HISTORY OF RAILWAY
 In 15th century stone slabs wooden bulks
were laid flush with the road surface for
carriage of heavy goods loaded on the carts
and drawn by animal’s .these were called
“Tramways’. These Tramways were
extensively used in 16th century.
It was only in the year 1804 when Richard
Trevithick designed and constructed a steam
locomotive how ever could be used for
tractions on roads only
The credit of panicking the design finally
goes to George Stephenson who in the year
1814 produce the steam locomotive used for
traction Railways.
The first railway opened in India in 1853
The maiden trips of Indian soil at the first
train consisting of steam engine and for
coaches was made on 16april 1853.When it
travel 21 mile stretch between Bombay and
Thane in about 1:25 hours time.
Starting from this humble beginning the
Indian railways system becomes Giant
networking at 62,000 route KM and crisis
crossing the great country from Himalaya
foot hill in the north to Kanyakumari in the
south.
The Indian railway about 11,000 trains every day,
serving 6,990 railway station and carry about 411
million tonnes of good traffic in the year.
DIFFERENT GAUGES ON THE WORLD RAILWAY
Sr. no. Types of gauges Gauge in
mm
Names of Country
1 Standard Gauge 1434 England, USA, Canada
Europe
2 Broad Gauge (W) 1676 India, Pakistan, Brazil,
Argentina
3 Cap gauge 1067 África, Japan, Java,
Australia, New Zealand
4 Meter Gauge 1000 India, France, Switzerland,
Argentina
5 Narrow Gauge 762 India
INTRODUCTION TO P.O.H.
Indian railway now a day’s largely are
locomotives of electrical variety because at
their large advantages over locomotives
The electrical locomotive workshop (E.L.W.)
repairs and does the necessary maintains at
these engine. The locomotive comes to
E.L.W. for P.O.H. (periodic overhauling).
In India there are two P.O.H.
workshops
1) Kacharpara (near Kolkata)
Kanchrapara Workshop came into
existence in 1863.
It caters to P.O.H.requirment at central,
western and northern railways.
2) Bhusawal(M.S.)
Electric locomotive workshop Bhusawal was set
up at a cost of Rs.3.52 corers in the year 1970 to
cater to P.O.H second workshop of electrical
locomotives .
The biggest locomotives workshop Bhusawal.
CAPACITY OF E.L.W. BHUSAWAL
As newly establishment ELW bhusawal
carry out 5 loco per month but now a days
they carry out 12 loco per month.
FURTHER PLANS (ELW BHUSAWAL):-
1) POH capacity extension to 15 loco per month .
2) POH of three phase loco
3) Up gradation at EDP centre
Every locomotive brought here every six
year or 600000 of run for periodic
overhauling (POH).
As new locomotive comes after 9 years on
900000 KM of run.
Mainly drawback of that POH Bhuswal is
that only do maintenance of the loco
THE production and designing of new
loco had done only in Chittranjan
locomotive workshop (CLW)
TYPES OF LOCO AND GEAR RATIO
Type of loco Gear ratio
WAM4 58/21
WAG5 62/15
WAP1/3 58/21
WAP4 58/23
WAM4 TAO 58/21
WCAM-1/2 58/21 or 61/16
WAG5-HITACHI 64/18
WAG7-HITACHI 65/17
WCG2 74/18
WAG9 77/15Where
W-Broad Gauge
A.A.C.-Electric loco
M-Mixed Service
G-Goods Loco
CA-AC & DC LOCO
All these loco comes in (ELW) Bhusawal for periodic overhauling.
WAM4
WAG5
WAP1/3
WAP4
WCG2
WCG9
ONE LOCOMOTIVE CONTAINS MAIN
EQUIPMENT Sr. No. Name of Equipment Quantity
1 Body 1
2 Bogie 2
3 Wheel set 6
4 Traction Motor 6
5 Transformer 1
6 D.I. 1
7 B. A. panel 2
8 Rectifier 2
9 Compressor 2/3
10 Exhauster (except air break)2
11 SMGR 1
12 MVMT(Blower for T.M.) 2
13 RPS 1
14 DBR 1
15 MPS(Blower for SL) 2
16 S.L. 2
17 S.J. 3 set
18 Arno 1
19 Baby Compressor 1
20 Battery Charger 1
21 Batteries 10
22 RTPR 2
23 Main reservoir 5
24 M.P. 2
25 Buffers 4
26 C.B.C. 2
27 Pantograph 2
28 CABS 2
29 Brake arrangement 5
30 H o m 2
31 Head light 2
32 Marker Height 4
33 Parking Light 4
34 Flasher 2
35 Total valves 40
36 Brake cylinder 8/12
37 R.C. Panel 1
38 Sand boxes 8/10/12/16
39 HOM Switch 1
Sr. No. Name of Equipment Quantity
SHORT DESCRIPTION, FUNCTIONS OF THE
EQUIPMENTS USED IN A LOCO
1) Arno -
In loco there are many three phase induction
motor because at their advantages then single phase
motor but OHE supply 25 KV is single phase.
To convert single phase supply into three
phases Arno is used. The Arno converter is designed a
type of three phase squirrel cage induction motor.
2) Transformer –
To provide different voltage supply to TM
transformer with tab changer is used. In this transformer
laminated core is magnetic circuit is made having three
legs. One of the leg having auto winding and with this tab
changing connector having laminated core. Another leg is
low voltage winding in their auxiliary circuit is supplied (380
V) constantly to drive 12 auxiliaries in loco. And others are
primary and secondary winding.
CAPACITY - 3469 KV
WEIGHT - 6880 KG
TOTAL - 11.5
TONNES
TAP CHANGER WEIGHT - 0.5
TONNES
OIL WEIGHT - 1.7
TONNES
OIL CONTAIN - 2000
LITRES
3) Pantograph –
The most important function of pantograph is to make contact with OHE or
cater nary wire and collect all supply from OHE (I.e. 25 KV)
Full panto is made up of hallow
aluminium pipe and strips and it can be
hold easily with 7 Kg contact pressure. The
whole panto is controlled by two spring. The
springs are fitted at the piston at
servomotor.
The time period of touching should 65
to19 sec. And lowering time for panto is
max. 10 sec. The height of OHE from base of
panto is between 1.75 to 2 meter
4) HOM –
