3. As a young designer, I am interested in the
many systematic processes that overwhelm
and control the urban environments humans
live in. One of the largest influences on these
systems is the design of the built environment.
Whether formal or informal, highly designed
or organic, beautiful or lifeless, complicated
or simple, the relationships and interactions
between these elements are all important within
design. There is no cookie cutter formula to
addressing the many affected scales of particular
design. For example, the design of a T-shirt,
effecting how someone feels that day to the
design of governmental process that changes
the procedure of signing up for healthcare
which effects over 9 million Americans are both
problems of design yet on massively different
scales. These may not be examples of the built
environment but they are representative of the
effect that one simple design can have within
space. My fascination of the urban environment
is due to this multiplying effect. Architecture
contributes to this process but is only a piece in
the many gears needed to make a city function.
This process is rarely clear-cut, straight forward
or easy. It involves a mixture of common sense,
confident action, multi-scale thinking and a
conscious mind-set to execute. Through the
many people I have had the opportunity to
learn from within and around the graduate
program, this is my current view of architecture.
This is not static and will change slightly as I
continue through this profession. The following
experiences have all shaped and challenged my
questions to lead to my current perspective on
architecture, the urban built environment and
design.
welcome.
5. page 3
04 | Eastern Market Corporation
10 | Detroit’s Youth
16 | THE ARKPOD
24 | The Role Inc.
32 | The protest hub
40 | Vancouver case study
50 | Clark Park hub
&mapping
&thestation
market study
&thep.i.v.
&programs
& framework
olympic park
Table of contents
6. page 4
using research and data
to display information
and tell a storyeastern market & residential:
residential feasible study for eastern market corporation
report presented to EMC SEPTEMBER 2015
8. page 6
project team:
Brandon
Olsen
Project Designer
Graduate Student
Masters of Fine Arts in Graphic Design
Rhode Island School of Design
Bachelors of Science in Architecture
Lawrence Technological University
Mena
bebawy, ph.d
Structural Advisor
Assistant Professor
Department of Civil and Architectural
Engineering
Lawrence Technological University
Meaghan
markiewicz
Project Manager
Graduate Student
Dual Masters of Urban Design &
Architecture
Lawrence Technological University
myles
hamby
Project Advisor
Food Access Coordinator
Eastern Market Corporation
Mike
paciero
Project Engineer
Graduate Student
Masters of Architectural Engineering
Lawrence Technological University
joongsub
kim, ph.d
Faculty Advisor
Professor
Director of the Masters of Urban Design
Program + Director of The Detroit Studio
Lawrence Technological University
9. page 7
PROJECT PARTNERS
site analysis
8
project partners:
lawrence tech
Detroit wholesale produce
Eastern market corporation
Center for Design + technology
1
2
3
A Mixed-Use Future
Detroit Wholesale Produce, located at 2614
Riopelle, Detroit, MI 48207, is a food wholesaler
in Detroit’s Eastern Market district. The business
services restaurants with large orders in early
mornings, and individual patrons throughout
the rest of the day. The existing retail space is
located in the left corner of the building on the
first floor. Most of the rest of the building is
used for storage. The business owners, Greg and
Tom, are looking to rehabilitate the second floor
into residential space, as well as expand their
produce business throughout the first floor. The
building is located in a prime location, directly
across from Eastern Market’s newly renovated
Shed 3, giving it a high level of visibility during
the market. The owner, Greg, has worked
extensively with the project team on his ideas for
redevelopment, even showing the team some of
his own drawings. He already completed some
renovation of the existing retail space to further
enhance the shopping experience and provide
living space. The goal of this study is to provide
him with a direction for future development
that will benefit him, the district, and future
residents.
The mission of the Eastern Market Corporation
(EMC) is to mobilize leadership and resources
to achieve the vision of stakeholders for the
Eastern Market District. It’s goal is also to
become the undisputed center for fresh and
nutritious food in southeast Michigan. EMC
1
2
Detroit Wholesale Produce
eastern Market Corporation
N
12
RussellSt.
RussellSt.
RivardSt.
RiopelleSt.
RiopelleSt.
RiopelleSt.
OrleansSt.
Adelaide St.
Adelaide St.
Adelaide St.
Division St.
Division St.
Alfred St.
Alfred St.
Wilkins St.
Division St.
Winder St.
Winder St.
Fisher Services Dr.
Site
6
4
5
2
3
3
4
5
6
2
1
4
5
1
6
1
1
4
3
22
3
1 The Historic Eastern Farmer’s Market M
Originally painted in 1972 and recently
the Eastern Farmers Market painting is
mural in the district, taking up about 6,
square feet of space on the exterior wall
2 The Weird -
The German/Austrian artist collective h
their mark on the Market District. Thei
character driven murals are easily recog
and adorn the sides of multiple building
Eastern Market.
3 OmniCorpDetroit -
The mural on the outside of the buildin
representation of what takes place on th
OmniCorpDetroit is a collection of mak
designers, artist, and others that come t
learn, share, and create together.
4 The Cow at Eastern Market Cold Storag
One of the largest pieces of art in the di
painted on one of the tallest buildings. A
made up of various vegetables looks do
markets below.
5 Red Bull House of Art-
This is an artist incubator that function
gallery and curator to house local artist
creative space that breaks down barrier
artists and financial burdens, the Red B
of Art is a one of a kind artists institutio
provides the tools and space for visiting
unleash their creativity.
6 The Shark Mural at Kap’s Wholesale
Los Angeles based contemporary artist,
Toof, adds to Eastern Market’s eclectic n
by painting a shark into Detroit’s urban
This mural embraces the sense of wond
occupies Eastern Market and keeps visi
their toes as they look around the next
2 art
#
#
#
Featured ART
Featured industry
Featured Residential
key
7
8
9 10
N
PEDESTRAIN PATH FROM
EASTERN MARKET SHEDSDS
STERERNN MMAARARKET
HEDEDS
PEDESTRAIN PATH FROM
EASTERN MARKET SHEDS
EASTERN MARKET SHEDS
EASTERN MARKET SHEDS
SIDEWALK
SIDEWALK
SIDEWALK
ALK
WAL
SIDEW
TRUCK
TRAFFIC
ROITDETR
OLESALEWHO
DUCEPROD
SURFACEEEU
PARKINGGI G SURF CEFAC
PARK NGKIN
ALLEY
A
EASTERN COLD
STORAGE
BUILDING
MEAT
INSPECTION
BUILDING
DUMPSTER
FIRE HYDRANT
HIIGHI
LOWOWOW
CCCTRA CAFFICA CCICCTT
CKTRUC
INGPARKI
1
6
7
5
5
8
3
2
2
4
1
3
1
2
4
10. page 8
SITE PLAN REDESIGN
RETAIL
PERMEABLE
SURFACE
ALLEY
RETAIL
RESIDENTAL EXIT
RESIDENTAL
ENTRANCE
OUTDOOR PRODUCE
PLANTERS
BENCHES
PEDESTRAIN SIDEWALK
EXISTING FIRE HYDRANT
STOREFRONT WINDOWS
RETAIL PARKING
RETAIL
ENTRANCE
FORKLIFT
TRAFFIC
FORKLIFT
TRAFFIC
1 Detroit Wholesale Produce
Address: 2614 Riopelle, Detroit, MI. Retail space
was expanded and residential was added to upper
floors.
2 Retail Entrance
The main retail entrance will be through one
sliding glass door, replacing the existing overhead
doors. This will aid retail circulation and security
for the store as well as keep the retail space
cleaner by keeping out dirt.
3 Forklift Traffic
Forklift traffic was diverted from the front of the
building by moving the main loading location
to Adelaide street. The only exception is using
the forklift to set up displays and produce on the
sidewalk outside the building during market days.
5 Residential Entrance
The resident entrance and lobby is at the front
left corner of the building as shown in the site
plan. Located here will be main circulation to the
apartments, mailboxes, and bike storage.
6 Permeable Surface Alley
The alley is re-done to be a green, permeable
surface alley to aid in the district’s water
management plan. Water from the roof will be
collected and responsibly diverted into the alley.
7 Improved Storefront/Pedestrian Access
The sidewalk outside of Detroit Wholesale
Produce was improved through new pavement
and the addition of benches, planters, and
outdoor produce displays. Elimination of forklift
traffic was key to this design element.
2 site plan
UP
Resident Entrance
• Placed at front left corn
design iterations and di
• This location is most ac
from major truck traffic
• Integrates into owner’s p
consuming just enough
for an elevator and main
retail square footage to
the building.
Additional Updates
• Addition of a residentia
• Slight adjustment to the
of one stair and a new e
• Removal of cashier stan
the cold storage space fr
• Addition of storefront w
3 first floor Rede
2
1
3 3
8
65
7
4
resident lobby
390 sq ft
private bath-
69 sq ft
mech
97 sq ft
public
bathroom
50 sq ft55 ssqq tt00 qq tt5050 sqsq ftfttttttttt
bike storage
resident
entrance
mailboxes
N
30
5 Exploded
3 roof redesign
existing roof experience
roof experience inspiration
BAD
Rooftop gathering and living spaces are extremely common
in major urban cities such as New York and Chicago. These
spaces enhance the living experience of residents, provide
spectacular views of the city, and make buildings more
functional. Detroit Wholesale Produce has the opportunity
create this atmosphere in the Eastern Market District of
Detroit. Currently, the roof is one large open space sloped
towards the alley. Regardless if the two story or three story
development option is selected, the rooftop space can be
transformed into a vibrant, usable space for the residents,
building owner and public during large gatherings. The
proposed plan above consists of the installation of an
outdoor patio surrounded by green roof vegetation. The
vegetation will keep the roof cooler for patrons utilizing the
roof space. The vegetation will also aid with storm water
runoff from the building. There are many impermeable
spaces in Eastern Market and the district is under pressure
to better manage their storm water runoff. Detroit Wholesale
produce can be a pilot project for solving this issue in the
district. The concept is of course expandable per the building
owner’s desire. If used on the 2 story development plan, the
patio will likely need to be elevated off the roof to create a flat
surface for people to stand and sit. However, if the three story
development plan is used, the new roof that is put on will be
a flat roof and raising the patio will not be necessary.
22
Greenroof vegetation
Rooftop view of eastern Market
Enclosure planters
Resident patio space
27
UP
UP
Resident Entrance
• Placed at front left corner of the building after several
design iterations and discussions with owner.
• This location is most accessible, visible, safe and furthest
from major truck traffic.
• Integrates into owner’s plans to expand retail area, by
consuming just enough floor space in the existing retail
for an elevator and main stairway but keeping the the
retail square footage to a maximum on the first floor of
the building.
Additional Updates
• Addition of a residential, fire rated, emergency stair
• Slight adjustment to the office space due to the removal
of one stair and a new entrance to the public bathroom
• Removal of cashier stand and new customer entry into
the cold storage space from the dry goods section
• Addition of storefront windows in place of the existing
front rolling doors with symmetrical to the storefront
windows installed on the opposite side of the building.
• Elimination of forklift traffic from the main building
entry and moved to the loading dock space off of
Adeliade Street to the south. Detroit Wholesale Produce
will then bring all their product to the shelves from the
back of the building instead of the front.
