Design, supply, installation, erection, commissioning Hydro-turbines,
Governors, Valves, Generators, Transformers, 150kV Switchyard
Equipment, MV Switchgear, Draft Tube Gates, Gantry Crane and
Auxiliary Electromechanical Equipment for two (2) units 70 MW each,
one (1) unit 4 MW and one (1) unit 500KW at Papadia, Florina
Project Summary
Customer
Public Power Corporation
Location
Kozani
Sector
Energy Projects
Category
Hydro
Start
2006
Status
Complete
ENERGY PROJECTS
Ilarion Hydropower Plant
Greece
 Ilarionas Lake
ALGERIA GHANA GREECE UNITED KINGDOM TURKEY
 
 
ΜΕΤΚΑ REPRESENTATION OFFICE
34, Rue de la Petite Provence
Hydra – Alger, Algerie
ΜΕΤΚΑ REPRESENTATION OFFICE
P.O. Box DTD CT 26
Plot B, 139 Ring Road Extension North
Labone, Accra, Ghana, West Africa
COMPANY HEADQUARTERS
8 Artemidos str.,
GR-15125 Maroussi, Athens
METKA EGN Ltd
32 Hermes Street,Islington
London, N1 9JD,
United Kingdom
POWER PROJECTS LIMITED
Visnezade Mah.
Süleyman Seba Cad. No: 44
B 1 Blok D:9
34357 Besiktas-Akaretler, Istanbul
Τ: +213 21605209
F: +213 21483240
Email: info@metka.com
W: www.metka.com
T: +233 (0) 302 772587
M: +233 (0) 50 1436972
E: info@metka.com
Τ: +30 2102709200
F: +30 2102759528
E: info@metka.com
T: +44 20 3397 8490, 755085 0
F: +44 20 3397 8383
E: info@metka-egn.com
W: www.metka-egn.com
T: +90 2123818100
F: +90 2123274256
E: info@powerprojects.com.tr
W: www.powerprojects.com.tr

More Related Content

What's hot

Motors and Drivers
Motors and DriversMotors and Drivers
Motors and Drivers
Think LABS
 

What's hot (18)

Alternator excitation systems
Alternator excitation systemsAlternator excitation systems
Alternator excitation systems
 
Electric locomotive
Electric locomotiveElectric locomotive
Electric locomotive
 
Motor driver ic
Motor driver icMotor driver ic
Motor driver ic
 
Motors and Drivers
Motors and DriversMotors and Drivers
Motors and Drivers
 
Vocation Training Program 50MW solar PPT By Hari Singh Rathore
Vocation Training  Program 50MW solar PPT By Hari Singh RathoreVocation Training  Program 50MW solar PPT By Hari Singh Rathore
Vocation Training Program 50MW solar PPT By Hari Singh Rathore
 
Dol and star delta
Dol and star deltaDol and star delta
Dol and star delta
 
Updated Pv Install Photo Album
Updated Pv Install Photo AlbumUpdated Pv Install Photo Album
Updated Pv Install Photo Album
 
Electrical Basics
Electrical BasicsElectrical Basics
Electrical Basics
 
Electric Vehicle Regenerative Acceleration ReGenX Presentation
Electric Vehicle Regenerative Acceleration ReGenX Presentation Electric Vehicle Regenerative Acceleration ReGenX Presentation
Electric Vehicle Regenerative Acceleration ReGenX Presentation
 
Stepper Motor
Stepper MotorStepper Motor
Stepper Motor
 
1hp solar pump ppt (1)
1hp solar pump ppt (1)1hp solar pump ppt (1)
1hp solar pump ppt (1)
 
NTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship reportNTDC 220kV Transmission gird station Internship report
NTDC 220kV Transmission gird station Internship report
 
Star delta starter
Star delta starterStar delta starter
Star delta starter
 
Ugsolar太阳能
Ugsolar太阳能Ugsolar太阳能
Ugsolar太阳能
 
Star delta starter circuit for protection of motor
Star delta starter circuit for protection of motorStar delta starter circuit for protection of motor
Star delta starter circuit for protection of motor
 
Presentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapperPresentation on Dehar power house(DPH), slapper
Presentation on Dehar power house(DPH), slapper
 
Wind Policy and Developments in Canada
Wind Policy and Developments in CanadaWind Policy and Developments in Canada
Wind Policy and Developments in Canada
 
Industrial summer training
Industrial summer trainingIndustrial summer training
Industrial summer training
 

Viewers also liked (7)

Malay nces ppt
Malay nces pptMalay nces ppt
Malay nces ppt
 
pressure measurement devices
pressure measurement devicespressure measurement devices
pressure measurement devices
 
Draft tube
Draft tubeDraft tube
Draft tube
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro electric power plant lecture
Hydro electric power plant lectureHydro electric power plant lecture
Hydro electric power plant lecture
 
Hydro-Electric Power
Hydro-Electric PowerHydro-Electric Power
Hydro-Electric Power
 
Elements of HYDRO ELECTRIC POWER PLANTS
Elements of HYDRO ELECTRIC POWER PLANTSElements of HYDRO ELECTRIC POWER PLANTS
Elements of HYDRO ELECTRIC POWER PLANTS
 

Similar to ilarion-hydropower-plant

S Burke CV 2015
S Burke CV 2015S Burke CV 2015
S Burke CV 2015
Sean Burke
 
2. UKTI Brochure Entry Form SA 17.09.14
2. UKTI Brochure Entry Form SA 17.09.142. UKTI Brochure Entry Form SA 17.09.14
2. UKTI Brochure Entry Form SA 17.09.14
Abbey King Khawaja
 