Indian Railway has a great safety policy. For this HOM switch is
designed in loco. It is a main switch of loco
When any maintenance is done in H>T>
Compartment HOM switch is used.
Compartment are closed and the keys are
not placed in B.V. Box pantograph key cannot
be taken out. There are 4 H.T. Compartment
keys.
5) D.J. –
D.J. is most important circuit breaker at loco D.J. helps in supplying single
phase 25 KV from pantograph to transformer. This circuit breaker having
specially that is takes very less time to open the loco circuit. To eliminate
the major fault in a loco DJ is used.
There are two types of D.J. –
i) Air blast circuit breaker
ii) Vacuum blast circuit
The time for DJ closed in 4 sec.
The time for DJ trimming is 0.02 to 0.03
sec
6) Rectifier –
Rectifier is used for converting AC into DC and
the process is known as rectification. The rectifier
uses silicon and germanium diode. It is a bridge
rectifier and have simply p-n junction.
7) S.L. (Smoothing reactor) –
D.C. voltage obtained from rectifier is not pure. It contain
little amount of A.C. pulse. It directly supply is given to T.M.
the eddy current will generate and motor get heated and also
spark and flashing occur between brush and commentator
therefore by smoothing reactor (S.L.) is provided which
absorbs A.C. pulse and gives D.C. to T.M
8) S.J. (Inductive Shunt) –
When we increased voltage with increase in tab T.M.
get sudden voltage and increases speed suddenly and
loco get jerking. To avoid this S.J. or inductive shunt
which provide smooth current and constantly to T.M. for
proper running.
9) Body
This is the main convert at locomotive. This
is made of very high strength of metal sheet.
It is also called as spinal cord of loco. It
protects all the equipment in loco form air.
Rain or dust etc.
It contains 2 cabs and all lighting system.
10) RPS (Permanent Field Resistance)
It is called as permanent field resistance. The current coming
from S.L.also not 100% pure D.C. It contain very little amount
of A.C. pulses. To absorb this pulses RPS is in parallel with T.M.
Also in case of shunting for increasing speed after 24 notches
these acts as resistance and lowers current and increases
speed at loco.
 RPS should form a current and voltage in
stator windings specially.
11) D.B.R.
When the locomotive on the sloping track then
voltage given is zero but the motor is revolving and
becomes as generator and emf is induced in a
T.M.This generated emf is directly gone to the
D.P.R. for rheostat braking(electric braking).It is
given with the help of M.P.in a braking side.
12) M.P.
It is called as master controller. We may call it as brain of
loco. When complete loco is ready and it doesn’t move without
M.P.
 M.P. contains control switches driver
handle, shunting handle, panto switch, R.F
switch and etc. It has 32 notches. As the
notches are increased the speed of loco is
increased.
13) T.M.
Traction motor is the main part of the loco. Without T. M. loco is unable to
move. Traction motor wants pure D.C. supply.
It has two main parts-
1) Armature
2) Winding
Following are the sections in ELW
Bhusawal
Erection Section
Bogie Section
Wheel Section
Recalling Section
Traction motor Section
Transformer Section
Test room Section
Pneumatic Section
Machine shop Section
R & M Section
B.A Panel Section
Mill Wright Section
Static Section
White metal Section
Inspection Section
Test Laboratory
Test room (Relay)
E.P Contactor section
Rewinding Section
DIFFERENT SECTIONS AND
RESPECTIVE FUNCTION OF ELW
•Erection Section :-
When loco comes in ELW for POH it is
comes to erection for dismantle. Assembling and
dismantling of all loco parts is carried out in this section.
After dismantling all parts are dispatched to respective
section for maintenance after completing all maintenance
work assembling of loco is done.
• Bogie Section :-
After dismantling loco bogie is send to this
section by erection section. In this section all parts are
attached from bogie frame is send for inspecting cracks.
Here wheels and traction motor are detached from
bogie and send them to respective section, where
overhauling of parts is done.
•Wheel Section :-
In this section wheel comes from bogie
sections. Here axle box and set are dismantle
and necessary operation are done on wheel
disc and axle box, with help of different
machines.
• Recalling Section :-
When whole body is checked and certificate from
erection section, it comes to recalling section. There are 15000
central cables so many power cables. All the cables have
number on both sides so that they can be connected after
overhauling at proper places. Elastomeric cables used for these
purpose of different diameter.
• Traction Motor Section :-
In this section relating traction motor all maintenance
including bearing and armature maintenance is carried out.
Different test are carried out on T.M. in this section.
 Tan θ Test :-
It is used for finding condition of insulation and is
angle between inductive and capacitive current. So value tan
θ must be minimum.
 Surge Voltage Test :-
In this test momentarily high voltage of applied to
T.M. and graph observed on CRO.
 H.V. Test :-
In this test 2.5 KV voltage applied to T.M. see the
leakage current.
 H.V. Test :-
In this test 2.5 KV voltage applied to T.M. see the
leakage current.
Balancing Test :-
Any rotor with an uneven distribution of mass
about its axis of rotation has an unbalance. It deteriorates