3 first floor Redesign
retail
2219 sq ft
retail
1003 sq ft
resident lobby
390 sq ft
forklifttraffic
388 sq ft
office
207 sq ft
private bath-
69 sq ft
mech
97 sq ft
public
bathroom
50 sq ft55 ssqq tt00 qq tt5050 sqsq ftfttttttttt
bike storage
retail entranceresident
entrance
mailboxes
N
27
UP
UP
Resident Entrance
• Placed at front left corner of the building after several
design iterations and discussions with owner.
• This location is most accessible, visible, safe and furthest
from major truck traffic.
• Integrates into owner’s plans to expand retail area, by
consuming just enough floor space in the existing retail
for an elevator and main stairway but keeping the the
retail square footage to a maximum on the first floor of
the building.
Additional Updates
• Addition of a residential, fire rated, emergency stair
• Slight adjustment to the office space due to the removal
of one stair and a new entrance to the public bathroom
• Removal of cashier stand and new customer entry into
the cold storage space from the dry goods section
• Addition of storefront windows in place of the existing
front rolling doors with symmetrical to the storefront
windows installed on the opposite side of the building.
• Elimination of forklift traffic from the main building
entry and moved to the loading dock space off of
Adeliade Street to the south. Detroit Wholesale Produce
will then bring all their product to the shelves from the
back of the building instead of the front.
3 first floor Redesign
retail
2219 sq ft
retail
1003 sq ft
resident lobby
390 sq ft
forklifttraffic
388 sq ft
office
207 sq ft
private bath-
69 sq ft
mech
97 sq ft
public
bathroom
50 sq ft55 ssqq tt00 qq tt5050 sqsq ftfttttttttt
bike storage
retail entranceresident
entrance
mailboxes
N
2928
3 Second floor living space
Studio
StudioStudioStudio
One bedroom One bedroom One bedroom
520 sq ft
457 sq ft491 sq ft448 sq ft
586 sq ft 591 sq ft 606 sq ft
w/dw/d
w/d
w/d w/d w/d
w/d
w/d
w/dw/dw/d
w/d
w/d
w/d
Studio one bedroom
two bedroom two bedroom
one bedroom one bedroom
520 sq ft 586 sq ft
810 sq ft 792 sq ft
591 sq ft 605 sq ft
4 third floor living space
Apartment Overview
• (7) Total Units
• (4) 450-520 SF Studio Units
• (3) 600 SF One Bedroom, One Bath Units
• Units on front utilize previous window openings
overlooking the market.
• Units in back require new window openings to be cut in
existing facade overlooking industrial Eastern Market.
Circulation Plan Details
• Stair on east side of building completely removed
• U-shaped stairs maximized the square footage of the units.
• The existing northeast stair will remain to save on the cost
of a new stair. The owner requested keeping the existing
stairway in lieu of a u-shaped stair in the middle of the future
cold storage shopping area. The proposed configuration saves
money, provides an emergency exit and also creates a unique
southeast corner studio with a proposed lofted space over the
exit stairs.
Apartment Overview
• (6) Total Units
• (1) 520 SF Studio Unit
• (3) 600 SF One Bedroom, One Bath Units
• (2) 800 SF Two Bedroom, Two Bath Units
• Floor plan nearly identical to 2nd floor except for two
bedrooms units on backside instead of studios for variety.
3rd Floor Construction Logistics
• Unlike the second floor, all windows, walls, floors, stairs,
and roof will be new construction.
• Adds considerable more cost since the current roof will
need to be removed, the beams leveled, new floor installed,
and new exterior walls and roof on top of the existing
masonry walls. All new construction would be wood framed.
• Construction calculations and return on investment
analysis are found in the following pages.
Projected Rental Rates
• Studio Apartments: $1.42/SF
• One bedrooms for $1.32/SF
• Two bedrooms for $1.22/SF
N N
2928
3 Second floor living space
Studio
StudioStudioStudio
One bedroom One bedroom One bedroom
520 sq ft
457 sq ft491 sq ft448 sq ft
586 sq ft 591 sq ft 606 sq ft
w/dw/d
w/d
w/d w/d w/d
w/d
w/d
w/dw/dw/d
w/d
w/d
w/d
Studio one bedroom
two bedroom two bedroom
one bedroom one bedroom
520 sq ft 586 sq ft
810 sq ft 792 sq ft
591 sq ft 605 sq ft
4 third floor living space
Apartment Overview
• (7) Total Units
• (4) 450-520 SF Studio Units
• (3) 600 SF One Bedroom, One Bath Units
• Units on front utilize previous window openings
overlooking the market.
• Units in back require new window openings to be cut in
existing facade overlooking industrial Eastern Market.
Circulation Plan Details
• Stair on east side of building completely removed
• U-shaped stairs maximized the square footage of the units.
• The existing northeast stair will remain to save on the cost
of a new stair. The owner requested keeping the existing
stairway in lieu of a u-shaped stair in the middle of the future
cold storage shopping area. The proposed configuration saves
money, provides an emergency exit and also creates a unique
southeast corner studio with a proposed lofted space over the
exit stairs.
Apartment Overview
• (6) Total Units
• (1) 520 SF Studio Unit
• (3) 600 SF One Bedroom, One Bath Units
• (2) 800 SF Two Bedroom, Two Bath Units
• Floor plan nearly identical to 2nd floor except for two
bedrooms units on backside instead of studios for variety.
3rd Floor Construction Logistics
• Unlike the second floor, all windows, walls, floors, stairs,
and roof will be new construction.
• Adds considerable more cost since the current roof will
need to be removed, the beams leveled, new floor installed,
and new exterior walls and roof on top of the existing
masonry walls. All new construction would be wood framed.
• Construction calculations and return on investment
analysis are found in the following pages.
Projected Rental Rates
• Studio Apartments: $1.42/SF
• One bedrooms for $1.32/SF
• Two bedrooms for $1.22/SF
N N
2928
3 Second floor living space
Studio
StudioStudioStudio
One bedroom One bedroom One bedroom
520 sq ft
457 sq ft491 sq ft448 sq ft
586 sq ft 591 sq ft 606 sq ft
w/dw/d
w/d
w/d w/d w/d
w/d
w/d
w/dw/dw/d
w/d
w/d
w/d
Studio one bedroom
two bedroom two bedroom
one bedroom one bedroom
520 sq ft 586 sq ft
810 sq ft 792 sq ft
591 sq ft 605 sq ft
4 third floor living space
Apartment Overview
• (7) Total Units
• (4) 450-520 SF Studio Units
• (3) 600 SF One Bedroom, One Bath Units
• Units on front utilize previous window openings
overlooking the market.
• Units in back require new window openings to be cut in
existing facade overlooking industrial Eastern Market.
Circulation Plan Details
• Stair on east side of building completely removed
• U-shaped stairs maximized the square footage of the units.
• The existing northeast stair will remain to save on the cost
of a new stair. The owner requested keeping the existing
stairway in lieu of a u-shaped stair in the middle of the future
cold storage shopping area. The proposed configuration saves
money, provides an emergency exit and also creates a unique
southeast corner studio with a proposed lofted space over the
exit stairs.
Apartment Overview
• (6) Total Units
• (1) 520 SF Studio Unit
• (3) 600 SF One Bedroom, One Bath Units
• (2) 800 SF Two Bedroom, Two Bath Units
• Floor plan nearly identical to 2nd floor except for two
bedrooms units on backside instead of studios for variety.
3rd Floor Construction Logistics
• Unlike the second floor, all windows, walls, floors, stairs,
and roof will be new construction.
• Adds considerable more cost since the current roof will
need to be removed, the beams leveled, new floor installed,
and new exterior walls and roof on top of the existing
masonry walls. All new construction would be wood framed.
• Construction calculations and return on investment
analysis are found in the following pages.
Projected Rental Rates
• Studio Apartments: $1.42/SF
• One bedrooms for $1.32/SF
• Two bedrooms for $1.22/SF
N N
2928
3 Second floor living space
Studio
StudioStudioStudio
One bedroom One bedroom One bedroom
520 sq ft
457 sq ft491 sq ft448 sq ft
586 sq ft 591 sq ft 606 sq ft
w/dw/d
w/d
w/d w/d w/d
w/d
w/d
w/dw/dw/d
w/d
w/d
w/d
Studio one bedroom
two bedroom two bedroom
one bedroom one bedroom
520 sq ft 586 sq ft
810 sq ft 792 sq ft
591 sq ft 605 sq ft
4 third floor living space
Apartment Overview
• (7) Total Units
• (4) 450-520 SF Studio Units
• (3) 600 SF One Bedroom, One Bath Units
• Units on front utilize previous window openings
overlooking the market.
• Units in back require new window openings to be cut in
existing facade overlooking industrial Eastern Market.
Circulation Plan Details
• Stair on east side of building completely removed
• U-shaped stairs maximized the square footage of the units.
• The existing northeast stair will remain to save on the cost
of a new stair. The owner requested keeping the existing
stairway in lieu of a u-shaped stair in the middle of the future
cold storage shopping area. The proposed configuration saves
money, provides an emergency exit and also creates a unique
southeast corner studio with a proposed lofted space over the
exit stairs.
Apartment Overview
• (6) Total Units
• (1) 520 SF Studio Unit
• (3) 600 SF One Bedroom, One Bath Units
• (2) 800 SF Two Bedroom, Two Bath Units
• Floor plan nearly identical to 2nd floor except for two
bedrooms units on backside instead of studios for variety.
3rd Floor Construction Logistics
• Unlike the second floor, all windows, walls, floors, stairs,
and roof will be new construction.
• Adds considerable more cost since the current roof will
need to be removed, the beams leveled, new floor installed,
and new exterior walls and roof on top of the existing
masonry walls. All new construction would be wood framed.
• Construction calculations and return on investment
analysis are found in the following pages.
Projected Rental Rates
• Studio Apartments: $1.42/SF
• One bedrooms for $1.32/SF
• Two bedrooms for $1.22/SF
N N
31
5Explodedview
11. page 9
two-story vs. three-story
Design:
1 building overview
At the request of the building owners, this section
includes two design options:
(1) A 2 story rehabilitation that converts the
second floor to residential living spaces and
(2) a 3 story option that requires new
construction of a 3rd floor for additional
apartments in addition to a 2nd story
rehabilitation.
The design team suggests that a different floor
the building could look like from the street.
A new cement fiber board material facade is
proposed on the residential levels. This material
choice was an aesthetic and functional decision
which is further explained in this section.
Although a new facade was added to the upper
stories, the original facade was preserved on the
first floor to maintain the urban rustic appearance
of the original and surrounding buildings in
the district. In addition, three new openings
1 Three-Story Option
2 Two-Story Option
38
two-Story option:
1
2
Two-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 2 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca on: DETROIT, MI
Story Count: 1 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 5,185
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $127.05
Building Cost: $658,754.25
Es mate Name:
** Es mate includes renova on to exis ng 2nd oor space for apartment units
*Costs are derived from a building model with basic
components.
