SlideShare a Scribd company logo
1 of 4
I
Mohamad Abd El-Rahman Hamed
Riyadh, Saudi Arabia
+966 557 562 110
Mohamad.a_hamed@yahoo.com
PROJECTS MANAGER
On-Time/On-Budget Delivery. Resource Optimization. Team Leadership. Relationship
management.
Projects management Ability in managing multi-million-Saudi Riyals turnkey projects. Building high performing
cross-functional teams. And optimizing project resources to achieve significant cost savings. Adept at assessing
client needs to determine project scope, budget and schedule, dedicated to ensuring regulatory compliance and
achieving outstanding quality of all deliverables. Proven problem-solver committed to identifying and harnessing
cutting-edge technologies to transform business performance and impact bottom-line growth.
Duties
Responsible for managing all aspects of a projects in order to deliver approved business functionality. Also involved in
leading a network of partner teams to deliver services which meet a customer's exact needs.
 Maintaining communication lines between all personnel involved in a project.
 Identifying, coordinating and ordering materials needed for projects.
 Acting as a mediator between team members and with external stakeholders when conflicts arise.
 Providing direction and support to projects teams and individuals.
 Tracking projects costs.
 Maintaining project records, data bases and other tracking tools.
 Communicating with senior managers and customers of the status of projects.
 Carrying out basic projects related calculations.
 Determining how project results will be measured.
 Identifying change and coordinating and managing the delivery of change.
 Managing conflict appropriately.
 Coordinating resources to deliver projects on time and to budget.
 Mentoring members of the project team in their personal development.
 Oversee daily operations.
Key Skills:
 Problem Solving.
 Project Planning.
 Cost Estimation.
 Regulatory
Compliance.
 Project Controls.
 Multi-Level Evaluation.
 Scope of Work
Evaluation.
 Cost Savings.
 Budget Management.
 Organization.
 Analytical skills.
 Numerate skills.
 Commercial awareness.
 Communication.
 Team working.
 Diplomacy.
 Ability to motivate
people.
 Management skills.
II
Professional Experience
KSA PROJECTS
Projects Manager
May 2015-Present
AlSharif Group Holding
Responsible for managing all aspects of 132KV substations project in order to
deliver approved business functionality. Also involved in leading a network of
partner teams to deliver services which meet a customer's exact needs.
 Maintaining communication lines between all personnel involved in
a project.
 Identifying, coordinating and ordering materials needed for
projects.
 Acting as a mediator between team members and with external
stakeholders when conflicts arise.
 Providing direction and support to projects teams and individuals.
 Tracking projects costs.
 Maintaining project records, data bases and other tracking tools.
 Communicating with senior managers and customers of the status
of projects.
 Carrying out basic projects related calculations.
 Determining how project results will be measured.
 Identifying change and coordinating and managing the delivery of
change.
 Managing conflict appropriately.
 Coordinating resources to deliver projects on time and to budget.
 Mentoring members of the project team in their personal
development.
 Oversee daily operations
Project Manager
2013-April,2015
AL FOZAN GROUP
(Projects & Supplies Co.)
SR.96,907,544.0
Automatic Meter Reading SYSTEMS Project
Supply and installation of Automatic Meter Reading System (AMRS) in NG-SA-
EOA 115KV Transmission Substations for 63 S/S’s in ARAMCO
Facilities.
 Reinforcement of 63 Substations 115KV network including supply,
install, T&C of 414nos’s CT&PT.
 Civil work including constructing new control rooms in each
substation.
 Telecommunication system including supply, Install, T&C of VSAT,
GSM&LAN/WAN.
 Supply, install, T&C of AMR System.
III
Eastern Region Branch
Manager
2011-2013
AL FOZAN GROUP
(Projects & Supplies Co.)
Branch Manager of Projects & Supplies Co. (AUVA) in Eastern region.
Spearhead of multi-million-SR projects by leading the following projects list,
interface regularly with project managers to enhance team skills and develop
extensive status reports for presentation to senior management and chief
executive officer. Projects list:
 Upgrading of hydrogen purity monitoring system at Shedgum PP and
Faras PP.
 Replacement of DC System at Qurrayah Power plant & Ghazlan power
plant.
 Retrofit of defective in KFMMC.
 Upgrading and Enhancement of Air Circuit Breaker of Mitsubishi.
 Automatic Meter Reading SYSTEMS (Three Contracts).
 Design, Supply, Installation and Testing and Commissioning of MV
switchgear in Building # 18.3 and UPC.
 Upgrading AK-1 Plant Network.
At SWCC AL KHOBAR.
Major Accomplishments:
 Led turnaround SR.210 million projects.
 Achieved and/or surpassed SR.145 million awarded.
 Apply new work flow procedure to enhance the performance and
team work environments.
Project Manager
AL FOZAN GROUP
(Projects & Supplies Co.)
 Automatic Meter Reading SYSTEMS Project
Supply and installation of Automatic Meter Reading System (AMRS) in
SEC-EOA Transmission Substations (10931037/00).
 Automatic Meter Reading SYSTEMS Project
Supply & Installation of Automatic Meter Reading System in SEC
Consolidated
 Transmission area Extra High Voltage
(CTA EHV) Transmission Substations (10931028/00).
 Automatic Meter Reading SYSTEMS Project
Installation of Automatic Meter Reading System in (30) Substation at
SEC, SARAMCO and SWCC in Eastern Region (30431144/00).
IV
ADDITIONAL EMPLOYEMENT
UPON REQUEST
Education
Faculty of Engineering, Helwan, Egypt
BSc electrical machines and power engineering department
Career Level
Career Level: Projects Manager
Notice Period to Work: 2 month or less

