WBC
Environmental Site Inspection
Checklist
Form Number : EF-EI04-01
Revision Number : 1
Date : 1-1-2006
Page 1
Note : This form is designed for general use and may not be exhaustive. Modifications and
additions may be necessary to suit individual projects and to address specific environmental
issues and associated mitigation measures.
Project : Project contract no. CV/2006/01 Site Location : Stanley Bay
Construction stage / status during inspection : Phase 1 โ€“ Drainage & Road works
Inspection Date : 25 January 2006 Inspection Time : 0900 โ€“ 1500
Inspected by : CY Tam (Project Environmental Engineer) Weather : Dry & cold
Inspection Items
Implemented?
N/A
Remarks
(i.e. specify location, good practices,
problem observed, possible cause of
nonconformity and/or proposed
corrective/preventative actions)
Yes No*
1. Air Pollution Control
1.1. Are the construction sites
watered to minimize dust
generated?
๏
1.2. Are stockpiles of dusty materials
(size with more than 20 bags
cement) covered or watered?
๏
1.3. Cement debagging process
undertaken in sheltered areas
๏
1.4. Are all vehicles carrying dusty
loads covered/watered over prior
to leaving the site?
๏
1.5. Are demolition work areas
watered? (e.g. trimming activities
by using breaker)
๏
1.6. Are dusty roads paved and/or
sprayed with water?
๏
1.7. Are dust controlled during
percussive drilling or rock
breaking?
๏
1.8. Are plant and equipment well
maintained? (any black smoke
observed, please indicate the
plant/equipment and location)
๏
1.9. Is dark smoke controlled from
plant?
๏
1.10. Are there enclosures around the
main dust-generating activities?
(e.g. grout mixing)
๏
1.11. Hoarding (not <2.4m) provided
along boundaries and properly
maintained (any damage /
opening observed, please
indicate the location).
๏
1.12. Are speed control measures
applied? (e.g. speed limit sign)
๏
1.13. Others (please specify)
WBC
Environmental Site Inspection
Checklist
Form Number : EF-EI04-01
Revision Number : 1
Date : 1-1-2006
Page 2
Inspection Items
Implemented?
N/A
Remarks
(i.e. specify location, good practices,
problem observed, possible cause of
nonconformity and/or proposed
corrective/preventative actions)
Yes No*
2. Water Pollution Control
2.1. Are water discharge licenses
valid?
๏
2.2. Are conditions of the license
compiled with? (check the
monitoring records and observe
physically)
๏
2.3. Are wastewater treatment system
being used and properly
maintained on site? (e.g. desilting
tank)
๏
2.4. Are there any wastewater
discharged to the stormdrains? Is
the wastewater being treated?
๏
2.5. Are measures provided to
properly direct effluent to silt
removal facilities? (e.g. provide
earth bunds / U-channels)
๏
2.6. Are u-channels and manholes
free of silt and sediment?
๏
2.7. Are sedimentation traps and
tanks free of silt and sediment?
๏
2.8. Are all manholes on-site covered
and sealed?
๏
2.9. Are sandbags/earth bund
adopted to prevent washing away
of sand/silt and wastewater to
drains, catchpit, public road and
footpath?
๏
2.10. Are vehicles and plants cleaned
before leaving the site?
๏
2.11. Are wheel washing facilities well
maintained to prevent overflow,
flooding sediment?
๏
2.12. Is sand and silt settled out in
wheel washing bay and
removed?
๏
2.13. Is the public road/area around the
site entrance and site hoarding
kept clean and free of muddy
water?
๏
2.14. Is domestic water directed to
septic tanks or chemical toilets? ๏
2.15. Others (please specify)
WBC
Environmental Site Inspection
Checklist
Form Number : EF-EI04-01
Revision Number : 1
Date : 1-1-2006
Page 3
Inspection Items
Implemented?
N/A
Remarks
(i.e. specify location, good practices,
problem observed, possible cause of
nonconformity and/or proposed
corrective/preventative actions)
Yes No*
3. Noise Control
3.1. Is the CNP (Construction Noise
Permit) valid for work during
restricted hours?
๏
3.2. Are copies of the valid
Construction Noise Permits
posted at site entrance/exit?
๏
3.3. Do air compressors and
generators operate with doors
closed?
๏
3.4. Is idle plant/equipment turned off
or throttled down?
๏
3.5. Do air compressors and hand-
held breakers have valid noise
emission labels (NEL)?
๏
3.6. Any noise mitigation measures
adopted (e.g. use noise barrier /
enclosure)?
๏
3.7. Are silenced equipments utilized? ๏
3.8. Others (please specify)
4. Waste Management
4.1. Is the site kept clean and tidy?
(e.g. litter free, good
housekeeping)
๏
4.2. Are separate chutes used for
