Introduction to Planning
Basic Principles and Tools
Contents
• Aim
• What is planning and why is it important?
• Introduction to military planning – the 7 Questions method
• Basic tools/products
• Other planning tools and structures
• Principles
• Q&A
Aim
• To generate an understanding of the importance of, and principles
that underpin, successful planning. To describe and talk through an
example planning structure.
What is Planning and Why is it Important?
• Effective planning is that which not only delivers the desired effect
but also helps guarantee it is achieved with the least amount of
expended effort, energy, time and material waste.
• The most important principle of effective planning is having a
fundamental knowledge of what it is you are trying to achieve and
why. This focus on a particular aim should not waiver or morph into
something different to what is desired.
• Planning does not occur solely at the start of a project, event or
activity. It is something that should drive work forward but should in
turn be shaped and altered by changes in reality or new information.
• Plans are never set in stone as no plan ever survives “first contact”.
What is crucial is the deeper knowledge of a particular situation that
an effective planning process develops.
• Plans must also be formulated that work up to, during and after the
delivery of the product/effect itself.
Introduction to Military Planning
The 7 Questions/Combat Estimate Approach
• Based on military planning structures, this provides a clear framework
that ensures work can be planned to a timeline and with the
necessary apportionment of load and responsibility; all founded upon
processed knowledge about the setting and purpose of the project.
• It takes the form of questions, adapted somewhat from their original
military format, to be developed and answered as necessary.
The 7 Questions
1) What is the situation, why and how does it effect me?
2) What have I been told to do and why?
3) What effects do I need to have on the situation and what direction
must I give to develop the plan?
4) Where can I best accomplish each action or effect?
5) What resources do I need to accomplish each action or effect?
6) When and where do the actions take place in relation to each other?
7) What control measures do I need to impose?
The Three Columns Format – Questions 1, 2, 3 and 7
• Questions One, Two, Three and Seven must be subjected to scrutiny,
best and most simply developed with three columns that
progressively develop understanding and determine the influence of
each piece of information.
• The first of these is a description of what is understood or known
about an aspect of each question. The second column deals with the
“so what?” element, explaining why this information has a bearing on
the plan or activity. The third column divides this reasoning into a
variety of outcomes to form the basis of the activity or be taken into
account in the plan
Q 1: Raw Information 2: So what? Output
1 (Situation) Weather: It tends to rain
heavily every afternoon.
As our event is outdoors we
cannot plan to have it later in the
day without tents etc.
Constraint – no afternoon
activities
Task – source
weatherproof
facilities/tents etc.
Example
• Effects – an outcome you wish to achieve, be it a change of behaviour, the creation of a specific item etc.
• Tasks – specific work that has to be done in the build-up to delivery of the project/work as it sets the
conditions for the success of the final delivery. This can be anything from sourcing stationary to ordering a
bespoke software suite.
• Constraints – an issue that may limit one’s ability to do exactly as one wishes and helps to focus the
direction of the plan and determine what effects are most feasible. Constraints should be seen in as positive
a light as possible for this reason but should never be ignored.
• Request for Information (RFI) – more often than not one does not have all of the required information
whilst working through the plan. Identifying these knowledge gaps is obviously important but managing
them is also necessary to push the plan forward and not undermine the whole process. A separate RFI list
can be created once the Estimate has been worked through.
Basic Tools/Products
Questions Four, Five and Six
• These questions provide a system for organising and prioritising all of the
information and direction developed earlier and each one is best worked
through using diagrams and tables.
Question Four
• The most fundamental effect is placed in the centre and described within
context. Concentric boxes are then built around this with additional effects
that are co-timeous and necessary to set the conditions for the
achievement of the principle effect. This in turn must set the conditions for
wider success. Any non-central but supporting effects or tasks that happen
outside of this specific time-frame can be drawn around this central set of
effect descriptors. This diagram now supports the work in Q’s 5 and 6.
• Using the example of a project to create a play to demonstrate the
potential of youth and discuss issues relating to young people a simple
effect diagram is produced below:
Example figure of an Effect Diagram
• Note the language used – “in order to” and “set the conditions for” are the sort of phrases that must be
included to ensure one understands how one effect supports the main effort that sits in the middle of the
diagram which itself is defined by a wider purpose.
• Now that one knows what effects/tasks are needed it is necessary to
compare options for delivering these effects. This can be incredibly
complicated or very simple but what is constant is the need to be open-
minded in the comparison and not to enter into it with a fixed notion of
what course of action is best.
• Several options, often diagrammatically, are presented and then assessed
on a scale of 1-3 according to a set of appropriate principles. Total scores
