SlideShare a Scribd company logo
1 of 5
C.V MoayadQbilawi
Project Manager –RE- Utilities-Construction Manager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -1 of 5
EDUCATION
Bachelor of Science in Civil
Engineering
Industrial and Agricultural
Constructions,
Romania, 1986
Marital status
Married
PROFESSION
Civil Engineer
NATIONALITY
Jordanian
Place and Date of Birth
Kuwait- 14 Aug.1968
MEMBERSHIPS
PMP- Advanced Project
Management, on progress
Member of Jordan Engineers
Association:Civil Engineering
Division Sewer and water Branch
No. of Registration (8665), 1987
Member of Jordanian
Environment Society 1998
Member of Federation of Arab
Engineers
LANGUAGES
Arabic
English
SUMMARY
Mr. Qbilawi isaqualifiedCivilEngineer dynamic,energetic,self-motivatedhonestly
possessing over 27 years of strong experience in various construction large scale
infrastructure &parallel Roads projects from reputed companies in the field of
consulting & construction firms in the Middle East. Previously working in Public
Works Authority since 2009 as Senior Civil Engineer in the Drainage Networks-
Operations and Maintenance Department.
PROFESSIONALEXPERIENCE
Area Engineer/SeniorConstructionEngineer, Dec. 2009 – Oct.2013 (4yearsand
2Months)-closedmycontract
Ashghal (PWA),Operationand Maintenance,AssetsAffairs,State of Qatar
UpgradingRoads& Pipes andconstruction &handnignover microtunnels by Micro
tunnel Boring machine) (MTBM with all infrastructures utilities
Draw the contractor to Carry out a soil corrosively study along the road of
proposedpipelinesasdirectedand designatedinthe projectspecification.Request
the sample of material ,catalogues details certificates and method statement for
qualifyingandgetapproval,andcoordinate withourmaterial Engineer and QC/QA
to study and check the submittals provided from contractor
Check and give opinion of the Submittals and shop drawing and mix design for
concrete and asphalt l.
Check the RFI (Trench excavation pipe Bedding alignment of pipe, etc. Check the
daily program submitted of contractor for every item which will be executed.
Monitoring and some inspection during installation Check all necessary tools for
cutting, chamfering, testing and all many other requirements for a satisfactory
installingthe pipe which will be used of contractor. Put down for the arrange and
managingthe machine,vehicles,manpowerandstaff foreveryitemof work. Check
and supervisionthe progressof workonsite (qualityandquantity) as per daily and
RFI submitted. Surplus pieces (cutting pipe, steel, reinforcement steel, defect
instrument and tools to move back to deposit. Managing the construction of the
works,activitiestoensure thatthe worksare run according to what schedule plan.
Construction and Supervision of Various Sewer and storm water network, and
Tunnels pipeline
Review&study of proposed civil projects and raise comments. Preparing snag list
and follow up. Perform inspections for road projects and issuing clearance
certificate.Supervise and issued work permit. Attend and arrange any shut down
related to his area as per the shutdown procedure. Attended emergency work
during rain
& pipe breaks. Provide and request material required for maintenance activities. Liaise with safety and QAQC
section.Responsible toraise anyservice requesttoconcernedsectionanddepartmentandfollow tocompletion.
ReviewCCTV reportscarriedoutand use latestGIS informationfeaturesto manage operation and maintenance.
MoayadQbilawi
Project Manager –RE- Utilities-ConstrictionManager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -2 of 5
Attendingsite inspectionforcompletedcapital projectsand taking over for operation. Provide technical reports
regardingsewerage,ground&surface waternetworkcondition.Evaluatingunit’sstaff performance andreportto
headof division.Followthe cleaningof greasytrapinthe restaurantswhichconnected with the network. Follow
the contractors whomworkin the area to preventanydamage of the existing sewer. Managing the construction
of the works, activities to ensure that the works are run according to what plan.