inert and non-inert wastes?
๏
4.3. Are separated labelled containers
/ areas provided for facilitating
recycling and waste segregation?
๏
4.4. Are construction wastes /
recyclable wastes and general
refuse removed off site regularly?
๏
4.5. Are construction wastes collected
and disposed of properly by
licensed collectors?
๏
4.6. Are chemical wastes, if any,
collected and disposed of
properly by licensed collectors?
๏
4.7. Does chemical waste producer
license covers all major chemical
wastes produced on site?
๏
4.8. Are chemical wastes properly
stored and labelled?
๏
4.9. Are oil drums and
plants/equipments provided with
drip trays?
๏
WBC
Environmental Site Inspection
Checklist
Form Number : EF-EI04-01
Revision Number : 1
Date : 1-1-2006
Page 4
Inspection Items
Implemented?
N/A
Remarks
(i.e. specify location, good practices,
problem observed, possible cause of
nonconformity and/or proposed
corrective/preventative actions)
Yes No*
4.10. Are drip trays free of oil and
water?
๏
4.11. Is there any oil spillage? Clean-
up the contaminated soil
immediately?
๏
4.12. Is litter, foam or other
objectionable matters in nearby
water drain/sewer cleaned?
๏
4.13. Are asbestos wastes handled by
registered professionals?
๏
4.14. Others (please specify)
5. Storage of Chemicals and Dangerous Goods
5.1. Are chemicals stored and
labelled properly?
๏
5.2. Does storage of DG comply with
license conditions (include types
and quantities if DG store is
available, check the DG store
license)?
๏
5.3. Are proper measures to control
oil spillage during maintenance or
to control other chemicals
spillage? (e.g. provide drip trays)
๏
5.4. Are spill kits / sand / saw dust
used for absorbing chemical
spillage readily accessible?
๏
5.5. Others (please specify)
6. Protection of Flora, Fauna and Historical Heritage
6.1. Are disturbance to terrestrial flora
minimized (e.g. plants to be
preserved)?
๏
6.2. Are disturbance to terrestrial
fauna minimized (if rare species
identified)?
๏
6.3. Any historical heritage exists on
site? If yes, ensure appropriate
measures taken to preserve it
๏
6.4. Others (please specify)
7. Resource Conservation
7.1. Is water recycled wherever
possible for dust suppression? ๏
WBC
Environmental Site Inspection
Checklist
Form Number : EF-EI04-01
Revision Number : 1
Date : 1-1-2006
Page 5
Inspection Items
Implemented?
N/A
Remarks
(i.e. specify location, good practices,
problem observed, possible cause of
nonconformity and/or proposed
corrective/preventative actions)
Yes No*
7.2. Is water pipe leakage and
wastage prevented? ๏
7.3. Are diesel-powered plants and
equipments shut off while not in
use to reduce excessive use?
๏
7.4. Are energy conservation
practices adopted? ๏
7.5. Are metal or other alternatives
used to minimize the use of
timber?
๏
7.6. Are materials stored in good
condition to prevent deterioration
and wastage (e.g. covered,
separated)?
๏
7.7. Are pesticides used under the
requirement of Agriculture,
Fishers and Conservation
Department?
๏
7.8. Others (please specify)
8. Emergency Preparedness and Response
8.1. Are fire extinguishers / fighting
facilities properly maintained and
not expired? Escape not blocked
/ obstructed?
๏
8.2. Are accidents and incidents
reported and reviewed, and
corrective & preventive actions
identified and recorded?
๏
8.3. Others (please specify)
*Any โ€œNoโ€ recorded represents the potential breach of regulation or improvement needed
and details of nonconformity (NC) shall be recorded in the Remarks.
* Report NC in the following forms. Each NC should make reference into the checklist as
coded. The responsible personnel shall identify the root cause of NC and adopt appropriate
corrective and preventive actions (CPA) for mitigation. Confirmation of the effectiveness of
the CPA shall be verified by Project Manager within an agreed time.
Signature of Site Inspector Date 5 Jan 2006
Reviewed by Project Manager Date 7 Jan 2006
WBC
Environmental Site Inspection
Checklist
Form Number : EF-EI04-01
Revision Number : 1
Date : 1-1-2006
Page 6
Improvement Request:
Project Site Location
Inspection Date Inspected by
NC Reference
Description of NC
Root cause of NC
CPA adopted Target
completion date
Verified by PEO (Date)
NC Reference
Description of NC
Root cause of NC
CPA adopted Target
completion date
Verified by PEO (Date)
NC Reference
Description of NC
Root cause of NC
CPA adopted Target
completion date
Verified by PEO (Date)

