SlideShare a Scribd company logo
1 of 4
Darren Fountain
Email:djdfountain@ymail.com
Telephone:01287652185 (Home)
Telephone:07854850742 (Mobile)
 Summary
Experienced, well trained JIB qualified Multi skilled electrician with over 19 years experiance and an open-
minded individual with a flexible approach to work, which enables accommodation of change. A proactive and
resourceful individual who refuses to cut corners even when under pressure and able to work well with in a
group or on own initiative. Willing to take any responsibilities and assignments regardless of the challenge. An
excellent communicator and self-reliant individual with the ability to pick up new ideas and concepts quickly.
Enjoys learning new skills and methods of working. Takes pride in producing excellent work. Organized and
can work under pressure in a busy environment.
 Personal Details
Date of Birth:
1stMay 1981
Status
Single
Address:
35 Hollybush EST
skelton
Cleveland
TS122LP
 Skills
 Engineering – Electrical charge hand/supervisor, Electrical Installation, Electrical Maintenance, Process
Engineering, Control Systems, Computer Management, Permit to Work systems, Fault Diagnosis, Lighting
Installation and Maintenance, Cable Containment, Health and Safety Procedures, Isolation Procedures.
 Work Experience
Installation and commissioning technician, Cleveland potash polysulphate plant (Qualter Hall) at boulby
April 2016 to Present
My role is to install and commission a large mineral crushing and screening plant which included belt
conveyors, screw conveyors, bucket elevators and a number of different vibrating screens. I installed and
commissioned 415v 3 phase motors (both drive and vibrating), motor slip detection switches, Tilt switches and
cable pull switches. I also installed stainless steel cable containment both ladder and tray.
Electrical charge hand/stand in supervisor, Cleveland potash treatment plant (Fabricom) at boulby
July 2011 to March 2016
In this role as well as preforming all my normal electrical duties previously with Carillion (see below) I was also
charge hand/stand in supervisor for a group of 12 electricians. I had a responsibility to organise and manage
projects with a large emphasis on safety and gathering risk assessments and method statements via the
computers systems. It is also my roll to obtain permits and liaise with senior management to make sure all
duties are carried out to a high standard and to the client’s specification. I am also in charge of stock control
and ordering parts/materials for forth coming projects.
I also installed, maintained and commissioned lighting DB’s which consisted of glanding and terminating SWA
cables, the installation of flood, fluro, LED, bulkhead, emergency twin spots and street lighting (including
lamppost erection) to client’s specification and insuring the IP integrity was maintained. I also fitted PVC dado
trunking throughout the main office block and installed 240v sockets, data outlets (including terminating
hubs) and telephone sockets as well as mentoring a number of trainee employees/Apprentices throughout my
time at ICL
Electrician, Cleveland potash treatment plant (Carillion) at Boulby
July 2009 to june 2011
In this role I replace old ladder rack and cable tray with new. Replace and manufacture all unistrut brackets
(both stainless and GRP) and to refit cables using stainless steel cables ties. I also had the opportunity to gain
experience in working below ground in a confined atmosphere where i carried out periodic lighting and three
phase motor tests and inspections up to 3.3kv, it was also my job to identify and repair all defects Testing
consisted of insulation resistance, earth fault loop impedance and RCD testing, all results were recorded and
logged.
E & I Installation technician, Luctie International (Cordell) in Billingham
August 2007 to july 2009
This was a multi-disciplined job roll across a large acrylic-based product manufacturing site. I was required to
work on a number of different low and medium voltage installations in Zone 0-2 Hazardous Areas. I was also
required to work at heights using a MEWPs/scaffolding and work in confined spaces as well as been required to
fault find and reading electrical drawings. I also installed, tested and commissioned a number of different 110v
instruments. All work was carried out to compEx standards.
Electrician, Univar (Cordell) in Middleborough
March 2007 to August 2007
I has two roles in this job firstly i was there to help on a large instillation. My duties included installing cable
tray and unistrut as well as tying in cables and glanding and terminating into control panels making sure not to
impair the IP integrity. After that i was moved to the maintenance squad and helped oversee all aspects of
planned preventative maintenance (PPM’s) with in a large chemical manufacturing plant.
Electrician, British water ways (Cordell) in Adrishage Scotland
September 2006 to March 2007