the bearing. So balancing test done on motor. The
balancing machine directly gives the weight to be added
and angle at which weight added.
 Run Test :-
In this test rated supply is given to motor and run it
for 2 hours. In between these vibration in motor, temp.
And motor, noise in rotor are observed. After completing
tests if armature and field winding are found OK. Then
they are assembled. If there is any disturb in field winding
replacement
A] Same resistance
B] Same inductance
C] No one winding open
D] No winding grounded
Growler test-
There is half stator when supply is given to stator it
produce flux. As rotor shorted close circuit formed so it acts as
electromagnet. If rotor is OK it attracts iron parts so it tests rotor.
• Transformer section –
In this section maintenance of transformer is done
following function are done in this section.
I] dismantling all parts of transformer
ii] Checking insulation of winding
iii] Breaking down voltage test on insulating oil
IV] Cleaning bushing
v] Cleaning winding
vi] Replacement oil
vii] Cleaning fins of cooling
viii] H.V. test
In HV test 380 V supply is given to auxiliary winding
so 25 KV we get across primary and by changing
taps the voltage across each tap is taken and check
for temperature rise.
•Test Room (DJ &S.M.G.R.) section –
The maintenance and overhauling of main component of loco DJ and
S.M.G.R. is done.
i] Checking of opening and closing time for DJ at particular air pressure.
ii] Checking S.M.G.R.
•Pneumatic Section –
There are 40 different valves are fitted in a loco.
All leakage or any problem are removed in this section and
make them fully efficient. In this section also overhauling of
horn is done. As all loco circuit is electro pneumatic.
Pneumatic section is the heart of loco and ELW.
•Machine Shop Section –
In this section all little and small quantity work is done.
Such as turning, drilling, tapering, shaping milling, threading, etc.
I] Centre lathe 5
ii] HMT machine 3
iii] Turrelathe machine 3
iv] Drilling machine 2
v] Milling machine 5
vi] GD2 lathe 2
vii] Surface grinder 1
viii] Shaper machine 2
ix] Sloter machine 2
•R and M section –
When loco is damaged or burned then repair and maintenance is
carried out in this section. It contain –
i] Press machine for bending
ii] Sharing machine for cutting
• BA panel section -
In this section BA panel in the loco are overhauled. Total
maintenance of reversal switch and other equipment is done.
•Mill Wright section-
All machine in machine shop, cranes are under mill weight
section. So maintenance of all these are done in this section. It is very
important section as it maintains all machines in good condition.
• Static section –
It involves maintenance of rectifier RPS, DBR, MSR, R118. After
doing all overhauls they send equipment to erection section
•White Metal Section –
This section includes casting of white metal
to suspension bearing brass bearing and other
equipments.
•Inspection section –
Whenever any locomotive comes to POH for
overhauling. First incoming test are done and seen all
equipments and test them. After that each equipment is
dispatched to particular section. After complete
assembly first HL tests are done and then H.T. tests
done on locomotive. After inspection loco dispatched to
customer.
•Test Lab -
Test lab is the most important part of ELW, Bhusawal when the new
equipment comes in ELW. All testing of sample piece is done here. After
certification of this department all stock is distributed to respective section.
Various tests are done in this section some of them are as follows:
•Non destructive Testing (NDT) –
•Ultrasonic testing
•RPDT (Red, penetrate dye test)
Ultrasonic Testing –
It is carried with the help of ultrasonic flow detector machine
used. This principle behind ultrasonic testing is based on piezoelectric
effect.
 RPDT--
The kit is having 3 can –
•Cleaner
•Red dye
•Developer
Principle based on capillary action.
•Test Room -
In test room (relay) section all relays which are
used in loco first inspected and then necessary overhauling
is done on that relay.
•Rewinding section -
In rewinding section winding of aux motors and
traction motors field winding if damaged or burned are
rewound or replaced
•E.P. contactor section –
E.P. contactor means electro pneumatic contactor. In
this section different tests conducted on E.P. contactor like –
Checking operation by electrical
Checking operation pneumatically
M.V. drop test
This test is used to see how perfectly the contact of
contactor makes contacts. This voltage drop is to leakage current If
contacts are perfect then there is no leakage current so voltage drop
across contactor reduced permissible limit of voltage drop.
In case line contactor - 4 to 6 mV
Shunt contactor - 12 mV
CONCLUSION
The Industrial training helps student to experience working
environment of industry & evoked in yourself technical
thinking and develop ability to understand basic factor.
So this training taught many new technique & procedure
of such a big organization.
It helped me to learn co-ordination between department,
organizations and communication between different levels of
organization.
References
Utilization of Electric Power & Electric Traction ( J.B. Gupta )
Electric Traction ( J. P. Ghodse)
Elements of Electric traction ( L. W. Gant)
Electric Traction Railways (Sir Philip Dawson’s)
NikhilYadav ( Training ppt)

