos. of Wells & their P.C. Pump Installation.  Individually handled different field as well as Control Room Operations safely.
  • 2.  Very Active Part of the team (Got Appreciation letter from Essar Ruia’s).  Got appreciation from Niko Resources India Ltd. Team Management/ Training & Development  Identifying and Implementing Strategies for building team Effectiveness by promoting a spirit of cooperation between team members.  Conceptualizing & developing need based training modules for Developing Technical Work Force for cross utilization within sub processes for Optimum Efficiency. Organizational Responsibilities: Project Planning/ Execution  Techno-commercial Review of Contract, Understand Project Scope, Clarify terms and Conditions.  Prepare detailed implementation schedule, co-ordinate with internal departments. Monitor and Review the progress of the project.  Planning for appropriate accessories & consumables in time & accordance with the need of uninterrupted & economical Operation.  Review of Punch Lists of Drilling Rigs & Auxiliaries & fill up of Commissioning Formats.  Spot decision for modification of Mechanical & Instrumentation equipments, developing Plans & Schedules for the same in sync with Project Budgets.  Unique in Maintaining Proper Records of C.B.M. Well Drilling, Cementation & Testing, Casing Tally, Well Consumption Reports, Rig Performance Chart, M.I.S. and Well Completion Reports. Have Knowledge about MWD and LWD system.  Preparing Well Cost.  Ensuring adherence to Safety practices & compliance of Safety policy for each & every job. Installation and Commissioning  Conducting Pre-Engineering site reviews.  Identification & rectification of Performance Bottlenecks for various activities at field site.  Ensuring effective Site Management and Setting up Standards for Safe Operations.  Effective Supervision of Coring & Drilling Operations of Pilot (Starting) Wells of Virgin blocks.  Anchoring Commissioning Activities of Drilling Rigs. Operations  Developing and Implementing Plans & Schedules for Maintenance Operations & Annual turnarounds with focus on Optimum Utilization of Manpower and Material.  Looking after Field Activities for Hydro-Fracturing & Work Over activities.  Assisting in a gamut of tasks pertaining to:  47 nos. of wells of 12-1/4” hole of more than 850 m 9-5/8” Casing lowering. Annulus Cementation of 12-1/4” to 9-5/8” casing.  27 nos. of wells of 8-1/2” hole of more than 1850 m 5-1/2” casing lowering. Annulus Cementation of 8-1/2” to 5-1/2” casing.  29 nos. of Core hole, Drilling upto completion.  Field trial of auxiliaries, (like Mud Pumps, Compressors, Boosters, Gensets etc.)  Troubleshooting and preventive / breakdown maintenance of Mechanical Systems to reduce downtime to minimum.  Undertaking regular inspections to prevent accidents and adherence to safety norms.
  • 3.  Basic Working Knowledge about Directional Drilling, MWD and LWD system.  Field support for smooth Wire line Survey of wells. Process Improvement  Analyzing various processes / applications and recommending process modifications and equipment calibrations to enhance operational efficiency & quality.  Implementing major cost savings strategies on contractor drilling, productivity enhancements.  Foreseeing performance bottlenecks and taking corrective measures to avoid the same. ACADEMIC CREDENTIALS  B-Tech in Mechanical from R.V.U.  Diploma in Safety Engineering from W.B.S.C.T.E.  Power Plant Engineering from N.P.T.I. COMPUTER PROFICIENCY  Window 98, 2000, XP.  Microsoft Office Pack.  Basic knowledge of SAP (Codification, P.R. Generation & SES). PROFESSIONAL TRAINING  Vacation training at Durgapur Steel Plant (SAIL) from Aug’03-Sep’03. Subject: Foundry, C.C.P., Power Plant, Coke Oven, Blast Furnace.  Specialized Training at Durgapur Steel Plant (SAIL) in Sep’04. Subject: C.N.C. Lathe Machine.  Training on 210 M.W. Thermal Unit operations on Simulator, Conducted by the National Power training Institute (N.R.), Badarpur, New Delhi in May’05.  Training for Skill development on solar energy service devices at West Bengal Renewable Energy Development Agency from Jun’05-Jul’05. Relevant Skills Ability to work with minimum supervision. Good communication skills. Positive Attitude. Ability to work in team. Ability to work in interdisciplinary team. Extra Curricular Activities  Actively participated in various cultural programs from school onwards.  Took karate and yoga classes at Sub-Division level.  Won prize in athletic competition at Sub-Division level.  Participated in TV show competition at State level. PERSONAL DOSSIER
  • 4. Date of Birth : 4th October 1979 Passport Number : J9609967 Languages Known : English, Hindi and Bengali Address : M -14/1, City Park, Housing, City Centre, Durgapur, District-Burdwan, West Bengal, Pin –713216.