1. C.V MoayadQbilawi
Project Manager –RE- Utilities-Construction Manager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -1 of 5
EDUCATION
Bachelor of Science in Civil
Engineering
Industrial and Agricultural
Constructions,
Romania, 1986
Marital status
Married
PROFESSION
Civil Engineer
NATIONALITY
Jordanian
Place and Date of Birth
Kuwait- 14 Aug.1968
MEMBERSHIPS
PMP- Advanced Project
Management, on progress
Member of Jordan Engineers
Association:Civil Engineering
Division Sewer and water Branch
No. of Registration (8665), 1987
Member of Jordanian
Environment Society 1998
Member of Federation of Arab
Engineers
LANGUAGES
Arabic
English
SUMMARY
Mr. Qbilawi isaqualifiedCivilEngineer dynamic,energetic,self-motivatedhonestly
possessing over 27 years of strong experience in various construction large scale
infrastructure ¶llel Roads projects from reputed companies in the field of
consulting & construction firms in the Middle East. Previously working in Public
Works Authority since 2009 as Senior Civil Engineer in the Drainage Networks-
Operations and Maintenance Department.
PROFESSIONALEXPERIENCE
Area Engineer/SeniorConstructionEngineer, Dec. 2009 – Oct.2013 (4yearsand
2Months)-closedmycontract
Ashghal (PWA),Operationand Maintenance,AssetsAffairs,State of Qatar
UpgradingRoads& Pipes andconstruction &handnignover microtunnels by Micro
tunnel Boring machine) (MTBM with all infrastructures utilities
Draw the contractor to Carry out a soil corrosively study along the road of
proposedpipelinesasdirectedand designatedinthe projectspecification.Request
the sample of material ,catalogues details certificates and method statement for
qualifyingandgetapproval,andcoordinate withourmaterial Engineer and QC/QA
to study and check the submittals provided from contractor
Check and give opinion of the Submittals and shop drawing and mix design for
concrete and asphalt l.
Check the RFI (Trench excavation pipe Bedding alignment of pipe, etc. Check the
daily program submitted of contractor for every item which will be executed.
Monitoring and some inspection during installation Check all necessary tools for
cutting, chamfering, testing and all many other requirements for a satisfactory
installingthe pipe which will be used of contractor. Put down for the arrange and
managingthe machine,vehicles,manpowerandstaff foreveryitemof work. Check
and supervisionthe progressof workonsite (qualityandquantity) as per daily and
RFI submitted. Surplus pieces (cutting pipe, steel, reinforcement steel, defect
instrument and tools to move back to deposit. Managing the construction of the
works,activitiestoensure thatthe worksare run according to what schedule plan.
Construction and Supervision of Various Sewer and storm water network, and
Tunnels pipeline
Review&study of proposed civil projects and raise comments. Preparing snag list
and follow up. Perform inspections for road projects and issuing clearance
certificate.Supervise and issued work permit. Attend and arrange any shut down
related to his area as per the shutdown procedure. Attended emergency work
during rain
& pipe breaks. Provide and request material required for maintenance activities. Liaise with safety and QAQC
section.Responsible toraise anyservice requesttoconcernedsectionanddepartmentandfollow tocompletion.
ReviewCCTV reportscarriedoutand use latestGIS informationfeaturesto manage operation and maintenance.
2. MoayadQbilawi
Project Manager –RE- Utilities-ConstrictionManager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -2 of 5
Attendingsite inspectionforcompletedcapital projectsand taking over for operation. Provide technical reports
regardingsewerage,ground&surface waternetworkcondition.Evaluatingunit’sstaff performance andreportto
headof division.Followthe cleaningof greasytrapinthe restaurantswhichconnected with the network. Follow
the contractors whomworkin the area to preventanydamage of the existing sewer. Managing the construction
of the works, activities to ensure that the works are run according to what plan.
