WAPDA 
WAPDA, the Pakistan Water and Power Development Authority, was created in 1958 
as a Semi-Autonomous Body for the purpose of coordinat ing and giving a unified direct ion 
to the development of schemes in Water and Power Sectors, which were previously being 
dealt with, by the respect ive Elect ricity and I rrigat ion Department of the Provinces. 
Since October 2007, WAPDA has been divided into two dist inct ent ities i.e. WAPDA and 
Pakistan Elect ric Power Company (PEPCO). 
 WAPDA is responsible for water and hydropower development 
 PEPCO is vested with the responsibility of thermal power generat ion, t ransmission, 
dist ribut ion and billing. 
 PEPCO has been fully empowered and is responsible for the management of all the 
affairs of corporat ized eight Dist ribution Companies (DISCOs), four Generat ion 
Companies (GENCOs) and a Nat ional Transmission Dispatch Company (NTDC). These 
companies are working under independent Board of Directors (Chairman and some 
Directors are from Private Sectors). 
 The Companies are administ rat ively autonomous and leading to financial autonomy 
by rest ructuring their balance sheet s by bringing their equity posit ion to at least 20 
percent , required to meet the prudent ial regulat ions and to facilitate financing from 
commercial sector (approved by ECC). 
 The Loan Liability Transfer Agreement s (LLTA) have been signed with Corporate Ent it ies 
and execut ion of loan t ransfer is complete. 
 All Ent ities have the physical possessions of all their operat ional asset s. 
 On 24th Feb. 2007 Minist ry of Water & Power not ified NEPRAapproved Tariff for all 
Dist ribut ion Companies replacing unified WAPDA Tariff. 
 Legal Agreement s such as Business Transfer Agreement s, Operat ion Development 
Agreement , Energy Supply Agreement , Business Supplementary Agreement and Fuel 
Supply Agreement etc. were executed between WAPDA and Corporate Ent ities to 
facilitate commercial operat ions. 
 Regulatory inst rument s like Grid Code, Dist ribut ion Codes, Performance Standard for 
Dist ribut ion Companies and Transmission Companies were drafted and got approved 
in 2007. 
 All major lenders gave their consent for t ransfer of their loan from WAPDA to Corporate 
Ent ities, thus 326 loan assumpt ion agreement were signed amongst respect ive 
Companies, WAPDA and EAD (Economic Affairs Division) GOP. 
 CPPA is established under the coverage of NTDC for payment s from DISCOs to IPPs, 
GENCOs and NTDC. Ult imately, it will funct ion independent ly under Federal Govt . and 
all forthcoming IPPs will be under CPPA.
WINGS OF WAPDA 
 water wing 
 power wing 
POWER WING 
Power wing is headed by Member (Power). After Re-st ructuring in 
2007, Power Wing was split up into companies i.e. NTDC, DISCOs & GENCOs and separated 
from WAPDA. Power wing now looks after Hydropower Generat ion only 
Mandate of Residual WAPDA Power Wing 
 Operat ion & maintenance of 19 Hydel Power Stat ions 
 Rehabilitat ion of Exist ing old Hydel Power Stat ions 
 Technical monitoring of E&M Works of new project s 
 Training act ivities for Capacity Building under G.M (Training). 
WATER WING 
Member (Water) heads the Water Wing of WAPDA for execut ion of project s in the 
ent ire count ry. For execut ion of water sector and hydropower development project s 
General Managers, Chief Engineers and Project Directors are responsible for their 
implementat ion and execut ion. The project s located in Gilgit Balt istan and northern side of 
Pakistan are being executed by General Manager (Northern Areas), Project s located in 
Khyber Pakhtunkhwa and Mangla Dam Raising Project s by General Manager (Project s) 
North, Neelum Jhelum Hydropower Project located in Azad Jammu Kashmir by MD/CEO 
NJHPC, Project s located in Punjab by General Manager (Cent ral) Water, Project s located in 
Sindh and Balochistan by General Manager (Project s) South. In addit ion, the Water Wing has 
a General Manager (Coordinat ion and Monitoring) Water for coordinat ion between various 
WAPDA format ions with Minist ry and other nat ional and internat ional format ions, monitoring 
of WAPDA ongoing, completed and proposed project s, career management and general 
administ rat ion of water wing (Grade-1 to Grade-19). The Planning Division of Water Wing, 
headed by a General Manager, looks after all planning act ivities on the water side. The 
act ivities of hydropower development are handled by General Manager (Hydro) Planning. 
Cent ral Design Office is headed by General Manager (CDO) and the mat ters of land 
acquisit ion and reset t lement are looked after by General Manager (Land Acquisit ion and 
Reset t lement ). The Environment cell and dam safety organizat ion and other technical 
services are being headed by General Manager (Technical Services). General Manager
(Tarbela) cont rols the operat ion and maintenance of Tarbela Dam while General Manager 
(Ghazi Barotha Hydropower Project ) looks after Ghazi Barotha Hydropower Project . 
