1. RESUME
PULAK BHATTACHARJEE
EXECUTIVE SURVEYOR
PERSONAL
INFORMATION : Date of birth : 15-Jan-1974
Nationality : Indian
Marital Status : Married
Passport No : Z3437031
Date issued : 28-10-2015
Valid Upto : 27-10-2025
EDUCATION : Equivalent to Graduation (Hydrographic Surveyor) from Indian Navy
Qualified Survey Recorder 1st
Class.
TRAINING COURSES:
HSE TRAINING DATE
1 BOSIET 23- 26 Apr 11
2 BOSIET (OPITO Approved) 02- 04 Jul 12
3 FOET (OPITO Approved) 24 May 16
EXPERIENCE WITH FUGRO:
Jun 2008 – 25 May 2016 Working as Executive Surveyor with Fugro Survey (India) Pvt.
Ltd. and executed following jobs:
Total Field Days as on 27 Apr 2016 w.e.f. Jun 08: 1343 Days
09 Mar 16 – 27 Apr 16 Carried out ROV inspection of Submarine pipelines at ONGC field
as a Party Chief using Sea Panther 910 Plus ROV, Scout Pro
USBL, SPS 461 DGPS system, etc.
22 Jan 16 – 06 Feb 16 Carried out ROTV survey of Submarine pipelines at ONGC field as
a Party chief by using ROTV, Scout pro USBL system, etc.
16 Dec 16 – 07 Jan 16 Carried out ROTV survey of Submarine pipelines at ONGC field as
a Party chief by using ROTV, Scout pro USBL system, etc.
13 Nov 15 – 11 Dec 15 Carried out Geophysical survey of Submarine pipelines at ONGC
field as a Party Chief by using Multibeam, Scout Pro USBL, Geo
acoustic Sub bottom profiler, SPS 461 DGPS System,etc.
Fugro Survey (India) Pvt. Ltd., Navi Mumbai 1 CV – Pulak Bhattacharjee
Revised on April 2011
2. RESUME
17 Jul 15 – 04 Sep 15 Carried out Cable lay at Safania field at Saudi for client McDermott
using Sector scan sonar, GAPS USBL system.
20 Apr 15 – 30 Apr 15 Carried out Deep water geophysical survey at Gulf of Manner using
Deep sea Multibeam Reson 8160, Side scan sonar, sparkar &
boomer for the client Oil India Limited.
18 Feb 15 – 06 Apr 2015 Carried out Topside installation of MB Platform at Panna Field using
Automatic level and tachystave and Spool installation at Panna field
using Navigation system and Scout pro USBL for the client LTS.
10 Nov 14 – 04 Jan 2015 Carried out Geophysical Survey using Side Scan Sonar, Multibeam,
Sub Bottom Profiler for the client Saipem.
23 Jun 14 – 02 Sep 14 Carried out Geophysical Survey using Side Scan Sonar, Multibeam,
Sub Bottom Profiler and Box coring and coring. Carried out TDM
using ROV with Costoro 2 and Costoro 8 Barge for the client
Saipem.
08 May 14 – 14 May 14 Carried out Riser removal and Installtion, spool installation using
USBL, Gyro and DGPS system on Barge Smit Borneo with two
AHTs as a Party Chief for the client Leighton Welspun Contractors
India Pvt. Ltd.
21 Apr 14 – 05 May 14 Carried out Jacket installation at Tapti field using positioning system
SPS 461, Gyro SG Brown, Sonardyne USBL, Jacket Gyro box, etc..
on Barge Sea Horizon as a second Surveyor for the client ESSAR
(I) Pvt. Ltd.
10 Mar 14 – 11 Apr 14 Carried out repair and laying job as Surveyor and Engineer of Flexi
Pipe, using DGPS and SG Brown Gyro, AUTOCAD software for the
client TECMAR, Abu Dhabi.
29 Nov 13 – 29 Jan 14 Carried out Riser Installation using USBL, Sector Scan Sonar,
etc.as a Party Chief for the client Kreuz Engineering.
25 Oct 13 – 13 Nov 13 Carried out Starfix.NG Roll out team in Geophysical Survey.
30 Jul 13 – 24 Sep 13 Carried out Multibeam Survey at JNPT, Mumbai as online surveyor in
QINSY Software using Reson 8125 Multibeam for client BOSKALIS,
Netherland.