Al Harbi Trading & Contracting, Saudi Arabia
Project Value:110,320,890 SR
Site Manager, Apr 2006 - May 2008(2years and 2 Months)-search upper position and High salary
Construction TrunklinesandReservoirs forSaline WaterconversionCorporation (SWCC),
Reportto the ProjectManager, monitoringall worksdone bysub-contractorsfromcommencementto
completionof projectsassuringqualityandworkmanshipandadherencetoall contract specifications.Lookafter
qualityassurance andqualitycontrol of all aspectsof the projectsincludingconstructionandmaterials. Ensure
use onlyapprovedmaterialsandexecutionof accordingtobestpracticestoachieve qualityaspercontract
requirements. Prepare the technical submittalslike methodstatements,shopdrawingsandassure compliance
withapproveddesignandcontractrequirementstoProjectManager. Preparingweeklyandmonthly progress
againstapprovedexecutive program. Ensure propermonitoringof site activitiesandestablishmentand
maintenance of all quality records. Make accordingwithmyuppermanagerto puthimknowingthe matteron
site andwhat I needforpushingandresolve the problemwhichinfluencesonadvancementthe work.Follow-up
our projectV.Oto getapproval and take actioninsite.
Al-Assil Eng.& Cont.Est., Amman- Jordan
Project Value:1,643,734 $
Project Manager, Oct 2005 – Apr 2006(7 Months)-leavinng to KSA
Upgrade Water Network at Al Nuzaha-Amman City
Coordinate with local authourity and various service dept.Preparesite storage(Open&Coverd)areafor
depositingthe pipes and fittings ,startto make trial holes,check and set up the bench mark ,charting out the
project objective and plans,setting performance requirements,and selecting project participate,Brining about
optimum utilization of resources-labor,material and equiment,and ensuring thier procurement at most cost-
effective terms.
Dar Alomran, Libya
Project Value:2,980,456,900 $
Site Engineer, Jun 2004 - Oct 2005 (1year and 5 Months)-closed the project
UP Grading the infrastructure and Roads (Sewer ,Strom water network, pipes of max. Dia 1000mm, and Roads
Work
Checked and ensured adherence of the pipeline layout with urban planning requirements, supervised the
constructionof gravitymainpipelines,manholesand chambers to approved drawings. Provided connections to
individual houses to the sewerage mains after analysis of the existing house surveys and preparing suitable
designs. Prepare measurementsheetsandInterimvaluationsforconsultant’sapproval. Monitored andreported
the progress of the Project Manager
Gama Contractor Est., Amman, Jordan
Project Value 01,765,897 $
Project Manager, Oct 2003 – June 2004(9 Months)-project nearly closing and leaving to Libya
Water Project
Perform a key role in project planning, budgeting, and identification of resource needed, create the terms,
3. MoayadQbilawi
Project Manager –RE- Utilities-ConstrictionManager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -3 of 5
develop the objective/goals of each and assign individual responsibilities, Ensure that construction activities
move accordingto predeterminedschedule.Devisethe projectworkplansandmake revisionsasand when need
arises,Ensure project documents are complete, Monitor the progress of the construction activates on a regular
basis and hold a regular status meetings with all the sub-teams
Al Assil Est. Contracting, Salt Jordan
Project Value:1,236,980$
Site Engineer, Sep. 2001 – June 2003(1 year and 10 Months)
Sewer Project- Salt Sewer
Setupinshopdrawingsalsothe as-builtdrawingsall surfacesandutilitiesincludingbutnotlimitedtowaterlines,
sewerlines,drains,cables,electricity. Getting PRO from several authorities for starting the project work, Make
arrangements necessary for carrying out the works with the various utilities services department and private
landowners, Identify the elements of project design and construction likely to give rise to disputes and claims.
Serve as a key link with the clients and review the deliverable prepared by the team before passing onto client
Boseheh Cont. Est., Karak Jordan
Project value:3,876,987 $
Construction Manager, June 1999 –Sep. 2001(2 years and 4 Months)-closed project
Water Project Al Karak Sewer& Roads Project
Followupthe site activitiesandguide the supervisorandforemantoachieve targetasperprogram and contract
documents. Prepare daily logs and reports on progress and status of the project and update the same to the
constructionteammanagement. Monitoredprogressof the works optimizeduse of equipment and manpower
and ensured adherence quality and cost targets. Liaised with consultant and client for achieving project
milestones. Carrying out pre inspections and final inspection with consultant & client
Hussin Atieh Est &Construction., Aqwar Jordan
Project Value:1,450,872 $
Site Engineer, June 1998 – Apr 1999(11 Months)-closed project
Water Project Al Kagreom Water Project
Actingas the main technical adviserona constructionsite forsubcontractor,craftspeople andoperatives,setting
Out ,levelingthe site, checkingplans,drawingsandquantitiesforaccuracyof calculations, Ensuring that material
used and work performed are as per specification, managing ,the progress of the work on site , check the
measurements with surveyors ,check the material need it to site (Quantity and Quality),check and follow
the maintenance of equipment ,submit the daily program and requests .
