This document provides a curriculum vitae for Akhirul Agus, including personal details such as name, date of birth, qualifications, and contact information. It then outlines his work experience as a driller from 2002 to the present, listing the companies and rigs he has worked on in locations such as India, Kuwait, Iraq, and Indonesia. His responsibilities as a driller are also summarized, which include supervising rig crews, conducting drilling operations safely, and maintaining equipment. A list of over 15 non-formal training courses relevant to drilling operations is also included.
1. CURRICULUM VITAE
PERSONAL DATA
Name : Akhirul Agus
Place/ Date of birth : Medan/ August 31, 1969
Nationality : Indonesia
Religion : Moslem
Sex : Male
Marital Status : Married with 2 (two) children
Language Spoken : English
Proposed Position/ Title : Driller
Certificate : IWCF Combined Surface and Subsea BOP Stack
Certificate No. DL3SS00048744-01-S17A Expiry 29 OCT 2017
Address : Jl . Dorowati no. 33 Medan 20236
Contact Number/ Mobile : +62-61-4144639, Mobile : +62-81266995088
Email : akhirul_agus@yahoo.co.id
: august.artesis@gmail.com
Passport No : A 3878921 Expiry :Oct 08, 2017
JOB PURPOSE – OVERALL SUMMARY
To operate and monitor all drilling system and equipment, supervise all drill crew work activities and
complete appropriate drilling documentation to the satisfaction of the client, Company management in
compliance with applicable policies and regulation. To maintain the cost efficiency of the operation. To
actively participate in the development of personnel.
FORMAL EDUCATION
1988 – 1996 Medan Institute of Technology
Bachelor Degree Mining of Exploration
GPA : 2.79
NON FORMAL EDUCATION
1. Basic Well Control Combined Surface and Subsea BOP Stack. indonesia
2. Drilling System &Technology Practice by Cameron, Kuwat
3. Refress First Aid Training by United Precision Drilling Co. Kuwait.
4. Rig Pass IADC Training and Operation Kuwait
5. Basic Offshore Safety Induction & Emergency Training (HUET, Sea Survival, Fire Fighting, First Aid &
CPR) Certificate No.BST.18610/IKS/11 Expiry January 28, 2014
6. Expert Well Control (APB III) Certificate No.24.5693.07 by Oil and Gas Training Center Indonesia Expiry
April, 2015
7. Basic Rigging and Lifting by PT. Chevron Pacific Indonesia
8. Escape Line Training by PT. Chevron Pacific Indonesia
9. Seminar Health, Safety and Environment by PT. Chevron Pacific Indonesia
10. Operation Excellent Management System by PT. Chevron Pacific Indonesia
2. 11. Fundamental Safe Work Practice by PT. Chevron Pacific Indonesia
12. Behavior Base Safety Training by PT. Caltex Pacific Indonesia
13. Basic Commercial Diver Class III Course by Department Transportation and Sea Communication
14. Welding Operator Course ( OAW, SMAW and TIG ) by Department of Labor
15. Safety Precaution on H2S Course by Directorate General of Oil and Natural Gas
JOB DISCRIPTION/ RESPONSIBILITY
1. Conducted Tail Gate Meeting and Pre job Meeting before doing the job
2. Organized and Supervised all rig crew to do every job safely and follow Standard Operating Procedure
3. Organized and supervised all rig crew to set all equipments/material and made sure all equipment had
been set properly
4. Organized the rig crew for process R/U Rig
5. Prepared tools and material for spud in and drilling
6. Measured install BOPE + bell nipple + choke manifold + flow line properly
7. Drill hole for BHA # 01 R.Bit 26”( Casing 20”), BHA # 02 R.Bit 17 ½”( Casing 13 3/8” ), BHA # 03 R.Bit
12 ¼” (Casing 10 ¾“ or 9 5/8”), BHA # 04 R.Bit 9 7/8” or 8 ½” (Casing 7”), BHA # 05 Under Reamer 14”
( 6 5/8” or 5” Screen Liner) as program
8. Running Casing, Float Collar, Float Shoe, Centralizer as Casing Tally
9. Conducted BOP Drill, LOT or Integrity Test
10. Follow and keep drilling parameter( P/U, R/W, S/O, WOB, RPM, Torque, SPM, Pump Pressure, SCR)
11. If the well found kick pulling string until tool joint above rotary table open HCR and choke valve on
manifold, closed BOP, monitored and record well data, coordination with Tool Pusher, Company Rep,