More Related Content

What's hot

Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadVishal Dubey
 
Training ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksTraining ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksDhruv Upadhaya
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco ShedAarti Ojha
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final studentsPiyush Saini
 
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA ABDUS SAMAD
 
Electrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurElectrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurAkash Karol
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotiveAkash Singh
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpurkalumutha
 
Traction machine shed
Traction machine shedTraction machine shed
Traction machine shedNeeraj Kumar
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTRavindra Rawat
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotiveRinku Sharma
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDPruthvi Raj
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabadPalash Awasthi
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technologyRajneesh Budania
 
NOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKANOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKADeepak kango
 

What's hot (19)

Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
 
Training ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive WorksTraining ppt on Chittaranjan Locomotive Works
Training ppt on Chittaranjan Locomotive Works
 
Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
 
Electrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurElectrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopur
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotive
 
Indian Railway
Indian Railway Indian Railway
Indian Railway
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
 
Niraj ppt
Niraj pptNiraj ppt
Niraj ppt
 
Traction machine shed
Traction machine shedTraction machine shed
Traction machine shed
 
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPTBHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
BHARAT HEAVY ELECTRICALS LIMITED.JHANSI LOCOMOTIVE PPT
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotive
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
 
Engine control
Engine controlEngine control
Engine control
 
The diesel locomotive
The diesel locomotiveThe diesel locomotive
The diesel locomotive
 
Abes engineering college ghaziabad
Abes engineering college  ghaziabadAbes engineering college  ghaziabad
Abes engineering college ghaziabad
 
Diesel locomotive technology
Diesel locomotive technologyDiesel locomotive technology
Diesel locomotive technology
 
NOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKANOTHERN RAILWAY DIESEL SHED KALKA
NOTHERN RAILWAY DIESEL SHED KALKA
 

Viewers also liked

Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTCRohit Dave
 
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7Aayush Singhal
 
Types of locomotives in indian railways
Types of locomotives in indian railwaysTypes of locomotives in indian railways
Types of locomotives in indian railwaysSrinivasaRao Guduru
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiPrabjeet Singh
 

Viewers also liked (6)

POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
 
Transformer & OLTC
Transformer & OLTCTransformer & OLTC
Transformer & OLTC
 
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
Aayush_loco report-PNEUMATIC SYSTEMS IN WAG-7
 
Sandeep
SandeepSandeep
Sandeep
 
Types of locomotives in indian railways
Types of locomotives in indian railwaysTypes of locomotives in indian railways
Types of locomotives in indian railways
 
Electric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New DelhiElectric Loco Shed, Tughlakabad, New Delhi
Electric Loco Shed, Tughlakabad, New Delhi
 

