SlideShare a Scribd company logo
1 of 25
Download to read offline
THE GLASS WAREHOUSE
Contents
V1 Formulated Design
V2 Continuous Process
V3 Remote Extended
V3 Remote Extended
MDIA
When Zion Appears
THE GLASS WAREHOUSE
Forward Looking Plan
Streamlined Operations
Formulative Properties
Wall Utilities and Tools
2
Remote
Access
BRIJ CONSULTING, LLC JEAN MARSHALL
2
BRIJ CONSULTING, LLC JEAN MARSHALL
FORWARD LOOKING PLAN
 In order to develop a Forward-Looking Plan, we need:
 Knowledge about our future requirement for remote building
 Formulation of the process in order to streamline it
 Knowledge of new IP Processes for Ark Media
 An understanding of how instances are extended
Relational
composites
from our last
paper shown
11.03
Br
More …on writing a continuous process, fully assimilated from
beginning to end from our last paper: Continuous Modeling
Some small parts omitted here, remain part of the argument
2.07 x = Growth
3
BRIJ CONSULTING, LLC JEAN MARSHALL
IP COMPOSITE END TO END STATEMENT
y = -800,896,344,488.51300x + 16,895,580,753,282.70000
R² = 0.01652
y = 722,771,272,255.94700ln(x) - 3,962,485,767,819.64000
R² = 0.01055
y = 1,246,229,030,612.29000x2 - 15,852,252,969,681.20000x +
52,689,655,835,985.70000
R² = 0.21231
(20,000,000,000,000.00)
(10,000,000,000,000.00)
-
10,000,000,000,000.00
20,000,000,000,000.00
30,000,000,000,000.00
40,000,000,000,000.00
50,000,000,000,000.00
60,000,000,000,000.00
(20,000,000,000,000.00)
(10,000,000,000,000.00)
-
10,000,000,000,000.00
20,000,000,000,000.00
30,000,000,000,000.00
40,000,000,000,000.00
50,000,000,000,000.00
60,000,000,000,000.00
70,000,000,000,000.00
1 2 3 4 5 6 7 8 9 10 11
IP Composite Stream
y m b r^2 Linear (y) Log. (m) Poly. (b)
Load Statement
Wall relationship
Branch Statement
IP Composite Graph, App I
4
800.896
1246.229
722.771
IP STREAM TABLE
BR 807.131-800.896= 6.235 x 2 = 12.46
3
BRIJ CONSULTING, LLC JEAN MARSHALL
NEW STREAM AND PARAMETERS
5
Load Statement
Wall relationship
Branch Statement
x
x
=
Lower rate used
Terms from Slide 3
Branch Pick-up
Br
Br+
New Rates
1 2
3
1
Chi
R Square
Form
Pipe to Pipe Transmission
BRIJ CONSULTING, LLC JEAN MARSHALL
c
B
STREAMLINED
RATES
 Lower map requirement
 Bridge to Gate direct
 Digital load direct
 Theta Carriage
6
New Requirements:
1. Remote Branch
2. Instance Staging
3. Secant Tooling Design
4. Ark Media Artifactual(s)
5. Integral Glass Mix Concept
6. Ground Case
7. Build Case
Thread v. Carriage
Direct Delivery
Voice
Command
BRIJ CONSULTING, LLC JEAN MARSHALL
BRIJ CONSULTING, LLC JEAN MARSHALL
V2 CONTINUOUS PROCESS
 PIPE TO PIPE TRANSMISSION
 Product Build Techniques
 Architectural vs. Non-Architectural Builds
7
Forward Looking Plan
BRIJ CONSULTING, LLC JEAN MARSHALL
Form = 105.09
Burden = 151.3
Once Form and Burden exceeded, Revenue Streams
from units of output exceed economic cost
Hypothetical Glass Format
Build Case for all build Plans
Contains Plan Documents,
Secant and Engineering Storyboard,
All Parts and History, Media Requirements,
Encryptions and IP Access
Requirements keep changing and Workforce is extended
Ark Based Format
Includes dimensional media
Come Holy Spirit
Enoch 105:26 I will bring them into the
splendid light of those who love my holy
name: and I will place each of them on a
throne of glory, of glory peculiarly his own,
and they shall be at rest during unnumbered
periods. Righteous is the judgment of God;
Make us Spiritually Minded
Clear Titles on Continuous
Builds are more common
Prior to the ability to make
a Continuous Model, the
title to the property
passes between parties.
But once the Continuous
Model is viable, the title
can rest with the
originator and be leased
to the customer; and until
such time as the entire
property is delivered.
Extended View
C
PLAIT GLASS AND THE CONTINUOUS PROCESS (CIP) INTEGRATION
 The Economy of CIP replaces all previous economies as it supplies benefits into all industries and categories
 Since Glass both Plaits and is Scalable, a one process CIP integration may contain a rule or formulation that submits to branching
 We can devise a set of rates, a formula for deriving changes to these rates, a statement of economic conversion and continuous production that supplies for the overall case
load. Since we are emulating this, the real case load statement will be most compliant, because it will be inter-relationally devised through engineering oversight and within
the True Glass Model
 So, in the Build Case there are subsets of industries and classifications and the standards set that will be financially viable and overcome the economic load requirement;
cost to the system [is overcome] once a subset of volume is achieved. In the Ground Case there is a certain kind of civil engineering requirement there, and we are not
familiar enough with that to develop much of an example here.
 One of the important aspects of the matrix of the glass warehouse is that it devises an appropriate ownership of Intellectual Properties so that they can not be diverted from
the true ownership rights. Also, Intangible Property such as the Build Portal resides as a Utility of the Glass System itself, although the attributed property rights may vary.
 Utilities then also belong to the Glass System but are conveyed for widespread use with a kind of fee arrangement [utilities] coming out of the system related to the
Prototyping, Production Book and Wall arrangements in glass. Once a certain economic load is achieved, the cost of this is overcome.
 The arrangements for manpower and other resources such as Ark Media can be purchased out of the system or directly. In any case it must be certified for Glass
compliance and capable of operating within its basic requirements.
 Replication and merchantability of consumer-based products are no different [certifications apply].