Mud engineer and all Team and made calculation for kill mud weight
12. Made drilling operation reported.
13. Interlaced the good communication and good connection to Tool Pusher, Company representative and
all Team
14. Responsible to keep the safety to all rig crew and all equipment
15. Supervised and organized the rig crew for process R/D Rig and move the rig and all equipments to the
next location
WORK EXPERIENCE
1. SunDowner Offshore International(Bermuda) LTD
Period : September 2013 – present as Driller
Fields : ONGC, Mumbai – India
Rig Type : CardWell International with 2 off OFM Triplex pump.
SCR CanRig AC TDS 175 ton
2. United Precision Drilling Company
Period : Nov 2011 – May 2013 as Driller
Fields : Kuwait
Rig Type : Joy stick Pyramid 3000 Hp with 3 off EWECO E- 2200 Triplex pump,
VFD LeToueneu Technology V2 TDS DirectDrive 750 ton
3. Iraq Drilling Company
Period : Jan 05 2011 – 11 April 2011 as Driller
Fields : South Rumaila Basra - Iraq
Rig Type : Drillmec 8000 with 2 off Drillmec 9T-800 Triplex Pump
4. Shiv-vani Oil & Gas Exploration Service Ltd
Period : Oct 19, 2009 – Dec 28, 2010 as Driller
Fields : ONGC, Assam – India
3. Rig Type : Cyberbase ZJ 90 DB 3000 Hp with 3 off BOMCO F 1600 Hp Triplex Pump,
VFD Varco TDS 08 SA 750 ton
5. PT.Matra Unikatama
Period : June 13, 2009 – Oct 12, 2009 as Tour Pusher
Field : PT. Chevron Pacific Indonesia - Riau
Rig Type : Mobile Trailer Rig 750 hp/124’ with 2 off Rongsheng RS-F500/500 hp triplex pump
6. PT. Zhongyuan Southeast Asia
Drilling and Completion representatif by PT. Tritama Mega Persada
Period : Dec 11, 2008 – June 12, 2009 as Driller
Fields : Petroselat Ltd - Riau
Rig Type : ZJ30-1700CZ/750Hp with 2 off Shandong QZ3NB-1000 Hp Triplex pump
7. PT. Bormindo Nusantara
Period : Sept 25, 2007 – Nov 05, 2008 as Driller
Field : PT. Chevron Pacific Indonesia
Rig Type : Conventional Land Rig Dreco Superior 1200 Hp/ with 2 off National 7P50# 500Hp,
Triplex pump and Tesco Top Drive 250 ton
Rig Model : Skytop Brewster 650Hp with 2 off Ideco 500 Hp Triplex pump
8. PT. Siak Zamrud Pusaka
Drilling and Workover Division
Period : Des 15, 2003 - Jan 31, 2007 as Driller
Period : Nov 15, 2002 - Des 14, 2003 as Derrickman
Period : May 01,2002 - Nov 14, 2002 as Floorman
Field : PT. Chevron Pacific Indonesia
Rig Type : Mobile Trailer ZJ30/1700CZ, 750 hp with 2 off QZ3NB Shandong 1000 hp Triplex pump
Rig Type : Crown 350 Hp Electric System with 2 off QZ3NB Shandong 1000 hp,Triplex pump
9. NDT Diving Service
Period : April 02, 1999 - Feb 12, 2001 as Diver
10. PT. Geoprolog Intiwijaya Mud Logging Division
Period : Des 11, 1997 – Feb 12, 1999 as Mud Logger
Fields record :
a. British Gas & Exploration and Production, Sorong – Iran Jaya with Sedco Forex, Submersible
Rig, Trident 19 Jack Up Rig and Falcon Ice Drill Ship Rig
b. Conoco Indonesia, Matak, Natuna Sea with Galaxy Driller Semi submersible rig
c. SPF Maxus Southeast Inc, Java Sea with Ocean Heritage Jack Up rig
d. Amoseas Indonesia Inc, Drajat Geothermal with Ogs Bina Drilling.