SlideShare a Scribd company logo
1 of 4
Download to read offline
CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
1 of 4
Personal Details
Name MOHAMMAD AZAM BIN ABDUL RAHMAN
Nationality Malaysian
Sex Male
Date of Birth 11 MARCH 1991
IC / Passport No. 910311036039 / A33396665
Date / Place of Issue 03 SEPT 2014 / KL (WANGSA MAJU)
Date of Expiry 03 SEPT 2016
Qualification 2010-2014 Bachelor of Engineering (Geomatics)
Contact +60136445464
Emel azam.rahman@orogenicgroup.com
Current Position and Main Job Scope
Company OROGENIC GEOEXPRO SDN BHD
Current Position Surveyor
Main Job Scopes  Install and operate the survey positioning, navigation and ancillary equipment.
 Install and operate the survey software.
 Responsible for obtaining and checking the required geodetic parameters in which
the survey is to be performed.
 Check and calibrate the positioning and survey equipment prior to the
commencement of a survey. To document such calibrations according to the work
procedures.
 Execute positioning and navigation tasks in accordance with survey procedures
and project requirements.
 Perform survey computations and data processing as may be necessary.
 Perform appropriate checks of data and computations.
 Compile final reports as may be necessary for issue to clients and for company
records.
 Actively participate in adherence to and improvement of the company
Management System on Quality and HSE related issues.
Year and duration of
employment
Sept 2014 – Present
CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
2 of 4
Working Experience with Previous Company
Company TrigStation Sdn Bhd
Position Surveyor
Main Job Scopes  Responsible for anchor pattern drawing
 Install and operate the survey software.
 Check and calibrate the positioning and survey equipment prior to the
commencement of a survey. To document such calibrations according to the work
procedures.
 Execute positioning and navigation tasks in accordance with survey procedures
and project requirements.
Company Syarikat Jaya Diri
Position Part Time Project Manager
 A construction company that have G1 license from CIDB
 Working as part time during semester break.
 Responsible for manage any construction work including documenting.
Courses & Training Attended
Date Venue Courses
MEDICAL
04 Sept 2014 Hospital Pusrawi Jalan Tun Razak, KL Offshore Medical Checkup
04 April 2015 Twin Towers Medical Clinic Urine, Drug, Alcohols Test (UDAT)
Safety Training
10 Sept 2014 Malaysia Maritime Academy (ALAM),
Melaka
Basic Offshore Safety Induction and
Emergency Training (B.O.S.I.E.T)
22 Sept 2014 Terengganu Safety Training Center
(TSTC)
Loss Prevention System (LPS) Training
22 Sept 2014 Terengganu Safety Training Center
(TSTC)
Safety, Security, Health and
Environment Induction
07 Jan 2015 Niosh Kemaman, Terengganu OGSP Level 1
Course Training
17 Sept 2014 THS Geoscience Training Center,
Cheras
QINSy Training
Summary of Experience
Date Client Project Title Vessel/Barge Designation
April 2016 Orogenic
Geocore Sdn.
Bhd.
Positioning Services onboard
Geotechnical Vessel
MV Trinity
Explorer.
Online Surveyor
January
2016
SapuraKencana
Allied Marine
Sdn. Bhd.
2016 SBO SMDP-B Seabed Debris
Survey & Removal
DSV Allied Jane Online Surveyor
CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
3 of 4
January
2016
SapuraKencana
Allied Marine
Sdn. Bhd.
2016 SKO F12-22 Wellhead
Inspection
DSV Allied Jane Online Suveyor
October
2015
SapuraKencana
Pinewell Sdn.
Bhd.