 This ONE SYSTEM has no currency diffusion or other economic principle other than glass accessibility which is free training and education. It is somewhat role-based but not
rigid in determination of an individual’s role except it may have a best fit recommendation in it.
 All rights and privileges assigned come through God and the Morning Star Association of God (GGIA)
8
BRIJ CONSULTING, LLC JEAN MARSHALL
All Builds submit to glass form and mix confection once the learning curve is acquired and will streamline.
STREAMLINED PRODUCTION
BRIJ CONSULTING, LLC JEAN MARSHALL 9
EP
912.164-911 =1.164307 -1.161 Std. Labor= .003307 Gate Clock/Conversion
---Eliminated---
STREAMLINED ECONOMIC CONVERSION
10
BRIJ CONSULTING, LLC JEAN MARSHALL
EP
FORWARD
LOOKING
STATEMENT
BRIJ CONSULTING, LLC JEAN MARSHALL 11
 The Forward-Looking Statement shows the Land
Pipe Construction has been leased, and the
original Build that was contracted with the vendor
is completed. The Title to the science building has
passed and is property of M&M Eng.
 Notes to the Forward-Looking Statement would
then describe any new agreements related to the
Planned Production that is compared to rates and
metrics achieved.
 The Intellectual Property (IP) acquired through the
continuous process supplies a payback compared
to the machine cost of the glass making
mechanics. The Expected Product (EP) is used as
the Asset Basis showing the Streamline Outcome
and should cover all builds. The Branch (BR+)
permits other Product Loads to assimilate into the
Production including Ark Media Product.
IP
Br+
.
.
EP
M=7629-7227=|402| x 2 = 804 – 810.52 = |6.52| rate,
compare to slide 5. Note that .00305 is additional build conversion.
144651
-144500
= 151
A
B
C
A
As
Appendix II
Pre-Production
Production Book Setup
12
V3 REMOTE EXTENDED
 Working in-between Instances
 Anticipating Future Requirements
 Encryptions
BRIJ CONSULTING, LLC JEAN MARSHALL
Form = 105.09
Burden = 151.3
Using Forms before and After an Instance can Integrate
A build with mechanics more inter-relationally
Hypothetical Glass Format
Build Case for all build Plans
Contains Plan Documents,
Secant and Engineering Storyboard,
All Parts and History, Media Requirements,
Encryptions and IP Access
Requirements keep changing and Workforce is extended
Ark Based Format
Includes dimensional media
Come Holy Spirit
Enoch 105:27 For to the faithful shall he give
faith in the habitations of uprightness. They
shall see those, who have been born in
darkness unto darkness shall be cast; while
the righteous shall be at rest. Sinners shall cry
out, beholding them, while they exist in
splendor and proceed forwards to the days
and periods prescribed to them.
Make us Spiritually Minded
Extended Plan
By learning to Plan with
Instances, Maintenance
and Upgrade is an
extended work plan.
Coverage and Weighted
Service Plans are better
than any type of
insurance, because
technological
obsolescence will cease.
Extended MU Plan
Branching can set up Instances Chi-Rho
Op
187 Rho – 151
=36 cycle
Image Translation,
Mechanics Transition
T&M
REQUIREMENT
BRIJ CONSULTING, LLC JEAN MARSHALL 13
We need to keep an eye on our standards
because the time and motion or other
requirements could exceed our scope. But
it looks like we are covered by the increased
leverage and conversion we picked up by
streamlining the Build: Very close ties.
We are told that Time and
Motion is easily made up by
the secant wheel ratio
Transit
differences
not an issue
It was necessary to
proof x to be certain
of our figures, y =
equity
TIME AND MOTION
41.469x+42.287y=83.752[+/-.004]- (d) 83.723=.033 clock
d
DATA TEST
d
Appendix I
13
V3 REMOTE EXTENDED
BRIJ CONSULTING, LLC JEAN MARSHALL 14
Writing complex designs and
bringing instances together
remotely through branching in the
Glass Warehouse begins to be an
interesting kind of work approach
that bridges multiple capabilities
and work instances more
integrally than people have
accomplished ever before.
Only possible in the Ark Mode
HOW TO: BRANCH CONCEPT
BRIJ CONSULTING, LLC JEAN MARSHALL 15
(6,000.00000000)
(4,000.00000000)
(2,000.00000000)
-
2,000.00000000
4,000.00000000
6,000.00000000
Branch 1
Branch 2
Branch 3
Branch Chart
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15
y = -30.667x + 239.47
R² = 0.0065
(6,000.00000000)
(4,000.00000000)
(2,000.00000000)
-
2,000.00000000
4,000.00000000
6,000.00000000
0 5 10 15 20
Branch Thread
Branch 1 Branch 2
Branch 3 Linear (Branch 1)
Branching can produce many
advanced capabilities through the
ark wall in relationship to the Glass
Warehouse. Adding these
capabilities enhances remote
building potential by adding on
various tooling and media
arrangements +z
Composite
Wall
Production
Predicted Y
vector Y
Eagle Graph
Working relationally with the Wall to
Branch Mechanics, allows properties
and utilities to project useful STREAMS
to the Project
ARK WALL EXTENSION
BRIJ CONSULTING, LLC JEAN MARSHALL 16
y = -15495x + 194130
R² = 0.2011
(100,000.00000000)
-
100,000.00000000
200,000.00000000
300,000.00000000
400,000.00000000
500,000.00000000
600,000.00000000
0 2 4 6 8 10 12 14 16
Ark Wall chart
Ark Wall 1 Ark Wall 2 Linear (Ark Wall 2)
From the Ark Wall it is
possible not only to extend
a bridge and create remote
instances, but it is also
media projection capable,
allowing for remote types of
media arrangements.
In our next paper we will
study Branch Capability
and remote building. See:
“Branch, Sound and Image
Construction.”
1
2
3
4
5
6
7
8
9
10
11
Tau Graph
Composite
Wall
Production
Predicted Y
vector Y
ARK CLOUD ARRANGEMENT
Responsorial Psalm
85:9ab and 10, 11-12, 13-14
R. (Isaiah 45:8) Let the clouds rain down the Just One, and the earth bring forth a Savior.
I will hear what God proclaims;
the LORD–for he proclaims peace to his people.
Near indeed is his salvation to those who fear him,
glory dwelling in our land.