16 Mar 13 – 04 May 13 Carried out vessel and Excavation tool positioning during Post
trenching job as a Party Chief using DGPS positioning system, Scout
Pro USBL with WSM beacon, SG Brown Gyro, etc. for Client Swiber
Offshore construction Pvt. Ltd.
05 Mar 13 – 10 Mar 13 Carried out Elevation and levelling of all decks of HRC Platform.
Checked COJ of HRC Platform as a Party Chief using ATG Valeport
740, Auto Level NAK1 and Total Station Trimble M3 for client Afcons
Infrastructure Ltd.
15 Dec 12 – 11 Feb 2013 Carried out Jacket installation and ROV positioning at Cluster 7 of
Mumbai High using positioning system HP 8200, Gyro SG Brown,
Sonardyne USBL, Jacket Gyro box, etc.. for client McDermott Middle
East.
Fugro Survey (India) Pvt. Ltd., Navi Mumbai 2 CV – Pulak Bhattacharjee
Revised on April 2011
3. RESUME
07 Dec 12 – 09 Dec 12 Carried out QC survey of bathymetry survey for Punj Lloyd Ltd..
21 Aug 12 – 16 Oct 12 Carried out Touch Down Monitoring Survey and Prelay Trench
monitoring survey as a Party Chief using Multibeam Reson 8125
and Simrad EM 3002 for Punj Lloyd Ltd..
18 Aug 12 – 21 Aug 12 Carried out Preconstruction and Anchor clearance survey as a Party
Chief using Multibeam, Side Scan Sonar, Pinger and positioning
System HP 8200 & SPS 461 for client Punj Lloyd Ltd.
14 Aug 12 – 18 Aug 12 Carried out Pipelay Barge Positioning +1 AHT Construction mode
using Navigation Systems for Punj Lloyd Ltd.
30 Jul 12 – 5 Aug 12 Carried out As built Survey as a Party Chief using Multibeam, Side
Scan Sonar, Pinger and positioning System HP 8200 & SPS 461 for
Leighton Welspun Contractors.
11 May 12 – 29 May 12 Carried out two in nos. sub sea hoses installation of SPM and PLEM
installation job as a Party chief at Barge Gal Constructor for
Leighton Welspun Contractors.
04 May 12 – 11 May 12 Carried out Pre-Trench,Trench Monitoring,Pipeline Positioning And
Backfill Survey as a Party Chief by Multibeam and processing of
Multibeam data for Leighton Welspun Contractors.
18 Feb 12 – 15 Apr 12 Carried out flexible pipe lay as a Party Chief by positioning of DP
Vessel using HP 8200 and SPS 461 as positioning system, SG
Brown Gyro and HIPAP USBL & Beacons for underwater
positioning and Carried out positioning of DP Vessel during grouting
and making of report as a Party Chief using AUTO CAD for Kreuz
Subsea Enineering.
10 Nov 11 – 19 Jan 12 Carried out Pre-Trench,Trench Monitoring,Pipeline Positioning And
Backfill Survey as a Party Chief by Multibeam and processing of
Multibeam data for Leighton Welspun Contractors.
6 Aug 11 – 25 Sep 11 Carried out positioning of DP Vessel during grouting, spool fitting,
mattress installation and making of report as a Party Chief using
AUTO CAD and underwater positioning of ROV using Sonardyne
USBL and Beacons for Kreuz Subsea Construction.
22 Jul 11 – 2 Aug 11 Carried out Rig Move for DDKG2 for Reliance Industries Ltd.
6 May 11 – 7 Jun 11 Carried out self propelled Barge +2 AHT positioning during Jacket
installation and underwater positioning of ROV using Sonardyne
USBL and Beacons for Swiber Offshore Construction.
27 Feb 11 – 8 Apr 11 Carried out External Acoustic Inspection and CP survey of Sub Sea
Pipeline in Western Offshore using Debris Survey, GVI and Jacket
Legs for Oil & Natural Gas Corporation Ltd.