*Scope di erences and market cond ns can cause
costs to vary signi cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $16.46 $1.37 $5,074 $60,888 $62,715 $64,596 $66,534 $68,530
Potential Gross Income: Retail 3.0% $12.00 $3,309 $39,708 $40,899 $42,126 $43,390 $44,692
Potential Gross Income (PGI) $9.70 $8,383 $100,596 $103,614 $106,722 $109,924 $113,222
Stabilized Residential Vacancy 7.00% $1.15 $355 $4,262 $4,390 $4,522 $4,657 $4,797
Stabilized Retail Vacancy 7.00% $0.84 $232 $2,780 $2,863 $2,949 $3,037 $3,128
Total Vacancy $587 $7,042 $7,253 $7,471 $7,695 $7,926
Effective Gross Income (EGI) $18.71 $7,796 $93,554 $96,361 $99,252 $102,229 $105,296
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Security 2.00% $0.19 $168 $2,012 $2,134 $2,198 $2,264 $2,332
Utilities (water, trash, common) 3.00% $0.29 $251 $3,018 $3,202 $3,298 $3,397 $3,499
Maintenance and Repairs 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Yard/Exterior Maintenance 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Miscellaneous 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Management fee 5.00% $0.49 $419 $5,030 $5,336 $5,496 $5,661 $5,831
Insurance 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Property Taxes 77.4 mills $0.67 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 31.94% $3.10 $2,677.79 $32,133 $33,875 $34,891 $35,938 $37,016
Total Operating Expenses/Unit $4,590.50 $4,839.23 $4,984.41 $5,133.94 ########
Net Operating Income (NOI) $5.92 $5,118 $61,421 $62,486 $64,361 $66,292 $68,280
Replacement Reserves 14.91% $1.45 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 9.19% 9.35% 9.63% 9.92% 10.22%
Less Debt Service $3.46 $2,993 $35,915 $35,915 $35,915 $35,915 $35,915
Debt Service Coverage Ratio 1.71 1.74 1.79 1.85 1.90
Before Tax Cash Flow (BTCF) $1.01 $875 $10,505 $11,121 $12,532 $13,986 $15,483
BTCF Return on Equity (BTCF/Equity) 9.51% 10.06% 11.34% 12.66% 14.01%
Capitalized value at: 10.00% $59.23 $614,208 $624,863 $643,609 $662,917 $682,805
Remaining Mortgage: $521,615 $485,699 $449,784 $413,869 $377,953
Operating Revenues MonthlyRate
$/GSF
per Yr
$/NSF
per Mo
42
Three-Story option:
1
2
Three-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation & Addition
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 3 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca n: DETROIT, MI
Story Count: 2 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 10,370
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $138.48
Building Cost: $1,436,037.60
Es mate Name:
** Es mate includes renova n to exis ng 2nd space for apartment units, and addi n of a 3rd story for apartment units.
*Costs are derived from a building model with basic
components.
*Scope di rences and market condi ons can cause
costs to vary sign cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $24.27 $2.02 $10,112 $121,344 $124,984 $128,734 $132,596 $136,574
Potential Gross Income: Retail 3.0% $12.00 $4,000 $48,000 $49,440 $50,923 $52,451 $54,024
Potential Gross Income (PGI) $10.89 $14,112 $169,344 $174,424 $179,657 $185,047 $190,598
Stabilized Residential Vacancy 7.00% $1.12 $708 $8,494 $8,749 $9,011 $9,282 $9,560
Stabilized Retail Vacancy 7.00% $1.02 $280 $3,360 $3,461 $3,565 $3,672 $3,782
Total Vacancy $988 $11,854 $12,210 $12,576 $12,953 $13,342
Effective Gross Income (EGI) $31.50 $13,124 $157,490 $162,215 $167,081 $172,093 $177,256
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Security 2.00% $0.22 $282 $3,387 $3,593 $3,701 $3,812 $3,926
Utilities (water, trash, common) 3.00% $0.33 $423 $5,080 $5,390 $5,551 $5,718 $5,889
Maintenance and Repairs 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Yard/Exterior Maintenance 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Miscellaneous 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Management fee 5.00% $0.54 $706 $8,467 $8,983 $9,252 $9,530 $9,816
Insurance 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Property Taxes 77.4 mills $0.45 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 29.12% $3.17 $4,110.04 $49,320 $52,108 $53,672 $55,282 $56,940
Total Operating Expenses/Unit $3,288 $3,474 $3,578 $3,685 $3,796
Net Operating Income (NOI) $6.95 $9,014 $108,169 $110,106 $113,410 $116,812 $120,316
Replacement Reserves 8.86% $0.96 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 8.75% 8.91% 9.17% 9.45% 9.73%
Less Debt Service $4.61 $5,972 $71,669 $71,669 $71,669 $71,669 $71,669
Debt Service Coverage Ratio 1.51 1.54 1.58 1.63 1.68
Before Tax Cash Flow (BTCF) $1.38 $1,792 $21,500 $22,987 $25,827 $28,752 $31,764
BTCF Return on Equity (BTCF/Equity) 17.39% 18.60% 20.89% 23.26% 25.70%
Capitalized value at: 10.00% $69.54 $1,081,694 $1,101,063 $1,134,095 $1,168,118 $1,203,162
Remaining Mortgage: $1,040,887 $969,218 $897,549 $825,879 $754,210
Operating Revenues MonthlyRate
$/GSF
per Yr
$/GSF
per Mo
3 sto33
Land/Bu
Total A
Renovat
Building
Security
Conting
Builders
Constru
Total H
Architec
Survey
Utilities
Environ
Legal L
Propert
Soft Cos
Financin
Historic
Develop
Total S
Total Costs
Soft Costs
Hard Costs (C
Acquisition
Rent a
Studio
Studio
Studio
Studio
1 BD 1 BA
1 BD 1 BA
1 BD 1 BA
2 BD 2 BA
2 BD 2 BA
Studio
1 BD 1 BA
1 BD 1 BA
1 BD 1 BA
Averages
Totals
Unit Type
Residentia
Studio
1 BD 1 BA
1 BD 1 BA
1 BD 1 BA
2 BD 2 BA
2 BD 2 BA
4 Acq
38
two-Story option:
1
2
Two-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 2 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca on: DETROIT, MI
Story Count: 1 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 5,185
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $127.05
Building Cost: $658,754.25
Es mate Name:
** Es mate includes renova on to exis ng 2nd oor space for apartment units
*Costs are derived from a building model with basic
components.
*Scope di erences and market cond ns can cause
costs to vary signi cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $16.46 $1.37 $5,074 $60,888 $62,715 $64,596 $66,534 $68,530
Potential Gross Income: Retail 3.0% $12.00 $3,309 $39,708 $40,899 $42,126 $43,390 $44,692
Potential Gross Income (PGI) $9.70 $8,383 $100,596 $103,614 $106,722 $109,924 $113,222
Stabilized Residential Vacancy 7.00% $1.15 $355 $4,262 $4,390 $4,522 $4,657 $4,797
Stabilized Retail Vacancy 7.00% $0.84 $232 $2,780 $2,863 $2,949 $3,037 $3,128
Total Vacancy $587 $7,042 $7,253 $7,471 $7,695 $7,926
Effective Gross Income (EGI) $18.71 $7,796 $93,554 $96,361 $99,252 $102,229 $105,296
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Security 2.00% $0.19 $168 $2,012 $2,134 $2,198 $2,264 $2,332
Utilities (water, trash, common) 3.00% $0.29 $251 $3,018 $3,202 $3,298 $3,397 $3,499
Maintenance and Repairs 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Yard/Exterior Maintenance 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Miscellaneous 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Management fee 5.00% $0.49 $419 $5,030 $5,336 $5,496 $5,661 $5,831
Insurance 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Property Taxes 77.4 mills $0.67 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 31.94% $3.10 $2,677.79 $32,133 $33,875 $34,891 $35,938 $37,016
Total Operating Expenses/Unit $4,590.50 $4,839.23 $4,984.41 $5,133.94 ########
Net Operating Income (NOI) $5.92 $5,118 $61,421 $62,486 $64,361 $66,292 $68,280
Replacement Reserves 14.91% $1.45 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 9.19% 9.35% 9.63% 9.92% 10.22%
Less Debt Service $3.46 $2,993 $35,915 $35,915 $35,915 $35,915 $35,915
Debt Service Coverage Ratio 1.71 1.74 1.79 1.85 1.90
Before Tax Cash Flow (BTCF) $1.01 $875 $10,505 $11,121 $12,532 $13,986 $15,483
BTCF Return on Equity (BTCF/Equity) 9.51% 10.06% 11.34% 12.66% 14.01%
Capitalized value at: 10.00% $59.23 $614,208 $624,863 $643,609 $662,917 $682,805
Remaining Mortgage: $521,615 $485,699 $449,784 $413,869 $377,953
Operating Revenues MonthlyRate
$/GSF
per Yr
$/NSF
per Mo
42
Three-Story option:
1
2
Three-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation & Addition
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 3 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca n: DETROIT, MI
Story Count: 2 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 10,370
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $138.48
Building Cost: $1,436,037.60
Es mate Name:
** Es mate includes renova n to exis ng 2nd space for apartment units, and addi n of a 3rd story for apartment units.
*Costs are derived from a building model with basic
components.
*Scope di rences and market condi ons can cause
costs to vary sign cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $24.27 $2.02 $10,112 $121,344 $124,984 $128,734 $132,596 $136,574
Potential Gross Income: Retail 3.0% $12.00 $4,000 $48,000 $49,440 $50,923 $52,451 $54,024
Potential Gross Income (PGI) $10.89 $14,112 $169,344 $174,424 $179,657 $185,047 $190,598
Stabilized Residential Vacancy 7.00% $1.12 $708 $8,494 $8,749 $9,011 $9,282 $9,560
Stabilized Retail Vacancy 7.00% $1.02 $280 $3,360 $3,461 $3,565 $3,672 $3,782
Total Vacancy $988 $11,854 $12,210 $12,576 $12,953 $13,342
Effective Gross Income (EGI) $31.50 $13,124 $157,490 $162,215 $167,081 $172,093 $177,256
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Security 2.00% $0.22 $282 $3,387 $3,593 $3,701 $3,812 $3,926
Utilities (water, trash, common) 3.00% $0.33 $423 $5,080 $5,390 $5,551 $5,718 $5,889
Maintenance and Repairs 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Yard/Exterior Maintenance 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Miscellaneous 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Management fee 5.00% $0.54 $706 $8,467 $8,983 $9,252 $9,530 $9,816
Insurance 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Property Taxes 77.4 mills $0.45 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 29.12% $3.17 $4,110.04 $49,320 $52,108 $53,672 $55,282 $56,940
Total Operating Expenses/Unit $3,288 $3,474 $3,578 $3,685 $3,796
Net Operating Income (NOI) $6.95 $9,014 $108,169 $110,106 $113,410 $116,812 $120,316
Replacement Reserves 8.86% $0.96 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 8.75% 8.91% 9.17% 9.45% 9.73%
Less Debt Service $4.61 $5,972 $71,669 $71,669 $71,669 $71,669 $71,669
Debt Service Coverage Ratio 1.51 1.54 1.58 1.63 1.68
Before Tax Cash Flow (BTCF) $1.38 $1,792 $21,500 $22,987 $25,827 $28,752 $31,764
BTCF Return on Equity (BTCF/Equity) 17.39% 18.60% 20.89% 23.26% 25.70%
Capitalized value at: 10.00% $69.54 $1,081,694 $1,101,063 $1,134,095 $1,168,118 $1,203,162
Remaining Mortgage: $1,040,887 $969,218 $897,549 $825,879 $754,210
Operating Revenues MonthlyRate
$/GSF
per Yr
$/GSF
per Mo
3 s33
Land
To
Reno
Build
Secu
Cont
Build
Cons
Tot
Arch
Surv
Utilit
Envi
Lega
Prop
Soft
Fina
Histo
Deve
Tot
Total Cos
Soft Cost
Hard Cos
Acquisitio
Rent
Studio
Studio
Studio
Studio
1 BD 1
1 BD 1
1 BD 1
2 BD 2
2 BD 2
Studio
1 BD 1
1 BD 1
1 BD 1
Averag
Totals
Unit T
Reside
Studio
1 BD 1
1 BD 1
1 BD 1
2 BD 2
2 BD 2
4 Ac
3938
two-Story option:
1
2
Two-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 2 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca on: DETROIT, MI
Story Count: 1 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 5,185
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $127.05
Building Cost: $658,754.25
Es mate Name:
** Es mate includes renova on to exis ng 2nd oor space for apartment units
*Costs are derived from a building model with basic
components.