R. Let the clouds rain down the Just One, and the earth bring forth a Savior.
Kindness and truth shall meet;
justice and peace shall kiss.
Truth shall spring out of the earth,
and justice shall look down from heaven.
R. Let the clouds rain down the Just One, and the earth bring forth a Savior.
The LORD himself will give his benefits;
our land shall yield its increase.
Justice shall walk before him,
and salvation, along the way of his steps.
R. Let the clouds rain down the Just One, and the earth bring forth a Savior.
BRIJ CONSULTING, LLC JEAN MARSHALL
17
Joshua &Moses
4And every house is built by someone, but God is the builder of
everything. 5Now Moses was faithful as a servant in all God’s
house, testifying to what would be spoken later.…Hebrews 3:4
A SON IS BORN TO US
 Seizing upon this occasion the infant God, resting upon the arms of his
Mother as upon the seat of wisdom, began to speak to saint Joseph in an
intelligible voice, saying: “My father, I came from heaven upon this earth in
order to be the light of the world, and in order to rescue it from darkness of
sin; in order to seek and know my sheep as a good Shepherd, to give them
nourishment of eternal life, teach them the way of heaven, open its gates,
which had been closed by their sins. I desire that you both be children of the
Light, which you have so close at hand.”
 These words of the Infant Jesus, being full of divine life, filled the heart of the
patriarch saint Joseph with new love, reverence and joy. He fell on his knees
before the infant God with the profoundest humility and thanked Him for
having called Him “father” by the very first word spoken to him. He besought
the Lord with many tears to enlighten him and enable him to fulfill entirely
his most holy will, to teach him to be thankful for the incomparable benefits
flowing from his generous hands. The Mystical City of God
BRIJ CONSULTING, LLC JEAN MARSHALL 18
HOW DO WE KNOW
GOD?
 The Attributes of God copied from The Mystical City of God help to define
the mystery of the invisible God and His Presence to us both in His
Attributes or Properties and in His established Events and Placements
BRIJ CONSULTING, LLC JEAN MARSHALL 19
The original proposed symbol for the Seal of the United States,
an image of Moses compared to the History of Fatima are Ark
Symbols demonstrating God’s forward leadership
17I see him, but not now; I behold him, but not near. A star will come
forth from Jacob, and a scepter will arise from Israel. Numbers 24:17
DATA CARRIED FORWARD
y = -30,937,178,136,838.5000x +
163,929,407,686,703.0000
R² = 0.2488
(50,000,000,000,000.00)
-
50,000,000,000,000.00
100,000,000,000,000.00
150,000,000,000,000.00
200,000,000,000,000.00
250,000,000,000,000.00
IP Composite
P(n)^
Appendix I
20
3
BRIJ CONSULTING, LLC JEAN MARSHALL
BRIJ CONSULTING, LLC, JEAN MARSHALL 21
21
As
BRIJ CONSULTING, LLC JEAN MARSHALL 22
B
22
OUR PAPERS
V3 and V4
holds all
contents
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for
Media to write and produce in Ark Science and Dimensional Systems, Introduction
of the Story “Eru finds a Golden Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and
Remix specifications, beginning crosswalk and encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of
Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark
encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass
facility for building and research in remote Ark Science. Start of Tooling and
Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the
Write Process
8. Bridging the Instance: Now operating multiple instances must bridge the
operations, learn about deciduous models and deliberate the outcome of
operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and the
Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land
Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of
seamless integration of methods and modes of operation. See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations of the
Marcus and Magi Engineering remote architectural process
https://www.slideshare.net/Marshallja/presentations
See next slide for list of the preceding Digital Plait content
23
Remote
Access
Streamlined
Rates
BRIJ CONSULTING, LLC JEAN MARSHALL
24
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants
and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion
characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional
Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional
systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at basic product
ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a
Digital Portal Production System using appliances gained through Plait Object and Gate
driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of
product, learning to specify material, looking for union of Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated
by sound it creates a means by sound to cascade light for safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck
(Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new
(Dialogue paper)
^Mu Sic, see The Corner of Mu Sic
To Change
Digital Plait Papers with Content Description
(Reverse Order)
BRIJ CONSULTING, LLC JEAN MARSHALL
WHAT IS
REQUIRED
25
 Architectural Plans, Digital Glass Model
 The Glass Modeling System, Ark Mode
 3- Dimensional Media Model
 Storyboards to describe…
 Process Plan
 Integral Materials
 Organization of Instances of
Building (Preludes)
 Secant Construction and Engineering
 Building Organization for Ark Mode
Methods, Tools and Utilities
The Design of the
whole process will be
an extended period of
listening about this
subject. But we will
spend our time in our
next paper organizing
Secant Processes
Monks of Norcia - Donations - EN - Monastero di San Benedetto in Monte (nursia.org)
BRIJ CONSULTING, LLC JEAN MARSHALL