More Related Content

What's hot (20)

MUHAMMED MUSA CIVIL ENGG PP
MUHAMMED MUSA CIVIL ENGG PPMUHAMMED MUSA CIVIL ENGG PP
MUHAMMED MUSA CIVIL ENGG PP
 
Resume for Thomas Salisbury
Resume for Thomas SalisburyResume for Thomas Salisbury
Resume for Thomas Salisbury
 
CV_LouiseCorris_2015_v1.00
CV_LouiseCorris_2015_v1.00CV_LouiseCorris_2015_v1.00
CV_LouiseCorris_2015_v1.00
 
Khairul Annuar LinkedIn
Khairul Annuar LinkedInKhairul Annuar LinkedIn
Khairul Annuar LinkedIn
 
Ravi teja
Ravi tejaRavi teja
Ravi teja
 
murali_Resume
murali_Resumemurali_Resume
murali_Resume
 
C.V
C.VC.V
C.V
 
Holly Uniek_Resume
Holly Uniek_ResumeHolly Uniek_Resume
Holly Uniek_Resume
 
Manohar Resume
Manohar ResumeManohar Resume
Manohar Resume
 
155809
155809155809
155809
 
UPDATED CV
UPDATED CVUPDATED CV
UPDATED CV
 
TCG Construction Project Management
TCG Construction Project Management TCG Construction Project Management
TCG Construction Project Management
 
Peter Weiland_Construction Final ResumeA
Peter Weiland_Construction Final ResumeAPeter Weiland_Construction Final ResumeA
Peter Weiland_Construction Final ResumeA
 
The role of project management consultants
The role of project management consultantsThe role of project management consultants
The role of project management consultants
 
NadeemCV-1
NadeemCV-1NadeemCV-1
NadeemCV-1
 
Resume
ResumeResume
Resume
 
EPC PLANNER
EPC PLANNEREPC PLANNER
EPC PLANNER
 
Engr_Shah_Resume
Engr_Shah_ResumeEngr_Shah_Resume
Engr_Shah_Resume
 
CHERYL_L_Gipfel - June
CHERYL_L_Gipfel - JuneCHERYL_L_Gipfel - June
CHERYL_L_Gipfel - June
 