This job required me to install a new control panel, tray work and SWA cable for a swing bridge over a canal
lock as well installing solar panels, wind turbines and charging systems to the local lighthouse. This also
included reconditioning/refitting the traffic lights and level crossing barriers systems.
Electrician, Techdrill (Cordell) in Bedlington
April 2006 to September 2006
In this job i was required to install tray work and the relative cabling on newly built skids as well as mount JB's,
panels and the testing and installation of small lighting circuits and 240v power circuits. This involved
glanding and terminating, drilling and tapping, reading electrical drawings and using unistrut.
E & I Installation technician, Centrica gas (Cordell) in Barrow-in-Furness
December 2005 to April 2006
At Centrica i helped intall the new gas terminal my duties included installing new tray work using unistrut,
glanding and terminating new SWA cables and well as installing new JB's and mounting instruments. This job
also required me to work at heights from scaffolding and MEWP's.
Maintenance electrician, Cordell in Thornaby-on-tees
May 2005 to December 2005
In this job role i was part of the routine maintenance squad maintaining the lighting and power systems across
five workshops. This included the service and maintenance of a number of cranes and the repair of
transformers and power tools as well installing floodlights and isolator units using the relative electrical
drawings. I also helped test all the work carried out.
Electrician, GE energy (Cordell) in Lavrio Greece
April 2005 to May 2005
In this job I was part of a decommissioning team and involved in the strip down and removal of mobile power
generation units. My duties included the removal of bolts and uncoupling large supply cables as well as the
removal of the relative tray work.
Electrician, BNFL Wylfa (Cordell / IPM) in Anglesey
November 2004 to April 2005
This job required me to be security cleared to gain access to the nuclear power station where I installed all new
containment, power and date for a newly erected prefabricated building which entailed me using stainless steel
tray work and running SWA supply cables. I also installed and terminated all the cat 5 system (including new
hub) as well as the new telephone system.
Electrician, Cordell in Stockton
April 2005 to March 2009
During my time at Cordell i have been contracted to a number of reputable companies such as Conoco Phillips,
Centrica gas, BNFL Wylfa power, British water ways, Techdrill and Haskels as well as work at the workshop as a
maintenance electrician. I spent the last year contracted to Lucite international. SEE ABOVE
Electrician, I P M ( industrial pumps and motors) in Thornaby-on-tees
September 2004 to April 2005
My duties included all aspects of contol panel building overhaul, refurbishment, system simulation, installation
and commissioning of panels in compliance with LV and EMC directives. As well as using enclosures suitable
for hazardous area applications in compliance with ATEX Directives, reading from electrical drawings, drilling &
tapping, installing pvc trunking, tray work, using hydraulic cutting tools and glanding and terminating. I also
service and maintained pumps which involved stripping and identifying damaged parts and ordering new and
rebuilding and rewiring them.
Installation & Service Engineer, Spraytherm in Thornaby-on-tees
September 2001 to August 2004
My duties included installation, servicing and repair of spray booths/Ovens which also included the service and
repair of force draft burners both gas and fuel oil to a corgi standard .I also installed, serviced and repaired
garage equipment such as Infrared heating systems, dust extraction units (including installation of ducting)
and workshop heaters all across the UK.
 Qualifications
Qualification Grade Achieved
City and Guilds 201 Basic Engineering Pass
City and Guilds 236 part 1 Electrical Installation Theory and Practice Pass
City and Guilds 236 part 2 Electrical Installation Theory and Practice Pass
City and Guilds Plant Process Operations part 1 Pass
NVQ2 Engineering Foundation (B) Pass
NVQ3 Engineering Maintenance Pass
17th Edition wiring regulations Pass
ECITB Safety passport Pass
Full UK Driving license Clean
IOSH Working safely Pass
JIB ECS Card Pass
10 GCSE’s Pass
 Courses
Abrasive Wheels
Fire Awareness Training
Asbestos Safety Awareness
Working at Heights
MEWP Training
Confined Space Training
Harness / Lanyard Inspection Storage and Use Training
Manual Handling
Risk Assessment Training
Safe Isolation/Switching Procedures
 Education History
De Brus secondery school in Skelton
September 1992 to June 1997
Redcar and Cleveland Collage in Redcar
September 1997 to June 2001
Teesside Training Enterprise in Southbank
September 1997 to September 2001
References
Walter Hockborn (Fabricom North East area manager) 07817870823
Paul Jeffers (Fabricom site manager) 07985625256
Alan Gladders (ICL supervisor) 01287640140