DISCOs 
Following are the nine dist ribut ion companies. 
1. GEPCO 
2. LESOC 
3. FESCO 
4. IESCO 
5. MEPCO 
6. PESCO 
7. HESCO 
8. QESCO 
WAPDA Hydel 
 Tarbela 3478 MW 
 Mangla 1000 MW 
 Ghazi – Barotha 1450 MW 
 Warsak 243 MW 
 Chashma 184 MW 
 Dargai 20 MW 
 Rasul 22 MW 
 Shadi-Waal 18 MW 
 Nandi pur 14 MW 
 Kurram Garhi 4 MW 
 Renala 1 MW 
 Chit ral 1 MW 
 Jagran (AK) 30 MW 
 Khankhwar 72 MW 
 AllaiKhwar 121 MW 
 Total Hydel 6,654 MW
WAPDA Thermal 
 Gas Turbine Power Station, Shahdra 59 MW 
 Steam Power Stat ion, Faisalabad 132 MW 
 Gas Turbine Power Station, Faisalabad 244 MW 
 Gas Power Stat ion, Multan 195 MW 
 Thermal Power Stat ion, Muzaffargarh 1350 MW 
 Thermal Power Stat ion, Guddu 1655 MW 
 Gas Turbine Power Station, Kot ri 174 MW 
 Thermal Power Stat ion, Jamshoro 850 MW 
 Thermal Power Stat ion, Larkana 150 MW 
 Thermal Power Stat ion, Quet ta 35 MW 
 Gas Turbine Power Station, Panjgur 39 MW 
 Thermal Power Stat ion, Pasni 17 MW 
 Total Thermal 4811 MW 
WAPDA’s t ot al hydel and t hermal capacit y is 11,272 MW. Hydel elect ricit y generat ed by 
WAPDA varies between two ext remit ies, i.e., between minimum of 2,414 MW and maximum 
of 6,761 MW depending upon the river flow. 
NTDC 
Nat ional Transmission & Despatch Company (NTDC) Limited was incorporated on 6th 
November, 1998 and commenced commercial operat ion on 24th December, 1998. I t was 
organized to take over all the propert ies, right s and asset s obligat ions and liabilit ies of 220 KV 
and 500KV Grid Stat ions and Transmission Lines/Network owned by Pakistan Water and 
Power Development Authority (WAPDA). NTDC operates and maintains twelve 500 KV and 
twenty nine 220 KV Grid Stations, 5077 km of 500 KV t ransmission line and 7359 km of 220 KV 
t ransmission line in Pakistan. 
MAIN FUNCTIONS 
 Cent ral Power Purchasing Agency 
 System Operator 
 Transmission Network Operator 
 Cont ract Regist rar and Power Exchange Administ rator
i) Central Power Purchasing Agency (CPPA):As the Cent ral Power Purchasing 
Agency (CPPA), for procurement of power from GENCOs, Hydel &IPPs on behalf of 
Dist ribut ion Companies (DISCOS), for delivery through 500 kV, 220 kV & 132kV Network. 
ii) System Operator: For secure, safe and reliable operat ion, cont rol and despatch of 
generat ion facilit ies. 
iii) Transmission Network Operator:For Operat ion & Maintenance, Planning, 
Design and expansion of the 500 kV and 220 kV t ransmission network 
. 
iv) Contract Registrar and Power Exchange Administrator (CRPEA):As 
CRPEA, to record and monitor cont ract s relat ing to bilateral t rading system. 
MISSION STATEMENT NTDC 
To contribute in the development of prosperous Pakistan by managing smooth and 
economical t ransmission and despatch system through excellence of professional work.
Gujranwala Electric Power 
Company (GEPCO) 
INTRODUCTION 
 GEPCO has been setup over area of jurisdict ion and network of former Area 
Elect ricity Board, which was created in early eight ies. 
 GEPCO was incorporated on 25th April, 1998. It encompassed the areas of exist ing 06 
Dist rict s Gujranwala, Hafizabad, Sialkot, Narowal, Gujrat and Mandi Bahauddin 
 GEPCO serves almost 2.454 million consumers, commercializing 6,220 GWh of electric 
energy per year, with a peak demand of 1,813 MW. 
 It operates approximately 19,786 kilometers of medium voltage distribution line, and 
16,726 kilometers of low voltage distribution circuits. 
DISTRIBUTION SYSTEM OF GEPCO 
Brief Introduction 
 GEPCO’S dist ribut ion network consist of 11 KV line at HT side and 415 V at LT side. 
 There are about 680 Nos. of 11 KV feeders in GEPCO with total length of about 
23,956 KM. LT line has length of about 18499 KM. 
 There are about 52000 Nos. of Dist ribut ion Transformers installed in GEPCO. 
DISTRIBUTION SYSTEM PLANNING 
Brief Introduction 
 Planning and Engineering (P&E) Sect ion of GEPCO deals with the technical study 
of 11 KV (HT) line network and 415 V (LT) line network. 
 A Dist ribut ion network is selected for rehabilitat ion on the basis of certain planning 
criteria such as voltage drop, power loss, equipment loading, Low power factor, 
accommodate future load growth, benefit/cost rat io, etc. For each selected 
network, a planning proposal is prepared to achieve the desired benefit s.
Rehabilitation Procedure of HT Distribution System Used 
in GEPCO 
SELECTION PROCDURE: 
Rehabilitation of HT Distribution System Selection criteria for HT network to be rehabilitated is 
on the basis of certain planning criteria such as high voltage drop, high power loss, 
equipment loading, Low power factor, accommodate future load growth, benefit/cost ratio, 
etc. For each selected network, a planning proposal is prepared to achieve the desired 
benefits. 
The required B/C(benefits/cost) for HT proposals > 2 
Rehabilitation Procedure of LT Distribution System Used 
in GEPCO 
SELECTION PROCDURE: 
For LT network rehabilitat ion higher priority is given to those areas where dist ribut ion 