More Related Content

Similar to The Glass Warehouse V3 Remote Extended

Instancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusInstancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusBrij Consulting, LLC
 
Malcolm_Spiller_CV_Current
Malcolm_Spiller_CV_CurrentMalcolm_Spiller_CV_Current
Malcolm_Spiller_CV_CurrentMalcolm Spiller
 
Introduction to Panel Built
Introduction to Panel BuiltIntroduction to Panel Built
Introduction to Panel BuiltPanel Built
 
Keep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesKeep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesAconex
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
20110514 PMI San Diego Keynote
20110514 PMI San Diego Keynote20110514 PMI San Diego Keynote
20110514 PMI San Diego KeynotePeter Coffee
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final DocumentationJennifer Cordes
 
Why Quantum Anywhere, Parts I and II, plus Intro
Why Quantum Anywhere, Parts I and II, plus IntroWhy Quantum Anywhere, Parts I and II, plus Intro
Why Quantum Anywhere, Parts I and II, plus IntroBrij Consulting, LLC
 
Developing a Business Case for Cloud
Developing a Business Case for CloudDeveloping a Business Case for Cloud
Developing a Business Case for CloudBooz Allen Hamilton
 
How do I migrate legacy contract_.pptx
How do I migrate legacy contract_.pptxHow do I migrate legacy contract_.pptx
How do I migrate legacy contract_.pptxBlockchainX
 
Cloud the answer to economic recession for cio’s and cfo’s final
Cloud the answer to economic recession for cio’s and cfo’s finalCloud the answer to economic recession for cio’s and cfo’s final
Cloud the answer to economic recession for cio’s and cfo’s finalNick Papadoglou
 
OpenStack in the Enterprise - Interop Las Vegas 2014
OpenStack in the Enterprise - Interop Las Vegas 2014OpenStack in the Enterprise - Interop Las Vegas 2014
OpenStack in the Enterprise - Interop Las Vegas 2014Seth Fox
 
Architectural Builds and Design V1 Yield to the Mix
Architectural Builds and Design V1 Yield to the MixArchitectural Builds and Design V1 Yield to the Mix
Architectural Builds and Design V1 Yield to the MixBrij Consulting, LLC
 