Similar to NikhilYadav ( Training ppt)

Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPURShivesh Ranjan
 
Railway workshop jhansi
Railway workshop jhansiRailway workshop jhansi
Railway workshop jhansiAnkur Savita
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)babai das
 
ppt of summer traning nwr jaipur
ppt of summer traning nwr jaipurppt of summer traning nwr jaipur
ppt of summer traning nwr jaipur7597861730
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotivesiva1501
 
WCR Kota junction internship ppt
WCR Kota junction internship pptWCR Kota junction internship ppt
WCR Kota junction internship pptSiddhantMishra43
 
Distribution of power supply in indian railway
Distribution of power supply in indian railwayDistribution of power supply in indian railway
Distribution of power supply in indian railwaySurajit Mondal
 
Kota super thermal power plant training report
Kota super thermal power plant training reportKota super thermal power plant training report
Kota super thermal power plant training reportAvinash Kumawat
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Ajeet Chaurasia
 
presentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowpresentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowTushar Seth
 
Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer TraningGaurav Singh
 
Training report trw
Training report trwTraining report trw
Training report trwChandan Garg
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail CorporationAnkit Chaudhary
 
Overhead railway traction
Overhead railway tractionOverhead railway traction
Overhead railway tractionProbodh Mallick
 

Similar to NikhilYadav ( Training ppt) (20)

Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
Traction motor
Traction motorTraction motor
Traction motor
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
Railway workshop jhansi
Railway workshop jhansiRailway workshop jhansi
Railway workshop jhansi
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
ppt of summer traning nwr jaipur
ppt of summer traning nwr jaipurppt of summer traning nwr jaipur
ppt of summer traning nwr jaipur
 
Railway ppt
Railway pptRailway ppt
Railway ppt
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotive
 
WCR Kota junction internship ppt
WCR Kota junction internship pptWCR Kota junction internship ppt
WCR Kota junction internship ppt
 
Distribution of power supply in indian railway
Distribution of power supply in indian railwayDistribution of power supply in indian railway
Distribution of power supply in indian railway
 
finalseminar.docx
finalseminar.docxfinalseminar.docx
finalseminar.docx
 
Presentation (BHEL)
Presentation (BHEL)Presentation (BHEL)
Presentation (BHEL)
 
Kota super thermal power plant training report
Kota super thermal power plant training reportKota super thermal power plant training report
Kota super thermal power plant training report
 
Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)Summer Training Report Ntpc barh (ajeet)
Summer Training Report Ntpc barh (ajeet)
 
presentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknowpresentation industrial trainning at Locomotive workshop lucknow
presentation industrial trainning at Locomotive workshop lucknow
 
Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer Traning
 
Training report trw
Training report trwTraining report trw
Training report trw
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail Corporation
 
Overhead railway traction
Overhead railway tractionOverhead railway traction
Overhead railway traction
 

NikhilYadav ( Training ppt)