t ransformers are running beyond 80% loading or LT Line is lengthy, service to service 
connect ions exist and consequent ly, the technical parameters (i.e. %Voltage Drop 
and %Annual Energy Loss) exceed above permissible limit s. Such LT proposals that give 
maximum technical as well as financial benefit s should be executed. 
The required B/C(benefit s/cost ) for LT proposals > 1 
THE NEW ERA OF PLANNING & 
ENGINEERING OF GEPCO P&E 
COMPUTER CENTER GEPCO 
Objectives of P&E Initiative 
 Establish a systematic and comprehensive distribution system planning process within 
GEPCO. 
 Build P&E’s Technical Capacity to develop distribution system maps, to perform load 
flow analyses, to evaluate load forecasts, area planning and contingency planning. 
 Development of GIS Mapping and System Planning strategies. 
 Prepare cost effective and techincally sound comprehensive work plan.
 Modernize and strengthen GEPCO’s Planning & Engineering function to implement 
integrated Distribution Planning and Engineering. 
P&E COMPUTER CENTER GEPCO 
The P&E Computer Center will perform following act ivities: 
 GIS Mapping and Database Creat ion( using ARC GIS SOFTWARE) 
 Planning & Engineering Analysis( using SYNERGee ELECTRIC SOFTWARE) 
 Power Quality Monitoring 
Project Management Unit (PMU): 
I t is a very important department of gepco it heads or look after all the grids project s 
that s are working or under development process. 
it s a technical sect ion of gepco most of the experienced and t rained engineers work in this 
sect ion 
IT works on following sect ions 
1. Tranche-1 (Fatehpur TL 132KV) 
2. Tranche-2 (Projects) 
a. New Grid Substations 
b. Conversion's 
c. New Transmission Lines. 
d. EIA/IEE Reports of Tranche-1 & Tranche-2.
Organisational Chart
MISSION STATEMENT OF GEPCO 
Provide Safe, Secure, Accessible and Reliable Elect ric Power supply to our esteemed 
Customers in accordance with their varying needs in a cost effect ive and efficient manner 
with special emphasis on excellence and innovat ion. 
The main object of the Company is to acquire or take over those propert ies, right s and 
liabilit ies of WAPDA AEB Gujranwala and to carry on expand and extend the business and 
act ivities of such board or any part thereof including, without limitation, the business of a 
public elect ricity dist ribution and supplier. i.e. the business of elect ricity dist ribution. 
Authorized share capital of the Company is 5 Billion ordinary shares of Rupees 10 each 
totaling Rs.50 Billion. 
To acquire or take over those propert ies, right s and liabilit ies of the Grid stat ions of the 
Pakistan WAPDA and the t ransmission lines in relat ion. 
To carry on all or any of the business of purchasing,import ing, t ransforming, convert ing, 
dist ribut ing, supplying, export ing and dealing in elect ricity and all other forms of energy and 
product s or services associated therewith and of promot ing the conversat ion and efficient ly 
use of elect ricity and all other forms of energy.
WAPDA POWER HISTORY 
At the t ime of independence, Pakistan inherited 60MW of power generat ion capability 
for a populat ion of 31.5 million, yielding 4.5 unit s per capita consumpt ion. Twelve years later, 
when WAPDA was created in 1959, the generat ion capacity had increased to 119 MW. By 
that t ime count ry had entered the phase of development , which required a dependable 
and sold infrast ructure, elect ricity being it s most significant part . The task of power 
development was undertaken by WAPDA for execut ing a number of hydel and thermal 
generat ion project s, a matching t ransmission network and a distribut ion system, which could 
sustain the load of rapidly increasing demand of elect ricity. 
The effect s of WAPDA's professional approach to find the solut ion to mult ifarious 
problems did not take long to show. After first five years of it s operat ion by 1964-65, the 
elect ricity generat ion capability rose to 636 MW from 119 in 1959, and power generat ion to 
about 2,500 MKWH from 781 MKWH. Number of consumers in 1959 to 688 thousand in 1965. 
As many as 609 villages had elect ricity supplied to them by 1959, increasing to 1882 in 1965. 
The rapid progress witnessed a new life to the social, technical and economic st ructures of 
the count ry, mechanized agriculture started, indust rializat ion picked up and general living 
standards improved. 
The task of accelerat ing the pace of power development picked up speed and by 
1970, in another five years the generat ing capability rose from 636 MW to 1331 MW with 
installat ion of a number of thermal and hydel power unit s. In the year 1980 the system 
capacity touched 3000 MW which rapidly rose to over 7000 MW in 1990-91. Now the total 
generat ion capacity from WAPDA's own hydel and thermal sources after complet ion of 
Chashma Hydro Power Plant plus generat ion from independent power procedures stands at 
15764 MW.