are then used to determine which the best course of action is.
• A similar approach could be taken in our example when considering what
venue to use for the production. Several options could be weighed
objectively according to factors such as acoustics, ease of set construction,
ease of public access, cost of hire etc.
• Whilst the principles/factors chosen will in some way influence potential
decisions due to the subjective reasoning of the planner, the aspect of
objectivity when it comes to weighing benefits must be reiterated.
Venue Acoustics Set Public Cost Total Rank
School, North 2 2 2 2 8 3
School, South 3 3 1 1 8 3
Public Theatre 3 3 2 1 9 2
Park 2 2 3 3 10 1
Town square 1 1 3 2 7 5
Example
• A final decision is not made in isolation, there may be other needs related to other tasks that necessitate
choosing another venue – it is about weighing the cost/benefit of these and one may have to choose the
second best venue to ensure the best overall event.
• What one has achieved is a develop a critically thought-through variety of options; one is aware of all of the
pros and cons of each option and can plan to take advantage of/mitigate against these as the plan is developed.
Question 5 – What Resources do I Need?
• This takes the form of a table where you list effects/tasks and assign
resources to achieve them. It is best to arrange them in priority order.
• Using the example of creating a publicity campaign for the theatre
production the table should look similar to this:
T/E Activity Description Assigned to
1 E Ensure an audience of 200 Jose, Callum
2 E Create wider awareness of theatre group Jose, Callum
3 T Create sufficient tickets Carolina, Dan
4 T Distribute tickets Carolina, Dan
5 T Create publicity poster Tina
6 T Create program for production Tina, Jose
7 E Leverage and boost social media presence Callum
8 T Create and leverage visual media Visual Media Team, All
When and Where do These Actions Take Place?
• Question Six - This is the process where one can de-conflict work in terms of
time and space and forms the foundation of one of the most important
products of the planning process – a timeline. It also takes the process of a
table with an appropriate timeline on the x-axis and resources listed on the y-
axis. Practically it is often most easily worked out in reverse chronology from
the delivery point.
- W4 - W3 - W2 - D5 - D4 - D3 - D2 - D1 Delivery
Jose 1, 2 1, 2, 6 1,2
Callum 1, 2, 7 1,2
Carolina 3 4
Dan 3 4
Tina 5 6
VMT 8
• This table can show conflicts as well as identifying spare capacity. It will
form the basis of the final plan itself; who needs to do what by what
date.
What Control Measures Do I Need to Impose?
Question Seven
• The results from the three column format should be used to create parameters
for activity as well as ensuring contingencies are adequately planned against.
These can be as obvious as legal constraints on a particular course of action or
ensuring work complies with budgetary requirements.
• Fundamentally anything that limits the scope of the plan beyond those issues
already dealt with.
• Control measures are crucial to monitoring progress and ensuring it remains
focused on the real objective and does not morph into something else. These can
be anything from creating a plan for regular updates by phone or e-mail to
regular meetings to allow central briefing to guarantee unity of message and for
back-briefing from different roles concerning progress.
• The format this takes can depend upon style and logistical realities but should not
interfere with autonomy or be done purely for the sake of doing so.
Other Supporting Products/Tools/Structures
• Warning Order – Possible to produce after completion of Qs 1-3, this is a short documentmeeting
to inform all those involved of the broad outline of the objective and what potential
tasks/materials/roles will be assigned and potentially to who. As the name suggests it is meant as
a “heads-up” so any preparatory work can begin concurrent to the plan being fully fleshed out –
ordering supplies, training individuals, sourcing specific skills etc.
• SWOT Analysis - This stands for Strengths, Weaknesses, Opportunities and Threats Analysis and is
a process utilised in many different sectors of business as well as the military. It involves
specifying the objective of the business venture or project and identifying the internal and
external factors that are favourable and unfavourable to achieve that objective. Identification of
SWOTs is important because they can inform later steps in planning to achieve the objective.
• Rehearsal of Concept (RoC) Drill – Essentially a detailed and interactive question and answer
session with the principal partners in the project. Under the direction of the primary planner and
alternating according to a timeline-based order each person describes the steps involved in the
work they will be producing.
• Rehearsals – Rehearsals are crucial to the execution of any event and provide an opportunity to
test and adjust lower-level processes; when effective they can contribute immensely to the
success of a project where delivery is dependent on different resources/work/people in the same
time and space.
• OODA-Loop – Not a product per se, rather a “decision cycle” process standing for Observe,
Orient, Decide and Act.
Underlying Principles
• Think through the problem to the finish and then beyond.
• Take the action that makes the next one easier.
• Break a problem down to its constituent parts, as small as possible,
and then resolve it from the ground up – do not be tempted to skip
ahead or fit your planning design to suit a solution one already has in
mind.
• Simplicity of concept. One should strive for a plan and its components
to be as simple as possible and just as simply communicable. Simple =
flexible.
• Timeliness and apportionment of time.
• Trust in those delivering the plan.
• Always be ready to reinforce success.
Q & A
FIN