More Related Content

Similar to EF-EI04-01.doc

Quality control audit for RMC Plants
Quality control audit for RMC PlantsQuality control audit for RMC Plants
Quality control audit for RMC PlantsRajendraDutta2
ย 
Contaminated land management in Malaysia: Policies and legal framework
Contaminated land management in Malaysia: Policies and legal frameworkContaminated land management in Malaysia: Policies and legal framework
Contaminated land management in Malaysia: Policies and legal frameworkExternalEvents
ย 
ESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdfESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdfEdmundQuartey1
ย 
Lecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIALecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIAIlyasKhan84634
ย 
Emergency Management Plan
Emergency Management PlanEmergency Management Plan
Emergency Management PlanAbdullah Madir
ย 
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUEWASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUEIRJET Journal
ย 
IRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET Journal
ย 
Gregory Valatin wp2 14 Nov 19
Gregory Valatin wp2 14 Nov 19Gregory Valatin wp2 14 Nov 19
Gregory Valatin wp2 14 Nov 19Forest Research
ย 
1.-Landfill-basics.pdf
1.-Landfill-basics.pdf1.-Landfill-basics.pdf
1.-Landfill-basics.pdfMartinP31
ย 
Cec application form_a
Cec application form_aCec application form_a
Cec application form_aUsha Harricharran
ย 
Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09Mohit Singh
ย 
2.s. smith environmental obligations
2.s. smith environmental obligations2.s. smith environmental obligations
2.s. smith environmental obligationsBill Bly
ย 
IRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET Journal
ย 

Similar to EF-EI04-01.doc (20)

Quality control audit for RMC Plants
Quality control audit for RMC PlantsQuality control audit for RMC Plants
Quality control audit for RMC Plants
ย 
mohammed Abohashim cv
mohammed Abohashim cvmohammed Abohashim cv
mohammed Abohashim cv
ย 
mohammed Abohashim cv
mohammed Abohashim cvmohammed Abohashim cv
mohammed Abohashim cv
ย 
mohammed Abohashim cv
mohammed Abohashim cvmohammed Abohashim cv
mohammed Abohashim cv
ย 
mohammed Abohashim cv
mohammed Abohashim cvmohammed Abohashim cv
mohammed Abohashim cv
ย 
Contaminated land management in Malaysia: Policies and legal framework
Contaminated land management in Malaysia: Policies and legal frameworkContaminated land management in Malaysia: Policies and legal framework
Contaminated land management in Malaysia: Policies and legal framework
ย 
ESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdfESMP Checklist for Construction and Rehabilitation Activities.pdf
ESMP Checklist for Construction and Rehabilitation Activities.pdf
ย 
mohammed Abohashim cv
mohammed Abohashim cvmohammed Abohashim cv
mohammed Abohashim cv
ย 
Iee
IeeIee
Iee
ย 
Lecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIALecture 3-4 EIA-process EIA EIA EIA EIA EIA
Lecture 3-4 EIA-process EIA EIA EIA EIA EIA
ย 
Emergency Management Plan
Emergency Management PlanEmergency Management Plan
Emergency Management Plan
ย 
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUEWASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
WASTE WATER TREATMENT BY USING INNOVATIVE FILTRATION TECHNIQUE
ย 
IRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil ErosionIRJET - Reaearch on Methods of Controlling Soil Erosion
IRJET - Reaearch on Methods of Controlling Soil Erosion
ย 
Gregory Valatin wp2 14 Nov 19
Gregory Valatin wp2 14 Nov 19Gregory Valatin wp2 14 Nov 19
Gregory Valatin wp2 14 Nov 19
ย 
Introduction to Mudlogging
Introduction to MudloggingIntroduction to Mudlogging
Introduction to Mudlogging
ย 
1.-Landfill-basics.pdf
1.-Landfill-basics.pdf1.-Landfill-basics.pdf
1.-Landfill-basics.pdf
ย 
Cec application form_a
Cec application form_aCec application form_a
Cec application form_a
ย 
Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09Environmental impact assessment of mining projects 17.03.09
Environmental impact assessment of mining projects 17.03.09
ย 
2.s. smith environmental obligations
2.s. smith environmental obligations2.s. smith environmental obligations
2.s. smith environmental obligations
ย 
IRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling MethodsIRJET - Reaearch on Erosion Controlling Methods
IRJET - Reaearch on Erosion Controlling Methods
ย 