More Related Content

What's hot

Summer training report on SJVNL
Summer training report on SJVNLSummer training report on SJVNL
Summer training report on SJVNLSudhir Negi
 
Mba project-sample-on-performance-management-system
Mba project-sample-on-performance-management-systemMba project-sample-on-performance-management-system
Mba project-sample-on-performance-management-systemStudy Stuff
 
USAID KESIP II - Final Deliverable
USAID KESIP II - Final DeliverableUSAID KESIP II - Final Deliverable
USAID KESIP II - Final DeliverableErik Spurgin
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)DBTGrupoIndia
 
Repowering the Indian Discoms
Repowering the Indian DiscomsRepowering the Indian Discoms
Repowering the Indian DiscomsAditya Parchure
 
Handbookfor ev charginginfrastructureimplementation081221
Handbookfor ev charginginfrastructureimplementation081221Handbookfor ev charginginfrastructureimplementation081221
Handbookfor ev charginginfrastructureimplementation081221PARASMONGIA2
 

What's hot (10)

Summer training report on SJVNL
Summer training report on SJVNLSummer training report on SJVNL
Summer training report on SJVNL
 
Mba project-sample-on-performance-management-system
Mba project-sample-on-performance-management-systemMba project-sample-on-performance-management-system
Mba project-sample-on-performance-management-system
 
Powergridppt
PowergridpptPowergridppt
Powergridppt
 
USAID KESIP II - Final Deliverable
USAID KESIP II - Final DeliverableUSAID KESIP II - Final Deliverable
USAID KESIP II - Final Deliverable
 