Al Harbi Trading & Contracting, Saudi Arabia
Project Value:110,320,890 SR
Site Manager, Apr 2006 - May 2008(2years and 2 Months)-search upper position and High salary
Construction TrunklinesandReservoirs forSaline WaterconversionCorporation (SWCC),
Reportto the ProjectManager, monitoringall worksdone bysub-contractorsfromcommencementto
completionof projectsassuringqualityandworkmanshipandadherencetoall contract specifications.Lookafter
qualityassurance andqualitycontrol of all aspectsof the projectsincludingconstructionandmaterials. Ensure
use onlyapprovedmaterialsandexecutionof accordingtobestpracticestoachieve qualityaspercontract
requirements. Prepare the technical submittalslike methodstatements,shopdrawingsandassure compliance
withapproveddesignandcontractrequirementstoProjectManager. Preparingweeklyandmonthly progress
againstapprovedexecutive program. Ensure propermonitoringof site activitiesandestablishmentand
maintenance of all quality records. Make accordingwithmyuppermanagerto puthimknowingthe matteron
site andwhat I needforpushingandresolve the problemwhichinfluencesonadvancementthe work.Follow-up
our projectV.Oto getapproval and take actioninsite.
Al-Assil Eng.& Cont.Est., Amman- Jordan
Project Value:1,643,734 $
Project Manager, Oct 2005 – Apr 2006(7 Months)-leavinng to KSA
Upgrade Water Network at Al Nuzaha-Amman City
Coordinate with local authourity and various service dept.Preparesite storage(Open&Coverd)areafor
depositingthe pipes and fittings ,startto make trial holes,check and set up the bench mark ,charting out the
project objective and plans,setting performance requirements,and selecting project participate,Brining about
optimum utilization of resources-labor,material and equiment,and ensuring thier procurement at most cost-
effective terms.
Dar Alomran, Libya
Project Value:2,980,456,900 $
Site Engineer, Jun 2004 - Oct 2005 (1year and 5 Months)-closed the project
UP Grading the infrastructure and Roads (Sewer ,Strom water network, pipes of max. Dia 1000mm, and Roads
Work
Checked and ensured adherence of the pipeline layout with urban planning requirements, supervised the
constructionof gravitymainpipelines,manholesand chambers to approved drawings. Provided connections to
individual houses to the sewerage mains after analysis of the existing house surveys and preparing suitable
designs. Prepare measurementsheetsandInterimvaluationsforconsultant’sapproval. Monitored andreported
the progress of the Project Manager
Gama Contractor Est., Amman, Jordan
Project Value 01,765,897 $
Project Manager, Oct 2003 – June 2004(9 Months)-project nearly closing and leaving to Libya
Water Project
Perform a key role in project planning, budgeting, and identification of resource needed, create the terms,
MoayadQbilawi
Project Manager –RE- Utilities-ConstrictionManager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -3 of 5
develop the objective/goals of each and assign individual responsibilities, Ensure that construction activities
move accordingto predeterminedschedule.Devisethe projectworkplansandmake revisionsasand when need
arises,Ensure project documents are complete, Monitor the progress of the construction activates on a regular
basis and hold a regular status meetings with all the sub-teams
Al Assil Est. Contracting, Salt Jordan
Project Value:1,236,980$
Site Engineer, Sep. 2001 – June 2003(1 year and 10 Months)
Sewer Project- Salt Sewer
Setupinshopdrawingsalsothe as-builtdrawingsall surfacesandutilitiesincludingbutnotlimitedtowaterlines,
sewerlines,drains,cables,electricity. Getting PRO from several authorities for starting the project work, Make
arrangements necessary for carrying out the works with the various utilities services department and private
landowners, Identify the elements of project design and construction likely to give rise to disputes and claims.