Awb Sarku 300 Move From West
Wharf To
Anpg-A Platform
AWB Sarku 300 Online Surveyor
September
2015
Hess
Exploration &
Production
Malaysia Bhd
(HEPMB)
Rig Positioning Services for North
Malay Basin (NMB) Drilling Program
Ju Rig Perisai Pacific 101
Ju Rig Perisai
Pacific 101
Party Chief / Online
Surveyor
September
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 SKO MCM/SCM Change-Out &
F9 Debris Removal Survey
DSV Crest
Odyssey 2
Party Chief / Online
Surveyor
August
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 PMOPL73 Bekok-A Flange
Protector Installation
DSV Allied Jane Party Chief / Online
Surveyor
August
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 PCSB PMO Seabed Scour
Survey & Gas Seepage at Duyong
CPP
DSV Allied Jane Party Chief / Online
Surveyor
August
2015
SapuraKencana
Allied Marine
Sdn Bhd
2015 PCSB PMOPL53 18” WANT-
CPP R4 Encapsulation Clamp
Installation for Flange Leak
Rectification – Revisit
DSV Allied Jane Party Chief / Online
Surveyor
July 2015 SapuraKencana
Allied Marine
Sdn Bhd
2015 PCSB Pipeline Anode Retrofit DSV Allied Jane Party Chief / Online
Surveyor
July 2015 SapuraKencana
Allied Marine
Sdn Bhd
SKO PL 348 Subsea Riser Bend
Replacement
DSV Allied Jane Party Chief / Online
Surveyor
Mei 2015 SapuraKencana
Allied Marine
Sdn Bhd
2015 SKO D18 Debris Survey and
Removal Campaign
DSV Allied Jane Party Chief / Online
Surveyor
April 2015 SapuraKencana
Allied Marine
Sdn Bhd
2015 SBO ZEDP-A Tarpon Baseline
Inspection
DSV Allied Jane Online Surveyor
April 2015 EMEPMI Provision of Survey Services Kpv
Redang & Setia Station 2
(Accommodation Work Boat) At
Tapis-C Platform
KPV Redang &
AWB Setia
Station 2
Online Surveyor
March
2015
PTTEP Geohazards Site Investigation (GSI)
Campaign 2015-01 At Arthit And
Bongkot Field
MV Genesis Online Surveyor
Jan 2015 PTTEP Ju Rig Naga 5 Move From Aung
Sinkha 10 to Aung Sinkha 11
UMW Naga 5 Online Surveyor
Dec 2014 PTTEP Ju Rig Naga 5 Move From Aung
Sinkha 8 to Aung Sinkha 9
UMW Naga 5 Online Surveyor
Nov 2014 SapuraKencana
Allied Marine
2014 PCPP Wellhead Monitoring Wawasan 8 Surveyor – Assist Mob
Employment History
1) JAN 2009 – MAY 2014 : Part time Project Manager (Syarikat Jaya Diri)
2) JULAI 2014 – OGOS 2014 : Surveyor (TrigStation Sdn Bhd)
3) SEPT 2014 - Present : Surveyor (Orogenic GeoExpro Sdn Bhd)
CURRICULUM VITAE
MOHAMMAD AZAM BIN ABDUL RAHMAN
Surveyor
4 of 4
Equipment System Used
Hardware
.
Software : Qinssy 8, Sonardyne USBL, WSM, Hipap 501 Interface System, Rx Control, WSM Hyperterminal
Veripos VQC, AutoCAD, AutoCAD R14, Microsoft Office, Topcon Tools, Civil Design (CDS)
& MapInfo 7.0.
: Total Station
 Topcon
: Multi-Beam Echosounder (MBES)
 Reson Seabat 7101
: Single – Beam Echosounder
 ODOM MKIII 12/220 kHz
: Side Scan sonar (SSS)
 EdgeTech 4100 Tow Fish
 EdgeTech 701-DL Top Side Unit
: Sub-Bottom Profiling (SBP)
 AA300 Boomer
 CODA recording software
 3m Barrel gravity corer system c/w coring winch
 Magnetometer
: Underwater Navigation/Position System
 Sonardyne Scout Plus USBL System
 Sonardyne Mini Beacon c/w chargers
 AML SV Plus
 TSS DMS-05 Heave Sensor with analogue repeater
 Hipap 501 USBL Tranducer
: Surface Navigation/Positioning System
 Primary DGPS System - Veripos Standard+ or Ultra Signal
 Secondary DGPS System - Veripos Standard+ or Ultra Signal
 Veripos "AsteRx2eh" GPS Heading
 TSS Meridian Survey Gyro Compass
 TRIMBLE GeoExplorer GeoXH 600.
 Radio Telemetry (SATEL)
 UHF and VHF Antenna
 Hemisphere GPS system