Amra Consulting Engineers, Amman Jordan
Project Value:1,765,970 $
Site Engineer, June 1996 – June 1998(2 years and 1Month)-closed project
Sewer Project Amman
Check and follow the inspection request as per daily program submitted ,monitoring and interpreting the
contract design documents supplied by the client or architect ,liaising with any consultant ,subcontractor,
supervisors,planners,quantitysurveyorsandthe general workforce involvedinthe project,liaisingwiththe local
authority (Where appropriate to the project)to ensure compliance with local construction regulations and by –
laws,dayto day managementof site,including supervising and monitoring the site labor force and the work of
any subcontractor
4. MoayadQbilawi
Project Manager –RE- Utilities-ConstrictionManager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -4 of 5
Al Mustasher(Engicon) JV Salzgitter Consulting Engineers, Salt Jordan
Project Value:1,150,982 $
Site Engineer, Dec. 1994 – May 1996(1 year and 6 Months)-closed Project
Supervised the construction of the sewerage pipe lines and associated chambers and rising main pipelines,
manholes and Inspection chambers. Determined the route of sewerage pipelines and location of manholes
basedon the layoutandexistingutilities. Participatedinthe preparation of program for execution. Assisted the
Quantity surveyor in measuring performed work at site and preparing measurement records for consultant’s
approval. Conducted pre-final Inspection and rectified snags prior to handover to the client.
Roqn Al Handasa Consulting Engineers
Project Value:1,564,980$
Site Engineer, Feb 1993 – Oct 1994(1 year and 9 Months)-closed project
Sewer and Water project
Monitoredandensuredcompliance of all constructionworkswithapproved methods of construction, drawings,
contract specificationsandinstructions. Lookedafterqualitycontrol of all materials and equipment used by the
contractor. Preparedweeklyandmonthlyreportsof the contractor’sprogressagainstschedules. Measured and
maintained approved records of works performed and reviewed monthly valuation against BOQ
Contracting Diab Company
Project Value:756000 $
Site Engineer, Jan 1992 – Nov 1992(11 Months)-closed project
Marka Secondary Boys School
Al Assil Est. Contracting
Project Value: 1,678,980 $
site Engineer, Feb 1990 – Dec 1991(1 year and 11 Months)-closed project
Salt-Arda-Middle Agwar Road and Infrastructure Project (Section) 39/88
9KM Roads,2 Bridges and Girders (Pre-stressed concrete),and 4 Ramps
Supervisedthe constructionof the sewerage pumping station and associated chambers, gravity and rising main
pipelines,manholesandInspectionchambers,Retainingwall.,Construction2Bridges(Pre-stress) Determinedthe
route of sewerage pipelinesandlocationof manholes based on the layout and existing utilities. Participated in
the preparation of program for execution Assisted the Quantity surveyor in measuring performed work at site
and preparing measurement records for consultant’s approval. Conducted pre-final Inspection and rectified
snags prior to handover to the client.
Jordan Armed Forces
Junior Engineer, Dec 1986 – Dec 1988(2 years)-closed period of Army
Road Channel Infrastructure
Checked and ensured adherence of the pipeline layout with urban planning requirements, supervised the
constructionof gravitymainpipelines,manholesand chambers to approved drawings. Provided connections to
individual houses to the sewerage mains after analysis of the existing house surveys and preparing suitable
designs. Prepare measurementsheetsandInterimvaluationsforconsultant’sapproval. Monitoredandreported
RELEVANT PROJECT EXPERIENCE
SewerProjectAmman114.
SewerProjectSaltCA No. 49/94.
Sewer& WaterProjects.