18 Feb 11 – 18 Feb 11 Carried out Dimension Controll Survey of MNF2 Jacket using Total
Station for L&T
Fugro Survey (India) Pvt. Ltd., Navi Mumbai 3 CV – Pulak Bhattacharjee
Revised on April 2011
4. RESUME
5 Jan 11 – 17 Jan 11 Carried out Pipelay Barge Positioning +2 AHT Construction mode
using Navigation Systems for HYUNDAI HEAVY INDUSTRIES CO.
LTD.
15 Dec 10 – 25 Dec10 Carried out Vibro Coring and Pre construction anchor clearance
survey for Swiber Offshore Construction
29 Sep 10 – 29 Nov 10 Carried out External Acoustic Inspection and CP survey of Sub Sea
Pipeline in Western Offshore using Multibeam, Pinger, Single Beam,
Side Scan Sorar for Oil & Natural Gas Corporation Ltd.
19 Aug 10 – 28 Aug 10 Carried out Search Survey for salvaging MSC Chitra for Smit
Singapore Pte. Ltd.
06 May 10 – 08 May 10 Carried out Post Dredging Survey using DGPS, SBES, GYRO for
Ambuja Cement Ltd
10 Mar 10 – 03 May 10 Carried out Riser Installation and Barge Positioning Services
onboard Eclipse for Leighton Contractors Pvt Ltd
16 Feb 10 – 04 Mar 10 Carried out Rig Move for D534 for Reliance Industries Ltd
09 Dec 09 – 07 Feb 10 Carried out Flexible Pipelay and Barge Positioning Services
onboard Smit Borneo using Starfix HP, SG Brown Gyro, Scout Pro
USBL System for Leighton Contractors Pvt Ltd
27 Nov 09 – 03 Dec 09 Carried out Top Side Survey for Afcons Infrastructure Ltd
27 Oct 09 – 03 Nov 09 Carried out Top Side Survey for Larsen & Toubro Ltd
24 Apr 09 – 23 May 09 Carried out Hook up Barge Positioning undertaking the specific task
of Operating barge Management System, Offset measurements,
Communication with client, Team Management on board Mynx for
Leighton Contractors using Starfix HP DGPS, HP 8200 DGPS, KVH
Compass and Starfix Seis 8.1.
14 Apr 09 – 21 Apr 09 Carried out Dimension Control Survey undertaking the specific task
of Setting up of equipment, Support for mobilization and interfacing,
Online shift for Swiber Offshore using Auto Tracking Total Station
and AutoCAD.
04 Mar 09 – 07 Apr 09 Carried out As Laid Survey undertaking the specific task of
Mobilization of equipment including interfacing, Support for
mobilization and interfacing, Online shift and Demobilization on
board Flamboyan for Leighton Contractors using Positioning
Systems, Pinger, Geoacoustic SSS, Echo Sounder MK III, USBL
Tracklink, Rason SVP, Starfix 8.1, G Log/ G Plot.
19 Feb 09 – 24 Feb 09 Carried out Dockside Calibration for Global Geophysical.
27 Dec 09 – 25 Jan 09 Carried out Bathymetry Survey at Hazira for L&T.
26 Nov 08 – 08 Dec 08 Carried out Rig Positioning undertaking the specific task of
Mobilisation, Demobilisation, DGPS & Gyro Verification, Reporting
and Offset Mesurement on board DWF at East Coast for RIL using
Starfix HP, SG Brown Gyro, Sextant and Starfix 8.1
Fugro Survey (India) Pvt. Ltd., Navi Mumbai 4 CV – Pulak Bhattacharjee
Revised on April 2011
5. RESUME
Previous Experience:
Worked in Indian Navy from 31st
Jul 1993 to 31st
Jul 2008, and retired
as Petty Officer (Surveying Recorder).
Fugro Survey (India) Pvt. Ltd., Navi Mumbai 5 CV – Pulak Bhattacharjee
Revised on April 2011
6. RESUME
Previous Experience:
Worked in Indian Navy from 31st
Jul 1993 to 31st
Jul 2008, and retired
as Petty Officer (Surveying Recorder).
Fugro Survey (India) Pvt. Ltd., Navi Mumbai 5 CV – Pulak Bhattacharjee
Revised on April 2011