Mohd. Mohsin Chouhna Modified Resume ,
Mohd. Mohsin Chouhna Modified Resume ,Mohd. Mohsin Chouhna Modified Resume ,
Mohd. Mohsin Chouhna Modified Resume ,
 

Similar to Mohamad Abd ElRahman

Similar to Mohamad Abd ElRahman (20)

Mansoor - PM.PDF
Mansoor - PM.PDFMansoor - PM.PDF
Mansoor - PM.PDF
 
Mansoor pm
Mansoor   pmMansoor   pm
Mansoor pm
 
Jamal Oklah CV
Jamal Oklah CVJamal Oklah CV
Jamal Oklah CV
 
Yasser c v
Yasser c v Yasser c v
Yasser c v
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Rahimulla CV
Rahimulla CVRahimulla CV
Rahimulla CV
 
Vinayak Rakesh_CV.DOC
Vinayak Rakesh_CV.DOCVinayak Rakesh_CV.DOC
Vinayak Rakesh_CV.DOC
 
Jois Lakshmipathy - CV
Jois Lakshmipathy - CVJois Lakshmipathy - CV
Jois Lakshmipathy - CV
 
V Simpson Senior Project Manager Resume v 2
V Simpson Senior Project Manager Resume v 2V Simpson Senior Project Manager Resume v 2
V Simpson Senior Project Manager Resume v 2
 
CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016CV PHILLIS SKONTOS_ Jun_2016
CV PHILLIS SKONTOS_ Jun_2016
 
D Camplejohn - Curriculum Vitae - 20151104
D Camplejohn - Curriculum Vitae - 20151104D Camplejohn - Curriculum Vitae - 20151104
D Camplejohn - Curriculum Vitae - 20151104
 
Kjf13a1 chron
Kjf13a1 chronKjf13a1 chron
Kjf13a1 chron
 
Kjf13a1 chron
Kjf13a1 chronKjf13a1 chron
Kjf13a1 chron
 
Teresa Wai Shan Tso_2016_PMP
Teresa Wai Shan Tso_2016_PMPTeresa Wai Shan Tso_2016_PMP
Teresa Wai Shan Tso_2016_PMP
 
Prejith M_CV
Prejith M_CVPrejith M_CV
Prejith M_CV
 
Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15Dave Parta sipm resume 2017 11 15
Dave Parta sipm resume 2017 11 15
 
Resume -Suniel Puri
Resume -Suniel PuriResume -Suniel Puri
Resume -Suniel Puri
 
Resume
ResumeResume
Resume
 
Monique Hubartt PMP Resume
Monique Hubartt PMP ResumeMonique Hubartt PMP Resume
Monique Hubartt PMP Resume
 
Project/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronProject/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chron
 