More Related Content

What's hot

Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh
 
Resume Devin Earl
Resume Devin EarlResume Devin Earl
Resume Devin Earldevin earl
 
Ed's Resume June 2016
Ed's Resume June 2016Ed's Resume June 2016
Ed's Resume June 2016Ed Mierzwa
 
Jeff Resume_2015-06-17
Jeff Resume_2015-06-17Jeff Resume_2015-06-17
Jeff Resume_2015-06-17Jeff Nelson
 
PRINCE EASON new resume 2
PRINCE EASON new resume 2PRINCE EASON new resume 2
PRINCE EASON new resume 2Prince E
 
Steve Fidler CV 2016
Steve Fidler CV 2016Steve Fidler CV 2016
Steve Fidler CV 2016Steve Fidler
 
BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1Dominic Dadzie
 
AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)Alex Marvelley
 
Ken Doctor_CV (11-4-2016)
Ken Doctor_CV (11-4-2016)Ken Doctor_CV (11-4-2016)
Ken Doctor_CV (11-4-2016)Kenneth Doctor
 
Nermin Smajic Resume 3.2016
Nermin Smajic  Resume  3.2016Nermin Smajic  Resume  3.2016
Nermin Smajic Resume 3.2016Nermin Smajic
 
Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)rasta man
 
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15Robert Thomas
 
lee coopers cv1
lee coopers cv1lee coopers cv1
lee coopers cv1lee cooper
 
Matthew Foster Resume
Matthew Foster ResumeMatthew Foster Resume
Matthew Foster ResumeMatt Foster
 
new_resume (1)
new_resume (1)new_resume (1)
new_resume (1)Prince E
 

What's hot (19)

Blair Mcintosh Resume 1
Blair Mcintosh Resume 1Blair Mcintosh Resume 1
Blair Mcintosh Resume 1
 
Resume Devin Earl
Resume Devin EarlResume Devin Earl
Resume Devin Earl
 
Ed's Resume June 2016
Ed's Resume June 2016Ed's Resume June 2016
Ed's Resume June 2016
 
Brian Johnson 2015
Brian Johnson 2015Brian Johnson 2015
Brian Johnson 2015
 
Jeff Resume_2015-06-17
Jeff Resume_2015-06-17Jeff Resume_2015-06-17
Jeff Resume_2015-06-17
 
PRINCE EASON new resume 2
PRINCE EASON new resume 2PRINCE EASON new resume 2
PRINCE EASON new resume 2
 
Steve Fidler CV 2016
Steve Fidler CV 2016Steve Fidler CV 2016
Steve Fidler CV 2016
 
November Cv
November CvNovember Cv
November Cv
 
BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1BRIDGE ELECTRICAL ENGINEERING WORK1
BRIDGE ELECTRICAL ENGINEERING WORK1
 
Paul Jeffers 20
Paul Jeffers 20Paul Jeffers 20
Paul Jeffers 20
 
Resume 11.2.16
Resume 11.2.16Resume 11.2.16
Resume 11.2.16
 
AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)AlexMarvelleyCV (1) (1)
AlexMarvelleyCV (1) (1)
 
Ken Doctor_CV (11-4-2016)
Ken Doctor_CV (11-4-2016)Ken Doctor_CV (11-4-2016)
Ken Doctor_CV (11-4-2016)
 
Nermin Smajic Resume 3.2016
Nermin Smajic  Resume  3.2016Nermin Smajic  Resume  3.2016
Nermin Smajic Resume 3.2016
 
Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)
 
Robert Resume 8-26-15
Robert Resume 8-26-15Robert Resume 8-26-15
Robert Resume 8-26-15
 
lee coopers cv1
lee coopers cv1lee coopers cv1
lee coopers cv1
 
Matthew Foster Resume
Matthew Foster ResumeMatthew Foster Resume
Matthew Foster Resume
 
new_resume (1)
new_resume (1)new_resume (1)
new_resume (1)
 

Similar to Experienced JIB electrician resume

quinton c. miller (1) new and improved (1) (1)
quinton c. miller (1) new and improved (1) (1)quinton c. miller (1) new and improved (1) (1)
quinton c. miller (1) new and improved (1) (1)Quinton Miller
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.Garry Doiron
 