More Related Content

What's hot

Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notesTony
 
The 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeThe 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeWorkfront
 
Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...
Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...
Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...Malik Khalid Mehmood
 
PM Notebook - Chapter 3: The Process Framework
PM Notebook - Chapter 3: The Process FrameworkPM Notebook - Chapter 3: The Process Framework
PM Notebook - Chapter 3: The Process FrameworkMohammad Elsheimy
 
Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World? Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World? Michelle Scifers, MBA
 
How to be a consultant and run a successful assignment
How to be a consultant and run a successful assignmentHow to be a consultant and run a successful assignment
How to be a consultant and run a successful assignment1STOUTSOURCE LTD
 
"Old school" 7 Step-problem solving NAVEDTRA12048 (MILREQ E8 & E9)
"Old school" 7 Step-problem solving NAVEDTRA12048  (MILREQ E8 & E9)"Old school" 7 Step-problem solving NAVEDTRA12048  (MILREQ E8 & E9)
"Old school" 7 Step-problem solving NAVEDTRA12048 (MILREQ E8 & E9)Glenn Mallo
 
John.rigoli
John.rigoliJohn.rigoli
John.rigoliNASAPMC
 
PM Notebook - Chapter 6 - Schedule Management
PM Notebook - Chapter 6 - Schedule ManagementPM Notebook - Chapter 6 - Schedule Management
PM Notebook - Chapter 6 - Schedule ManagementMohammad Elsheimy
 
The unwritten rules_of_budgeting
The unwritten rules_of_budgetingThe unwritten rules_of_budgeting
The unwritten rules_of_budgetingMikel Arriaga
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysisLiris Thomas
 
Problem solving
Problem solvingProblem solving
Problem solvingRob Graham
 
Forecasting cost and schedule performance
Forecasting cost and schedule performanceForecasting cost and schedule performance
Forecasting cost and schedule performanceGlen Alleman
 
Problem and situation analysis
Problem and situation analysisProblem and situation analysis
Problem and situation analysisMoamen Abu Nada
 
Budgeting, Forecasting, and Closing Process
Budgeting, Forecasting, and Closing ProcessBudgeting, Forecasting, and Closing Process
Budgeting, Forecasting, and Closing ProcessJason Lundell
 

What's hot (20)

Module 8 presenter notes
Module 8 presenter notesModule 8 presenter notes
Module 8 presenter notes
 
Developing a problem tree
Developing a problem treeDeveloping a problem tree
Developing a problem tree
 
The 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeThe 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All Time
 
Lect2
Lect2Lect2
Lect2
 
Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...
Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...
Understanding logframe ___problem_tree_analysis_____by_dr_malik_khalid_mehmoo...
 
PM Notebook - Chapter 3: The Process Framework
PM Notebook - Chapter 3: The Process FrameworkPM Notebook - Chapter 3: The Process Framework
PM Notebook - Chapter 3: The Process Framework
 
Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World? Working Like Fred Flintstone in a George Jetson World?
Working Like Fred Flintstone in a George Jetson World?
 