Hydro Experiences
Hydro ExperiencesHydro Experiences
Hydro Experiences
Ali Akal
 
Design of a 400kv Transmission network
Design of a 400kv Transmission networkDesign of a 400kv Transmission network
Design of a 400kv Transmission network
Isaac Muyinza
 
2015 New CS Woon CV.doc
2015 New CS Woon CV.doc2015 New CS Woon CV.doc
2015 New CS Woon CV.doc
Woon Chee Sang
 

Similar to ilarion-hydropower-plant (20)

PHRI Workshop with NGCP for Plant energization
PHRI Workshop with NGCP for Plant energizationPHRI Workshop with NGCP for Plant energization
PHRI Workshop with NGCP for Plant energization
 
L25 - Electrical Power system components.pptx
L25 - Electrical Power system components.pptxL25 - Electrical Power system components.pptx
L25 - Electrical Power system components.pptx
 
121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station Presentation121 MW Allai Khwar Hydel Power Station Presentation
121 MW Allai Khwar Hydel Power Station Presentation
 
S Burke CV 2015
S Burke CV 2015S Burke CV 2015
S Burke CV 2015
 
PROJECTS HANDLED
PROJECTS HANDLEDPROJECTS HANDLED
PROJECTS HANDLED
 
2. UKTI Brochure Entry Form SA 17.09.14
2. UKTI Brochure Entry Form SA 17.09.142. UKTI Brochure Entry Form SA 17.09.14
2. UKTI Brochure Entry Form SA 17.09.14
 
GAVIN'S 2016 CV
GAVIN'S 2016 CVGAVIN'S 2016 CV
GAVIN'S 2016 CV
 
Supreme & co pvt ltd
Supreme & co pvt ltdSupreme & co pvt ltd
Supreme & co pvt ltd
 
CV Catrinescu Florian
CV Catrinescu FlorianCV Catrinescu Florian
CV Catrinescu Florian
 
Hydro Experiences
Hydro ExperiencesHydro Experiences
Hydro Experiences
 
Training Report
Training Report Training Report
Training Report
 
Ppt on chilla hydropower plant.
Ppt on chilla hydropower plant.Ppt on chilla hydropower plant.
Ppt on chilla hydropower plant.
 
Design of a 400kv Transmission network
Design of a 400kv Transmission networkDesign of a 400kv Transmission network
Design of a 400kv Transmission network
 
2015 New CS Woon CV.doc
2015 New CS Woon CV.doc2015 New CS Woon CV.doc
2015 New CS Woon CV.doc
 
STUDY OF ELECTRICAL POWER GENERATION, TRANSMISSION AND DISTRIBUTION IN BANG...
STUDY OF  ELECTRICAL POWER GENERATION,  TRANSMISSION AND DISTRIBUTION IN BANG...STUDY OF  ELECTRICAL POWER GENERATION,  TRANSMISSION AND DISTRIBUTION IN BANG...
STUDY OF ELECTRICAL POWER GENERATION, TRANSMISSION AND DISTRIBUTION IN BANG...
 
DPL Training .doc file
DPL Training .doc file DPL Training .doc file
DPL Training .doc file
 
Power generation in egypt
Power generation in egyptPower generation in egypt
Power generation in egypt
 
Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power Plant
 
pptpdf-131117235616-phpapp02.pdf
pptpdf-131117235616-phpapp02.pdfpptpdf-131117235616-phpapp02.pdf
pptpdf-131117235616-phpapp02.pdf
 
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan) 2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
2x600MW Kalishindh Super Thermal Jhalawar (Rajasthan)
 

ilarion-hydropower-plant

  • 1. Description Design, supply, installation, erection, commissioning Hydro-turbines, Governors, Valves, Generators, Transformers, 150kV Switchyard Equipment, MV Switchgear, Draft Tube Gates, Gantry Crane and Auxiliary Electromechanical Equipment for two (2) units 70 MW each, one (1) unit 4 MW and one (1) unit 500KW at Papadia, Florina Project Summary Customer Public Power Corporation Location Kozani Sector Energy Projects Category Hydro Start 2006 Status Complete ENERGY PROJECTS Ilarion Hydropower Plant Greece  Ilarionas Lake ALGERIA GHANA GREECE UNITED KINGDOM TURKEY     ΜΕΤΚΑ REPRESENTATION OFFICE 34, Rue de la Petite Provence Hydra – Alger, Algerie ΜΕΤΚΑ REPRESENTATION OFFICE P.O. Box DTD CT 26 Plot B, 139 Ring Road Extension North Labone, Accra, Ghana, West Africa COMPANY HEADQUARTERS 8 Artemidos str., GR-15125 Maroussi, Athens METKA EGN Ltd 32 Hermes Street,Islington London, N1 9JD, United Kingdom POWER PROJECTS LIMITED Visnezade Mah. Süleyman Seba Cad. No: 44 B 1 Blok D:9 34357 Besiktas-Akaretler, Istanbul Τ: +213 21605209 F: +213 21483240 Email: info@metka.com W: www.metka.com T: +233 (0) 302 772587 M: +233 (0) 50 1436972 E: info@metka.com Τ: +30 2102709200 F: +30 2102759528 E: info@metka.com T: +44 20 3397 8490, 755085 0 F: +44 20 3397 8383 E: info@metka-egn.com W: www.metka-egn.com T: +90 2123818100 F: +90 2123274256 E: info@powerprojects.com.tr W: www.powerprojects.com.tr