Elastic, DevSecOps, and the DOD software factory
Elastic, DevSecOps, and the DOD software factoryElastic, DevSecOps, and the DOD software factory
Elastic, DevSecOps, and the DOD software factoryElasticsearch
 
Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014William Crenshaw
 
Resume for Michael Marocco January 20 2017
Resume for Michael Marocco January 20 2017Resume for Michael Marocco January 20 2017
Resume for Michael Marocco January 20 2017Michael Marocco
 

Similar to The Glass Warehouse V3 Remote Extended (20)

Instancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load ProspectusInstancing at the Gate V1 The Load Prospectus
Instancing at the Gate V1 The Load Prospectus
 
Malcolm_Spiller_CV_Current
Malcolm_Spiller_CV_CurrentMalcolm_Spiller_CV_Current
Malcolm_Spiller_CV_Current
 
Introduction to Panel Built
Introduction to Panel BuiltIntroduction to Panel Built
Introduction to Panel Built
 
Keep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesKeep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slides
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
20110514 PMI San Diego Keynote
20110514 PMI San Diego Keynote20110514 PMI San Diego Keynote
20110514 PMI San Diego Keynote
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final Documentation
 
Why Quantum Anywhere, Parts I and II, plus Intro
Why Quantum Anywhere, Parts I and II, plus IntroWhy Quantum Anywhere, Parts I and II, plus Intro
Why Quantum Anywhere, Parts I and II, plus Intro
 
Mohideen Khader-122316
Mohideen Khader-122316Mohideen Khader-122316
Mohideen Khader-122316
 
Developing a Business Case for Cloud
Developing a Business Case for CloudDeveloping a Business Case for Cloud
Developing a Business Case for Cloud
 
How do I migrate legacy contract_.pptx
How do I migrate legacy contract_.pptxHow do I migrate legacy contract_.pptx
How do I migrate legacy contract_.pptx
 
Cloud the answer to economic recession for cio’s and cfo’s final
Cloud the answer to economic recession for cio’s and cfo’s finalCloud the answer to economic recession for cio’s and cfo’s final
Cloud the answer to economic recession for cio’s and cfo’s final
 
OpenStack in the Enterprise - Interop Las Vegas 2014
OpenStack in the Enterprise - Interop Las Vegas 2014OpenStack in the Enterprise - Interop Las Vegas 2014
OpenStack in the Enterprise - Interop Las Vegas 2014
 
Architectural Builds and Design V1 Yield to the Mix
Architectural Builds and Design V1 Yield to the MixArchitectural Builds and Design V1 Yield to the Mix
Architectural Builds and Design V1 Yield to the Mix
 
Elastic, DevSecOps, and the DOD software factory
Elastic, DevSecOps, and the DOD software factoryElastic, DevSecOps, and the DOD software factory
Elastic, DevSecOps, and the DOD software factory
 
Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014Brooks 972 Project WriteUp-03-17-2014
Brooks 972 Project WriteUp-03-17-2014
 
Resume for Michael Marocco January 20 2017
Resume for Michael Marocco January 20 2017Resume for Michael Marocco January 20 2017
Resume for Michael Marocco January 20 2017
 
March 2023 PNW User Group
March 2023 PNW User GroupMarch 2023 PNW User Group
March 2023 PNW User Group
 
Clutch-group_LinkedIn
Clutch-group_LinkedInClutch-group_LinkedIn
Clutch-group_LinkedIn
 

More from Brij Consulting, LLC

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
 

More from Brij Consulting, LLC (20)