CV - James Ayrton - November 2014
CV - James Ayrton - November 2014CV - James Ayrton - November 2014
CV - James Ayrton - November 2014James Ayrton
 
Tommy_Phipps_Resume2015_final (1)
Tommy_Phipps_Resume2015_final (1)Tommy_Phipps_Resume2015_final (1)
Tommy_Phipps_Resume2015_final (1)Thomas Phipps
 
Mark powell resume2017
Mark powell resume2017Mark powell resume2017
Mark powell resume2017Mark Powell
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Holland Kendall
 
adamwraggCV 01 06 15
adamwraggCV 01 06 15adamwraggCV 01 06 15
adamwraggCV 01 06 15adam wragg
 
Simon McLean CV 2017
Simon McLean CV 2017Simon McLean CV 2017
Simon McLean CV 2017Simon McLean
 
Simon McLean CV 2017 (Repaired)
Simon McLean CV 2017 (Repaired)Simon McLean CV 2017 (Repaired)
Simon McLean CV 2017 (Repaired)Simon McLean
 
Neil Todd CV
Neil Todd CVNeil Todd CV
Neil Todd CVNeil Todd
 
Patrick Rodrigue Updated Resume
Patrick Rodrigue Updated ResumePatrick Rodrigue Updated Resume
Patrick Rodrigue Updated ResumePatrick Rodrigue
 
Craig Langley - Curriculum Vitae Newest
Craig Langley - Curriculum Vitae NewestCraig Langley - Curriculum Vitae Newest
Craig Langley - Curriculum Vitae NewestCraig Langley
 
Yvan Dufresne resume - Nov 2014
Yvan Dufresne resume - Nov 2014Yvan Dufresne resume - Nov 2014
Yvan Dufresne resume - Nov 2014Yvan Dufresne
 

Similar to Experienced JIB electrician resume (20)

Jake Comerford CV 2
Jake Comerford CV  2Jake Comerford CV  2
Jake Comerford CV 2
 
quinton c. miller (1) new and improved (1) (1)
quinton c. miller (1) new and improved (1) (1)quinton c. miller (1) new and improved (1) (1)
quinton c. miller (1) new and improved (1) (1)
 
GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.GARRY RESUME Red Seal industrial Electrician.
GARRY RESUME Red Seal industrial Electrician.
 
CV - James Ayrton - November 2014
CV - James Ayrton - November 2014CV - James Ayrton - November 2014
CV - James Ayrton - November 2014
 
Tommy_Phipps_Resume2015_final (1)
Tommy_Phipps_Resume2015_final (1)Tommy_Phipps_Resume2015_final (1)
Tommy_Phipps_Resume2015_final (1)
 
Mark powell resume2017
Mark powell resume2017Mark powell resume2017
Mark powell resume2017
 
Lachlan M Innes CV
Lachlan M Innes CVLachlan M Innes CV
Lachlan M Innes CV
 
MIchael CV 2
MIchael CV 2MIchael CV 2
MIchael CV 2
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
adamwraggCV 01 06 15
adamwraggCV 01 06 15adamwraggCV 01 06 15
adamwraggCV 01 06 15
 
Simon McLean CV 2017
Simon McLean CV 2017Simon McLean CV 2017
Simon McLean CV 2017
 
RyanResume2014
RyanResume2014RyanResume2014
RyanResume2014
 
andrew cv
andrew cvandrew cv
andrew cv
 
Simon McLean CV 2017 (Repaired)
Simon McLean CV 2017 (Repaired)Simon McLean CV 2017 (Repaired)
Simon McLean CV 2017 (Repaired)
 
Neil Todd CV
Neil Todd CVNeil Todd CV
Neil Todd CV
 
Patrick Rodrigue Updated Resume
Patrick Rodrigue Updated ResumePatrick Rodrigue Updated Resume
Patrick Rodrigue Updated Resume
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Craig Langley - Curriculum Vitae Newest
Craig Langley - Curriculum Vitae NewestCraig Langley - Curriculum Vitae Newest
Craig Langley - Curriculum Vitae Newest
 
Yvan Dufresne resume - Nov 2014
Yvan Dufresne resume - Nov 2014Yvan Dufresne resume - Nov 2014
Yvan Dufresne resume - Nov 2014
 