Serve as a key link with the clients and review the deliverable prepared by the team before passing onto client
Boseheh Cont. Est., Karak Jordan
Project value:3,876,987 $
Construction Manager, June 1999 –Sep. 2001(2 years and 4 Months)-closed project
Water Project Al Karak Sewer& Roads Project
Followupthe site activitiesandguide the supervisorandforemantoachieve targetasperprogram and contract
documents. Prepare daily logs and reports on progress and status of the project and update the same to the
constructionteammanagement. Monitoredprogressof the works optimizeduse of equipment and manpower
and ensured adherence quality and cost targets. Liaised with consultant and client for achieving project
milestones. Carrying out pre inspections and final inspection with consultant & client
Hussin Atieh Est &Construction., Aqwar Jordan
Project Value:1,450,872 $
Site Engineer, June 1998 – Apr 1999(11 Months)-closed project
Water Project Al Kagreom Water Project
Actingas the main technical adviserona constructionsite forsubcontractor,craftspeople andoperatives,setting
Out ,levelingthe site, checkingplans,drawingsandquantitiesforaccuracyof calculations, Ensuring that material
used and work performed are as per specification, managing ,the progress of the work on site , check the
measurements with surveyors ,check the material need it to site (Quantity and Quality),check and follow
the maintenance of equipment ,submit the daily program and requests .
Amra Consulting Engineers, Amman Jordan
Project Value:1,765,970 $
Site Engineer, June 1996 – June 1998(2 years and 1Month)-closed project
Sewer Project Amman
Check and follow the inspection request as per daily program submitted ,monitoring and interpreting the
contract design documents supplied by the client or architect ,liaising with any consultant ,subcontractor,
supervisors,planners,quantitysurveyorsandthe general workforce involvedinthe project,liaisingwiththe local
authority (Where appropriate to the project)to ensure compliance with local construction regulations and by –
laws,dayto day managementof site,including supervising and monitoring the site labor force and the work of
any subcontractor
MoayadQbilawi
Project Manager –RE- Utilities-ConstrictionManager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -4 of 5
Al Mustasher(Engicon) JV Salzgitter Consulting Engineers, Salt Jordan
Project Value:1,150,982 $
Site Engineer, Dec. 1994 – May 1996(1 year and 6 Months)-closed Project
Supervised the construction of the sewerage pipe lines and associated chambers and rising main pipelines,
manholes and Inspection chambers. Determined the route of sewerage pipelines and location of manholes
basedon the layoutandexistingutilities. Participatedinthe preparation of program for execution. Assisted the
Quantity surveyor in measuring performed work at site and preparing measurement records for consultant’s
approval. Conducted pre-final Inspection and rectified snags prior to handover to the client.
Roqn Al Handasa Consulting Engineers
Project Value:1,564,980$
Site Engineer, Feb 1993 – Oct 1994(1 year and 9 Months)-closed project
Sewer and Water project
Monitoredandensuredcompliance of all constructionworkswithapproved methods of construction, drawings,
contract specificationsandinstructions. Lookedafterqualitycontrol of all materials and equipment used by the
contractor. Preparedweeklyandmonthlyreportsof the contractor’sprogressagainstschedules. Measured and
maintained approved records of works performed and reviewed monthly valuation against BOQ
Contracting Diab Company
Project Value:756000 $
Site Engineer, Jan 1992 – Nov 1992(11 Months)-closed project
Marka Secondary Boys School
Al Assil Est. Contracting
Project Value: 1,678,980 $
site Engineer, Feb 1990 – Dec 1991(1 year and 11 Months)-closed project
Salt-Arda-Middle Agwar Road and Infrastructure Project (Section) 39/88
9KM Roads,2 Bridges and Girders (Pre-stressed concrete),and 4 Ramps
Supervisedthe constructionof the sewerage pumping station and associated chambers, gravity and rising main
pipelines,manholesandInspectionchambers,Retainingwall.,Construction2Bridges(Pre-stress) Determinedthe
route of sewerage pipelinesandlocationof manholes based on the layout and existing utilities. Participated in
the preparation of program for execution Assisted the Quantity surveyor in measuring performed work at site
and preparing measurement records for consultant’s approval. Conducted pre-final Inspection and rectified
snags prior to handover to the client.
Jordan Armed Forces
Junior Engineer, Dec 1986 – Dec 1988(2 years)-closed period of Army
Road Channel Infrastructure
Checked and ensured adherence of the pipeline layout with urban planning requirements, supervised the
constructionof gravitymainpipelines,manholesand chambers to approved drawings. Provided connections to
individual houses to the sewerage mains after analysis of the existing house surveys and preparing suitable
designs. Prepare measurementsheetsandInterimvaluationsforconsultant’sapproval. Monitoredandreported
RELEVANT PROJECT EXPERIENCE
SewerProjectAmman114.