Objective Oriented Project Planning
Objective Oriented Project PlanningObjective Oriented Project Planning
Objective Oriented Project Planning
 
How to be a consultant and run a successful assignment
How to be a consultant and run a successful assignmentHow to be a consultant and run a successful assignment
How to be a consultant and run a successful assignment
 
"Old school" 7 Step-problem solving NAVEDTRA12048 (MILREQ E8 & E9)
"Old school" 7 Step-problem solving NAVEDTRA12048  (MILREQ E8 & E9)"Old school" 7 Step-problem solving NAVEDTRA12048  (MILREQ E8 & E9)
"Old school" 7 Step-problem solving NAVEDTRA12048 (MILREQ E8 & E9)
 
John.rigoli
John.rigoliJohn.rigoli
John.rigoli
 
PS 130 Rev D Problem Solving
PS 130 Rev D Problem SolvingPS 130 Rev D Problem Solving
PS 130 Rev D Problem Solving
 
PM Notebook - Chapter 6 - Schedule Management
PM Notebook - Chapter 6 - Schedule ManagementPM Notebook - Chapter 6 - Schedule Management
PM Notebook - Chapter 6 - Schedule Management
 
The unwritten rules_of_budgeting
The unwritten rules_of_budgetingThe unwritten rules_of_budgeting
The unwritten rules_of_budgeting
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysis
 
Problem solving
Problem solvingProblem solving
Problem solving
 
Forecasting cost and schedule performance
Forecasting cost and schedule performanceForecasting cost and schedule performance
Forecasting cost and schedule performance
 
Projektledelse og softwareinnovation
Projektledelse og softwareinnovationProjektledelse og softwareinnovation
Projektledelse og softwareinnovation
 
Problem and situation analysis
Problem and situation analysisProblem and situation analysis
Problem and situation analysis
 
Budgeting, Forecasting, and Closing Process
Budgeting, Forecasting, and Closing ProcessBudgeting, Forecasting, and Closing Process
Budgeting, Forecasting, and Closing Process
 

Viewers also liked

PAS councillor training: Introduction to planning
PAS councillor training: Introduction to planningPAS councillor training: Introduction to planning
PAS councillor training: Introduction to planningPlanning Advisory Service
 
Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)
Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)
Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)Neeraj Bhandari
 
The Nature of Strategic Management
The Nature of Strategic ManagementThe Nature of Strategic Management
The Nature of Strategic ManagementNoel Buensuceso
 
introduction to management and planning
introduction to management and planningintroduction to management and planning
introduction to management and planningMegha Aggarwal
 
Basic Concepts Of Strategic Management
Basic Concepts Of Strategic ManagementBasic Concepts Of Strategic Management
Basic Concepts Of Strategic Managementhassnibaba
 
Concepts of Strategic Management
Concepts of Strategic ManagementConcepts of Strategic Management
Concepts of Strategic Managementsaberkhosravi
 
Plannning and Types of planning
Plannning and Types of planningPlannning and Types of planning
Plannning and Types of planningEr Garima Patil
 

Viewers also liked (9)

PAS councillor training: Introduction to planning
PAS councillor training: Introduction to planningPAS councillor training: Introduction to planning
PAS councillor training: Introduction to planning
 
Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)
Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)
Introduction to Planning by Neeraj Bhandari (Surkhet,Nepal)
 
Introduction to Planning for nursing/Public Health Students
Introduction to Planning for nursing/Public Health Students Introduction to Planning for nursing/Public Health Students
Introduction to Planning for nursing/Public Health Students
 
Operations Planning
Operations PlanningOperations Planning
Operations Planning
 
The Nature of Strategic Management
The Nature of Strategic ManagementThe Nature of Strategic Management
The Nature of Strategic Management
 
introduction to management and planning
introduction to management and planningintroduction to management and planning
introduction to management and planning
 
Basic Concepts Of Strategic Management
Basic Concepts Of Strategic ManagementBasic Concepts Of Strategic Management
Basic Concepts Of Strategic Management
 
Concepts of Strategic Management
Concepts of Strategic ManagementConcepts of Strategic Management
Concepts of Strategic Management
 
Plannning and Types of planning
Plannning and Types of planningPlannning and Types of planning
Plannning and Types of planning
 