Final report kesc
Final report kescFinal report kesc
Final report kesc
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
 
Power industry
Power industryPower industry
Power industry
 
Repowering the Indian Discoms
Repowering the Indian DiscomsRepowering the Indian Discoms
Repowering the Indian Discoms
 
Handbookfor ev charginginfrastructureimplementation081221
Handbookfor ev charginginfrastructureimplementation081221Handbookfor ev charginginfrastructureimplementation081221
Handbookfor ev charginginfrastructureimplementation081221
 
Yash full
Yash fullYash full
Yash full
 

Viewers also liked

MultiModal Image Search on Mobile Device
MultiModal Image Search on Mobile DeviceMultiModal Image Search on Mobile Device
MultiModal Image Search on Mobile DeviceShailesh kumar
 
Software Requirement Specification Master Template
Software Requirement Specification Master TemplateSoftware Requirement Specification Master Template
Software Requirement Specification Master TemplateWayne Chen
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training reportMuntazir Mehdi
 
Intrnship report on wapda
Intrnship report on wapdaIntrnship report on wapda
Intrnship report on wapdakhanlodhi
 
Uml diagrams
Uml diagramsUml diagrams
Uml diagramsbarney92
 

Viewers also liked (6)

Internshio report-on-pesco
Internshio report-on-pescoInternshio report-on-pesco
Internshio report-on-pesco
 
MultiModal Image Search on Mobile Device
MultiModal Image Search on Mobile DeviceMultiModal Image Search on Mobile Device
MultiModal Image Search on Mobile Device
 
Software Requirement Specification Master Template
Software Requirement Specification Master TemplateSoftware Requirement Specification Master Template
Software Requirement Specification Master Template
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 
Intrnship report on wapda
Intrnship report on wapdaIntrnship report on wapda
Intrnship report on wapda
 
Uml diagrams
Uml diagramsUml diagrams
Uml diagrams
 

Similar to WAPDA HISTORY AND OPERATIONS

Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistanUSMAN TARIQ
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanIBRAR AHMAD
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Er. Abhushan Neupane
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plantAnkita Shrestha
 
GDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ LtdGDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ LtdNcedeka Stuurman
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libreAbanihi
 
Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgeNate Sandvig
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...zubeditufail
 
Power Sector Pakistan (Overview) 28072016.pdf
Power Sector Pakistan (Overview) 28072016.pdfPower Sector Pakistan (Overview) 28072016.pdf
Power Sector Pakistan (Overview) 28072016.pdfRASIKHCONSILIUM
 
Power scenario and approach in india
Power scenario and approach in indiaPower scenario and approach in india
Power scenario and approach in indiaCol Mukteshwar Prasad
 
National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)Aneel-k Suthar
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfHASSAN527910
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Kachinga-Wankunda Phiri
 
TAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORT
TAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORTTAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORT
TAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORTZhengShunMattHuang
 

Similar to WAPDA HISTORY AND OPERATIONS (20)

Power sector of pakistan
Power sector of pakistanPower sector of pakistan
Power sector of pakistan
 
Power industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistanPower industries and solar pv power plant in pakistan
Power industries and solar pv power plant in pakistan
 
ARNAB12.pdf
ARNAB12.pdfARNAB12.pdf
ARNAB12.pdf
 
Wapda internship report
Wapda internship reportWapda internship report
Wapda internship report
 
Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
Status of Hydropower in Nepal- Presented in CIA Training Session at Luang Pra...
 
Summer training project on DVC power plant
Summer training project on DVC power plantSummer training project on DVC power plant
Summer training project on DVC power plant
 
GDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ LtdGDF SUEZ Energy Southern Africa Co_ Ltd
GDF SUEZ Energy Southern Africa Co_ Ltd
 
Final Report
Final ReportFinal Report
Final Report
 
9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre9i9 determination-of-bus-voltages-libre
9i9 determination-of-bus-voltages-libre
 
Preliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia GorgePreliminary plans for pumped storage at Columbia Gorge
Preliminary plans for pumped storage at Columbia Gorge
 
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
Esia of 132 k v interconnection scheme loop in out from existing boc dhabeji ...
 