*Scope di erences and market cond ns can cause
costs to vary signi cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $16.46 $1.37 $5,074 $60,888 $62,715 $64,596 $66,534 $68,530
Potential Gross Income: Retail 3.0% $12.00 $3,309 $39,708 $40,899 $42,126 $43,390 $44,692
Potential Gross Income (PGI) $9.70 $8,383 $100,596 $103,614 $106,722 $109,924 $113,222
Stabilized Residential Vacancy 7.00% $1.15 $355 $4,262 $4,390 $4,522 $4,657 $4,797
Stabilized Retail Vacancy 7.00% $0.84 $232 $2,780 $2,863 $2,949 $3,037 $3,128
Total Vacancy $587 $7,042 $7,253 $7,471 $7,695 $7,926
Effective Gross Income (EGI) $18.71 $7,796 $93,554 $96,361 $99,252 $102,229 $105,296
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Security 2.00% $0.19 $168 $2,012 $2,134 $2,198 $2,264 $2,332
Utilities (water, trash, common) 3.00% $0.29 $251 $3,018 $3,202 $3,298 $3,397 $3,499
Maintenance and Repairs 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Yard/Exterior Maintenance 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Miscellaneous 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Management fee 5.00% $0.49 $419 $5,030 $5,336 $5,496 $5,661 $5,831
Insurance 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Property Taxes 77.4 mills $0.67 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 31.94% $3.10 $2,677.79 $32,133 $33,875 $34,891 $35,938 $37,016
Total Operating Expenses/Unit $4,590.50 $4,839.23 $4,984.41 $5,133.94 ########
Net Operating Income (NOI) $5.92 $5,118 $61,421 $62,486 $64,361 $66,292 $68,280
Replacement Reserves 14.91% $1.45 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 9.19% 9.35% 9.63% 9.92% 10.22%
Less Debt Service $3.46 $2,993 $35,915 $35,915 $35,915 $35,915 $35,915
Debt Service Coverage Ratio 1.71 1.74 1.79 1.85 1.90
Before Tax Cash Flow (BTCF) $1.01 $875 $10,505 $11,121 $12,532 $13,986 $15,483
BTCF Return on Equity (BTCF/Equity) 9.51% 10.06% 11.34% 12.66% 14.01%
Capitalized value at: 10.00% $59.23 $614,208 $624,863 $643,609 $662,917 $682,805
Remaining Mortgage: $521,615 $485,699 $449,784 $413,869 $377,953
Operating Revenues MonthlyRate
$/GSF
per Yr
$/NSF
per Mo
2 story program & rent assumptions33
rent assumptions
Uses of Capital Total % Total $
Land/Building/Parking Lot 0% $
Hard Cost 74% 815,327$
Soft Cost 26% 289,733$
Total 100.00% 1,105,060$
Sources of Capital
Equity 10% 110,506$
First Mortgage 50% 557,530$
CRP 17% 191,012$
Historic Tax Credits 21% 236,012$
Eastern Market Façade Grant 1% 10,000$
Total 100% 1,105,060$
Budget P/GSF P/Unit
Land/Buildings/Parking Lot $ $ $
Total Acquisition Costs $ $ $
Renovation Construction 658,754$ 63.53$ 94,108$
Building Permits 8,234$ 0.79$ 1,176$
Security 10,000$ 0.96$ 1,429$
Contingency (10%) 65,875$ 11.28$ 9,411$
Builders Risk Insurance 6,588$ 0.64$ 941$
Construction Manager Fee (10% of Const) 65,875$ 6.35$ 9,411$
Total Hard Costs 815,327$ 83.55$ 116,475$
Architectural & Engingeering Services 44,078$ 4.25$ 6,297$
Survey 6,500$ 0.63$ 929$
Utilities 5,000$ 0.48$ 714$
Environmental Assessments 15,000$ 1.45$ 2,143$
Legal Land Use/Lease/Acquisition 15,000$ 1.45$ 2,143$
Property Taxes During Construction 6,984$ 0.67$ 998$
Soft Cost Contingency 10,000$ 0.96$ 1,429$
Financing Fees (2% of loan) 22,170$ 2.14$ 3,167$
Historic Tax Credit Transaction Costs 15,000$ 1.45$ 2,143$
Developer's Fee (8% of Total Cost) 150,000$ 14.46$ 21,429$
Total Soft Costs 289,733$ 27.94$ 41,390.38$
#REF!
1,105,060$ 106.56$ 92,088$Total Costs
Soft Costs
Hard Costs (Construction)
Acquisition
Item
second floor units
4 Acquisition & Development Costs
# of Monthly Annual
Units Size (NSF) Rent/Unit (Y1) Rent (Y1) P/NSF/mo
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
Average 1 529 725$ 8,698$ 1.37$
Totals 7 3700 5,074$ 60,888$ 1.37$
Unit Type
Residential (2nd Floor)
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
w / d
450 sf
450 sf
500 sf 500 sf
600 sf 600 sf 600 sf
4342
Three-Story option:
1
2
Three-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation & Addition
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 3 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca n: DETROIT, MI
Story Count: 2 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 10,370
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $138.48
Building Cost: $1,436,037.60
Es mate Name:
** Es mate includes renova n to exis ng 2nd space for apartment units, and addi n of a 3rd story for apartment units.
*Costs are derived from a building model with basic
components.
*Scope di rences and market condi ons can cause
costs to vary sign cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $24.27 $2.02 $10,112 $121,344 $124,984 $128,734 $132,596 $136,574
Potential Gross Income: Retail 3.0% $12.00 $4,000 $48,000 $49,440 $50,923 $52,451 $54,024
Potential Gross Income (PGI) $10.89 $14,112 $169,344 $174,424 $179,657 $185,047 $190,598
Stabilized Residential Vacancy 7.00% $1.12 $708 $8,494 $8,749 $9,011 $9,282 $9,560
Stabilized Retail Vacancy 7.00% $1.02 $280 $3,360 $3,461 $3,565 $3,672 $3,782
Total Vacancy $988 $11,854 $12,210 $12,576 $12,953 $13,342
Effective Gross Income (EGI) $31.50 $13,124 $157,490 $162,215 $167,081 $172,093 $177,256
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Security 2.00% $0.22 $282 $3,387 $3,593 $3,701 $3,812 $3,926
Utilities (water, trash, common) 3.00% $0.33 $423 $5,080 $5,390 $5,551 $5,718 $5,889
Maintenance and Repairs 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Yard/Exterior Maintenance 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Miscellaneous 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Management fee 5.00% $0.54 $706 $8,467 $8,983 $9,252 $9,530 $9,816
Insurance 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Property Taxes 77.4 mills $0.45 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 29.12% $3.17 $4,110.04 $49,320 $52,108 $53,672 $55,282 $56,940
Total Operating Expenses/Unit $3,288 $3,474 $3,578 $3,685 $3,796
Net Operating Income (NOI) $6.95 $9,014 $108,169 $110,106 $113,410 $116,812 $120,316
Replacement Reserves 8.86% $0.96 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 8.75% 8.91% 9.17% 9.45% 9.73%
Less Debt Service $4.61 $5,972 $71,669 $71,669 $71,669 $71,669 $71,669
Debt Service Coverage Ratio 1.51 1.54 1.58 1.63 1.68
Before Tax Cash Flow (BTCF) $1.38 $1,792 $21,500 $22,987 $25,827 $28,752 $31,764
BTCF Return on Equity (BTCF/Equity) 17.39% 18.60% 20.89% 23.26% 25.70%
Capitalized value at: 10.00% $69.54 $1,081,694 $1,101,063 $1,134,095 $1,168,118 $1,203,162
Remaining Mortgage: $1,040,887 $969,218 $897,549 $825,879 $754,210
Operating Revenues MonthlyRate
$/GSF
per Yr
$/GSF
per Mo
3 story program & rent assumptions33
third floor units
Uses of Capital Total % Total $
Land/Building/Parking Lot 0.00% $
Hard Cost 83.52% 1,713,722$
Soft Cost 16.48% 338,235$
Total 100.00% 2,051,957$
Sources of Capital
Owners Equity 6% 123,617$
First Mortgage 54% 1,112,557$
CRP 19% 380,391$
Historic Tax Credits 21% 425,391$
Eastern Market Façade Grant 0% 10,000$
Total 100% 2,051,957$
Budget P/GSF P/Unit
Land/Buildings/Parking Lot $ $ $
Total Acquisition Costs $ $ $
Renovation Construction 1,393,638$ 89.59$ 107,203$
Building Permits 17,420$ 1.12$ 1,340$
Security 10,000$ 0.64$ 769$
Contingency (10%) 139,364$ 11.28$ 10,720$
Builders Risk Insurance 13,936$ 0.90$ 1,072$
Construction Manager Fee (10% of Const) 139,364$ 8.96$ 10,720$
Total Hard Costs 1,713,722$ 112.49$ 131,825$
Architectural & Engingeering Services 92,580$ 5.95$ 7,122$
Survey 6,500$ 0.42$ 500$
Utilities 5,000$ 0.32$ 385$
Environmental Assessments 15,000$ 0.96$ 1,154$
Legal Land Use/Lease/Acquisition 15,000$ 0.96$ 1,154$
Property Taxes During Construction 6,984$ 0.45$ 537$
Soft Cost Contingency 10,000$ 0.64$ 769$
Financing Fees (2% of loan) 22,170$ 1.43$ 1,705$
Historic Tax Credit Transaction Costs 15,000$ 0.96$ 1,154$
Developer's Fee (8% of Total Cost) 150,000$ 9.64$ 11,538$
Total Soft Costs 338,235$ 21.74$ 26,018.07$#REF!
2,051,957$ 131.92$ 170,996$Total Costs
Soft Costs
Hard Costs (Construction)
Acquisition
Item
w / d
Rent assumptions
# of Monthly Annual
Units Size (NSF) Rent/Unit (Y1) Rent (Y1) P/NSF/mo
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
Averages 1 585 778$ 9,334$ 1.33$
Totals 13 7600 10,112$ 121,344$ 1.33$
Unit Type
Residential (2nd & 3rd Floor)
Studio 1 500 710$ 8,520$ 1.42$$ ,$ $
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
450 sf
800 sf 800 sf
600 sf 600 sf 600 sf
4 Acquisition & Development Costs
3938
two-Story option:
1
2
Two-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 2 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca on: DETROIT, MI
Story Count: 1 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 5,185
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $127.05
Building Cost: $658,754.25
Es mate Name:
** Es mate includes renova on to exis ng 2nd oor space for apartment units
*Costs are derived from a building model with basic
components.