Similar to Introduction to Planning

component 3 moving from theory to practice.pdf
component  3 moving from theory to practice.pdfcomponent  3 moving from theory to practice.pdf
component 3 moving from theory to practice.pdfAnatole9
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Lean Projects with A3 Method
Lean Projects with A3 MethodLean Projects with A3 Method
Lean Projects with A3 MethodNitor
 
Project Management How To
Project Management How ToProject Management How To
Project Management How Tokellyfrey
 
Seda emdedding learning technologies evaluating and sustainability3
Seda emdedding learning technologies   evaluating and sustainability3Seda emdedding learning technologies   evaluating and sustainability3
Seda emdedding learning technologies evaluating and sustainability3BrianKilpatrick
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?Catherine Bendell
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Failjpstewar
 
Top Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP WebinarTop Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP WebinarWhizlabs
 
Definition of requirements for each project phases.pdf
Definition of requirements for each project phases.pdfDefinition of requirements for each project phases.pdf
Definition of requirements for each project phases.pdfcalf_ville86
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringThabang Nare
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skillspaulyeboah
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria ujjwal Mania
 

Similar to Introduction to Planning (20)

component 3 moving from theory to practice.pdf
component  3 moving from theory to practice.pdfcomponent  3 moving from theory to practice.pdf
component 3 moving from theory to practice.pdf
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
 
Lec 06 planning
Lec 06 planningLec 06 planning
Lec 06 planning
 
Lean Projects with A3 Method
Lean Projects with A3 MethodLean Projects with A3 Method
Lean Projects with A3 Method
 
Topic for Organization and Management 'Planning'
Topic for Organization and Management 'Planning'Topic for Organization and Management 'Planning'
Topic for Organization and Management 'Planning'
 
Project Management How To
Project Management How ToProject Management How To
Project Management How To
 
FOCUS PDCA
FOCUS PDCAFOCUS PDCA
FOCUS PDCA
 
Seda emdedding learning technologies evaluating and sustainability3
Seda emdedding learning technologies   evaluating and sustainability3Seda emdedding learning technologies   evaluating and sustainability3
Seda emdedding learning technologies evaluating and sustainability3
 
Planning can we do with out it?
Planning can we do with out it?Planning can we do with out it?
Planning can we do with out it?
 
Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
 
Top Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP WebinarTop Ten Reasons For Project Failure - PMP Webinar
Top Ten Reasons For Project Failure - PMP Webinar
 
Definition of requirements for each project phases.pdf
Definition of requirements for each project phases.pdfDefinition of requirements for each project phases.pdf
Definition of requirements for each project phases.pdf
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post Monitoring
 
Drs 255 project management skills
Drs 255 project management skillsDrs 255 project management skills
Drs 255 project management skills
 
Project Implementation.pptx
Project Implementation.pptxProject Implementation.pptx
Project Implementation.pptx
 
Project management and Success Criteria
Project management and Success Criteria Project management and Success Criteria
Project management and Success Criteria
 
PROJECT WE LIKE
PROJECT WE LIKE PROJECT WE LIKE
PROJECT WE LIKE
 
Business cases, the project fundamentals
Business cases, the project fundamentalsBusiness cases, the project fundamentals
Business cases, the project fundamentals
 