More from MoolRaj3

GENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptxGENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptxMoolRaj3
ย 
404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.pptMoolRaj3
ย 
Crane ratio.docx
Crane ratio.docxCrane ratio.docx
Crane ratio.docxMoolRaj3
ย 
emergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdfemergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdfMoolRaj3
ย 
MachineGuardingPPT (4).ppt
MachineGuardingPPT (4).pptMachineGuardingPPT (4).ppt
MachineGuardingPPT (4).pptMoolRaj3
ย 
Doc1.docx
Doc1.docxDoc1.docx
Doc1.docxMoolRaj3
ย 
MRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMoolRaj3
ย 
EHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxEHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxMoolRaj3
ย 
ACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).pptACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).pptMoolRaj3
ย 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptxMoolRaj3
ย 
DAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docxDAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docxMoolRaj3
ย 
EMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptxEMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptxMoolRaj3
ย 

More from MoolRaj3 (12)

GENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptxGENERAL SAFETY RULES (004).pptx hindi.pptx
GENERAL SAFETY RULES (004).pptx hindi.pptx
ย 
404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt404106149-Day-2-Machine-Safety-ppt.ppt
404106149-Day-2-Machine-Safety-ppt.ppt
ย 
Crane ratio.docx
Crane ratio.docxCrane ratio.docx
Crane ratio.docx
ย 
emergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdfemergency-exit-routes-factsheet (1).pdf
emergency-exit-routes-factsheet (1).pdf
ย 
MachineGuardingPPT (4).ppt
MachineGuardingPPT (4).pptMachineGuardingPPT (4).ppt
MachineGuardingPPT (4).ppt
ย 
Doc1.docx
Doc1.docxDoc1.docx
Doc1.docx
ย 
MRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptxMRM 01-04-2022 To 30-09-2022.pptx
MRM 01-04-2022 To 30-09-2022.pptx
ย 
EHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptxEHS APRIL_April -2023.pptx
EHS APRIL_April -2023.pptx
ย 
ACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).pptACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ACCIDENT PREVENTION (SLIP, TRIP & FALL).ppt
ย 
HIRA TRAINING PPT.pptx
HIRA  TRAINING PPT.pptxHIRA  TRAINING PPT.pptx
HIRA TRAINING PPT.pptx
ย 
DAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docxDAILY TOOL BOX TALKS MODULES (1).docx
DAILY TOOL BOX TALKS MODULES (1).docx
ย 
EMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptxEMERGENCY CONTACT NUMBER.pptx
EMERGENCY CONTACT NUMBER.pptx
ย 

Recently uploaded

Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
ย 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...Escorts Call Girls
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
ย 
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...kauryashika82
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
ย 

Recently uploaded (20)

Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
ย 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Deforestation
DeforestationDeforestation
Deforestation
ย 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
ย 
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune โ‚น7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
ย 
Climate Change
Climate ChangeClimate Change
Climate Change
ย 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
ย 
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 