Power Sector Pakistan (Overview) 28072016.pdf
Power Sector Pakistan (Overview) 28072016.pdfPower Sector Pakistan (Overview) 28072016.pdf
Power Sector Pakistan (Overview) 28072016.pdf
 
Power scenario and approach in india
Power scenario and approach in indiaPower scenario and approach in india
Power scenario and approach in india
 
National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)National Transmission And Dispatch Company (NTDC)
National Transmission And Dispatch Company (NTDC)
 
Resume
ResumeResume
Resume
 
Presentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdfPresentation-on-NPCC-by-Salman-Gul_4.pdf
Presentation-on-NPCC-by-Salman-Gul_4.pdf
 
Project report
Project reportProject report
Project report
 
Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16Fixing Our Power Crisis - EAZ v2 28.10.16
Fixing Our Power Crisis - EAZ v2 28.10.16
 
TAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORT
TAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORTTAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORT
TAIWAN OFFSHORE WIND ENERGY INDUSTRY REPORT
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 

WAPDA HISTORY AND OPERATIONS

  • 1. WAPDA WAPDA, the Pakistan Water and Power Development Authority, was created in 1958 as a Semi-Autonomous Body for the purpose of coordinat ing and giving a unified direct ion to the development of schemes in Water and Power Sectors, which were previously being dealt with, by the respect ive Elect ricity and I rrigat ion Department of the Provinces. Since October 2007, WAPDA has been divided into two dist inct ent ities i.e. WAPDA and Pakistan Elect ric Power Company (PEPCO).  WAPDA is responsible for water and hydropower development  PEPCO is vested with the responsibility of thermal power generat ion, t ransmission, dist ribut ion and billing.  PEPCO has been fully empowered and is responsible for the management of all the affairs of corporat ized eight Dist ribution Companies (DISCOs), four Generat ion Companies (GENCOs) and a Nat ional Transmission Dispatch Company (NTDC). These companies are working under independent Board of Directors (Chairman and some Directors are from Private Sectors).  The Companies are administ rat ively autonomous and leading to financial autonomy by rest ructuring their balance sheet s by bringing their equity posit ion to at least 20 percent , required to meet the prudent ial regulat ions and to facilitate financing from commercial sector (approved by ECC).  The Loan Liability Transfer Agreement s (LLTA) have been signed with Corporate Ent it ies and execut ion of loan t ransfer is complete.  All Ent ities have the physical possessions of all their operat ional asset s.  On 24th Feb. 2007 Minist ry of Water & Power not ified NEPRAapproved Tariff for all Dist ribut ion Companies replacing unified WAPDA Tariff.  Legal Agreement s such as Business Transfer Agreement s, Operat ion Development Agreement , Energy Supply Agreement , Business Supplementary Agreement and Fuel Supply Agreement etc. were executed between WAPDA and Corporate Ent ities to facilitate commercial operat ions.  Regulatory inst rument s like Grid Code, Dist ribut ion Codes, Performance Standard for Dist ribut ion Companies and Transmission Companies were drafted and got approved in 2007.  All major lenders gave their consent for t ransfer of their loan from WAPDA to Corporate Ent ities, thus 326 loan assumpt ion agreement were signed amongst respect ive Companies, WAPDA and EAD (Economic Affairs Division) GOP.  CPPA is established under the coverage of NTDC for payment s from DISCOs to IPPs, GENCOs and NTDC. Ult imately, it will funct ion independent ly under Federal Govt . and all forthcoming IPPs will be under CPPA.