Introduction to Planning

  • 1. Introduction to Planning Basic Principles and Tools
  • 2. Contents • Aim • What is planning and why is it important? • Introduction to military planning – the 7 Questions method • Basic tools/products • Other planning tools and structures • Principles • Q&A
  • 3. Aim • To generate an understanding of the importance of, and principles that underpin, successful planning. To describe and talk through an example planning structure.
  • 4.
  • 5. What is Planning and Why is it Important? • Effective planning is that which not only delivers the desired effect but also helps guarantee it is achieved with the least amount of expended effort, energy, time and material waste. • The most important principle of effective planning is having a fundamental knowledge of what it is you are trying to achieve and why. This focus on a particular aim should not waiver or morph into something different to what is desired. • Planning does not occur solely at the start of a project, event or activity. It is something that should drive work forward but should in turn be shaped and altered by changes in reality or new information.
  • 6. • Plans are never set in stone as no plan ever survives “first contact”. What is crucial is the deeper knowledge of a particular situation that an effective planning process develops. • Plans must also be formulated that work up to, during and after the delivery of the product/effect itself.
  • 7.
  • 8. Introduction to Military Planning The 7 Questions/Combat Estimate Approach • Based on military planning structures, this provides a clear framework that ensures work can be planned to a timeline and with the necessary apportionment of load and responsibility; all founded upon processed knowledge about the setting and purpose of the project. • It takes the form of questions, adapted somewhat from their original military format, to be developed and answered as necessary.
  • 9. The 7 Questions 1) What is the situation, why and how does it effect me? 2) What have I been told to do and why? 3) What effects do I need to have on the situation and what direction must I give to develop the plan? 4) Where can I best accomplish each action or effect? 5) What resources do I need to accomplish each action or effect? 6) When and where do the actions take place in relation to each other? 7) What control measures do I need to impose?
  • 10. The Three Columns Format – Questions 1, 2, 3 and 7 • Questions One, Two, Three and Seven must be subjected to scrutiny, best and most simply developed with three columns that progressively develop understanding and determine the influence of each piece of information. • The first of these is a description of what is understood or known about an aspect of each question. The second column deals with the “so what?” element, explaining why this information has a bearing on the plan or activity. The third column divides this reasoning into a variety of outcomes to form the basis of the activity or be taken into account in the plan
  • 11. Q 1: Raw Information 2: So what? Output 1 (Situation) Weather: It tends to rain heavily every afternoon. As our event is outdoors we cannot plan to have it later in the day without tents etc. Constraint – no afternoon activities Task – source weatherproof facilities/tents etc. Example • Effects – an outcome you wish to achieve, be it a change of behaviour, the creation of a specific item etc. • Tasks – specific work that has to be done in the build-up to delivery of the project/work as it sets the conditions for the success of the final delivery. This can be anything from sourcing stationary to ordering a bespoke software suite. • Constraints – an issue that may limit one’s ability to do exactly as one wishes and helps to focus the direction of the plan and determine what effects are most feasible. Constraints should be seen in as positive a light as possible for this reason but should never be ignored. • Request for Information (RFI) – more often than not one does not have all of the required information whilst working through the plan. Identifying these knowledge gaps is obviously important but managing them is also necessary to push the plan forward and not undermine the whole process. A separate RFI list can be created once the Estimate has been worked through.
  • 12.
  • 13. Basic Tools/Products Questions Four, Five and Six • These questions provide a system for organising and prioritising all of the information and direction developed earlier and each one is best worked through using diagrams and tables. Question Four • The most fundamental effect is placed in the centre and described within context. Concentric boxes are then built around this with additional effects that are co-timeous and necessary to set the conditions for the achievement of the principle effect. This in turn must set the conditions for wider success. Any non-central but supporting effects or tasks that happen outside of this specific time-frame can be drawn around this central set of effect descriptors. This diagram now supports the work in Q’s 5 and 6. • Using the example of a project to create a play to demonstrate the potential of youth and discuss issues relating to young people a simple effect diagram is produced below:
  • 14. Example figure of an Effect Diagram • Note the language used – “in order to” and “set the conditions for” are the sort of phrases that must be included to ensure one understands how one effect supports the main effort that sits in the middle of the diagram which itself is defined by a wider purpose.