Mohamad Abd ElRahman

  • 1. I Mohamad Abd El-Rahman Hamed Riyadh, Saudi Arabia +966 557 562 110 Mohamad.a_hamed@yahoo.com PROJECTS MANAGER On-Time/On-Budget Delivery. Resource Optimization. Team Leadership. Relationship management. Projects management Ability in managing multi-million-Saudi Riyals turnkey projects. Building high performing cross-functional teams. And optimizing project resources to achieve significant cost savings. Adept at assessing client needs to determine project scope, budget and schedule, dedicated to ensuring regulatory compliance and achieving outstanding quality of all deliverables. Proven problem-solver committed to identifying and harnessing cutting-edge technologies to transform business performance and impact bottom-line growth. Duties Responsible for managing all aspects of a projects in order to deliver approved business functionality. Also involved in leading a network of partner teams to deliver services which meet a customer's exact needs.  Maintaining communication lines between all personnel involved in a project.  Identifying, coordinating and ordering materials needed for projects.  Acting as a mediator between team members and with external stakeholders when conflicts arise.  Providing direction and support to projects teams and individuals.  Tracking projects costs.  Maintaining project records, data bases and other tracking tools.  Communicating with senior managers and customers of the status of projects.  Carrying out basic projects related calculations.  Determining how project results will be measured.  Identifying change and coordinating and managing the delivery of change.  Managing conflict appropriately.  Coordinating resources to deliver projects on time and to budget.  Mentoring members of the project team in their personal development.  Oversee daily operations. Key Skills:  Problem Solving.  Project Planning.  Cost Estimation.  Regulatory Compliance.  Project Controls.  Multi-Level Evaluation.  Scope of Work Evaluation.  Cost Savings.  Budget Management.  Organization.  Analytical skills.  Numerate skills.  Commercial awareness.  Communication.  Team working.  Diplomacy.  Ability to motivate people.  Management skills.
  • 2. II Professional Experience KSA PROJECTS Projects Manager May 2015-Present AlSharif Group Holding Responsible for managing all aspects of 132KV substations project in order to deliver approved business functionality. Also involved in leading a network of partner teams to deliver services which meet a customer's exact needs.  Maintaining communication lines between all personnel involved in a project.  Identifying, coordinating and ordering materials needed for projects.  Acting as a mediator between team members and with external stakeholders when conflicts arise.  Providing direction and support to projects teams and individuals.  Tracking projects costs.  Maintaining project records, data bases and other tracking tools.  Communicating with senior managers and customers of the status of projects.  Carrying out basic projects related calculations.  Determining how project results will be measured.  Identifying change and coordinating and managing the delivery of change.  Managing conflict appropriately.  Coordinating resources to deliver projects on time and to budget.  Mentoring members of the project team in their personal development.  Oversee daily operations Project Manager 2013-April,2015 AL FOZAN GROUP (Projects & Supplies Co.) SR.96,907,544.0 Automatic Meter Reading SYSTEMS Project Supply and installation of Automatic Meter Reading System (AMRS) in NG-SA- EOA 115KV Transmission Substations for 63 S/S’s in ARAMCO Facilities.  Reinforcement of 63 Substations 115KV network including supply, install, T&C of 414nos’s CT&PT.  Civil work including constructing new control rooms in each substation.  Telecommunication system including supply, Install, T&C of VSAT, GSM&LAN/WAN.  Supply, install, T&C of AMR System.
  • 3. III Eastern Region Branch Manager 2011-2013 AL FOZAN GROUP (Projects & Supplies Co.) Branch Manager of Projects & Supplies Co. (AUVA) in Eastern region. Spearhead of multi-million-SR projects by leading the following projects list, interface regularly with project managers to enhance team skills and develop extensive status reports for presentation to senior management and chief executive officer. Projects list:  Upgrading of hydrogen purity monitoring system at Shedgum PP and Faras PP.  Replacement of DC System at Qurrayah Power plant & Ghazlan power plant.  Retrofit of defective in KFMMC.  Upgrading and Enhancement of Air Circuit Breaker of Mitsubishi.  Automatic Meter Reading SYSTEMS (Three Contracts).  Design, Supply, Installation and Testing and Commissioning of MV switchgear in Building # 18.3 and UPC.  Upgrading AK-1 Plant Network. At SWCC AL KHOBAR. Major Accomplishments:  Led turnaround SR.210 million projects.  Achieved and/or surpassed SR.145 million awarded.  Apply new work flow procedure to enhance the performance and team work environments. Project Manager AL FOZAN GROUP (Projects & Supplies Co.)  Automatic Meter Reading SYSTEMS Project Supply and installation of Automatic Meter Reading System (AMRS) in SEC-EOA Transmission Substations (10931037/00).  Automatic Meter Reading SYSTEMS Project Supply & Installation of Automatic Meter Reading System in SEC Consolidated  Transmission area Extra High Voltage (CTA EHV) Transmission Substations (10931028/00).  Automatic Meter Reading SYSTEMS Project Installation of Automatic Meter Reading System in (30) Substation at SEC, SARAMCO and SWCC in Eastern Region (30431144/00).
  • 4. IV ADDITIONAL EMPLOYEMENT UPON REQUEST Education Faculty of Engineering, Helwan, Egypt BSc electrical machines and power engineering department Career Level Career Level: Projects Manager Notice Period to Work: 2 month or less