More Related Content

What's hot

What's hot (9)

Pulak Bhattacharjee-CV
Pulak Bhattacharjee-CVPulak Bhattacharjee-CV
Pulak Bhattacharjee-CV
 
Abdul Waheed
Abdul WaheedAbdul Waheed
Abdul Waheed
 
HARISH
HARISHHARISH
HARISH
 
5. Updated CV
5. Updated CV 5. Updated CV
5. Updated CV
 
CV CE.Yana
CV CE.YanaCV CE.Yana
CV CE.Yana
 
santosh-ANDT Inspector
santosh-ANDT Inspectorsantosh-ANDT Inspector
santosh-ANDT Inspector
 
Indtt 2013 training programme
Indtt 2013 training programmeIndtt 2013 training programme
Indtt 2013 training programme
 
1FEB2011 Staff Call Slides
1FEB2011 Staff Call Slides1FEB2011 Staff Call Slides
1FEB2011 Staff Call Slides
 
1FEB2011 Staff Call Slides
1FEB2011 Staff Call Slides1FEB2011 Staff Call Slides
1FEB2011 Staff Call Slides
 

Similar to CV - AZAM RAHMAN - Jr Surveyor

Similar to CV - AZAM RAHMAN - Jr Surveyor (20)

Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016Mohammad Azman Bin Salleh Cv 2016
Mohammad Azman Bin Salleh Cv 2016
 
Khairul Amilin CV
Khairul Amilin CVKhairul Amilin CV
Khairul Amilin CV
 
CV faurizul
CV faurizulCV faurizul
CV faurizul
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
Hafizan VSI Format CV
Hafizan VSI Format CVHafizan VSI Format CV
Hafizan VSI Format CV
 
CV Muhammad Haiqal 2015
CV Muhammad Haiqal 2015CV Muhammad Haiqal 2015
CV Muhammad Haiqal 2015
 
sree cv.doc REV -03
sree cv.doc REV -03sree cv.doc REV -03
sree cv.doc REV -03
 
CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)
 
CV MUHTADI AZMAN
CV MUHTADI AZMANCV MUHTADI AZMAN
CV MUHTADI AZMAN
 
IZAAN FAZRIN AZWAR RAPIE RESUME
IZAAN FAZRIN AZWAR RAPIE RESUMEIZAAN FAZRIN AZWAR RAPIE RESUME
IZAAN FAZRIN AZWAR RAPIE RESUME
 
RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)RESUME FIKRI 2014 WELDER (1) (1)
RESUME FIKRI 2014 WELDER (1) (1)
 
CV Summary Achmat Munib ( up dated Feb 18 2015)
CV Summary  Achmat Munib  ( up dated Feb 18  2015)CV Summary  Achmat Munib  ( up dated Feb 18  2015)
CV Summary Achmat Munib ( up dated Feb 18 2015)
 
Mohamed Magdi CV
Mohamed Magdi CVMohamed Magdi CV
Mohamed Magdi CV
 
Mostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CVMostafa Nabil ELBanhawy CV
Mostafa Nabil ELBanhawy CV
 
MOHD HAFIZI BIN MOHD AMIN
MOHD HAFIZI BIN MOHD AMINMOHD HAFIZI BIN MOHD AMIN
MOHD HAFIZI BIN MOHD AMIN
 
CV2016 NasseerQusyairi
CV2016 NasseerQusyairiCV2016 NasseerQusyairi
CV2016 NasseerQusyairi
 
CVword
CVwordCVword
CVword
 
Wang Guang Yu(Charlie).CV
Wang Guang Yu(Charlie).CVWang Guang Yu(Charlie).CV
Wang Guang Yu(Charlie).CV
 
CV_HONCULADA, Leizl M
CV_HONCULADA, Leizl MCV_HONCULADA, Leizl M
CV_HONCULADA, Leizl M
 
TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1TATIRA TATIRA CV Current 1
TATIRA TATIRA CV Current 1
 