SewerProjectSaltCA No. 49/94.
Sewer& WaterProjects.
MoayadQbilawi
Project Manager –RE- Utilities-ConstrictionManager
Moayad_qblawi@yahoo.com
Mobile #00962798447331-00962799434510
Moayad Qbilawi -5 of 5
Water ProjectAl KarakWater Project.
Trunk line forSaline WaterconversionCorporation.
OperationandMaintenance of VariousSewerNetworks.
Road Channel Infrastructure.
TRAININGSAND COURSES
Course inConcrete Structures Design. JordanianEng.Association-1995
Course inSewerNetwork Design. -JordanianEng.Association-1995
Course inWater supplyNetworkDesign. JordanianEng.Association-1996
Course inReinforcedtanks Design. JordanianEng. Association-1996
Course inRoad Design. JordanianEng.Association-1996
Course inConcrete andasphaltmixturesDesign - JordanianEng.Association-1997
Course inprimaveraprojectplannerver.3.0 ./Dec2005
Workshopinwaterand waste waterby inWentGroup. June/2003.
Maintenance of SewerNetwork&EquipmentTraining-2012
Assessments&TakingOverSewage Network&PumpingStationsProjects(PWA&NCB).2011
Course in PMP 4th
edition.May/2011
PMP 5th
edition,PMI Examonprogress.
Qatar EngineeringCommitteeUPDA, Examonprogress.

More Related Content

What's hot (20)

CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
CV1
CV1CV1
CV1
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
Khan.CV
Khan.CVKhan.CV
Khan.CV
 
Yusuf Khan (CV) Up Date
Yusuf Khan (CV) Up DateYusuf Khan (CV) Up Date
Yusuf Khan (CV) Up Date
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Bannichan Savier CV
Bannichan Savier CVBannichan Savier CV
Bannichan Savier CV
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
Bill resume
Bill resumeBill resume
Bill resume
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
CV Piping Supervisor
CV Piping SupervisorCV Piping Supervisor
CV Piping Supervisor
 

Similar to Moayad c.v version 3

CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4Atif Ashraf
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Nahiyoon
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddinFiazuddin Memon
 
Sami resume new
Sami resume newSami resume new
Sami resume newsamiuae
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 

Similar to Moayad c.v version 3 (20)

Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Basheer Ahmed Senior Infrastructure
Basheer Ahmed Senior InfrastructureBasheer Ahmed Senior Infrastructure
Basheer Ahmed Senior Infrastructure
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Ranjith_Kumar R - CV
Ranjith_Kumar R - CVRanjith_Kumar R - CV
Ranjith_Kumar R - CV
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
jainco
jaincojainco
jainco
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 

Moayad c.v version 3

  • 1. C.V MoayadQbilawi Project Manager –RE- Utilities-Construction Manager Moayad_qblawi@yahoo.com Mobile #00962798447331-00962799434510 Moayad Qbilawi -1 of 5 EDUCATION Bachelor of Science in Civil Engineering Industrial and Agricultural Constructions, Romania, 1986 Marital status Married PROFESSION Civil Engineer NATIONALITY Jordanian Place and Date of Birth Kuwait- 14 Aug.1968 MEMBERSHIPS PMP- Advanced Project Management, on progress Member of Jordan Engineers Association:Civil Engineering Division Sewer and water Branch No. of Registration (8665), 1987 Member of Jordanian Environment Society 1998 Member of Federation of Arab Engineers LANGUAGES Arabic English SUMMARY Mr. Qbilawi isaqualifiedCivilEngineer dynamic,energetic,self-motivatedhonestly possessing over 27 years of strong experience in various construction large scale infrastructure &parallel Roads projects from reputed companies in the field of consulting & construction firms in the Middle East. Previously working in Public Works Authority since 2009 as Senior Civil Engineer in the Drainage Networks- Operations and Maintenance Department. PROFESSIONALEXPERIENCE Area Engineer/SeniorConstructionEngineer, Dec. 2009 – Oct.2013 (4yearsand 2Months)-closedmycontract Ashghal (PWA),Operationand Maintenance,AssetsAffairs,State of Qatar UpgradingRoads& Pipes andconstruction &handnignover microtunnels by Micro tunnel Boring machine) (MTBM with all infrastructures utilities Draw the contractor to Carry out a soil corrosively study along the road of proposedpipelinesasdirectedand