HRM PPT on placement , induction and socialization
Mark powell resume2017
1. 1
Mark Powell
18 Luke Court
Bushland Beach QLD 4818
Phone: 0413 347 583
Email: markpowell75@hotmail.com
Experience
August 2017 – Present
Electrician – Kidston Solar Project (Phase One)
My duties in this role have included installation of HV cable pulls, installation of
240mm cable pulls, all associated pit and conduit works (soft and hard tape),
running of DC strings cable, running of DC array harnesses, connecting solar
panels and arrays to specification, Q & A of invertors prior to installation,
installation, termination and testing of combination boxes, installation,
termination, testing of invertor cables/earthing, installation, termination of next
tracker and weather stations, point-to-point testing, duct testing, IR testing,
CCTV installation and installation of fibre optic cables.
January 2017 – August 2017
Various sub-contracting assignments
During this time I have undertaken various electrical roles, including working on
cranes and fitout work. The purpose of doing this was to allow me to gain
experience in a variety of different areas in the electrical industry.
2. 2
May 2016 – January 2017
Tendered Repairs Electrician – Schindler Lifts
I worked as part of the Sundries Department. Duties consisted of carrying out
chargeable repairs vertical transportation systems, escalators and walks.
January 2007 – May 2016
Senior Service Mechanic – Otis Elevators
Duties consisted of termination and installation of: service of VIP department;
experienced in repair, modernisation and service; Experienced in resolves 20’s,
40’s, 100’s (magnetic drive DC), TMS 600 and 9000, Monospace, EPL and
Hydraulic; Elevonic 401, 411, 413, 320, 420 and various foreign equipment;
extensive knowledge of escalators and walkways; extra low voltage: 12 volt, 32
volt, 100 volt DC wiring and equipment; low voltage 240 VAC and 415 VAC;
installing and wiring main switchboards, utilising thermoplastic insulated and
sheathed flat cables; lift motors (AC and DC) and control encoders utilising
armoured and special cabling; earthing all equipment and metallic supports;
continuity of earthing system in equipment, troughing and metallic conduits;
installing lift shaft equipment, ducting, cable trays and troughing; screwing
metallic conduits and fittings and flexible conduits.
July 2006 – January 2007
Lane Cove Tunnel Project – United Group
Duties consisted of termination and installation of: Run mains supply cables;
sub-circuits; data and control wiring; and installation of all cable trays and tunnel
lighting.
October 2005 – July 2006
Electrician – Various Assignments
Contract involving commercial fitout installations in Sydney CBD;
In a commercial setting, installation of power sub-circuits, installation of
powered submains, installation of lighting sub-circuits;
3. 3
Installation of emergency lighting sub-circuits;
Installation of stanilite nexus (6 month testing and reporting of issues);
Installation of data, structured and integrated systems, CAT 5E, CAT 6E;
Data patch panels and field terminations;
Installation of fibre optics and multimode;
Installation of comms cabinets and computer room equipment;
Installation of UPS systems;
Installation and termination of electrical switchboards, testing and labelling;
Fluke testing of data connections and labelling;
Installation and termination of phone multicore cables;
Installation and termination of refrigeration wiring for cool rooms and freezer
and fridges for David Jones and Woolworths stores. Locations at Manly Wharf,
Bondi Junction and Eastlakes shopping centres;
Installation of conduits and cable trays and testing and commissioning or wiring
to AS 3017 standards;
Inspection of overhead cranes, certification and recording;
Maintenance of cranes and equipment;
Breakdowns, fault finding on Bradley Allen/ PLCs and VSDs, motors and
associated equipment;
Tagging and testing of appliances and electrical tools; and
Shutdowns, removal of production equipment, testing and reinstallation of new
equipment.
January 2002 – October 2005
Electrician (Modernisation Department) – Kone Elevators
Duties consisted of termination and installation of: Installation and leading hand;
installation of low and medium rise lift systems; resole 100’s/resolve
10’s/resolve 20’s and resolve MX machines; and tendered repair work.
4. 4
December 2001 – January 2002
Electrician – Sommerville Group, Sydney
Duties consisted of termination and installation of: lighting circuits, general,
emergency, fixtures and fittings; power sub-circuits and data cables.
September 2001 – December 2001
M5 Tunnel Project – Heyday Group
Duties consisted of: termination and installation of: lighting circuits, general,
emergency, fixtures and fittings, power, sub-mains, sub-circuits, and control,
jet-fan in 240v/415v.
Also the installation of cable trays, cable and switchboards.
June 2001 – August 2001
Electrician – O’Donnell Griffin – Sydney Airport
Duties consisted of termination and installation of: lighting circuits, general,
emergency, fixtures and fittings, and control and power circuits.
January 1999 – December 2000
Electrician – Relabond Limited, UK
Duties consisted of termination and installation of: lighting circuits, general,
emergency, fixtures and fittings, power sub-circuits, and data cables.
December 1997 – December 1998
I spent a year travelling around Australia. During this time, I completed two
contract jobs for Rotric Pty Ltd and ElectData.
5. 5
Education
City & Guilds Part One Electrical Installation Competencies
City & Guilds Part Two Electrical Installation Competencies
City & Guilds Supplementary Studies in Electrical Installation Competencies in
Electronics
City & Guilds Electrical Installation Work Course C
Completion of Fibre Installation & Testing Multimode
Occupational Health & Safety (White Card)
ACA Open Registration Licence (Data, Lift Endorsement)
Elevating Work Platform Licence
Electrical Contractors Licence
References may be obtained upon request.