1. CURRICULUM VITAE
Name : Moataza Abdel Rahman Metawea
1
Marital Status : Married
Date of Birth : 28/5/1959
Address : 1 Ramo buildings-Nasr road-Nasr City Cairo Egypt
Telephone NO : Home : 02-24186512 Mobile : 0127-3669908
Email : moataza.motawe@orascomci-projects.com
Religion : Moslem
Languages : Arabic (mother tongue)
Very Good Command Of English
QUALIFICATON:
a) B.S Civil Engineering -Cairo University - 1982
b) Computer Skills ( Excel , Auto cad )
EMPLOYMENT HISTORY
1-From August 2008 Till Now:
ORASCOM Construction Industries-Egypt COMPANY
Project: CAIRO FESTIVAL CITY
Quantity Surveying Manager:
Responsibilities were:
Management work to achieve maximum recovery
Set up initial system of co-ordination measure of system & Preparation variation.
2. Preparation of Wastage Monthly Report Concrete , Reinforcement Quantity
Liaison with the consultant several technical issues in light of contract document
2
and international standards.
Conduct Q.S Seniors engineers and technical audit.
Review and follow up the invoice about sub contractors
2-From September2006 Till July 2008:
ACC ARABIAN CONSTRUCTION COMPANY
Quantity Surveying Manager , Responsible for All Company's Projects
:
1-CHILDREN'S ONCOLOGY HOSPITAL CAIRO - EGYPT
2-Cairo Marriott Hotel Rooms Renovation.
3-AUDI BANK 20 BRANCH
4-BelAir
5-BAVERLY HILLS - SALES BUILDING AND SHOWROOMS
6-EAMAAR VILLAS
7-Mena House Oberoi Hotel & Casino Renovation& Development
Responsibilities were :
Set up initial system of co-ordination measure of system
Management work to achieve maximum recovery
Liaison with the consultant several technical issues in light of contract document
and international standards
Conduct Q.S Seniors engineers and technical audit
3-From July 2005 Till August 2006:
Project: TB3- Cairo international airport
The project is financed by the world bank by NACO-ECG .
3. TB3- Cairo international airport contract value : U 350 million capacity 11 million
passenger/ year with an area 164000 m2
CONTRACTOR : TAV (Tepe Akfen in vestment ) is main contractor as joint venture with
the holding company for Road a, Bridge and Land Transportation
Design Company : Egyptian group for engineering consultation - ( EGEC ) House of
expertise
as a sub contractor responsible for the construction design office including developing the
construction design and preparing setting out and workshop drawing
( Main Co-ordinate ) Responsibilities were :
Revised The shop drawing and coordinate between EGEC , TAV and GMW
Liaison with the consultant several technical issues in light of Egyptian Code ,
3
International standards
Conduct technical audits
:
4- From August 1999 Till July 2005
-Consolidated Contractors International Company & ORASCOM Construction
City Stars-Cairo EGYPT (Total amount 70 Million $ )
Some of Project data : 450,00 m3 of concrete 760.000 m2 built area , consisting of 3
Hotels Five Stars
3 Office - multistory Car park
- Assistant Quantity Surveying Manger , Responsible for the Following :
Set up initial system of co-ordination measure of system
Co-ordination work to achieve maximum recovery for civil work &
architectural work
Review & payment of major sub-contractors
Liaison with the consultant several technical issues in light of contract document
and international standards
Conduct Q.S engineers and technical audits
Preparation of Wastage Monthly Report Concrete , Reinforcement Quantity
Preparation of final measured ,as built drawing and review with consultant
5- From January 1999 Till August 1999
Alexandria company for construction
City Stars-Cairo EGYPT (Total amount 70 Million $ )
Some of Project data : 450,00 m3 of concrete 760.000 m2 built area , consisting of 3
Hotels Five Stars
3 Office - multistory Car park
- Assistant Quantity Surveying Manger , Responsible for the Following :
4. Preparation of a monthly invoice about the company and its submission to the
4
consultant office
Review & follow up the invoice about the sub-contractors
Follow up the progress of works at the site and the time schedule
Conduct Q.S Engineers and technical audits
6- From December 1997 Till December 1998
Dream land company in the group of DR: Ahmed Bahgat companies
In the position of manger of the technical office over the cream park . the project of
health resort :
Review and follow up the invoice about sub contractors
review of workshop drawings
Review of contracts of all contractors
Preparation of monthly report about the rate of contractors works
7- From December 1995 Till December 1997
International Islamic company for metallic industries
in the position of manger of technical office Responsible for the following :
Design of many metallic factories and trusses by the means of computer and cads
programs
Drawing of complete drawings of the projects which i design by the auto cad
program
Calculation of steel quantity
Design of factories foundation
Workshop drawings
Analytical study for the projects and determination of prices
Preparation of invoice and final statements about the projects
8- From January 1988 Till June 1995
In the position of office engineer
I had prepared of the work of the design of the building design for a number of different
projects of villas placed and commercial marks by means of programs for the design and
auto cad drawings
9- From July 1985 Till August 1987
Technical office and consultant studies (Seif Soliman - Sied Helmy -Samir Helmy )
Participation in the design of an administrative and housing building Tahrir
Towers - Dokki - with a surface of 2000 square meters for the floor
5. Participation in the design of El Marwa tower -which consists of sixteen floors-
5
Heliopolis
Design of building of Tenth of Ramadan City
Preparation of executive drawings for the new building of American embassy at
Garden City
Works for the determination of quantity , schedules and specification for the
projects
10- From January 1983 Till June 1985
International Islamic for contracting ( one of Islamic banking group of companies
for investment and development / along with the performance of the following
works :
Determination of quantities
Study analysis and storing of reinforced steel
planning and follow up of works of projects on the computer
analysis of resource by the mean of computers
Review of geometrical design , and drawing of executive panels for sites