designatedinthe projectspecification.Request the sample of material ,catalogues details certificates and method statement for qualifyingandgetapproval,andcoordinate withourmaterial Engineer and QC/QA to study and check the submittals provided from contractor Check and give opinion of the Submittals and shop drawing and mix design for concrete and asphalt l. Check the RFI (Trench excavation pipe Bedding alignment of pipe, etc. Check the daily program submitted of contractor for every item which will be executed. Monitoring and some inspection during installation Check all necessary tools for cutting, chamfering, testing and all many other requirements for a satisfactory installingthe pipe which will be used of contractor. Put down for the arrange and managingthe machine,vehicles,manpowerandstaff foreveryitemof work. Check and supervisionthe progressof workonsite (qualityandquantity) as per daily and RFI submitted. Surplus pieces (cutting pipe, steel, reinforcement steel, defect instrument and tools to move back to deposit. Managing the construction of the works,activitiestoensure thatthe worksare run according to what schedule plan. Construction and Supervision of Various Sewer and storm water network, and Tunnels pipeline Review&study of proposed civil projects and raise comments. Preparing snag list and follow up. Perform inspections for road projects and issuing clearance certificate.Supervise and issued work permit. Attend and arrange any shut down related to his area as per the shutdown procedure. Attended emergency work during rain & pipe breaks. Provide and request material required for maintenance activities. Liaise with safety and QAQC section.Responsible toraise anyservice requesttoconcernedsectionanddepartmentandfollow tocompletion. ReviewCCTV reportscarriedoutand use latestGIS informationfeaturesto manage operation and maintenance.
  • 2. MoayadQbilawi Project Manager –RE- Utilities-ConstrictionManager Moayad_qblawi@yahoo.com Mobile #00962798447331-00962799434510 Moayad Qbilawi -2 of 5 Attendingsite inspectionforcompletedcapital projectsand taking over for operation. Provide technical reports regardingsewerage,ground&surface waternetworkcondition.Evaluatingunit’sstaff performance andreportto headof division.Followthe cleaningof greasytrapinthe restaurantswhichconnected with the network. Follow the contractors whomworkin the area to preventanydamage of the existing sewer. Managing the construction of the works, activities to ensure that the works are run according to what plan. Al Harbi Trading & Contracting, Saudi Arabia Project Value:110,320,890 SR Site Manager, Apr 2006 - May 2008(2years and 2 Months)-search upper position and High salary Construction TrunklinesandReservoirs forSaline WaterconversionCorporation (SWCC), Reportto the ProjectManager, monitoringall worksdone bysub-contractorsfromcommencementto completionof projectsassuringqualityandworkmanshipandadherencetoall contract specifications.Lookafter qualityassurance andqualitycontrol of all aspectsof the projectsincludingconstructionandmaterials. Ensure use onlyapprovedmaterialsandexecutionof accordingtobestpracticestoachieve qualityaspercontract requirements. Prepare the technical submittalslike methodstatements,shopdrawingsandassure compliance withapproveddesignandcontractrequirementstoProjectManager. Preparingweeklyandmonthly progress againstapprovedexecutive program. Ensure propermonitoringof site activitiesandestablishmentand maintenance of all quality records. Make accordingwithmyuppermanagerto puthimknowingthe matteron site andwhat I needforpushingandresolve the problemwhichinfluencesonadvancementthe work.Follow-up our projectV.Oto getapproval and take actioninsite. Al-Assil Eng.