10 of Macau's 30, world-class casinos, rely on the Cementaid Everdure Caltite System, to deliver permanently, inherently DRY!, structural concrete, eliminating for design life all old, membrane 'waterproofing'.
2. Macau Casino Projects
1992 Macau Landmark
2005 Galaxy Starworld Hotel
MGM Grand
2006 Galaxy Resort & Casino P. 1
2012 Galaxy Resort & Casino P.2
2013 MGM Cotai
2014 Broadway Hotel
Louis XIII
Studio City Macau
2015 Hollywood Roosevelt Hotel
3. Project details:
1992 The Landmark Macau - Pharaoh's Palace Casino
Product: Caltite System@1,200m3
Consultant: Carlos M Coute Atelier De Arquitectura
Estados De Projectos de Engenharia Ltd.
Location: B5 Basement Slab
4. 2005 Galaxy Starworld Hotel
Product: 3CC System@6,700m3
Consultant: Rocco Design
Meinhardt (C & S) Ltd.
Location: Podium Roofs and Swimming Pool
5. 2005 MGM Grand
Product: Caltite System – 33,500m3
Consultant:Wong Tung & Partners
Siu Yin Wai & Associates
Location: Basement Slab & Wall
Podium, Swimming Pool, Spa Pool and Water Tanks
6. Product: Caltite System – 49,000m3
Consultant: Simon Kwan & Associates
Meinhardt (C&S) Ltd.
Hotel Lists: Galaxy Hotel
Hotel Okura Macau
Banyan Tree Hotel & Resorts
2006 Galaxy Resorts & Casino P. 1
7. Basement Slab, Water Tanks
Podium and Wave Pool
Skytop Resort Deck spanning over 38,500 square
meter
Skytop Wave Pool
8. 2012 Galaxy Resorts & Casino P. 2
Product: Caltite System – 55,000m3
3CC System – 16,500m3
Consultant: Wong & Ouyang (Hong Kong)
Ltd.
ARUP
Hotel List:
10. After completion of Galaxy Phase 2 the Grand Resort
Deck expanded to over 75,000 square meters including
350-ton white sand beach wave pool, waterslides, beach
lagoons, white water rapids, geysers, waterfalls and a
kids zone. Moreover, tropical gardens offering poolside
resort service including pool side restaurants and
lounges for the hotel guests.