  • 1.
  • 2. ELECTRIC LOCOMOTIVE WORKSHOP BHUSAWAL (P.O.H.) Submitted By: NIKHIL YADAV BE(E&Tc)
  • 3.  History of Railway Introduction of POH Types of loco Loco contents Section of ELW Functions of the equipments used in loco Wheel section Bogie section Conclusion Reference
  • 4. HISTORY OF RAILWAY  In 15th century stone slabs wooden bulks were laid flush with the road surface for carriage of heavy goods loaded on the carts and drawn by animal’s .these were called “Tramways’. These Tramways were extensively used in 16th century. It was only in the year 1804 when Richard Trevithick designed and constructed a steam locomotive how ever could be used for tractions on roads only
  • 5. The credit of panicking the design finally goes to George Stephenson who in the year 1814 produce the steam locomotive used for traction Railways. The first railway opened in India in 1853 The maiden trips of Indian soil at the first train consisting of steam engine and for coaches was made on 16april 1853.When it travel 21 mile stretch between Bombay and Thane in about 1:25 hours time.
  • 6. Starting from this humble beginning the Indian railways system becomes Giant networking at 62,000 route KM and crisis crossing the great country from Himalaya foot hill in the north to Kanyakumari in the south. The Indian railway about 11,000 trains every day, serving 6,990 railway station and carry about 411 million tonnes of good traffic in the year.
  • 7. DIFFERENT GAUGES ON THE WORLD RAILWAY Sr. no. Types of gauges Gauge in mm Names of Country 1 Standard Gauge 1434 England, USA, Canada Europe 2 Broad Gauge (W) 1676 India, Pakistan, Brazil, Argentina 3 Cap gauge 1067 África, Japan, Java, Australia, New Zealand 4 Meter Gauge 1000 India, France, Switzerland, Argentina 5 Narrow Gauge 762 India
  • 8. INTRODUCTION TO P.O.H. Indian railway now a day’s largely are locomotives of electrical variety because at their large advantages over locomotives The electrical locomotive workshop (E.L.W.) repairs and does the necessary maintains at these engine. The locomotive comes to E.L.W. for P.O.H. (periodic overhauling).
  • 9. In India there are two P.O.H. workshops 1) Kacharpara (near Kolkata) Kanchrapara Workshop came into existence in 1863. It caters to P.O.H.requirment at central, western and northern railways.
  • 10. 2) Bhusawal(M.S.) Electric locomotive workshop Bhusawal was set up at a cost of Rs.3.52 corers in the year 1970 to cater to P.O.H second workshop of electrical locomotives . The biggest locomotives workshop Bhusawal.
  • 11. CAPACITY OF E.L.W. BHUSAWAL As newly establishment ELW bhusawal carry out 5 loco per month but now a days they carry out 12 loco per month. FURTHER PLANS (ELW BHUSAWAL):- 1) POH capacity extension to 15 loco per month . 2) POH of three phase loco 3) Up gradation at EDP centre Every locomotive brought here every six year or 600000 of run for periodic overhauling (POH). As new locomotive comes after 9 years on 900000 KM of run.
  • 12. Mainly drawback of that POH Bhuswal is that only do maintenance of the loco THE production and designing of new loco had done only in Chittranjan locomotive workshop (CLW)
  • 13. TYPES OF LOCO AND GEAR RATIO Type of loco Gear ratio WAM4 58/21 WAG5 62/15 WAP1/3 58/21 WAP4 58/23 WAM4 TAO 58/21 WCAM-1/2 58/21 or 61/16 WAG5-HITACHI 64/18 WAG7-HITACHI 65/17 WCG2 74/18 WAG9 77/15Where W-Broad Gauge A.A.C.-Electric loco M-Mixed Service G-Goods Loco CA-AC & DC LOCO All these loco comes in (ELW) Bhusawal for periodic overhauling.
  • 17. ONE LOCOMOTIVE CONTAINS MAIN EQUIPMENT Sr. No. Name of Equipment Quantity 1 Body 1 2 Bogie 2 3 Wheel set 6 4 Traction Motor 6 5 Transformer 1 6 D.I. 1 7 B. A. panel 2 8 Rectifier 2 9 Compressor 2/3 10 Exhauster (except air break)2 11 SMGR 1 12 MVMT(Blower for T.M.) 2 13 RPS 1 14 DBR 1 15 MPS(Blower for SL) 2 16 S.L. 2 17 S.J. 3 set 18 Arno 1 19 Baby Compressor 1 20 Battery Charger 1
  • 18. 21 Batteries 10 22 RTPR 2 23 Main reservoir 5 24 M.P. 2 25 Buffers 4 26 C.B.C. 2 27 Pantograph 2 28 CABS 2 29 Brake arrangement 5 30 H o m 2 31 Head light 2 32 Marker Height 4 33 Parking Light 4 34 Flasher 2 35 Total valves 40 36 Brake cylinder 8/12 37 R.C. Panel 1 38 Sand boxes 8/10/12/16 39 HOM Switch 1 Sr. No. Name of Equipment Quantity
  • 19. SHORT DESCRIPTION, FUNCTIONS OF THE EQUIPMENTS USED IN A LOCO 1) Arno - In loco there are many three phase induction motor because at their advantages then single phase motor but OHE supply 25 KV is single phase. To convert single phase supply into three phases Arno is used. The Arno converter is designed a type of three phase squirrel cage induction motor.
  • 20. 2) Transformer – To provide different voltage supply to TM transformer with tab changer is used. In this transformer laminated core is magnetic circuit is made having three legs. One of the leg having auto winding and with this tab changing connector having laminated core. Another leg is low voltage winding in their auxiliary circuit is supplied (380 V) constantly to drive 12 auxiliaries in loco. And others are primary and secondary winding. CAPACITY - 3469 KV WEIGHT - 6880 KG TOTAL - 11.5 TONNES TAP CHANGER WEIGHT - 0.5 TONNES OIL WEIGHT - 1.7 TONNES OIL CONTAIN - 2000 LITRES
  • 21. 3) Pantograph – The most important function of pantograph is to make contact with OHE or cater nary wire and collect all supply from OHE (I.e. 25 KV) Full panto is made up of hallow aluminium pipe and strips and it can be hold easily with 7 Kg contact pressure. The whole panto is controlled by two spring. The springs are fitted at the piston at servomotor. The time period of touching should 65 to19 sec. And lowering time for panto is max. 10 sec. The height of OHE from base of panto is between 1.75 to 2 meter