& Cont.Est., Amman- Jordan Project Value:1,643,734 $ Project Manager, Oct 2005 – Apr 2006(7 Months)-leavinng to KSA Upgrade Water Network at Al Nuzaha-Amman City Coordinate with local authourity and various service dept.Preparesite storage(Open&Coverd)areafor depositingthe pipes and fittings ,startto make trial holes,check and set up the bench mark ,charting out the project objective and plans,setting performance requirements,and selecting project participate,Brining about optimum utilization of resources-labor,material and equiment,and ensuring thier procurement at most cost- effective terms. Dar Alomran, Libya Project Value:2,980,456,900 $ Site Engineer, Jun 2004 - Oct 2005 (1year and 5 Months)-closed the project UP Grading the infrastructure and Roads (Sewer ,Strom water network, pipes of max. Dia 1000mm, and Roads Work Checked and ensured adherence of the pipeline layout with urban planning requirements, supervised the constructionof gravitymainpipelines,manholesand chambers to approved drawings. Provided connections to individual houses to the sewerage mains after analysis of the existing house surveys and preparing suitable designs. Prepare measurementsheetsandInterimvaluationsforconsultant’sapproval. Monitored andreported the progress of the Project Manager Gama Contractor Est., Amman, Jordan Project Value 01,765,897 $ Project Manager, Oct 2003 – June 2004(9 Months)-project nearly closing and leaving to Libya Water Project Perform a key role in project planning, budgeting, and identification of resource needed, create the terms,
  • 3. MoayadQbilawi Project Manager –RE- Utilities-ConstrictionManager Moayad_qblawi@yahoo.com Mobile #00962798447331-00962799434510 Moayad Qbilawi -3 of 5 develop the objective/goals of each and assign individual responsibilities, Ensure that construction activities move accordingto predeterminedschedule.Devisethe projectworkplansandmake revisionsasand when need arises,Ensure project documents are complete, Monitor the progress of the construction activates on a regular basis and hold a regular status meetings with all the sub-teams Al Assil Est. Contracting, Salt Jordan Project Value:1,236,980$ Site Engineer, Sep. 2001 – June 2003(1 year and 10 Months) Sewer Project- Salt Sewer Setupinshopdrawingsalsothe as-builtdrawingsall surfacesandutilitiesincludingbutnotlimitedtowaterlines, sewerlines,drains,cables,electricity. Getting PRO from several authorities for starting the project work, Make arrangements necessary for carrying out the works with the various utilities services department and private landowners, Identify the elements of project design and construction likely to give rise to disputes and claims. Serve as a key link with the clients and review the deliverable prepared by the team before passing onto client Boseheh Cont. Est., Karak Jordan Project value:3,876,987 $ Construction Manager, June 1999 –Sep. 2001(2 years and 4 Months)-closed project Water Project Al Karak Sewer& Roads Project Followupthe site activitiesandguide the supervisorandforemantoachieve targetasperprogram and contract documents. Prepare daily logs and reports on progress and status of the project and update the same to the constructionteammanagement. Monitoredprogressof the works optimizeduse of equipment and manpower and ensured adherence quality and cost targets. Liaised with consultant and client for achieving project milestones. Carrying out pre inspections and final inspection with consultant & client Hussin Atieh Est &Construction., Aqwar Jordan Project Value:1,450,872 $ Site Engineer, June 1998 – Apr 1999(11 Months)-closed project Water Project Al Kagreom Water Project Actingas the main technical adviserona constructionsite forsubcontractor,craftspeople andoperatives,setting Out ,levelingthe site, checkingplans,drawingsandquantitiesforaccuracyof calculations, Ensuring that material used and work performed are as per specification, managing ,the progress of the work on site , check the measurements with surveyors ,check the material need it to site (Quantity and Quality),check and follow the maintenance of equipment ,submit the daily program and requests . Amra Consulting Engineers, Amman Jordan Project Value:1,765,970 $ Site Engineer, June 1996 – June 1998(2 years and 1Month)-closed project Sewer Project Amman Check and follow the inspection request as per daily program submitted ,monitoring and interpreting the contract design documents supplied by the client or architect ,liaising with any consultant ,subcontractor, supervisors,planners,quantitysurveyorsandthe general workforce involvedinthe project,liaisingwiththe local authority (Where appropriate to the project)to ensure compliance with local construction regulations and by – laws,dayto day managementof site,including supervising and monitoring the site labor force and the work of any subcontractor