*Scope di erences and market cond ns can cause
costs to vary signi cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $16.46 $1.37 $5,074 $60,888 $62,715 $64,596 $66,534 $68,530
Potential Gross Income: Retail 3.0% $12.00 $3,309 $39,708 $40,899 $42,126 $43,390 $44,692
Potential Gross Income (PGI) $9.70 $8,383 $100,596 $103,614 $106,722 $109,924 $113,222
Stabilized Residential Vacancy 7.00% $1.15 $355 $4,262 $4,390 $4,522 $4,657 $4,797
Stabilized Retail Vacancy 7.00% $0.84 $232 $2,780 $2,863 $2,949 $3,037 $3,128
Total Vacancy $587 $7,042 $7,253 $7,471 $7,695 $7,926
Effective Gross Income (EGI) $18.71 $7,796 $93,554 $96,361 $99,252 $102,229 $105,296
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Security 2.00% $0.19 $168 $2,012 $2,134 $2,198 $2,264 $2,332
Utilities (water, trash, common) 3.00% $0.29 $251 $3,018 $3,202 $3,298 $3,397 $3,499
Maintenance and Repairs 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Yard/Exterior Maintenance 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Miscellaneous 1.00% $0.10 $84 $1,006 $1,067 $1,099 $1,132 $1,166
Management fee 5.00% $0.49 $419 $5,030 $5,336 $5,496 $5,661 $5,831
Insurance 6.00% $0.58 $503 $6,036 $6,403 $6,595 $6,793 $6,997
Property Taxes 77.4 mills $0.67 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 31.94% $3.10 $2,677.79 $32,133 $33,875 $34,891 $35,938 $37,016
Total Operating Expenses/Unit $4,590.50 $4,839.23 $4,984.41 $5,133.94 ########
Net Operating Income (NOI) $5.92 $5,118 $61,421 $62,486 $64,361 $66,292 $68,280
Replacement Reserves 14.91% $1.45 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 9.19% 9.35% 9.63% 9.92% 10.22%
Less Debt Service $3.46 $2,993 $35,915 $35,915 $35,915 $35,915 $35,915
Debt Service Coverage Ratio 1.71 1.74 1.79 1.85 1.90
Before Tax Cash Flow (BTCF) $1.01 $875 $10,505 $11,121 $12,532 $13,986 $15,483
BTCF Return on Equity (BTCF/Equity) 9.51% 10.06% 11.34% 12.66% 14.01%
Capitalized value at: 10.00% $59.23 $614,208 $624,863 $643,609 $662,917 $682,805
Remaining Mortgage: $521,615 $485,699 $449,784 $413,869 $377,953
Operating Revenues MonthlyRate
$/GSF
per Yr
$/NSF
per Mo
2 story program & rent assumptions33
rent assumptions
Uses of Capital Total % Total $
Land/Building/Parking Lot 0% $
Hard Cost 74% 815,327$
Soft Cost 26% 289,733$
Total 100.00% 1,105,060$
Sources of Capital
Equity 10% 110,506$
First Mortgage 50% 557,530$
CRP 17% 191,012$
Historic Tax Credits 21% 236,012$
Eastern Market Façade Grant 1% 10,000$
Total 100% 1,105,060$
Budget P/GSF P/Unit
Land/Buildings/Parking Lot $ $ $
Total Acquisition Costs $ $ $
Renovation Construction 658,754$ 63.53$ 94,108$
Building Permits 8,234$ 0.79$ 1,176$
Security 10,000$ 0.96$ 1,429$
Contingency (10%) 65,875$ 11.28$ 9,411$
Builders Risk Insurance 6,588$ 0.64$ 941$
Construction Manager Fee (10% of Const) 65,875$ 6.35$ 9,411$
Total Hard Costs 815,327$ 83.55$ 116,475$
Architectural & Engingeering Services 44,078$ 4.25$ 6,297$
Survey 6,500$ 0.63$ 929$
Utilities 5,000$ 0.48$ 714$
Environmental Assessments 15,000$ 1.45$ 2,143$
Legal Land Use/Lease/Acquisition 15,000$ 1.45$ 2,143$
Property Taxes During Construction 6,984$ 0.67$ 998$
Soft Cost Contingency 10,000$ 0.96$ 1,429$
Financing Fees (2% of loan) 22,170$ 2.14$ 3,167$
Historic Tax Credit Transaction Costs 15,000$ 1.45$ 2,143$
Developer's Fee (8% of Total Cost) 150,000$ 14.46$ 21,429$
Total Soft Costs 289,733$ 27.94$ 41,390.38$
#REF!
1,105,060$ 106.56$ 92,088$Total Costs
Soft Costs
Hard Costs (Construction)
Acquisition
Item
second floor units
4 Acquisition & Development Costs
# of Monthly Annual
Units Size (NSF) Rent/Unit (Y1) Rent (Y1) P/NSF/mo
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
Average 1 529 725$ 8,698$ 1.37$
Totals 7 3700 5,074$ 60,888$ 1.37$
Unit Type
Residential (2nd Floor)
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
w / d
450 sf
450 sf
500 sf 500 sf
600 sf 600 sf 600 sf
4342
Three-Story option:
1
2
Three-Story Construction Cost summary
Operating revenues & programs
Square Foot Cost Estimate Report
Detroit Wholesale Produce Apartment
Renovation & Addition
2614 Riopelle St , Detroit , Michigan , 48207
Building Type:
Apartment, 3 Story with Brick Veneer/Wood
Frame/Cement Board Exterior
Loca n: DETROIT, MI
Story Count: 2 Resident Levels, 1 Retail Level
Story Height (L.F.): 14
Floor Area (S.F.): 10,370
Labor Type: STD
Basement Included: No
Cost Per Square Foot: $138.48
Building Cost: $1,436,037.60
Es mate Name:
** Es mate includes renova n to exis ng 2nd space for apartment units, and addi n of a 3rd story for apartment units.
*Costs are derived from a building model with basic
components.
*Scope di rences and market condi ons can cause
costs to vary sign cantly.
Projected
Year 1 Year 2 Year 3 Year 4 Year 5
Potential Gross Income: Residential 3.0% $24.27 $2.02 $10,112 $121,344 $124,984 $128,734 $132,596 $136,574
Potential Gross Income: Retail 3.0% $12.00 $4,000 $48,000 $49,440 $50,923 $52,451 $54,024
Potential Gross Income (PGI) $10.89 $14,112 $169,344 $174,424 $179,657 $185,047 $190,598
Stabilized Residential Vacancy 7.00% $1.12 $708 $8,494 $8,749 $9,011 $9,282 $9,560
Stabilized Retail Vacancy 7.00% $1.02 $280 $3,360 $3,461 $3,565 $3,672 $3,782
Total Vacancy $988 $11,854 $12,210 $12,576 $12,953 $13,342
Effective Gross Income (EGI) $31.50 $13,124 $157,490 $162,215 $167,081 $172,093 $177,256
Operating Expenses % of PGI
Marketing and Advertising 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Security 2.00% $0.22 $282 $3,387 $3,593 $3,701 $3,812 $3,926
Utilities (water, trash, common) 3.00% $0.33 $423 $5,080 $5,390 $5,551 $5,718 $5,889
Maintenance and Repairs 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Yard/Exterior Maintenance 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Miscellaneous 1.00% $0.11 $141 $1,693 $1,797 $1,850 $1,906 $1,963
Management fee 5.00% $0.54 $706 $8,467 $8,983 $9,252 $9,530 $9,816
Insurance 6.00% $0.65 $847 $10,161 $10,779 $11,103 $11,436 $11,779
Property Taxes 77.4 mills $0.45 $582 $6,984 $7,194 $7,410 $7,632 $7,861
Total Operating Expenses 29.12% $3.17 $4,110.04 $49,320 $52,108 $53,672 $55,282 $56,940
Total Operating Expenses/Unit $3,288 $3,474 $3,578 $3,685 $3,796
Net Operating Income (NOI) $6.95 $9,014 $108,169 $110,106 $113,410 $116,812 $120,316
Replacement Reserves 8.86% $0.96 $1,250 $15,000 $15,450 $15,914 $16,391 $16,883
Return on Cost (NOI/Total Cost after Incentives) 8.75% 8.91% 9.17% 9.45% 9.73%
Less Debt Service $4.61 $5,972 $71,669 $71,669 $71,669 $71,669 $71,669
Debt Service Coverage Ratio 1.51 1.54 1.58 1.63 1.68
Before Tax Cash Flow (BTCF) $1.38 $1,792 $21,500 $22,987 $25,827 $28,752 $31,764
BTCF Return on Equity (BTCF/Equity) 17.39% 18.60% 20.89% 23.26% 25.70%
Capitalized value at: 10.00% $69.54 $1,081,694 $1,101,063 $1,134,095 $1,168,118 $1,203,162
Remaining Mortgage: $1,040,887 $969,218 $897,549 $825,879 $754,210
Operating Revenues MonthlyRate
$/GSF
per Yr
$/GSF
per Mo
3 story program & rent assumptions33
third floor units
Uses of Capital Total % Total $
Land/Building/Parking Lot 0.00% $
Hard Cost 83.52% 1,713,722$
Soft Cost 16.48% 338,235$
Total 100.00% 2,051,957$
Sources of Capital
Owners Equity 6% 123,617$
First Mortgage 54% 1,112,557$
CRP 19% 380,391$
Historic Tax Credits 21% 425,391$
Eastern Market Façade Grant 0% 10,000$
Total 100% 2,051,957$
Budget P/GSF P/Unit
Land/Buildings/Parking Lot $ $ $
Total Acquisition Costs $ $ $
Renovation Construction 1,393,638$ 89.59$ 107,203$
Building Permits 17,420$ 1.12$ 1,340$
Security 10,000$ 0.64$ 769$
Contingency (10%) 139,364$ 11.28$ 10,720$
Builders Risk Insurance 13,936$ 0.90$ 1,072$
Construction Manager Fee (10% of Const) 139,364$ 8.96$ 10,720$
Total Hard Costs 1,713,722$ 112.49$ 131,825$
Architectural & Engingeering Services 92,580$ 5.95$ 7,122$
Survey 6,500$ 0.42$ 500$
Utilities 5,000$ 0.32$ 385$
Environmental Assessments 15,000$ 0.96$ 1,154$
Legal Land Use/Lease/Acquisition 15,000$ 0.96$ 1,154$
Property Taxes During Construction 6,984$ 0.45$ 537$
Soft Cost Contingency 10,000$ 0.64$ 769$
Financing Fees (2% of loan) 22,170$ 1.43$ 1,705$
Historic Tax Credit Transaction Costs 15,000$ 0.96$ 1,154$
Developer's Fee (8% of Total Cost) 150,000$ 9.64$ 11,538$
Total Soft Costs 338,235$ 21.74$ 26,018.07$#REF!