CV - AZAM RAHMAN - Jr Surveyor

  • 1. CURRICULUM VITAE MOHAMMAD AZAM BIN ABDUL RAHMAN Surveyor 1 of 4 Personal Details Name MOHAMMAD AZAM BIN ABDUL RAHMAN Nationality Malaysian Sex Male Date of Birth 11 MARCH 1991 IC / Passport No. 910311036039 / A33396665 Date / Place of Issue 03 SEPT 2014 / KL (WANGSA MAJU) Date of Expiry 03 SEPT 2016 Qualification 2010-2014 Bachelor of Engineering (Geomatics) Contact +60136445464 Emel azam.rahman@orogenicgroup.com Current Position and Main Job Scope Company OROGENIC GEOEXPRO SDN BHD Current Position Surveyor Main Job Scopes  Install and operate the survey positioning, navigation and ancillary equipment.  Install and operate the survey software.  Responsible for obtaining and checking the required geodetic parameters in which the survey is to be performed.  Check and calibrate the positioning and survey equipment prior to the commencement of a survey. To document such calibrations according to the work procedures.  Execute positioning and navigation tasks in accordance with survey procedures and project requirements.  Perform survey computations and data processing as may be necessary.  Perform appropriate checks of data and computations.  Compile final reports as may be necessary for issue to clients and for company records.  Actively participate in adherence to and improvement of the company Management System on Quality and HSE related issues. Year and duration of employment Sept 2014 – Present
  • 2. CURRICULUM VITAE MOHAMMAD AZAM BIN ABDUL RAHMAN Surveyor 2 of 4 Working Experience with Previous Company Company TrigStation Sdn Bhd Position Surveyor Main Job Scopes  Responsible for anchor pattern drawing  Install and operate the survey software.  Check and calibrate the positioning and survey equipment prior to the commencement of a survey. To document such calibrations according to the work procedures.  Execute positioning and navigation tasks in accordance with survey procedures and project requirements. Company Syarikat Jaya Diri Position Part Time Project Manager  A construction company that have G1 license from CIDB  Working as part time during semester break.  Responsible for manage any construction work including documenting. Courses & Training Attended Date Venue Courses MEDICAL 04 Sept 2014 Hospital Pusrawi Jalan Tun Razak, KL Offshore Medical Checkup 04 April 2015 Twin Towers Medical Clinic Urine, Drug, Alcohols Test (UDAT) Safety Training 10 Sept 2014 Malaysia Maritime Academy (ALAM), Melaka Basic Offshore Safety Induction and Emergency Training (B.O.S.I.E.T) 22 Sept 2014 Terengganu Safety Training Center (TSTC) Loss Prevention System (LPS) Training 22 Sept 2014 Terengganu Safety Training Center (TSTC) Safety, Security, Health and Environment Induction 07 Jan 2015 Niosh Kemaman, Terengganu OGSP Level 1 Course Training 17 Sept 2014 THS Geoscience Training Center, Cheras QINSy Training Summary of Experience Date Client Project Title Vessel/Barge Designation April 2016 Orogenic Geocore Sdn. Bhd. Positioning Services onboard Geotechnical Vessel MV Trinity Explorer. Online Surveyor January 2016 SapuraKencana Allied Marine Sdn. Bhd. 2016 SBO SMDP-B Seabed Debris Survey & Removal DSV Allied Jane Online Surveyor