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
 

Recently uploaded

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 

Recently uploaded (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 

The Glass Warehouse V3 Remote Extended

  • 1. THE GLASS WAREHOUSE Contents V1 Formulated Design V2 Continuous Process V3 Remote Extended V3 Remote Extended MDIA When Zion Appears
  • 2. THE GLASS WAREHOUSE Forward Looking Plan Streamlined Operations Formulative Properties Wall Utilities and Tools 2 Remote Access BRIJ CONSULTING, LLC JEAN MARSHALL 2 BRIJ CONSULTING, LLC JEAN MARSHALL
  • 3. FORWARD LOOKING PLAN  In order to develop a Forward-Looking Plan, we need:  Knowledge about our future requirement for remote building  Formulation of the process in order to streamline it  Knowledge of new IP Processes for Ark Media  An understanding of how instances are extended Relational composites from our last paper shown 11.03 Br More …on writing a continuous process, fully assimilated from beginning to end from our last paper: Continuous Modeling Some small parts omitted here, remain part of the argument 2.07 x = Growth 3 BRIJ CONSULTING, LLC JEAN MARSHALL
  • 4. IP COMPOSITE END TO END STATEMENT y = -800,896,344,488.51300x + 16,895,580,753,282.70000 R² = 0.01652 y = 722,771,272,255.94700ln(x) - 3,962,485,767,819.64000 R² = 0.01055 y = 1,246,229,030,612.29000x2 - 15,852,252,969,681.20000x + 52,689,655,835,985.70000 R² = 0.21231 (20,000,000,000,000.00) (10,000,000,000,000.00) - 10,000,000,000,000.00 20,000,000,000,000.00 30,000,000,000,000.00 40,000,000,000,000.00 50,000,000,000,000.00 60,000,000,000,000.00 (20,000,000,000,000.00) (10,000,000,000,000.00) - 10,000,000,000,000.00 20,000,000,000,000.00 30,000,000,000,000.00 40,000,000,000,000.00 50,000,000,000,000.00 60,000,000,000,000.00 70,000,000,000,000.00 1 2 3 4 5 6 7 8 9 10 11 IP Composite Stream y m b r^2 Linear (y) Log. (m) Poly. (b) Load Statement Wall relationship Branch Statement IP Composite Graph, App I 4 800.896 1246.229 722.771 IP STREAM TABLE BR 807.131-800.896= 6.235 x 2 = 12.46 3 BRIJ CONSULTING, LLC JEAN MARSHALL
  • 5. NEW STREAM AND PARAMETERS 5 Load Statement Wall relationship Branch Statement x x = Lower rate used Terms from Slide 3 Branch Pick-up Br Br+ New Rates 1 2 3 1 Chi R Square Form Pipe to Pipe Transmission BRIJ CONSULTING, LLC JEAN MARSHALL c B
  • 6. STREAMLINED RATES  Lower map requirement  Bridge to Gate direct  Digital load direct  Theta Carriage 6 New Requirements: 1. Remote Branch 2. Instance Staging 3. Secant Tooling Design 4. Ark Media Artifactual(s) 5. Integral Glass Mix Concept 6. Ground Case 7. Build Case Thread v. Carriage Direct Delivery Voice Command BRIJ CONSULTING, LLC JEAN MARSHALL BRIJ CONSULTING, LLC JEAN MARSHALL
  • 7. V2 CONTINUOUS PROCESS  PIPE TO PIPE TRANSMISSION  Product Build Techniques  Architectural vs. Non-Architectural Builds 7 Forward Looking Plan BRIJ CONSULTING, LLC JEAN MARSHALL Form = 105.09 Burden = 151.3 Once Form and Burden exceeded, Revenue Streams from units of output exceed economic cost Hypothetical Glass Format Build Case for all build Plans Contains Plan Documents, Secant and Engineering Storyboard, All Parts and History, Media Requirements, Encryptions and IP Access Requirements keep changing and Workforce is extended Ark Based Format Includes dimensional media Come Holy Spirit Enoch 105:26 I will bring them into the splendid light of those who love my holy name: and I will place each of them on a throne of glory, of glory peculiarly his own, and they shall be at rest during unnumbered periods. Righteous is the judgment of God; Make us Spiritually Minded Clear Titles on Continuous Builds are more common Prior to the ability to make a Continuous Model, the title to the property passes between parties. But once the Continuous Model is viable, the title can rest with the originator and be leased to the customer; and until such time as the entire property is delivered. Extended View C
  • 8. PLAIT GLASS AND THE CONTINUOUS PROCESS (CIP) INTEGRATION  The Economy of CIP replaces all previous economies as it supplies benefits into all industries and categories  Since Glass both Plaits and is Scalable, a one process CIP integration may contain a rule or formulation that submits to branching  We can devise a set of rates, a formula for deriving changes to these rates, a statement of economic conversion and continuous production that supplies for the overall case load. Since we are emulating this, the real case load statement will be most compliant, because it will be inter-relationally devised through engineering oversight and within the True Glass Model  So, in the Build Case there are subsets of industries and classifications and the standards set that will be financially viable and overcome the economic load requirement; cost to the system [is overcome] once a subset of volume is achieved. In the Ground Case there is a certain kind of civil engineering requirement there, and we are not familiar enough with that to develop much of an example here.  One of the important aspects of the matrix of the glass warehouse is that it devises an appropriate ownership of Intellectual Properties so that they can not be diverted from the true ownership rights. Also, Intangible Property such as the Build Portal resides as a Utility of the Glass System itself, although the attributed property rights may vary.  