1. CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
1 of 4
Personal Details
Name MOHAMMAD AZAM BIN ABDUL RAHMAN
Nationality Malaysian
Sex Male
Date of Birth 11 MARCH 1991
IC / Passport No. 910311036039 / A33396665
Date / Place of Issue 03 SEPT 2014 / KL (WANGSA MAJU)
Date of Expiry 03 SEPT 2016
Qualification 2010-2014 Bachelor of Engineering (Geomatics)
Contact +60136445464
Emel azam.rahman@orogenicgroup.com
Current Position and Main Job Scope
Company OROGENIC GEOEXPRO SDN BHD
Current Position Surveyor
Main Job Scopes Install and operate the survey positioning, navigation and ancillary equipment.
Install and operate the survey software.
Responsible for obtaining and checking the required geodetic parameters in which
the survey is to be performed.
Check and calibrate the positioning and survey equipment prior to the
commencement of a survey. To document such calibrations according to the work
procedures.
Execute positioning and navigation tasks in accordance with survey procedures
and project requirements.
Perform survey computations and data processing as may be necessary.
Perform appropriate checks of data and computations.
Compile final reports as may be necessary for issue to clients and for company
records.
Actively participate in adherence to and improvement of the company
Management System on Quality and HSE related issues.
Year and duration of
employment
Sept 2014 – Present
2. CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
2 of 4
Working Experience with Previous Company
Company TrigStation Sdn Bhd
Position Surveyor
Main Job Scopes Responsible for anchor pattern drawing
Install and operate the survey software.
Check and calibrate the positioning and survey equipment prior to the
commencement of a survey. To document such calibrations according to the work
procedures.
Execute positioning and navigation tasks in accordance with survey procedures
and project requirements.
Company Syarikat Jaya Diri
Position Part Time Project Manager
A construction company that have G1 license from CIDB
Working as part time during semester break.
Responsible for manage any construction work including documenting.
Courses & Training Attended
Date Venue Courses
MEDICAL
04 Sept 2014 Hospital Pusrawi Jalan Tun Razak, KL Offshore Medical Checkup
04 April 2015 Twin Towers Medical Clinic Urine, Drug, Alcohols Test (UDAT)
Safety Training
10 Sept 2014 Malaysia Maritime Academy (ALAM),
Melaka
Basic Offshore Safety Induction and
Emergency Training (B.O.S.I.E.T)
22 Sept 2014 Terengganu Safety Training Center
(TSTC)
Loss Prevention System (LPS) Training
22 Sept 2014 Terengganu Safety Training Center
(TSTC)
Safety, Security, Health and
Environment Induction
07 Jan 2015 Niosh Kemaman, Terengganu OGSP Level 1
Course Training
17 Sept 2014 THS Geoscience Training Center,
Cheras
QINSy Training
Summary of Experience
Date Client Project Title Vessel/Barge Designation
April 2016 Orogenic
Geocore Sdn.
Bhd.
Positioning Services onboard
Geotechnical Vessel
MV Trinity
Explorer.
Online Surveyor
January
2016
SapuraKencana
Allied Marine
Sdn. Bhd.
2016 SBO SMDP-B Seabed Debris
Survey & Removal
DSV Allied Jane Online Surveyor
3. CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
3 of 4
January
2016
SapuraKencana
Allied Marine
Sdn. Bhd.
2016 SKO F12-22 Wellhead
Inspection
DSV Allied Jane Online Suveyor
October
2015
SapuraKencana
Pinewell Sdn.
Bhd.