EF-EI04-01.doc

  • 1. WBC Environmental Site Inspection Checklist Form Number : EF-EI04-01 Revision Number : 1 Date : 1-1-2006 Page 1 Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated mitigation measures. Project : Project contract no. CV/2006/01 Site Location : Stanley Bay Construction stage / status during inspection : Phase 1 โ€“ Drainage & Road works Inspection Date : 25 January 2006 Inspection Time : 0900 โ€“ 1500 Inspected by : CY Tam (Project Environmental Engineer) Weather : Dry & cold Inspection Items Implemented? N/A Remarks (i.e. specify location, good practices, problem observed, possible cause of nonconformity and/or proposed corrective/preventative actions) Yes No* 1. Air Pollution Control 1.1. Are the construction sites watered to minimize dust generated? ๏ 1.2. Are stockpiles of dusty materials (size with more than 20 bags cement) covered or watered? ๏ 1.3. Cement debagging process undertaken in sheltered areas ๏ 1.4. Are all vehicles carrying dusty loads covered/watered over prior to leaving the site? ๏ 1.5. Are demolition work areas watered? (e.g. trimming activities by using breaker) ๏ 1.6. Are dusty roads paved and/or sprayed with water? ๏ 1.7. Are dust controlled during percussive drilling or rock breaking? ๏ 1.8. Are plant and equipment well maintained? (any black smoke observed, please indicate the plant/equipment and location) ๏ 1.9. Is dark smoke controlled from plant? ๏ 1.10. Are there enclosures around the main dust-generating activities? (e.g. grout mixing) ๏ 1.11. Hoarding (not <2.4m) provided along boundaries and properly maintained (any damage / opening observed, please indicate the location). ๏ 1.12. Are speed control measures applied? (e.g. speed limit sign) ๏ 1.13. Others (please specify)
  • 2. WBC Environmental Site Inspection Checklist Form Number : EF-EI04-01 Revision Number : 1 Date : 1-1-2006 Page 2 Inspection Items Implemented? N/A Remarks (i.e. specify location, good practices, problem observed, possible cause of nonconformity and/or proposed corrective/preventative actions) Yes No* 2. Water Pollution Control 2.1. Are water discharge licenses valid? ๏ 2.2. Are conditions of the license compiled with? (check the monitoring records and observe physically) ๏ 2.3. Are wastewater treatment system being used and properly maintained on site? (e.g. desilting tank) ๏ 2.4. Are there any wastewater discharged to the stormdrains? Is the wastewater being treated? ๏ 2.5. Are measures provided to properly direct effluent to silt removal facilities? (e.g. provide earth bunds / U-channels) ๏ 2.6. Are u-channels and manholes free of silt and sediment? ๏ 2.7. Are sedimentation traps and tanks free of silt and sediment? ๏ 2.8. Are all manholes on-site covered and sealed? ๏ 2.9. Are sandbags/earth bund adopted to prevent washing away of sand/silt and wastewater to drains, catchpit, public road and footpath? ๏ 2.10. Are vehicles and plants cleaned before leaving the site? ๏ 2.11. Are wheel washing facilities well maintained to prevent overflow, flooding sediment? ๏ 2.12. Is sand and silt settled out in wheel washing bay and removed? ๏ 2.13. Is the public road/area around the site entrance and site hoarding kept clean and free of muddy water? ๏ 2.14. Is domestic water directed to septic tanks or chemical toilets? ๏ 2.15. Others (please specify)
  • 3. WBC Environmental Site Inspection Checklist Form Number : EF-EI04-01 Revision Number : 1 Date : 1-1-2006 Page 3 Inspection Items Implemented? N/A Remarks (i.e. specify location, good practices, problem observed, possible cause of nonconformity and/or proposed corrective/preventative actions) Yes No* 3. Noise Control 3.1. Is the CNP (Construction Noise Permit) valid for work during restricted hours? ๏ 3.2. Are copies of the valid Construction Noise Permits posted at site entrance/exit? ๏ 3.3. Do air compressors and generators operate with doors closed? ๏ 3.4. Is idle plant/equipment turned off or throttled down? ๏ 3.5. Do air compressors and hand- held breakers have valid noise emission labels (NEL)? ๏ 3.6. Any noise mitigation measures adopted (e.g. use noise barrier / enclosure)? ๏ 3.7. Are silenced equipments utilized? ๏ 3.8. Others (please specify) 4. Waste Management 4.1. Is the site kept clean and tidy? (e.g. litter free, good housekeeping) ๏ 4.2. Are separate chutes used for inert and non-inert wastes? ๏ 4.3. Are separated labelled containers / areas provided for facilitating recycling and waste segregation? ๏ 4.4. Are construction wastes / recyclable wastes and general refuse removed off site regularly? ๏ 4.5. Are construction wastes collected and disposed of properly by licensed collectors? ๏ 4.6. Are chemical wastes, if any, collected and disposed of properly by licensed collectors? ๏ 4.7. Does chemical waste producer license covers all major chemical wastes produced on site? ๏ 4.8. Are chemical wastes properly stored and labelled? ๏ 4.9. Are oil drums and plants/equipments provided with drip trays? ๏
