SlideShare a Scribd company logo
1 of 2
Download to read offline
STEEL BAND CONSTRUCTION CC
STRUCTURAL STEELWORK & CLADDING
CONTRACTORS & PROJECT MANAGERS
78 Gousblom Street P O Box 6030 GAUTENG
Northmead DUNSWART Tel: (011) 425-4569
Benoni 1508 Fax: (011) 425-0659
CAPE
E-Mail: steelband@icon.co.za Tel: (044) 874-6554
Fax: (044) 884-1422
MEMBER:
- S.A. Institute of
Steel Construction
- International Steel
Fabricators Council
MEMBER: S. SMIT
CK 92/27638/23
1985
2005
Ref: Macintosh HD:Users:stevensmit:Documents:A Steel Band Construction:A SBC Contracts:J1040 Bruma:J1040 Phase
2:Correspondence:Steelinx letter of thanks J1040.doc
	
  
28 July 2014
Steelinx
4 Mckinley Road
Kenilworth
7708
Attention: Mr Ray McCaig
Dear Ray
RE: Bruma Oriental Shopping Centre
Please receive this letter of thanks and commendation for an excellent job done
in detailing the Structural Steelwork for this project.
The total steel mass for Phase 1 was around 830T and Phase 2 a further 700T,
resulting in a total project mass of 1,530T. This is massive and the accuracy of
the workshop detailing and your professional approach contributed hugely to the
success of the project.
Your dedication and attention to detail made it a pleasure to work with you.
We wish you every success in your future endeavours.
Yours faithfully
Steven Smit
0826100426
CC: Mr Mark Mahood Steel Band Construction cc steelband@vodamail.co.za

More Related Content

Similar to Steelinx letter of thanks J1040

2376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure52376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure5Joshua Ting
 
Saul Strachan CV 17.10.14
Saul Strachan CV 17.10.14Saul Strachan CV 17.10.14
Saul Strachan CV 17.10.14Saul Strachan
 
Structure home emeco steel presentation (final)
Structure home emeco steel presentation (final)Structure home emeco steel presentation (final)
Structure home emeco steel presentation (final)structurehomeQatar
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015john kinds
 
C.V. updated Oct 2015
C.V. updated Oct 2015C.V. updated Oct 2015
C.V. updated Oct 2015Davor Bucic
 
Crrugated sheets vks
Crrugated sheets vksCrrugated sheets vks
Crrugated sheets vksvenkatkurra
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA sMike Darwich
 
IanWalker CV 2015
IanWalker CV  2015IanWalker CV  2015
IanWalker CV 2015Ian Walker
 
Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014Jimmy Locklear
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET Journal
 
MICHAEL UJVARY - CV
MICHAEL UJVARY - CVMICHAEL UJVARY - CV
MICHAEL UJVARY - CVmike ujvary
 

Similar to Steelinx letter of thanks J1040 (20)

2376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure52376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure5
 
Saul Strachan CV 17.10.14
Saul Strachan CV 17.10.14Saul Strachan CV 17.10.14
Saul Strachan CV 17.10.14
 
Structure home emeco steel presentation (final)
Structure home emeco steel presentation (final)Structure home emeco steel presentation (final)
Structure home emeco steel presentation (final)
 
john kinds resume 2015
john kinds resume 2015john kinds resume 2015
john kinds resume 2015
 
Schilf A CV 2016
Schilf A CV 2016Schilf A CV 2016
Schilf A CV 2016
 
Resume (apr16)
Resume (apr16)Resume (apr16)
Resume (apr16)
 
C.V. updated Oct 2015
C.V. updated Oct 2015C.V. updated Oct 2015
C.V. updated Oct 2015
 
DOVINA (final)
DOVINA (final)DOVINA (final)
DOVINA (final)
 
Crrugated sheets vks
Crrugated sheets vksCrrugated sheets vks
Crrugated sheets vks
 
Harthill footbridge
Harthill footbridgeHarthill footbridge
Harthill footbridge
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
C.V wesam -UPDATED-
C.V wesam -UPDATED-C.V wesam -UPDATED-
C.V wesam -UPDATED-
 
Munger ganga bridge
Munger ganga bridgeMunger ganga bridge
Munger ganga bridge
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
IanWalker CV 2015
IanWalker CV  2015IanWalker CV  2015
IanWalker CV 2015
 
Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014Jimmy Locklear Resume updated 091014
Jimmy Locklear Resume updated 091014
 
Scbj 11032017-cv
Scbj 11032017-cvScbj 11032017-cv
Scbj 11032017-cv
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
 
MICHAEL UJVARY - CV
MICHAEL UJVARY - CVMICHAEL UJVARY - CV
MICHAEL UJVARY - CV
 
My CV OFFICE
My CV OFFICEMy CV OFFICE
My CV OFFICE
 

Steelinx letter of thanks J1040

  • 1. STEEL BAND CONSTRUCTION CC STRUCTURAL STEELWORK & CLADDING CONTRACTORS & PROJECT MANAGERS 78 Gousblom Street P O Box 6030 GAUTENG Northmead DUNSWART Tel: (011) 425-4569 Benoni 1508 Fax: (011) 425-0659 CAPE E-Mail: steelband@icon.co.za Tel: (044) 874-6554 Fax: (044) 884-1422 MEMBER: - S.A. Institute of Steel Construction - International Steel Fabricators Council MEMBER: S. SMIT CK 92/27638/23 1985 2005 Ref: Macintosh HD:Users:stevensmit:Documents:A Steel Band Construction:A SBC Contracts:J1040 Bruma:J1040 Phase 2:Correspondence:Steelinx letter of thanks J1040.doc   28 July 2014 Steelinx 4 Mckinley Road Kenilworth 7708 Attention: Mr Ray McCaig Dear Ray RE: Bruma Oriental Shopping Centre Please receive this letter of thanks and commendation for an excellent job done in detailing the Structural Steelwork for this project. The total steel mass for Phase 1 was around 830T and Phase 2 a further 700T, resulting in a total project mass of 1,530T. This is massive and the accuracy of the workshop detailing and your professional approach contributed hugely to the success of the project. Your dedication and attention to detail made it a pleasure to work with you. We wish you every success in your future endeavours.
  • 2. Yours faithfully Steven Smit 0826100426 CC: Mr Mark Mahood Steel Band Construction cc steelband@vodamail.co.za