2,051,957$ 131.92$ 170,996$Total Costs
Soft Costs
Hard Costs (Construction)
Acquisition
Item
w / d
Rent assumptions
# of Monthly Annual
Units Size (NSF) Rent/Unit (Y1) Rent (Y1) P/NSF/mo
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
Studio 1 450 639$ 7,668$ 1.42$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
Studio 1 500 710$ 8,520$ 1.42$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
Averages 1 585 778$ 9,334$ 1.33$
Totals 13 7600 10,112$ 121,344$ 1.33$
Unit Type
Residential (2nd & 3rd Floor)
Studio 1 500 710$ 8,520$ 1.42$$ ,$ $
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
1 BD 1 BA 1 600 792$ 9,504$ 1.32$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
2 BD 2 BA 1 800 976$ 11,712$ 1.22$
450 sf
800 sf 800 sf
600 sf 600 sf 600 sf
4 Acquisition & Development Costs
40
5 construction Costs
19% 24.01 124,491.85
B1020 Roof Repair/Construction 1.7 8,814.50
1.7 8,814.50
B2010 Exterior Walls 14.43 74,819.55
14.43 74,819.55
B2020 Exterior Windows 6.01 31,161.85
6.01 31,161.85
B2030 Exterior Doors 0.36 1,866.60
0.36 1,866.60
B3010 Roof Coverings 1.51 7,829.35
1.34 6,947.90
0.17 881.45
28% 35.23 182,667.55
C1010 Partitions 10.36 53,716.60
6.81 35,309.85
3.55 18,406.75
C1020 Interior Doors 7.35 38,109.75
1.23 6,377.55
6.12 31,732.20
C1030 Fittings 3.38 17,525.30
3.38 17,525.30
C2010 Stair Construction 0.76 3,940.60
0.76 3,940.60
C3010 Wall Finishes 2.87 14,880.95
1.18 6,118.30
0.98 5,081.30
0.71 3,681.35
C3020 Floor Finishes 5.74 29,761.90
1.36 7,051.60
1.55 8,036.75
0.36 1,866.60
0.43 2,229.55
0.37 1,918.45
0.43 2,229.55
1.23 6,377.55
C3030 Ceiling Finishes 4.77 24,732.45
4.77 24,732.45
Windows, aluminum, sliding, standard glass, 5' x 3'
B Shell
Wood roof, truss, 4/12 slope, 24" O.C., 30' to 43' span
Brick veneer wall repair, insula on & cement board
% of Total Cost Per S.F. Cost
Vinyl wall covering, fabric back, medium weight
Door, steel 18 gauge, hollow metal, 1 door with frame, no label, 3'-6" x 7'-
Asphalt roo ng, strip shingles, inorganic, Class C, 4" slope, 235-240 lbs/SQ
Flashing, aluminum, no backing sides, .019"
C Interiors
Wood par on, 5/8" re rated gypsum board face, 1/4"sound deadening
1/2" re rated gypsum board, taped & nished, painted on metal furring
Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, solid core
Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, hollow core
Cabinets, residen , wall, two doors x 48" wide
Stairs, wood, prefab box type, oak treads, wood rails 3'-6" wide, 14 risers
Pain ng, interior on plaster and drywall, walls & ceilings, roller work,
Ceramic e, thin set, 4-1/4" x 4-1/4"
Carpet e, nylon, fusion bonded, 18" x 18" or 24" x 24", 24 oz
Carpet e, nylon, fusion bonded, 18" x 18" or 24" x 24", 35 oz
Carpet, padding, add to above, 2.7 density
Carpet, padding, add to above, 13.0 density
Vinyl, composi on e, minimum
Vinyl, composi on e, maximum
Tile, ceramic natural clay
Gypsum board ceilings, 1/2" re rated gypsum board, painted and
5 construction Costs
25.79% 35.72 370,384.11
B1010 Floor Construction 6.53 67,755.46
2.47 25,653.31
2.63 27,227.99
1.43 14,874.16
B1020 Roof Construction 3.41 35,328.10
3.41 35,328.10
B2010 Exterior Walls 17.9 185,605.13
17.9 185,605.13
B2020 Exterior Windows 6.01 62,280.85
6.01 62,280.85
B2030 Exterior Doors 0.36 3,730.29
0.36 3,730.29
B3010 Roof Coverings 1.51 15,684.28
1.34 13,934.80
0.17 1,749.48
25.45% 35.24 365,480.13
C1010 Partitions 10.36 107,479.83
6.81 70,633.99
3.55 36,845.84
C1020 Interior Doors 7.35 76,220.82
1.23 12,786.83
6.12 63,433.99
C1030 Fittings 3.38 35,101.82
Door, steel 18 gauge, hollow metal, 1 door with frame, no label, 3'-6" x 7'-
Asphalt roo ng, strip shingles, inorganic, Class C, 4" slope, 235-240 lbs/SQ
Flashing, aluminum, no backing sides, .019"
C Interiors
Wood par n, 5/8" e rated gypsum board face, 1/4"sound deadening
1/2" e rated gypsum board, taped & nished, painted on metal furring
Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, solid core
Door, single leaf, wood frame, 3'-0" x 7'-0" x 1-3/8", birch, hollow core
Windows, aluminum, sliding, standard glass, 5' x 3'
B Shell
Steel column, W8, 150 KIPS, 10' unsupported height, 35 PLF
Floor, wood joist, 2 x 12 @12" O.C., 1/2" CDX sub r
Fireproo ng, gypsum board, e rated, 3 layer, 1.5" thick, 8" steel column,
Wood roof, truss, 4/12 slope, 24" O.C., 30' to 43' span
Brick veneer wall repair, 2x6 studs @ 16", insula n & cement board
% of Total Cost Per S.F. Cost
SUMMARY:
Average unit SF: 650 SF
Total Annual Rent Revenue: $60,456
P/NSF/mo: $1.29
6 unit option rent Assumption
Total SF: 10,370 SF
Cost per SF (hard costs): $138.48
Total Cost: $2,510,957
Total Cost after incentives: $1,236,174
Annual Rent Profit: $121,344
Year 1 R.O.I: 17.39%
3 story development finances
Total SF: 5,185 SF
Cost per SF (hard costs): $127.05
Total Cost: $1,105,060
Total Cost after incentives: $668,036
Annual Rent Profit: $60,888
Year 1 R.O.I: 9.51%
2 story development finances
Key Ratios
Floor GSF 5,185
Floors 2
Building GSF 10,370
Residential NSF 3,700
Retail NSF 3,309
Building NSF 7,009
Residential Efficiency 71.36%
Retail Efficiency 63.82%
Building Efficiency 67.59%
Op. Expense Inflation 3%
Key Ratios
Floor GSF 5,185
Floors 3
Building GSF 15,555
Residential NSF 7,600
Retail NSF 3,309
Building NSF 10,909
Residential Efficiency 146.58%
Retail Efficiency 63.82%
Building Efficiency 70.13%
Op. Expense Inflation 3%
Financing Assumptions
Total Cost 1,105,060$
CRP Grant (191,012)
EMC Façade Grant (10,000)
20% Historic Tax Credit (236,012)
Total After Incentives 668,036$
Debt 83.46% $557,530
Equity 16.54% $110,506
Total 100.00% $668,036
Annual Monthly
Interest Rate 5.00% 0.42%
Amort Period 30 360
Debt Service $35,915 $2,993
Financing Assumptions
Total Cost 2,051,957$
CRP Grant (380,391)
EMC Façade Grant (10,000)
20% Historic Tax Credit (425,391)
Total After Incentives 1,236,174$
Debt 90.00% $1,112,557
Equity 10.00% $123,617
Total 100.00% $1,236,174
Annual Monthly
Interest Rate 5.00% 0.42%
Amort Period 30 360
Debt Service $71,669 $5,972
37
Revenue
Costs +
SUMMARY:
1 cost + revenue Conclusions
Recommendation to building owner:
• Our recommendation is to renovate the existing second
floor and build out a third story with new construction for
residential units.
• The 3 story option is recommended for long term investment
• Average quality wood frame construction
• Mid-range finishes and kitchen
• A variety of unit types and square footage sizes
• First floor existing exterior facade remains and is repaired
• Second and third story exterior facade is new construction
• First floor retail space upgraded to enhance the shopping
experience and market appeal for residents and shoppers
Explanation for recommendations:
Taking into account hard building costs, soft costs, financial
incentives and rent assumptions, it is estimated the building
owner will make back the initial investment on the building
renovations over a ten year period. This does not take into
account residential vacancy, operating costs or interest on
finance options. For a more detailed explanation of this see
the operating revenues and programs sections for the two
story and three story options.
Average unit SF: 529 SF
Total Annual Rent Revenue: $60,888
P/NSF/mo: $1.37
7 unit option rent Assumption
Average unit SF: 650 SF
Total Annual Rent Revenue: $60,456
P/NSF/mo: $1.29
6 unit option rent Assumption
Total SF: 10,370 SF
Cost per SF (hard costs): $138.48
Total Cost: $2,510,957
Total Cost after incentives: $1,236,174
Annual Rent Profit: $121,344
Year 1 R.O.I: 17.39%
3 story development finances
Total SF: 5,185 SF
Cost per SF (hard costs): $127.05
Total Cost: $1,105,060
Total Cost after incentives: $668,036
Annual Rent Profit: $60,888
Year 1 R.O.I: 9.51%
2 story development finances
Key Ratios
Floor GSF 5,185
Floors 2
Building GSF 10,370
Residential NSF 3,700
Retail NSF 3,309
Building NSF 7,009
Residential Efficiency 71.36%
Retail Efficiency 63.82%
Building Efficiency 67.59%
Op. Expense Inflation 3%
Key Ratios
Floor GSF 5,185
Floors 3
Building GSF 15,555
Residential NSF 7,600
Retail NSF 3,309
Building NSF 10,909
Residential Efficiency 146.58%
Retail Efficiency 63.82%
Building Efficiency 70.13%
Op. Expense Inflation 3%
Financing Assumptions
Total Cost 1,105,060$
CRP Grant (191,012)
EMC Façade Grant (10,000)
20% Historic Tax Credit (236,012)
Total After Incentives 668,036$
Debt 83.46% $557,530
Equity 16.54% $110,506
Total 100.00% $668,036
Annual Monthly
Interest Rate 5.00% 0.42%
Amort Period 30 360
Debt Service $35,915 $2,993
Financing Assumptions
Total Cost 2,051,957$
CRP Grant (380,391)
EMC Façade Grant (10,000)
20% Historic Tax Credit (425,391)
Total After Incentives 1,236,174$
Debt 90.00% $1,112,557
Equity 10.00% $123,617
Total 100.00% $1,236,174
Annual Monthly
Interest Rate 5.00% 0.42%
Amort Period 30 360
Debt Service $71,669 $5,972
12. page 10
using research and data
to display information
and tell a storyDetroit’s Youth after the bell rings:
a mapping narative
18. page 16
A speculative group
project - the 1st
a r c h i t e c t u r a l
graduate studio
FOR ADAPTATION
ticulous genetic fusion of two
pecies – the bluefin tuna and
s of both species to adapt to a
o acquiring the characteristics
om the former and a durable,
thesis capabilities from the
bridization to also develop a
mote plant distribution across
GER
physiognomies from both the
cs of soy pods are found within
as analogues of seed banks.
m and leaves integrate with
fin. A strong propulsion tail is
e appendages (male only). The
na digestive system, allowing
ergy by photosynthesis.
the arkpod & the station:
a design + science + world issue challenge
BOOK PUBLISHED SEPTEMBER 2015
19. page 17
EVC | Mobile Moss | Design Lead: Jhana Frederiksen
Design Team: Heather Woodcock, Emily Matt, Mingxue (Michelle) Huang, Futun
Alhamed, Emmanuel (Manny) Rubio, Steven Romkema, John Brown, Nathaniel
Ringholz, Matt Showalter.