  • 2. WINGS OF WAPDA  water wing  power wing POWER WING Power wing is headed by Member (Power). After Re-st ructuring in 2007, Power Wing was split up into companies i.e. NTDC, DISCOs & GENCOs and separated from WAPDA. Power wing now looks after Hydropower Generat ion only Mandate of Residual WAPDA Power Wing  Operat ion & maintenance of 19 Hydel Power Stat ions  Rehabilitat ion of Exist ing old Hydel Power Stat ions  Technical monitoring of E&M Works of new project s  Training act ivities for Capacity Building under G.M (Training). WATER WING Member (Water) heads the Water Wing of WAPDA for execut ion of project s in the ent ire count ry. For execut ion of water sector and hydropower development project s General Managers, Chief Engineers and Project Directors are responsible for their implementat ion and execut ion. The project s located in Gilgit Balt istan and northern side of Pakistan are being executed by General Manager (Northern Areas), Project s located in Khyber Pakhtunkhwa and Mangla Dam Raising Project s by General Manager (Project s) North, Neelum Jhelum Hydropower Project located in Azad Jammu Kashmir by MD/CEO NJHPC, Project s located in Punjab by General Manager (Cent ral) Water, Project s located in Sindh and Balochistan by General Manager (Project s) South. In addit ion, the Water Wing has a General Manager (Coordinat ion and Monitoring) Water for coordinat ion between various WAPDA format ions with Minist ry and other nat ional and internat ional format ions, monitoring of WAPDA ongoing, completed and proposed project s, career management and general administ rat ion of water wing (Grade-1 to Grade-19). The Planning Division of Water Wing, headed by a General Manager, looks after all planning act ivities on the water side. The act ivities of hydropower development are handled by General Manager (Hydro) Planning. Cent ral Design Office is headed by General Manager (CDO) and the mat ters of land acquisit ion and reset t lement are looked after by General Manager (Land Acquisit ion and Reset t lement ). The Environment cell and dam safety organizat ion and other technical services are being headed by General Manager (Technical Services). General Manager
  • 3. (Tarbela) cont rols the operat ion and maintenance of Tarbela Dam while General Manager (Ghazi Barotha Hydropower Project ) looks after Ghazi Barotha Hydropower Project . DISCOs Following are the nine dist ribut ion companies. 1. GEPCO 2. LESOC 3. FESCO 4. IESCO 5. MEPCO 6. PESCO 7. HESCO 8. QESCO WAPDA Hydel  Tarbela 3478 MW  Mangla 1000 MW  Ghazi – Barotha 1450 MW  Warsak 243 MW  Chashma 184 MW  Dargai 20 MW  Rasul 22 MW  Shadi-Waal 18 MW  Nandi pur 14 MW  Kurram Garhi 4 MW  Renala 1 MW  Chit ral 1 MW  Jagran (AK) 30 MW  Khankhwar 72 MW  AllaiKhwar 121 MW  Total Hydel 6,654 MW
  • 4. WAPDA Thermal  Gas Turbine Power Station, Shahdra 59 MW  Steam Power Stat ion, Faisalabad 132 MW  Gas Turbine Power Station, Faisalabad 244 MW  Gas Power Stat ion, Multan 195 MW  Thermal Power Stat ion, Muzaffargarh 1350 MW  Thermal Power Stat ion, Guddu 1655 MW  Gas Turbine Power Station, Kot ri 174 MW  Thermal Power Stat ion, Jamshoro 850 MW  Thermal Power Stat ion, Larkana 150 MW  Thermal Power Stat ion, Quet ta 35 MW  Gas Turbine Power Station, Panjgur 39 MW  Thermal Power Stat ion, Pasni 17 MW  Total Thermal 4811 MW WAPDA’s t ot al hydel and t hermal capacit y is 11,272 MW. Hydel elect ricit y generat ed by WAPDA varies between two ext remit ies, i.e., between minimum of 2,414 MW and maximum of 6,761 MW depending upon the river flow. NTDC Nat ional Transmission & Despatch Company (NTDC) Limited was incorporated on 6th November, 1998 and commenced commercial operat ion on 24th December, 1998. I t was organized to take over all the propert ies, right s and asset s obligat ions and liabilit ies of 220 KV and 500KV Grid Stat ions and Transmission Lines/Network owned by Pakistan Water and Power Development Authority (WAPDA). NTDC operates and maintains twelve 500 KV and twenty nine 220 KV Grid Stations, 5077 km of 500 KV t ransmission line and 7359 km of 220 KV t ransmission line in Pakistan. MAIN FUNCTIONS  Cent ral Power Purchasing Agency  System Operator  Transmission Network Operator  Cont ract Regist rar and Power Exchange Administ rator
  • 5. i) Central Power Purchasing Agency (CPPA):As the Cent ral Power Purchasing Agency (CPPA), for procurement of power from GENCOs, Hydel &IPPs on behalf of Dist ribut ion Companies (DISCOS), for delivery through 500 kV, 220 kV & 132kV Network. ii) System Operator: For secure, safe and reliable operat ion, cont rol and despatch of generat ion facilit ies. iii) Transmission Network Operator:For Operat ion & Maintenance, Planning, Design and expansion of the 500 kV and 220 kV t ransmission network . iv) Contract Registrar and Power Exchange Administrator (CRPEA):As CRPEA, to record and monitor cont ract s relat ing to bilateral t rading system. MISSION STATEMENT NTDC To contribute in the development of prosperous Pakistan by managing smooth and economical t ransmission and despatch system through excellence of professional work.