  • 15. • Now that one knows what effects/tasks are needed it is necessary to compare options for delivering these effects. This can be incredibly complicated or very simple but what is constant is the need to be open- minded in the comparison and not to enter into it with a fixed notion of what course of action is best. • Several options, often diagrammatically, are presented and then assessed on a scale of 1-3 according to a set of appropriate principles. Total scores are then used to determine which the best course of action is. • A similar approach could be taken in our example when considering what venue to use for the production. Several options could be weighed objectively according to factors such as acoustics, ease of set construction, ease of public access, cost of hire etc. • Whilst the principles/factors chosen will in some way influence potential decisions due to the subjective reasoning of the planner, the aspect of objectivity when it comes to weighing benefits must be reiterated.
  • 16. Venue Acoustics Set Public Cost Total Rank School, North 2 2 2 2 8 3 School, South 3 3 1 1 8 3 Public Theatre 3 3 2 1 9 2 Park 2 2 3 3 10 1 Town square 1 1 3 2 7 5 Example • A final decision is not made in isolation, there may be other needs related to other tasks that necessitate choosing another venue – it is about weighing the cost/benefit of these and one may have to choose the second best venue to ensure the best overall event. • What one has achieved is a develop a critically thought-through variety of options; one is aware of all of the pros and cons of each option and can plan to take advantage of/mitigate against these as the plan is developed.
  • 17.
  • 18. Question 5 – What Resources do I Need? • This takes the form of a table where you list effects/tasks and assign resources to achieve them. It is best to arrange them in priority order. • Using the example of creating a publicity campaign for the theatre production the table should look similar to this: T/E Activity Description Assigned to 1 E Ensure an audience of 200 Jose, Callum 2 E Create wider awareness of theatre group Jose, Callum 3 T Create sufficient tickets Carolina, Dan 4 T Distribute tickets Carolina, Dan 5 T Create publicity poster Tina 6 T Create program for production Tina, Jose 7 E Leverage and boost social media presence Callum 8 T Create and leverage visual media Visual Media Team, All
  • 19. When and Where do These Actions Take Place? • Question Six - This is the process where one can de-conflict work in terms of time and space and forms the foundation of one of the most important products of the planning process – a timeline. It also takes the process of a table with an appropriate timeline on the x-axis and resources listed on the y- axis. Practically it is often most easily worked out in reverse chronology from the delivery point. - W4 - W3 - W2 - D5 - D4 - D3 - D2 - D1 Delivery Jose 1, 2 1, 2, 6 1,2 Callum 1, 2, 7 1,2 Carolina 3 4 Dan 3 4 Tina 5 6 VMT 8 • This table can show conflicts as well as identifying spare capacity. It will form the basis of the final plan itself; who needs to do what by what date.
  • 20. What Control Measures Do I Need to Impose? Question Seven • The results from the three column format should be used to create parameters for activity as well as ensuring contingencies are adequately planned against. These can be as obvious as legal constraints on a particular course of action or ensuring work complies with budgetary requirements. • Fundamentally anything that limits the scope of the plan beyond those issues already dealt with. • Control measures are crucial to monitoring progress and ensuring it remains focused on the real objective and does not morph into something else. These can be anything from creating a plan for regular updates by phone or e-mail to regular meetings to allow central briefing to guarantee unity of message and for back-briefing from different roles concerning progress. • The format this takes can depend upon style and logistical realities but should not interfere with autonomy or be done purely for the sake of doing so.
  • 21.
  • 22. Other Supporting Products/Tools/Structures • Warning Order – Possible to produce after completion of Qs 1-3, this is a short documentmeeting to inform all those involved of the broad outline of the objective and what potential tasks/materials/roles will be assigned and potentially to who. As the name suggests it is meant as a “heads-up” so any preparatory work can begin concurrent to the plan being fully fleshed out – ordering supplies, training individuals, sourcing specific skills etc. • SWOT Analysis - This stands for Strengths, Weaknesses, Opportunities and Threats Analysis and is a process utilised in many different sectors of business as well as the military. It involves specifying the objective of the business venture or project and identifying the internal and external factors that are favourable and unfavourable to achieve that objective. Identification of SWOTs is important because they can inform later steps in planning to achieve the objective. • Rehearsal of Concept (RoC) Drill – Essentially a detailed and interactive question and answer session with the principal partners in the project. Under the direction of the primary planner and alternating according to a timeline-based order each person describes the steps involved in the work they will be producing. • Rehearsals – Rehearsals are crucial to the execution of any event and provide an opportunity to test and adjust lower-level processes; when effective they can contribute immensely to the success of a project where delivery is dependent on different resources/work/people in the same time and space. • OODA-Loop – Not a product per se, rather a “decision cycle” process standing for Observe, Orient, Decide and Act.
  • 23. Underlying Principles • Think through the problem to the finish and then beyond. • Take the action that makes the next one easier. • Break a problem down to its constituent parts, as small as possible, and then resolve it from the ground up – do not be tempted to skip ahead or fit your planning design to suit a solution one already has in mind. • Simplicity of concept. One should strive for a plan and its components to be as simple as possible and just as simply communicable. Simple = flexible. • Timeliness and apportionment of time. • Trust in those delivering the plan. • Always be ready to reinforce success.
  • 24. Q & A
  • 25. FIN