1. Telecoms. Power Engineer
Ericsson
Present Role: Working with the customer to make sure that node-B material shipment received in WH tallied
with the customer invoice. In charge of Material Deployment and tracking the material usage. Site kitting and
all related power issues .
2011 – 2015 (4 years)
Complete end to end management of passive service deliveries on BTS sites and core locations. Deliveries such
as janitorial, Perimeter fence maintenance, Battery maintenance, DG maintenance, grid, tower and site
infrastructure.
Monitoring and effecting the service level agreement on maintenance contractors for the management and
maintenance of site infrastructures for Airtel /Ericsson BTS sites network
Performing periodic job inspections to make sure that the scope is adhere to and all power projects under
supervision meet their targeted implementation time lines.
Preventive and corrective maintenance fulfillment on all passive network devices/element within the network
to ensure 99.9% power/network availability
Planning and coordinating the replacement old DG's, air-conditioners, bad batteries ,transformers, control
panels ,inverters UPS etc.
Very keen in KPI fulfillment, vendor management and efficient strategies in fuel management base on daily
tracking of fuel availability on consumption per hour (cph)
Electrical Power Engineer
Sierra Rutile Company- Mobimbi-Sierra Leone
2008- 2010
As an Electrical Engineer managing the SEIRRA RUTILE new power station on full automation on SCADA
control system, PLC technology was extensively used for local intelligence and the processing of analog signals
(-20mA , - or+ 10V) using SCADA software. All the main components in power system automation were PLC
controlled.
• Electrical Protection ( opening and closing of switch gears )
2. • Control ( remote and local)
• Measurement (voltages, current, power, power factor, transformer or motor temperature)
• Monitoring
• Data communication.
Good knowledge in trouble shooting and restoring fault in PLC automated control system under severe
pressure and urgency .Tremendous knowledge in team work backed with records in keeping with factory
health and safety regulation in a work environment . Had supervised the installation, maintenance, repairs and
service of four MARK/CARTERPILLAR engines for RUTILE mines each of 8 Megawatts capacity. Appreciable
knowledge in automation and controls Engineering acquired from 2 months of intensive hand on experience at
ARIES POWER PLANT Ltd, Estuary works, Walton Avenue, Felixstowe IP118HH, England.
Engineer and Senior Engineer
1992-2008
Telecommunication power plant maintenance Engineer
Maintenance Engineer with a centralized maintenance team in DG maintenance, Aircons. Maintenance,
Battery maintenance , Electrical /Electronics devices and Electrical installations. Vast knowledge in solar power
installation for BTS sites