Awb Sarku 300 Move From West
Wharf To
Anpg-A Platform
AWB Sarku 300 Online Surveyor
September
2015
Hess
Exploration &
Production
Malaysia Bhd
(HEPMB)
Rig Positioning Services for North
Malay Basin (NMB) Drilling Program
Ju Rig Perisai Pacific 101
Ju Rig Perisai
Pacific 101
Party Chief / Online
Surveyor
September
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 SKO MCM/SCM Change-Out &
F9 Debris Removal Survey
DSV Crest
Odyssey 2
Party Chief / Online
Surveyor
August
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 PMOPL73 Bekok-A Flange
Protector Installation
DSV Allied Jane Party Chief / Online
Surveyor
August
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 PCSB PMO Seabed Scour
Survey & Gas Seepage at Duyong
CPP
DSV Allied Jane Party Chief / Online
Surveyor
August
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 PCSB PMOPL53 18” WANT-
CPP R4 Encapsulation Clamp
Installation for Flange Leak
Rectification – Revisit
DSV Allied Jane Party Chief / Online
Surveyor
July 2015 SapuraKencana
Allied Marine
Sdn Bhd
2015 PCSB Pipeline Anode Retrofit DSV Allied Jane Party Chief / Online
Surveyor
July 2015 SapuraKencana
Allied Marine
Sdn Bhd
SKO PL 348 Subsea Riser Bend
Replacement
DSV Allied Jane Party Chief / Online
Surveyor
Mei 2015 SapuraKencana
Allied Marine
Sdn Bhd
2015 SKO D18 Debris Survey and
Removal Campaign
DSV Allied Jane Party Chief / Online
Surveyor
April 2015 SapuraKencana
Allied Marine
Sdn Bhd
2015 SBO ZEDP-A Tarpon Baseline
Inspection
DSV Allied Jane Online Surveyor
April 2015 EMEPMI Provision of Survey Services Kpv
Redang & Setia Station 2
(Accommodation Work Boat) At
Tapis-C Platform
KPV Redang &
AWB Setia
Station 2
Online Surveyor
March
2015
PTTEP Geohazards Site Investigation (GSI)
Campaign 2015-01 At Arthit And
Bongkot Field
MV Genesis Online Surveyor
Jan 2015 PTTEP Ju Rig Naga 5 Move From Aung
Sinkha 10 to Aung Sinkha 11
UMW Naga 5 Online Surveyor
Dec 2014 PTTEP Ju Rig Naga 5 Move From Aung
Sinkha 8 to Aung Sinkha 9
UMW Naga 5 Online Surveyor
Nov 2014 SapuraKencana
Allied Marine
2014 PCPP Wellhead Monitoring Wawasan 8 Surveyor – Assist Mob
Employment History
1) JAN 2009 – MAY 2014 : Part time Project Manager (Syarikat Jaya Diri)
2) JULAI 2014 – OGOS 2014 : Surveyor (TrigStation Sdn Bhd)
3) SEPT 2014 - Present : Surveyor (Orogenic GeoExpro Sdn Bhd)
4. CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
4 of 4
Equipment System Used
Hardware
.
Software : Qinssy 8, Sonardyne USBL, WSM, Hipap 501 Interface System, Rx Control, WSM Hyperterminal
Veripos VQC, AutoCAD, AutoCAD R14, Microsoft Office, Topcon Tools, Civil Design (CDS)
& MapInfo 7.0.
: Total Station
Topcon
: Multi-Beam Echosounder (MBES)
Reson Seabat 7101
: Single – Beam Echosounder
ODOM MKIII 12/220 kHz
: Side Scan sonar (SSS)
EdgeTech 4100 Tow Fish
EdgeTech 701-DL Top Side Unit
: Sub-Bottom Profiling (SBP)
AA300 Boomer
CODA recording software
3m Barrel gravity corer system c/w coring winch
Magnetometer
: Underwater Navigation/Position System
Sonardyne Scout Plus USBL System
Sonardyne Mini Beacon c/w chargers
AML SV Plus
TSS DMS-05 Heave Sensor with analogue repeater
Hipap 501 USBL Tranducer
: Surface Navigation/Positioning System
Primary DGPS System - Veripos Standard+ or Ultra Signal
Secondary DGPS System - Veripos Standard+ or Ultra Signal
Veripos "AsteRx2eh" GPS Heading
TSS Meridian Survey Gyro Compass
TRIMBLE GeoExplorer GeoXH 600.
Radio Telemetry (SATEL)
UHF and VHF Antenna
Hemisphere GPS system