  • 22. 4) HOM – Indian Railway has a great safety policy. For this HOM switch is designed in loco. It is a main switch of loco When any maintenance is done in H>T> Compartment HOM switch is used. Compartment are closed and the keys are not placed in B.V. Box pantograph key cannot be taken out. There are 4 H.T. Compartment keys.
  • 23. 5) D.J. – D.J. is most important circuit breaker at loco D.J. helps in supplying single phase 25 KV from pantograph to transformer. This circuit breaker having specially that is takes very less time to open the loco circuit. To eliminate the major fault in a loco DJ is used. There are two types of D.J. – i) Air blast circuit breaker ii) Vacuum blast circuit The time for DJ closed in 4 sec. The time for DJ trimming is 0.02 to 0.03 sec
  • 24. 6) Rectifier – Rectifier is used for converting AC into DC and the process is known as rectification. The rectifier uses silicon and germanium diode. It is a bridge rectifier and have simply p-n junction.
  • 25. 7) S.L. (Smoothing reactor) – D.C. voltage obtained from rectifier is not pure. It contain little amount of A.C. pulse. It directly supply is given to T.M. the eddy current will generate and motor get heated and also spark and flashing occur between brush and commentator therefore by smoothing reactor (S.L.) is provided which absorbs A.C. pulse and gives D.C. to T.M
  • 26. 8) S.J. (Inductive Shunt) – When we increased voltage with increase in tab T.M. get sudden voltage and increases speed suddenly and loco get jerking. To avoid this S.J. or inductive shunt which provide smooth current and constantly to T.M. for proper running.
  • 27. 9) Body This is the main convert at locomotive. This is made of very high strength of metal sheet. It is also called as spinal cord of loco. It protects all the equipment in loco form air. Rain or dust etc. It contains 2 cabs and all lighting system.
  • 28. 10) RPS (Permanent Field Resistance) It is called as permanent field resistance. The current coming from S.L.also not 100% pure D.C. It contain very little amount of A.C. pulses. To absorb this pulses RPS is in parallel with T.M. Also in case of shunting for increasing speed after 24 notches these acts as resistance and lowers current and increases speed at loco.  RPS should form a current and voltage in stator windings specially.
  • 29. 11) D.B.R. When the locomotive on the sloping track then voltage given is zero but the motor is revolving and becomes as generator and emf is induced in a T.M.This generated emf is directly gone to the D.P.R. for rheostat braking(electric braking).It is given with the help of M.P.in a braking side.
  • 30. 12) M.P. It is called as master controller. We may call it as brain of loco. When complete loco is ready and it doesn’t move without M.P.  M.P. contains control switches driver handle, shunting handle, panto switch, R.F switch and etc. It has 32 notches. As the notches are increased the speed of loco is increased.
  • 31. 13) T.M. Traction motor is the main part of the loco. Without T. M. loco is unable to move. Traction motor wants pure D.C. supply. It has two main parts- 1) Armature 2) Winding
  • 32. Following are the sections in ELW Bhusawal Erection Section Bogie Section Wheel Section Recalling Section Traction motor Section Transformer Section Test room Section Pneumatic Section Machine shop Section R & M Section B.A Panel Section Mill Wright Section Static Section White metal Section Inspection Section Test Laboratory Test room (Relay) E.P Contactor section Rewinding Section
  • 33. DIFFERENT SECTIONS AND RESPECTIVE FUNCTION OF ELW •Erection Section :- When loco comes in ELW for POH it is comes to erection for dismantle. Assembling and dismantling of all loco parts is carried out in this section. After dismantling all parts are dispatched to respective section for maintenance after completing all maintenance work assembling of loco is done.
  • 34. • Bogie Section :- After dismantling loco bogie is send to this section by erection section. In this section all parts are attached from bogie frame is send for inspecting cracks. Here wheels and traction motor are detached from bogie and send them to respective section, where overhauling of parts is done.
  • 35. •Wheel Section :- In this section wheel comes from bogie sections. Here axle box and set are dismantle and necessary operation are done on wheel disc and axle box, with help of different machines. • Recalling Section :- When whole body is checked and certificate from erection section, it comes to recalling section. There are 15000 central cables so many power cables. All the cables have number on both sides so that they can be connected after overhauling at proper places. Elastomeric cables used for these purpose of different diameter.
  • 36. • Traction Motor Section :- In this section relating traction motor all maintenance including bearing and armature maintenance is carried out. Different test are carried out on T.M. in this section.  Tan θ Test :- It is used for finding condition of insulation and is angle between inductive and capacitive current. So value tan θ must be minimum.  Surge Voltage Test :- In this test momentarily high voltage of applied to T.M. and graph observed on CRO.  H.V. Test :- In this test 2.5 KV voltage applied to T.M. see the leakage current.