  • 4. MoayadQbilawi Project Manager –RE- Utilities-ConstrictionManager Moayad_qblawi@yahoo.com Mobile #00962798447331-00962799434510 Moayad Qbilawi -4 of 5 Al Mustasher(Engicon) JV Salzgitter Consulting Engineers, Salt Jordan Project Value:1,150,982 $ Site Engineer, Dec. 1994 – May 1996(1 year and 6 Months)-closed Project Supervised the construction of the sewerage pipe lines and associated chambers and rising main pipelines, manholes and Inspection chambers. Determined the route of sewerage pipelines and location of manholes basedon the layoutandexistingutilities. Participatedinthe preparation of program for execution. Assisted the Quantity surveyor in measuring performed work at site and preparing measurement records for consultant’s approval. Conducted pre-final Inspection and rectified snags prior to handover to the client. Roqn Al Handasa Consulting Engineers Project Value:1,564,980$ Site Engineer, Feb 1993 – Oct 1994(1 year and 9 Months)-closed project Sewer and Water project Monitoredandensuredcompliance of all constructionworkswithapproved methods of construction, drawings, contract specificationsandinstructions. Lookedafterqualitycontrol of all materials and equipment used by the contractor. Preparedweeklyandmonthlyreportsof the contractor’sprogressagainstschedules. Measured and maintained approved records of works performed and reviewed monthly valuation against BOQ Contracting Diab Company Project Value:756000 $ Site Engineer, Jan 1992 – Nov 1992(11 Months)-closed project Marka Secondary Boys School Al Assil Est. Contracting Project Value: 1,678,980 $ site Engineer, Feb 1990 – Dec 1991(1 year and 11 Months)-closed project Salt-Arda-Middle Agwar Road and Infrastructure Project (Section) 39/88 9KM Roads,2 Bridges and Girders (Pre-stressed concrete),and 4 Ramps Supervisedthe constructionof the sewerage pumping station and associated chambers, gravity and rising main pipelines,manholesandInspectionchambers,Retainingwall.,Construction2Bridges(Pre-stress) Determinedthe route of sewerage pipelinesandlocationof manholes based on the layout and existing utilities. Participated in the preparation of program for execution Assisted the Quantity surveyor in measuring performed work at site and preparing measurement records for consultant’s approval. Conducted pre-final Inspection and rectified snags prior to handover to the client. Jordan Armed Forces Junior Engineer, Dec 1986 – Dec 1988(2 years)-closed period of Army Road Channel Infrastructure Checked and ensured adherence of the pipeline layout with urban planning requirements, supervised the constructionof gravitymainpipelines,manholesand chambers to approved drawings. Provided connections to individual houses to the sewerage mains after analysis of the existing house surveys and preparing suitable designs. Prepare measurementsheetsandInterimvaluationsforconsultant’sapproval. Monitoredandreported RELEVANT PROJECT EXPERIENCE SewerProjectAmman114. SewerProjectSaltCA No. 49/94. Sewer& WaterProjects.
  • 5. MoayadQbilawi Project Manager –RE- Utilities-ConstrictionManager Moayad_qblawi@yahoo.com Mobile #00962798447331-00962799434510 Moayad Qbilawi -5 of 5 Water ProjectAl KarakWater Project. Trunk line forSaline WaterconversionCorporation. OperationandMaintenance of VariousSewerNetworks. Road Channel Infrastructure. TRAININGSAND COURSES Course inConcrete Structures Design. JordanianEng.Association-1995 Course inSewerNetwork Design. -JordanianEng.Association-1995 Course inWater supplyNetworkDesign. JordanianEng.Association-1996 Course inReinforcedtanks Design. JordanianEng. Association-1996 Course inRoad Design. JordanianEng.Association-1996 Course inConcrete andasphaltmixturesDesign - JordanianEng.Association-1997 Course inprimaveraprojectplannerver.3.0 ./Dec2005 Workshopinwaterand waste waterby inWentGroup. June/2003. Maintenance of SewerNetwork&EquipmentTraining-2012 Assessments&TakingOverSewage Network&PumpingStationsProjects(PWA&NCB).2011 Course in PMP 4th edition.May/2011 PMP 5th edition,PMI Examonprogress. Qatar EngineeringCommitteeUPDA, Examonprogress.