Experienced JIB electrician resume

  • 1. Darren Fountain Email:djdfountain@ymail.com Telephone:01287652185 (Home) Telephone:07854850742 (Mobile)  Summary Experienced, well trained JIB qualified Multi skilled electrician with over 19 years experiance and an open- minded individual with a flexible approach to work, which enables accommodation of change. A proactive and resourceful individual who refuses to cut corners even when under pressure and able to work well with in a group or on own initiative. Willing to take any responsibilities and assignments regardless of the challenge. An excellent communicator and self-reliant individual with the ability to pick up new ideas and concepts quickly. Enjoys learning new skills and methods of working. Takes pride in producing excellent work. Organized and can work under pressure in a busy environment.  Personal Details Date of Birth: 1stMay 1981 Status Single Address: 35 Hollybush EST skelton Cleveland TS122LP  Skills  Engineering – Electrical charge hand/supervisor, Electrical Installation, Electrical Maintenance, Process Engineering, Control Systems, Computer Management, Permit to Work systems, Fault Diagnosis, Lighting Installation and Maintenance, Cable Containment, Health and Safety Procedures, Isolation Procedures.  Work Experience Installation and commissioning technician, Cleveland potash polysulphate plant (Qualter Hall) at boulby April 2016 to Present My role is to install and commission a large mineral crushing and screening plant which included belt conveyors, screw conveyors, bucket elevators and a number of different vibrating screens. I installed and commissioned 415v 3 phase motors (both drive and vibrating), motor slip detection switches, Tilt switches and cable pull switches. I also installed stainless steel cable containment both ladder and tray. Electrical charge hand/stand in supervisor, Cleveland potash treatment plant (Fabricom) at boulby July 2011 to March 2016 In this role as well as preforming all my normal electrical duties previously with Carillion (see below) I was also charge hand/stand in supervisor for a group of 12 electricians. I had a responsibility to organise and manage projects with a large emphasis on safety and gathering risk assessments and method statements via the computers systems. It is also my roll to obtain permits and liaise with senior management to make sure all duties are carried out to a high standard and to the client’s specification. I am also in charge of stock control and ordering parts/materials for forth coming projects.
  • 2. I also installed, maintained and commissioned lighting DB’s which consisted of glanding and terminating SWA cables, the installation of flood, fluro, LED, bulkhead, emergency twin spots and street lighting (including lamppost erection) to client’s specification and insuring the IP integrity was maintained. I also fitted PVC dado trunking throughout the main office block and installed 240v sockets, data outlets (including terminating hubs) and telephone sockets as well as mentoring a number of trainee employees/Apprentices throughout my time at ICL Electrician, Cleveland potash treatment plant (Carillion) at Boulby July 2009 to june 2011 In this role I replace old ladder rack and cable tray with new. Replace and manufacture all unistrut brackets (both stainless and GRP) and to refit cables using stainless steel cables ties. I also had the opportunity to gain experience in working below ground in a confined atmosphere where i carried out periodic lighting and three phase motor tests and inspections up to 3.3kv, it was also my job to identify and repair all defects Testing consisted of insulation resistance, earth fault loop impedance and RCD testing, all results were recorded and logged. E & I Installation technician, Luctie International (Cordell) in Billingham August 2007 to july 2009 This was a multi-disciplined job roll across a large acrylic-based product manufacturing site. I was required to work on a number of different low and medium voltage installations in Zone 0-2 Hazardous Areas. I was also required to work at heights using a MEWPs/scaffolding and work in confined spaces as well as been required to fault find and reading electrical drawings. I also installed, tested and commissioned a number of different 110v instruments. All work was carried out to compEx standards. Electrician, Univar (Cordell) in Middleborough March 2007 to August 2007 I has two roles in this job firstly i was there to help on a large instillation. My duties included installing cable tray and unistrut as well as tying in cables and glanding and terminating into control panels making sure not to impair the IP integrity. After that i was moved to the maintenance squad and helped oversee all aspects of planned preventative maintenance (PPM’s) with in a large chemical manufacturing plant. Electrician, British water ways (Cordell) in Adrishage Scotland September 2006 to March 2007 This job required me to