  • 3. CURRICULUM VITAE MOHAMMAD AZAM BIN ABDUL RAHMAN Surveyor 3 of 4 January 2016 SapuraKencana Allied Marine Sdn. Bhd. 2016 SKO F12-22 Wellhead Inspection DSV Allied Jane Online Suveyor October 2015 SapuraKencana Pinewell Sdn. Bhd. Awb Sarku 300 Move From West Wharf To Anpg-A Platform AWB Sarku 300 Online Surveyor September 2015 Hess Exploration & Production Malaysia Bhd (HEPMB) Rig Positioning Services for North Malay Basin (NMB) Drilling Program Ju Rig Perisai Pacific 101 Ju Rig Perisai Pacific 101 Party Chief / Online Surveyor September 2015 SapuraKencana Allied Marine Sdn Bhd 2015 SKO MCM/SCM Change-Out & F9 Debris Removal Survey DSV Crest Odyssey 2 Party Chief / Online Surveyor August 2015 SapuraKencana Allied Marine Sdn Bhd 2015 PMOPL73 Bekok-A Flange Protector Installation DSV Allied Jane Party Chief / Online Surveyor August 2015 SapuraKencana Allied Marine Sdn Bhd 2015 PCSB PMO Seabed Scour Survey & Gas Seepage at Duyong CPP DSV Allied Jane Party Chief / Online Surveyor August 2015 SapuraKencana Allied Marine Sdn Bhd 2015 PCSB PMOPL53 18” WANT- CPP R4 Encapsulation Clamp Installation for Flange Leak Rectification – Revisit DSV Allied Jane Party Chief / Online Surveyor July 2015 SapuraKencana Allied Marine Sdn Bhd 2015 PCSB Pipeline Anode Retrofit DSV Allied Jane Party Chief / Online Surveyor July 2015 SapuraKencana Allied Marine Sdn Bhd SKO PL 348 Subsea Riser Bend Replacement DSV Allied Jane Party Chief / Online Surveyor Mei 2015 SapuraKencana Allied Marine Sdn Bhd 2015 SKO D18 Debris Survey and Removal Campaign DSV Allied Jane Party Chief / Online Surveyor April 2015 SapuraKencana Allied Marine Sdn Bhd 2015 SBO ZEDP-A Tarpon Baseline Inspection DSV Allied Jane Online Surveyor April 2015 EMEPMI Provision of Survey Services Kpv Redang & Setia Station 2 (Accommodation Work Boat) At Tapis-C Platform KPV Redang & AWB Setia Station 2 Online Surveyor March 2015 PTTEP Geohazards Site Investigation (GSI) Campaign 2015-01 At Arthit And Bongkot Field MV Genesis Online Surveyor Jan 2015 PTTEP Ju Rig Naga 5 Move From Aung Sinkha 10 to Aung Sinkha 11 UMW Naga 5 Online Surveyor Dec 2014 PTTEP Ju Rig Naga 5 Move From Aung Sinkha 8 to Aung Sinkha 9 UMW Naga 5 Online Surveyor Nov 2014 SapuraKencana Allied Marine 2014 PCPP Wellhead Monitoring Wawasan 8 Surveyor – Assist Mob Employment History 1) JAN 2009 – MAY 2014 : Part time Project Manager (Syarikat Jaya Diri) 2) JULAI 2014 – OGOS 2014 : Surveyor (TrigStation Sdn Bhd) 3) SEPT 2014 - Present : Surveyor (Orogenic GeoExpro Sdn Bhd)
  • 4. CURRICULUM VITAE MOHAMMAD AZAM BIN ABDUL RAHMAN Surveyor 4 of 4 Equipment System Used Hardware . Software : Qinssy 8, Sonardyne USBL, WSM, Hipap 501 Interface System, Rx Control, WSM Hyperterminal Veripos VQC, AutoCAD, AutoCAD R14, Microsoft Office, Topcon Tools, Civil Design (CDS) & MapInfo 7.0. : Total Station  Topcon : Multi-Beam Echosounder (MBES)  Reson Seabat 7101 : Single – Beam Echosounder  ODOM MKIII 12/220 kHz : Side Scan sonar (SSS)  EdgeTech 4100 Tow Fish  EdgeTech 701-DL Top Side Unit : Sub-Bottom Profiling (SBP)  AA300 Boomer  CODA recording software  3m Barrel gravity corer system c/w coring winch  Magnetometer : Underwater Navigation/Position System  Sonardyne Scout Plus USBL System  Sonardyne Mini Beacon c/w chargers  AML SV Plus  TSS DMS-05 Heave Sensor with analogue repeater  Hipap 501 USBL Tranducer : Surface Navigation/Positioning System  Primary DGPS System - Veripos Standard+ or Ultra Signal  Secondary DGPS System - Veripos Standard+ or Ultra Signal  Veripos "AsteRx2eh" GPS Heading  TSS Meridian Survey Gyro Compass  TRIMBLE GeoExplorer GeoXH 600.  Radio Telemetry (SATEL)  UHF and VHF Antenna  Hemisphere GPS system