Utilities then also belong to the Glass System but are conveyed for widespread use with a kind of fee arrangement [utilities] coming out of the system related to the Prototyping, Production Book and Wall arrangements in glass. Once a certain economic load is achieved, the cost of this is overcome.  The arrangements for manpower and other resources such as Ark Media can be purchased out of the system or directly. In any case it must be certified for Glass compliance and capable of operating within its basic requirements.  Replication and merchantability of consumer-based products are no different [certifications apply].  This ONE SYSTEM has no currency diffusion or other economic principle other than glass accessibility which is free training and education. It is somewhat role-based but not rigid in determination of an individual’s role except it may have a best fit recommendation in it.  All rights and privileges assigned come through God and the Morning Star Association of God (GGIA) 8 BRIJ CONSULTING, LLC JEAN MARSHALL All Builds submit to glass form and mix confection once the learning curve is acquired and will streamline.
  • 9. STREAMLINED PRODUCTION BRIJ CONSULTING, LLC JEAN MARSHALL 9 EP 912.164-911 =1.164307 -1.161 Std. Labor= .003307 Gate Clock/Conversion ---Eliminated---
  • 10. STREAMLINED ECONOMIC CONVERSION 10 BRIJ CONSULTING, LLC JEAN MARSHALL EP
  • 11. FORWARD LOOKING STATEMENT BRIJ CONSULTING, LLC JEAN MARSHALL 11  The Forward-Looking Statement shows the Land Pipe Construction has been leased, and the original Build that was contracted with the vendor is completed. The Title to the science building has passed and is property of M&M Eng.  Notes to the Forward-Looking Statement would then describe any new agreements related to the Planned Production that is compared to rates and metrics achieved.  The Intellectual Property (IP) acquired through the continuous process supplies a payback compared to the machine cost of the glass making mechanics. The Expected Product (EP) is used as the Asset Basis showing the Streamline Outcome and should cover all builds. The Branch (BR+) permits other Product Loads to assimilate into the Production including Ark Media Product. IP Br+ . . EP M=7629-7227=|402| x 2 = 804 – 810.52 = |6.52| rate, compare to slide 5. Note that .00305 is additional build conversion. 144651 -144500 = 151 A B C A As Appendix II Pre-Production Production Book Setup
  • 12. 12 V3 REMOTE EXTENDED  Working in-between Instances  Anticipating Future Requirements  Encryptions BRIJ CONSULTING, LLC JEAN MARSHALL Form = 105.09 Burden = 151.3 Using Forms before and After an Instance can Integrate A build with mechanics more inter-relationally Hypothetical Glass Format Build Case for all build Plans Contains Plan Documents, Secant and Engineering Storyboard, All Parts and History, Media Requirements, Encryptions and IP Access Requirements keep changing and Workforce is extended Ark Based Format Includes dimensional media Come Holy Spirit Enoch 105:27 For to the faithful shall he give faith in the habitations of uprightness. They shall see those, who have been born in darkness unto darkness shall be cast; while the righteous shall be at rest. Sinners shall cry out, beholding them, while they exist in splendor and proceed forwards to the days and periods prescribed to them. Make us Spiritually Minded Extended Plan By learning to Plan with Instances, Maintenance and Upgrade is an extended work plan. Coverage and Weighted Service Plans are better than any type of insurance, because technological obsolescence will cease. Extended MU Plan Branching can set up Instances Chi-Rho Op 187 Rho – 151 =36 cycle Image Translation, Mechanics Transition
  • 13. T&M REQUIREMENT BRIJ CONSULTING, LLC JEAN MARSHALL 13 We need to keep an eye on our standards because the time and motion or other requirements could exceed our scope. But it looks like we are covered by the increased leverage and conversion we picked up by streamlining the Build: Very close ties. We are told that Time and Motion is easily made up by the secant wheel ratio Transit differences not an issue It was necessary to proof x to be certain of our figures, y = equity TIME AND MOTION 41.469x+42.287y=83.752[+/-.004]- (d) 83.723=.033 clock d DATA TEST d Appendix I 13
  • 14. V3 REMOTE EXTENDED BRIJ CONSULTING, LLC JEAN MARSHALL 14 Writing complex designs and bringing instances together remotely through branching in the Glass Warehouse begins to be an interesting kind of work approach that bridges multiple capabilities and work instances more integrally than people have accomplished ever before. Only possible in the Ark Mode
  • 15. HOW TO: BRANCH CONCEPT BRIJ CONSULTING, LLC JEAN MARSHALL 15 (6,000.00000000) (4,000.00000000) (2,000.00000000) - 2,000.00000000 4,000.00000000 6,000.00000000 Branch 1 Branch 2 Branch 3 Branch Chart 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 y = -30.667x + 239.47 R² = 0.0065 (6,000.00000000) (4,000.00000000) (2,000.00000000) - 2,000.00000000 4,000.00000000 6,000.00000000 0 5 10 15 20 Branch Thread Branch 1 Branch 2 Branch 3 Linear (Branch 1) Branching can produce many advanced capabilities through the ark wall in relationship to the Glass Warehouse. Adding these capabilities enhances remote building potential by adding on various tooling and media arrangements +z Composite Wall Production Predicted Y vector Y Eagle Graph Working relationally with the Wall to Branch Mechanics, allows properties and utilities to project useful STREAMS to the Project