install a new control panel, tray work and SWA cable for a swing bridge over a canal lock as well installing solar panels, wind turbines and charging systems to the local lighthouse. This also included reconditioning/refitting the traffic lights and level crossing barriers systems. Electrician, Techdrill (Cordell) in Bedlington April 2006 to September 2006 In this job i was required to install tray work and the relative cabling on newly built skids as well as mount JB's, panels and the testing and installation of small lighting circuits and 240v power circuits. This involved glanding and terminating, drilling and tapping, reading electrical drawings and using unistrut. E & I Installation technician, Centrica gas (Cordell) in Barrow-in-Furness December 2005 to April 2006 At Centrica i helped intall the new gas terminal my duties included installing new tray work using unistrut,
  • 3. glanding and terminating new SWA cables and well as installing new JB's and mounting instruments. This job also required me to work at heights from scaffolding and MEWP's. Maintenance electrician, Cordell in Thornaby-on-tees May 2005 to December 2005 In this job role i was part of the routine maintenance squad maintaining the lighting and power systems across five workshops. This included the service and maintenance of a number of cranes and the repair of transformers and power tools as well installing floodlights and isolator units using the relative electrical drawings. I also helped test all the work carried out. Electrician, GE energy (Cordell) in Lavrio Greece April 2005 to May 2005 In this job I was part of a decommissioning team and involved in the strip down and removal of mobile power generation units. My duties included the removal of bolts and uncoupling large supply cables as well as the removal of the relative tray work. Electrician, BNFL Wylfa (Cordell / IPM) in Anglesey November 2004 to April 2005 This job required me to be security cleared to gain access to the nuclear power station where I installed all new containment, power and date for a newly erected prefabricated building which entailed me using stainless steel tray work and running SWA supply cables. I also installed and terminated all the cat 5 system (including new hub) as well as the new telephone system. Electrician, Cordell in Stockton April 2005 to March 2009 During my time at Cordell i have been contracted to a number of reputable companies such as Conoco Phillips, Centrica gas, BNFL Wylfa power, British water ways, Techdrill and Haskels as well as work at the workshop as a maintenance electrician. I spent the last year contracted to Lucite international. SEE ABOVE Electrician, I P M ( industrial pumps and motors) in Thornaby-on-tees September 2004 to April 2005 My duties included all aspects of contol panel building overhaul, refurbishment, system simulation, installation and commissioning of panels in compliance with LV and EMC directives. As well as using enclosures suitable for hazardous area applications in compliance with ATEX Directives, reading from electrical drawings, drilling & tapping, installing pvc trunking, tray work, using hydraulic cutting tools and glanding and terminating. I also service and maintained pumps which involved stripping and identifying damaged parts and ordering new and rebuilding and rewiring them. Installation & Service Engineer, Spraytherm in Thornaby-on-tees September 2001 to August 2004 My duties included installation, servicing and repair of spray booths/Ovens which also included the service and repair of force draft burners both gas and fuel oil to a corgi standard .I also installed, serviced and repaired garage equipment such as Infrared heating systems, dust extraction units (including installation of ducting) and workshop heaters all across the UK.
  • 4.  Qualifications Qualification Grade Achieved City and Guilds 201 Basic Engineering Pass City and Guilds 236 part 1 Electrical Installation Theory and Practice Pass City and Guilds 236 part 2 Electrical Installation Theory and Practice Pass City and Guilds Plant Process Operations part 1 Pass NVQ2 Engineering Foundation (B) Pass NVQ3 Engineering Maintenance Pass 17th Edition wiring regulations Pass ECITB Safety passport Pass Full UK Driving license Clean IOSH Working safely Pass JIB ECS Card Pass 10 GCSE’s Pass  Courses Abrasive Wheels Fire Awareness Training Asbestos Safety Awareness Working at Heights MEWP Training Confined Space Training Harness / Lanyard Inspection Storage and Use Training Manual Handling Risk Assessment Training Safe Isolation/Switching Procedures  Education History De Brus secondery school in Skelton September 1992 to June 1997 Redcar and Cleveland Collage in Redcar September 1997 to June 2001 Teesside Training Enterprise in Southbank September 1997 to September 2001 References Walter Hockborn (Fabricom North East area manager) 07817870823 Paul Jeffers (Fabricom site manager) 07985625256 Alan Gladders (ICL supervisor) 01287640140