  • 37.  H.V. Test :- In this test 2.5 KV voltage applied to T.M. see the leakage current. Balancing Test :- Any rotor with an uneven distribution of mass about its axis of rotation has an unbalance. It deteriorates the bearing. So balancing test done on motor. The balancing machine directly gives the weight to be added and angle at which weight added.  Run Test :- In this test rated supply is given to motor and run it for 2 hours. In between these vibration in motor, temp. And motor, noise in rotor are observed. After completing tests if armature and field winding are found OK. Then they are assembled. If there is any disturb in field winding replacement A] Same resistance B] Same inductance C] No one winding open D] No winding grounded
  • 38. Growler test- There is half stator when supply is given to stator it produce flux. As rotor shorted close circuit formed so it acts as electromagnet. If rotor is OK it attracts iron parts so it tests rotor.
  • 39. • Transformer section – In this section maintenance of transformer is done following function are done in this section. I] dismantling all parts of transformer ii] Checking insulation of winding iii] Breaking down voltage test on insulating oil IV] Cleaning bushing v] Cleaning winding vi] Replacement oil vii] Cleaning fins of cooling viii] H.V. test In HV test 380 V supply is given to auxiliary winding so 25 KV we get across primary and by changing taps the voltage across each tap is taken and check for temperature rise.
  • 40. •Test Room (DJ &S.M.G.R.) section – The maintenance and overhauling of main component of loco DJ and S.M.G.R. is done. i] Checking of opening and closing time for DJ at particular air pressure. ii] Checking S.M.G.R.
  • 41. •Pneumatic Section – There are 40 different valves are fitted in a loco. All leakage or any problem are removed in this section and make them fully efficient. In this section also overhauling of horn is done. As all loco circuit is electro pneumatic. Pneumatic section is the heart of loco and ELW.
  • 42. •Machine Shop Section – In this section all little and small quantity work is done. Such as turning, drilling, tapering, shaping milling, threading, etc. I] Centre lathe 5 ii] HMT machine 3 iii] Turrelathe machine 3 iv] Drilling machine 2 v] Milling machine 5 vi] GD2 lathe 2 vii] Surface grinder 1 viii] Shaper machine 2 ix] Sloter machine 2
  • 43. •R and M section – When loco is damaged or burned then repair and maintenance is carried out in this section. It contain – i] Press machine for bending ii] Sharing machine for cutting • BA panel section - In this section BA panel in the loco are overhauled. Total maintenance of reversal switch and other equipment is done.
  • 44. •Mill Wright section- All machine in machine shop, cranes are under mill weight section. So maintenance of all these are done in this section. It is very important section as it maintains all machines in good condition. • Static section – It involves maintenance of rectifier RPS, DBR, MSR, R118. After doing all overhauls they send equipment to erection section
  • 45. •White Metal Section – This section includes casting of white metal to suspension bearing brass bearing and other equipments. •Inspection section – Whenever any locomotive comes to POH for overhauling. First incoming test are done and seen all equipments and test them. After that each equipment is dispatched to particular section. After complete assembly first HL tests are done and then H.T. tests done on locomotive. After inspection loco dispatched to customer.
  • 46. •Test Lab - Test lab is the most important part of ELW, Bhusawal when the new equipment comes in ELW. All testing of sample piece is done here. After certification of this department all stock is distributed to respective section. Various tests are done in this section some of them are as follows: •Non destructive Testing (NDT) – •Ultrasonic testing •RPDT (Red, penetrate dye test) Ultrasonic Testing – It is carried with the help of ultrasonic flow detector machine used. This principle behind ultrasonic testing is based on piezoelectric effect.  RPDT-- The kit is having 3 can – •Cleaner •Red dye •Developer Principle based on capillary action.
  • 47. •Test Room - In test room (relay) section all relays which are used in loco first inspected and then necessary overhauling is done on that relay. •Rewinding section - In rewinding section winding of aux motors and traction motors field winding if damaged or burned are rewound or replaced
  • 48. •E.P. contactor section – E.P. contactor means electro pneumatic contactor. In this section different tests conducted on E.P. contactor like – Checking operation by electrical Checking operation pneumatically M.V. drop test This test is used to see how perfectly the contact of contactor makes contacts. This voltage drop is to leakage current If contacts are perfect then there is no leakage current so voltage drop across contactor reduced permissible limit of voltage drop. In case line contactor - 4 to 6 mV Shunt contactor - 12 mV
  • 49. CONCLUSION The Industrial training helps student to experience working environment of industry & evoked in yourself technical thinking and develop ability to understand basic factor. So this training taught many new technique & procedure of such a big organization. It helped me to learn co-ordination between department, organizations and communication between different levels of organization.