  • 4. WBC Environmental Site Inspection Checklist Form Number : EF-EI04-01 Revision Number : 1 Date : 1-1-2006 Page 4 Inspection Items Implemented? N/A Remarks (i.e. specify location, good practices, problem observed, possible cause of nonconformity and/or proposed corrective/preventative actions) Yes No* 4.10. Are drip trays free of oil and water? ๏ 4.11. Is there any oil spillage? Clean- up the contaminated soil immediately? ๏ 4.12. Is litter, foam or other objectionable matters in nearby water drain/sewer cleaned? ๏ 4.13. Are asbestos wastes handled by registered professionals? ๏ 4.14. Others (please specify) 5. Storage of Chemicals and Dangerous Goods 5.1. Are chemicals stored and labelled properly? ๏ 5.2. Does storage of DG comply with license conditions (include types and quantities if DG store is available, check the DG store license)? ๏ 5.3. Are proper measures to control oil spillage during maintenance or to control other chemicals spillage? (e.g. provide drip trays) ๏ 5.4. Are spill kits / sand / saw dust used for absorbing chemical spillage readily accessible? ๏ 5.5. Others (please specify) 6. Protection of Flora, Fauna and Historical Heritage 6.1. Are disturbance to terrestrial flora minimized (e.g. plants to be preserved)? ๏ 6.2. Are disturbance to terrestrial fauna minimized (if rare species identified)? ๏ 6.3. Any historical heritage exists on site? If yes, ensure appropriate measures taken to preserve it ๏ 6.4. Others (please specify) 7. Resource Conservation 7.1. Is water recycled wherever possible for dust suppression? ๏
  • 5. WBC Environmental Site Inspection Checklist Form Number : EF-EI04-01 Revision Number : 1 Date : 1-1-2006 Page 5 Inspection Items Implemented? N/A Remarks (i.e. specify location, good practices, problem observed, possible cause of nonconformity and/or proposed corrective/preventative actions) Yes No* 7.2. Is water pipe leakage and wastage prevented? ๏ 7.3. Are diesel-powered plants and equipments shut off while not in use to reduce excessive use? ๏ 7.4. Are energy conservation practices adopted? ๏ 7.5. Are metal or other alternatives used to minimize the use of timber? ๏ 7.6. Are materials stored in good condition to prevent deterioration and wastage (e.g. covered, separated)? ๏ 7.7. Are pesticides used under the requirement of Agriculture, Fishers and Conservation Department? ๏ 7.8. Others (please specify) 8. Emergency Preparedness and Response 8.1. Are fire extinguishers / fighting facilities properly maintained and not expired? Escape not blocked / obstructed? ๏ 8.2. Are accidents and incidents reported and reviewed, and corrective & preventive actions identified and recorded? ๏ 8.3. Others (please specify) *Any โ€œNoโ€ recorded represents the potential breach of regulation or improvement needed and details of nonconformity (NC) shall be recorded in the Remarks. * Report NC in the following forms. Each NC should make reference into the checklist as coded. The responsible personnel shall identify the root cause of NC and adopt appropriate corrective and preventive actions (CPA) for mitigation. Confirmation of the effectiveness of the CPA shall be verified by Project Manager within an agreed time. Signature of Site Inspector Date 5 Jan 2006 Reviewed by Project Manager Date 7 Jan 2006
  • 6. WBC Environmental Site Inspection Checklist Form Number : EF-EI04-01 Revision Number : 1 Date : 1-1-2006 Page 6 Improvement Request: Project Site Location Inspection Date Inspected by NC Reference Description of NC Root cause of NC CPA adopted Target completion date Verified by PEO (Date) NC Reference Description of NC Root cause of NC CPA adopted Target completion date Verified by PEO (Date) NC Reference Description of NC Root cause of NC CPA adopted Target completion date Verified by PEO (Date)