Sela-Tern | Design Lead: Aaron Jones
Design Team: Dustin Altschul, Katherine Cahalane, Jad Chedid, Kyle Converse,
Justin Lee, Hanna Matievich, Oliver Raupp, Katie Shelton, Joy Sportel, Michael
Yakamovich.
Threshingbird | Design Lead: Ross Hoekstra
Design Team: Basmah Algadani, Jamie Mederer, Rachel Slagh, Thomas Apperson,
John McGarry, Andrew Stone, Nicholas Strahle, Nathan Loree, Ray Embach.
HPAD | Design Leads: Anirban Adhya, Alina Chelaidite
Design Team: Ramya Jangamakote, Ruth Mashni, Rachel Kowalczyk, Shany Puthiya
Kunnon, Eric Meyers, Michael Kemp, Brandon Calleja, Gabriel Ramirez, Ryan Alm,
Thomas Williams.
Arkpod | Design Lead: Wesley Taylor
Design Team: Meaghan Markiewicz, Larry Carcoana, Ergys Hoxha, Rndah Baharith,
Marianne Jones, Brian Keckan, Di Meng, Michael Neumann, Stephanie Kolpacke,
Paul Vassos.
20. page 18
THUNNUS GLYCINE MAX
Latin Name: Thunnus Glycine Max
Common Name: Arkpod [ärk päd]
LIFECYCLE OF CREATURE
A typical Arkpod will have a lifecycle of 15-20 years with the
first year of maturity occurring in year 5-6, giving the Arkpod
approximately 10 to 15 years of reproduction as well as seed
distribution.
SEXUAL REPRODUCTION AND ACTIVITIES OF THE CREATURE
TheArkpodhasanannualspawningevent,guidedbyabiological
migration pattern to search out shallower waters, which is
also combined with a pre-determination of data to populate
and dispense of seed banks. The female Arkpod dispenses her
eggs into the water and the male Arkpod fertilizes them while
they are in the water.
HABITAT OF THE CREATURE
The habitat of the Arkpod is a deep sea environment with
varying water temperatures including the range found in the
Atlantic ocean, Mediterranean Sea and Gulf of Mexico. These
waters maintain the optimum temperature and pressure for
the species.
ECO-GRAM | Instantly recognizable graphic that expresses a specific notion
of modern man’s relationship with the environment.
ECOTARIUM | UNLIMITED LIFE CYCLE DESIGN
THUNNUS GLYCINE MAX
Latin Name: Thunnus Glycine Max
Common Name: Arkpod [ärk päd]
LIFECYCLE OF CREATURE
A typical Arkpod will have a lifecycle of 15-20 years with the
first year of maturity occurring in year 5-6, giving the Arkpod
approximately 10 to 15 years of reproduction as well as seed
distribution.
SEXUAL REPRODUCTION AND ACTIVITIES OF THE CREATURE
TheArkpodhasanannualspawningevent,guidedbyabiological
migration pattern to search out shallower waters, which is
also combined with a pre-determination of data to populate
and dispense of seed banks. The female Arkpod dispenses her
eggs into the water and the male Arkpod fertilizes them while
they are in the water.
HABITAT OF THE CREATURE
The habitat of the Arkpod is a deep sea environment with
varying water temperatures including the range found in the
Atlantic ocean, Mediterranean Sea and Gulf of Mexico. These
waters maintain the optimum temperature and pressure for
the species.
ECO-GRAM | Instantly recognizable graphic that expresses a specific notion
of modern man’s relationship with the environment.
ECOTARIUM | UNLIMITED LIFE CYCLE DESIGN
FOOD CYCLE
The Arkpod, although solely a water based creature, is able
to absorbs nutrients via photosynthesis, using the integrated
soybean tendencies for energy – requiring 1-1/2 to 2 hours of
direct sunlight to maintain/complete this food cycle. In between
periods were this process is unavailable to the Arkpod, it is
able to compensate by a secondary method of carnivorous food
intake. Juveniles feed on fish, squid, and crustaceans while
adults feed on herring, bluefish, and mackerel. These dual
abilities to obtain life sustaining nutrients coincides with the
Arkpods natural manner of living near the surface in temperate
waters but frequently diving to depths of 500 to 1,000 meters.
INTERACTION WITH ENVIRONMENT
Within their natural environment, the Arkpod are the top
predators with larger creatures - sharks, marine mammals
(including killer whales and pilot whales) – being their only
ecological threats. The Arkpod is well adapted to the long
ECOTARIUM | THUNNUS GLYCINE MAX
FOOD CYCLE
The Arkpod, although solely a water based creature, is able
to absorbs nutrients via photosynthesis, using the integrated
soybean tendencies for energy – requiring 1-1/2 to 2 hours of
direct sunlight to maintain/complete this food cycle. In between
periods were this process is unavailable to the Arkpod, it is
able to compensate by a secondary method of carnivorous food
intake. Juveniles feed on fish, squid, and crustaceans while
adults feed on herring, bluefish, and mackerel. These dual
abilities to obtain life sustaining nutrients coincides with the
Arkpods natural manner of living near the surface in temperate
waters but frequently diving to depths of 500 to 1,000 meters.
INTERACTION WITH ENVIRONMENT
Within their natural environment, the Arkpod are the top
predators with larger creatures - sharks, marine mammals
(including killer whales and pilot whales) – being their only
ecological threats. The Arkpod is well adapted to the long
distances it travels and the ability to escape potential risks
with their enormous muscular strength, which it channels
through a pair of tendons to its lunate shaped caudal fin for
propulsion. In contrast to many other marine species, the body
stays rigid while the tail flicks back and forth, increasing stroke
efficiency. The Arkpod has an efficient circulatory system which
possesses a high blood hemoglobin concentration, allowing
ECOTARIUM | THUNNUS GLYCINE MAX
The exploration is combining a Tuna fish and a Soy bean plant to
address the lack in biodiversity.
[Part 1]
The arkpod
ECO-CREATURE | THUNNUS GLYCINE MAX
ECO-CREATURE | Anticipation of a future species, part plant and creature,
complete with its unique life-cycle, habits, needs, and social patterns.
21. page 19Plant diversity
1980 2000 2020 2040 2060
plant diversity vs. human population
human population
high diversity
areas
high plant diversity areas
THREATS TO BIODIVERSITY
ARE FOUND TO HAVE GLOBAL
EFFECTS. HUMAN INTERVENTION
OF THE GLOBAL ECOSYSTEM
THRUSTS SPECIES TO THE BRINK
OF TOTAL EXPLOITATION AND/OR
EXTINCTION.
THUNNUS GLYCINE MAX
ECOTARIUM | UNLIMITED LIFE CYCLE DESIGN
Why should we
even care about
this creature?
ark pod intervention on biodiversity
2080
2130
2030
2010
Marine bio-chain
remediation
process
ark pod
intervention
2020
2010
arkpod population
marine biodiversity
2130208020302020
22. page 20
ECOTARIUM
TERMINUM NON VITA CYCLUS CONSILIUM
UNLIMITED LIFE CYCLE DESIGN
Designing the environment for the network of Arkpods
[Part 2]
the eco-habitat
ECO-HABITAT | THUNNUS GLYCINE MAX
ECO-HABITAT | Design of a habitat for this new species that supports its life
for at least one year.
215
habitat for this new species that supports its life
ECO-HABITAT | THUNNUS GLYCINE MAX
ECO-HABITAT | Design of a habitat for this new species that supports its life
for at least one year.
24. page 22
ECOTARIUM | PLAN VIEW
rural experiencenatural experience
ECO-TRANSECT | THUNNUS GLYCINE MAX
cloud interpolation
population change data set
dense suburban rural natural
river
-1,000
500
1,000
1,500
3 inch
6 inch
4 inch
5 inch
hyper dense
populationchange
dowel interpolation
4 people
8 people
16 people
20 people
24 people
30 people
1”
2”
3”
4”
5”
6”
maximum rod lengths
hyper dense
+1,000
dense
-1,500
natural
0
rural
-1,000
suburban
-500
3 inch
29. page 27
The exploration is
understanding major global
issues that can be seen
at the local level, using
Detroit, MI as a case study.
[Research]
Case studies
CASESTUDY
After school program for young women at risk for teen pregnancy, poverty
and homelessness.
CASESTUDY:
Bettermanoutreach
‐Weekend program for young
Detroit males to reflect and play
basketball
Casestudy
DFA partners with local high schools, educators, and food
entrepreneurs to facilitate a year-round afterschool and summer
employment program that culminates in the design and launch of
students' own triple-bottom-line food business. 13
Fall (“Mealshare”): Students gain experience in basic knife skills,
nutrition fundamentals, smart grocery shopping, meal budgeting,
culinary arts, and event planning in their effort to organize a
community dinner for their family and friends. As part of this process,
students develop cooking basics lessons to share with elementary and
middle school students and their families. Fieldtrips include farm to
fork explorations of the Detroit food community; workshops from local
chefs, community leaders, and food professionals; and the opportunity
to take, then lead, a smart shopping tour of a local grocery store. Each
group is mentored throughout by a Detroit chef. 13
Spring (“Pop-up”): Students hone their craft by designing their own
healthy, local food recipe in order to build a triple bottom line food
business from the ground up. Throughout the semester, students
participate in field trips, engage in workshops held by community
leaders, and pilot their product by premiering their business at a
‘Market Day’ at their high school. 13
Case
studyhttp://detroitfoodacademy.com/what‐we‐do/quantifying‐impact0/
30. page 28
ROLE INC. is an afterschool program
for young women at risk of teen
pregnancy in Detroit high schools.
The exploration was continued through the investigation of the
following grand challenge question.
The exploration was continued through the investigation of the
following grand challenge question.
[problem]
the grand challenge
[addressing the problem]
a possible answer
What
Intervention
is needed
to break the cycle
of lack of educationin women to
prevent the overuse of depleting resources
such as foodand energy?
31. page 29
Programoutline
Gathering
Component
TheShip.
CollegePartnerships
Universitystudentsprovide
mentorship,throughthe
gatheringcomponent..
ProfessionalPartnerships
Localproduceandrestaurant
ownersprovideeducationaland
Entrepreneurcomponents.
Entrepreneur
Component
TheRoleingShip.
Educational
Component
TheShip.
Ideastobusiness
The RoleingShip&providing
freshfoodtocommunity &
sellingatlargermarkets
Internships
Thestudentsareequipped
withskillsforhighereducation
andjobopportunities.
SenseofFamily
Throughthegathering
component,theintentinto
createacomfortable
welcomingenvironmentfor
students.
ROLEINC.
HighSchoolPartnerships
Throughpartnershipswithlocalschools,thestudentswillbeinvolvedinthisafterschoolprogram.
ROLE INC, and it’s architectural intervention, will decrease over
population and address issues of depleting resources by offering
a program and “safe haven” for young women at risk of teen
pregnancy.
[addressing the problem]
an architectural intervention
ROLEINC.
3maincomponentstoprogram
1. Gathering Component
- Discussion
- Mentorships
- Informal Activity
2. Educational Component
- Sustainable Food Production Techniques
- Effective Business Models and Practices
- Entrepreneurial Skills
Gatheringcomponent- Discussion
- Mentorships
- Informal Activity
Research
A variety of activities, such as sports, homework help, the arts, or community service,
may attract a diverse group of participants. In neighborhoods with few alternatives, a
mixture of activities is even more important, because students consistently state that
activity choices matter to them.12
This component is focused
on offering a place for
youth to use as a “third
place” and to promote
the program to other
youths.