  • 16. ARK WALL EXTENSION BRIJ CONSULTING, LLC JEAN MARSHALL 16 y = -15495x + 194130 R² = 0.2011 (100,000.00000000) - 100,000.00000000 200,000.00000000 300,000.00000000 400,000.00000000 500,000.00000000 600,000.00000000 0 2 4 6 8 10 12 14 16 Ark Wall chart Ark Wall 1 Ark Wall 2 Linear (Ark Wall 2) From the Ark Wall it is possible not only to extend a bridge and create remote instances, but it is also media projection capable, allowing for remote types of media arrangements. In our next paper we will study Branch Capability and remote building. See: “Branch, Sound and Image Construction.” 1 2 3 4 5 6 7 8 9 10 11 Tau Graph Composite Wall Production Predicted Y vector Y
  • 17. ARK CLOUD ARRANGEMENT Responsorial Psalm 85:9ab and 10, 11-12, 13-14 R. (Isaiah 45:8) Let the clouds rain down the Just One, and the earth bring forth a Savior. I will hear what God proclaims; the LORD–for he proclaims peace to his people. Near indeed is his salvation to those who fear him, glory dwelling in our land. R. Let the clouds rain down the Just One, and the earth bring forth a Savior. Kindness and truth shall meet; justice and peace shall kiss. Truth shall spring out of the earth, and justice shall look down from heaven. R. Let the clouds rain down the Just One, and the earth bring forth a Savior. The LORD himself will give his benefits; our land shall yield its increase. Justice shall walk before him, and salvation, along the way of his steps. R. Let the clouds rain down the Just One, and the earth bring forth a Savior. BRIJ CONSULTING, LLC JEAN MARSHALL 17 Joshua &Moses 4And every house is built by someone, but God is the builder of everything. 5Now Moses was faithful as a servant in all God’s house, testifying to what would be spoken later.…Hebrews 3:4
  • 18. A SON IS BORN TO US  Seizing upon this occasion the infant God, resting upon the arms of his Mother as upon the seat of wisdom, began to speak to saint Joseph in an intelligible voice, saying: “My father, I came from heaven upon this earth in order to be the light of the world, and in order to rescue it from darkness of sin; in order to seek and know my sheep as a good Shepherd, to give them nourishment of eternal life, teach them the way of heaven, open its gates, which had been closed by their sins. I desire that you both be children of the Light, which you have so close at hand.”  These words of the Infant Jesus, being full of divine life, filled the heart of the patriarch saint Joseph with new love, reverence and joy. He fell on his knees before the infant God with the profoundest humility and thanked Him for having called Him “father” by the very first word spoken to him. He besought the Lord with many tears to enlighten him and enable him to fulfill entirely his most holy will, to teach him to be thankful for the incomparable benefits flowing from his generous hands. The Mystical City of God BRIJ CONSULTING, LLC JEAN MARSHALL 18
  • 19. HOW DO WE KNOW GOD?  The Attributes of God copied from The Mystical City of God help to define the mystery of the invisible God and His Presence to us both in His Attributes or Properties and in His established Events and Placements BRIJ CONSULTING, LLC JEAN MARSHALL 19 The original proposed symbol for the Seal of the United States, an image of Moses compared to the History of Fatima are Ark Symbols demonstrating God’s forward leadership 17I see him, but not now; I behold him, but not near. A star will come forth from Jacob, and a scepter will arise from Israel. Numbers 24:17
  • 20. DATA CARRIED FORWARD y = -30,937,178,136,838.5000x + 163,929,407,686,703.0000 R² = 0.2488 (50,000,000,000,000.00) - 50,000,000,000,000.00 100,000,000,000,000.00 150,000,000,000,000.00 200,000,000,000,000.00 250,000,000,000,000.00 IP Composite P(n)^ Appendix I 20 3 BRIJ CONSULTING, LLC JEAN MARSHALL
  • 21. BRIJ CONSULTING, LLC, JEAN MARSHALL 21 21 As
  • 22. BRIJ CONSULTING, LLC JEAN MARSHALL 22 B 22
  • 23. OUR PAPERS V3 and V4 holds all contents 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process https://www.slideshare.net/Marshallja/presentations See next slide for list of the preceding Digital Plait content 23 Remote Access Streamlined Rates BRIJ CONSULTING, LLC JEAN MARSHALL
  • 24. 24 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) ^Mu Sic, see The Corner of Mu Sic To Change Digital Plait Papers with Content Description (Reverse Order) BRIJ CONSULTING, LLC JEAN MARSHALL
  • 25. WHAT IS REQUIRED 25  Architectural Plans, Digital Glass Model  The Glass Modeling System, Ark Mode  3- Dimensional Media Model  Storyboards to describe…  Process Plan  Integral Materials  Organization of Instances of Building (Preludes)  Secant Construction and Engineering  Building Organization for Ark Mode Methods, Tools and Utilities The Design of the whole process will be an extended period of listening about this subject. But we will spend our time in our next paper organizing Secant Processes Monks of Norcia - Donations - EN - Monastero di San Benedetto in Monte (nursia.org) BRIJ CONSULTING, LLC JEAN MARSHALL