ROLEINC.
Educationalcomponent- Sustainable Food Production Techniques
- Effective Business Models and Practices
- Entrepreneurial Skills
Research
According to a Harvard Family Research Survey, it has been proven successful to
link fun activities to “hidden” educational components in afterschool programs. 12
This component is focused on offering youth education in
sustainable, efficient business techniques, such as managing a
budget and addressing issues of packaging and transportation
within business models. The component also teaches students how
to become entrepreneurs.
ROLEINC.
Entrepreneurialcomponent- Experience with professionals
- Leadership Skills
- Ideas into action
Research
Through the Food Lab Academy, 13
This component is focused on offering the students training
techniques they can use after graduation. These can not only be
used in their community to bring fresh food to the area but also to
excel their lives into higher education and professional careers.
33. page 31
ROLEINC.
TheShipexpanded
Modular Design
The Ship was designed for expansion.
TheRoleingShip
Removable Component
This element that fits into The Ship can be removed and
set up independent of The Ship. This can be utilized at
local markets or at neighborhood events.
ROLEINC.
TheRoleingShip
Removable Component
This element that fits into The Ship can be removed and set upindependent of The
Ship. This can be utilized at local markets or at neighborhood events.
ROLEINC.
TheRoleingShip
Removable
Component
This element that fits into
The Ship can be
removed and set up
independent of The
Ship. This can be utilized
at local markets or at
neighborhood events.
Merchandise display
Merchandise display
34. page 32
A Individual Speculative
Design Project | Public
Exhibition December
2016 in Detroit, MIpresented at a Public Exhibition held in December 2016, Detroit, MI
the protest hub:
an architectural intervention to address social issues
36. page 34
oh you think you
are better than
me now?
hey! ya know, I would
rather be a nice sweet
thing then a black cup of
coffee
mutha fucka VANILLA
ICE, get away from the
driver
This girl probably
doesn’t eat pork...
And this white chick probably
doesn’t eats collar greens...
What if no one
could tell we
were different?
What if
everyone
looked just
the same?
Would people
still be able to
THINK? Would people
still be able to
THINK?!?!
!?!
!?!
37. page 35
This project is the exploration of individual expression, collective culture, structure and mobility through the elimination of personal identity
by examining a variety of social interactions within the urban context.
The Personal Identity Voider explores
how the lack of individual expression
can shape and eliminate collective
culture. With a lack in personal
identity, the P.I.V. challenges society
to live without grouping. Due to this
human desire, as quoted by Kalle
Ksam in Culture Jam, “The most
powerful narcotic in the world is the
power of belonging.” This idea then
challenges multiple facets of people’s
daily lives. Can you still have emotion
without identity? Is there still culture
without grouping? Can you have
collective culture without differences?
The issues of understanding personal
identity while questioning external
identities take place while people
in society engage with P.I.V.s. The
Personal Identity Voider was created
to bring attention to the history,
current identity and social tensions
occurring in the city of Detroit`s
political, economic and societal
layers. The issue of territory and
boundaries within the city is also
addressed through the Personal
Identity Voider (P.I.V.). This takes place
through multiple contexts within the
city, especially through the daily life
of citizens.
[part 1]
the personal identity voider
Eye Color
INDIVIDUALISM VOIDED
Voice & Teeth Status
Fashion Accessories
Hair Color Choice
Skin Color
Type of Clothing
Weight
Body Mannerism
Shoes size
who are you if you
are all the same?
38. page 36
“If you mobilize a mass action,
you can change the world.”
– Grace Lee Boggs
“The real protests begin in the realm of everyday and domestic life... It is an insurgence that begins with the
struggle for rights to have a daily life in the city worthy of a citizen’s dignity.”’
-MIT Dispatch -- Urban Design and Civil Protest, Places Journal, 2008
^CHANGING LAYERS OF SYSTEMS
PROTESTS, MARCHES AND SOCIAL MOVEMENT
ADVOCACY LOCATIONS WITHIN THE CITY OF
DETROIT, MICHIGAN
PHYSICAL ENVIRONMENT
INFRASTRUCTURE
BUSINESS REGULATIONS
PUBLIC AMENITIES
TRANSIT OPTIONS
DEMOGRAPHICS
THE MAPS TO THE LEFT SHOW
THE DEMOGRAPHIC SHIFT THAT
TOOK PLACE IN DETROIT FROM
1950 - 2010.
NATIONAL & LOCAL CALL
RACIAL RIOTS
WATER SHUTOFF MARCHES
DIE-IN PROTEST
PUBLIC TRANSIT DEMAND
DIE-INDetroit Institute of Arts, Detroit MI
2015
MILLION HOODIE MARCHNew York City, New York
2015
FERGUSON PROTESTS1-75 Highway Blockage, Detroit, MI
2014
BUS BOYCOTTMontgomery, AL
1955
DETROIT RACE RIOTSDetroit MI
1967 | 1943 | 1863
ECONOMIC STATUS
EDUCATION OPPORTUNITY
EMPLOYMENT OPTIONS
POPULATION
IMPORTS AND EXPORTS
CADILLAC SQUARE BUS HUB CAPITAL PARK BUS HUB ROSA PARKS TRANSIT CENTERDOWNTOWN HORSE & BUGGY
1920 1955 20081900
1950 1970 2010
MAJORITY CAUCASIAN DEMOGRAPHIC SHIFT MAJORITY AFRICAN AMERICAN
1960 1985 2005
$3 BILLION
$1.4 BILLION
$7.4 BILLION
RESTRICTED BOUNDARIES
2015 RALLY, COLEMAN YOUNG BUILDING
MOBILIZATION ABILITY
2014 FERGUSON PROTEST
LANDSCAPE CHANGE
2015 DIE-IN
39. page 37
The exploration of spatial, societal and political influences of protests within an urban context and its role in collective culture and social
policies.
Through the
investigation and
research of how
protests manifest
and influence greater
social societal
policies and systems
is explored in the
non-fi realm. The
critical investigation
is understanding
the effect these
influences have on
determining the built
urban environment,
social effects and
collective identity.
This inquiry attempts
to answer questions
such as: What
determines collective
identity? How do
protests contribute
the identity of a
society? What causes
protests to manifest
and mobilize? How
influential and
essential are protests
to the development
of an urban
environment?
[part 2]
The protest Hub
whatdoplacesfor
protest look like?
40. page 38
MOBILIZATION
ABILITY
RESTRICTED
BOUNDARIES
LANDSCAPE
CHANGE
POINTS OF FICTION
The Rosa Parks Transit
Center represents
Detroit`s future transit
goals and the ongoing
advocacy history put
forward by Rosa Parks.
While Rosa Parks had
a large influence on
racial discrimination
throughout the United
States due to her role in
the 1951 Montgomery
bus boycott, she carried
on her advocacy work ,
along with many other
civic leaders, while
living in the Virginia
Park Neighborhood on
Detroit`s north side.
Grace Lee Boggs was
one the these civic
leaders in the city of
Detroit.
“The Montgomery
bus boycott was
not only about
transforming the
system but an
example of how we
ourselves change
in the process of
changing the system.”
-Grace Lee Boggs
ROSA PARKS PROTEST HUB
A CAMPUS DESIGNED TO PROVOKE SOCIAL MOVEMENTS
41. page 39
PROJECT INFLUENCES
The following is a list of literature and media
that influenced the overall project:
-Rebel Cities by David Harvey
-The Promise of the City by Kian Tajbaksh
-American Revolutionary: The Evolution of
Grace Lee Boggs directed by Grace Lee
-The Giver directed by Phillip Noyce
-The Aesthetics of Equity by Craig Wilkins
-Hyper City by Nas
-Spaces of Contention, Spatialities and Social
Movements by Walter Nicholls, Byron Miller
and Justin Beaumont
-Culture Jam, the uncooling of America by
Kalle Lasn
-Archigram, Architecture without Architecture
by Simon Sadler o Protest in an
Information Society: A Review of Literature on
Social Movements and New ICTs Article by R.
Kelly Garrett
-MIT Dispatch -- Urban Design and Civil
Protest, featured in Places Journal, 2008
-Invisible Cities by Italo Calvino
42. page 40
Aurbandesignresearch
project based in
vancouver, Canada
0 0.5 10.25 Miles
µ0 0.5 10.25 Miles
µ0 0.5 10.25 Miles
µ0 0.5 10.25 Miles
µ
¾¾½
¾¾½ ¾¾½ ¾¾½ ¾¾½
¾¾½
¾¾½
¾¾½
¾¾½
¾¾½¾¾½
¾¾½
¾¾½¾¾½¾¾½¾¾½¾¾½¾¾½¾¾½¾¾½¾¾½
¾¾½ ¾¾½ ¾¾½ ¾¾½ ¾¾½
¾¾½
¾¾½
¾¾½
¾¾½ ¾¾½ ¾¾½ ¾¾½ ¾¾½
¾¾½ ¾¾½ ¾¾½ ¾¾½ ¾¾½
¾¾½
¾¾½
¾¾½
¾¾½
¾¾½
¾¾½
¾¾½¾¾½¾¾½
¾¾½
¾¾½
¾¾½
0 0.5 10.25 Miles
µ
short term planning, long term effects:
An urban design case study
44. page 42
[sec.1]researchOlympic village development ENVIRONMENTAL
Responsibility
1
Due to the heavy rainfall Vancouver receives, the development strived to include storm water management in the plan. This
was done through bioswale installation. Part of the design was to make the management of water present to people as they
walk down the street to celebrate the process.
LARGE FOCUS
Sustainability of the environment was the largest focal point of
the development. Without an extensive study on the damage
done to the earth through this development, the project took
every step possible in reducing the footprint of the construction
and maintenance. Through this aspect this focus was extremely
successful. Unfortunately, this causes unbalance among other aspects
of sustainability.
A series of processes were considered to reduce the amount of energy being used within the site. In
addition, there were systems used to capture renewable energy cleanly.
Information taken from: http://www.thechallengeseries.ca/chapter-03/environmental-remediation/#history
Remediation of site contamination
taking control of water management
Conserving energy
SITE CONTAMINATION
-12 Areas of Potential Environmental Concern (APEC)
- 64 Olympic sized pools of excavated material
- 38 Olympic sized pools of contaminated site material
- 9 Olympic sized pools of hazardous waste
before re-mediation
Hazardous Waste Contamination
after remediation
[sec.1]researchOlympic village development MIXED-USE
COMMUNITY
2
mixed use buildings
MIXED USE zoning
From an architecture standpoint the building were designed to be mixed use. This incorporated
street level retail and, residential units and gathering / green space all in the same building. There
were many of these types of buildings located in close proximity to each other. This aspect of the
architecture was successful in providing options for the residents. Living an urban lifestyle includes
covenant and accessibility needs and amenities within walking distance. Designing mixed use
buildings contribute to this urban initiative.
From a planning
perspective,
the site was
split into zones.
While each of
these zones was
not strictly one
typology, there
is a large divide
in the zones.
Unfortunately
this does
not allow for
spontaneous
diversity within
the urban space.
While each
GREEN ROOF /
GATHERING SPACE
RESIDENTIAL
UNITS
COMMERICAL / RETAIL LEVEL
STREET LEVEL RETAIL