  • 6. Gujranwala Electric Power Company (GEPCO) INTRODUCTION  GEPCO has been setup over area of jurisdict ion and network of former Area Elect ricity Board, which was created in early eight ies.  GEPCO was incorporated on 25th April, 1998. It encompassed the areas of exist ing 06 Dist rict s Gujranwala, Hafizabad, Sialkot, Narowal, Gujrat and Mandi Bahauddin  GEPCO serves almost 2.454 million consumers, commercializing 6,220 GWh of electric energy per year, with a peak demand of 1,813 MW.  It operates approximately 19,786 kilometers of medium voltage distribution line, and 16,726 kilometers of low voltage distribution circuits. DISTRIBUTION SYSTEM OF GEPCO Brief Introduction  GEPCO’S dist ribut ion network consist of 11 KV line at HT side and 415 V at LT side.  There are about 680 Nos. of 11 KV feeders in GEPCO with total length of about 23,956 KM. LT line has length of about 18499 KM.  There are about 52000 Nos. of Dist ribut ion Transformers installed in GEPCO. DISTRIBUTION SYSTEM PLANNING Brief Introduction  Planning and Engineering (P&E) Sect ion of GEPCO deals with the technical study of 11 KV (HT) line network and 415 V (LT) line network.  A Dist ribut ion network is selected for rehabilitat ion on the basis of certain planning criteria such as voltage drop, power loss, equipment loading, Low power factor, accommodate future load growth, benefit/cost rat io, etc. For each selected network, a planning proposal is prepared to achieve the desired benefit s.
  • 7. Rehabilitation Procedure of HT Distribution System Used in GEPCO SELECTION PROCDURE: Rehabilitation of HT Distribution System Selection criteria for HT network to be rehabilitated is on the basis of certain planning criteria such as high voltage drop, high power loss, equipment loading, Low power factor, accommodate future load growth, benefit/cost ratio, etc. For each selected network, a planning proposal is prepared to achieve the desired benefits. The required B/C(benefits/cost) for HT proposals > 2 Rehabilitation Procedure of LT Distribution System Used in GEPCO SELECTION PROCDURE: For LT network rehabilitat ion higher priority is given to those areas where dist ribut ion t ransformers are running beyond 80% loading or LT Line is lengthy, service to service connect ions exist and consequent ly, the technical parameters (i.e. %Voltage Drop and %Annual Energy Loss) exceed above permissible limit s. Such LT proposals that give maximum technical as well as financial benefit s should be executed. The required B/C(benefit s/cost ) for LT proposals > 1 THE NEW ERA OF PLANNING & ENGINEERING OF GEPCO P&E COMPUTER CENTER GEPCO Objectives of P&E Initiative  Establish a systematic and comprehensive distribution system planning process within GEPCO.  Build P&E’s Technical Capacity to develop distribution system maps, to perform load flow analyses, to evaluate load forecasts, area planning and contingency planning.  Development of GIS Mapping and System Planning strategies.  Prepare cost effective and techincally sound comprehensive work plan.
  • 8.  Modernize and strengthen GEPCO’s Planning & Engineering function to implement integrated Distribution Planning and Engineering. P&E COMPUTER CENTER GEPCO The P&E Computer Center will perform following act ivities:  GIS Mapping and Database Creat ion( using ARC GIS SOFTWARE)  Planning & Engineering Analysis( using SYNERGee ELECTRIC SOFTWARE)  Power Quality Monitoring Project Management Unit (PMU): I t is a very important department of gepco it heads or look after all the grids project s that s are working or under development process. it s a technical sect ion of gepco most of the experienced and t rained engineers work in this sect ion IT works on following sect ions 1. Tranche-1 (Fatehpur TL 132KV) 2. Tranche-2 (Projects) a. New Grid Substations b. Conversion's c. New Transmission Lines. d. EIA/IEE Reports of Tranche-1 & Tranche-2.
  • 10. MISSION STATEMENT OF GEPCO Provide Safe, Secure, Accessible and Reliable Elect ric Power supply to our esteemed Customers in accordance with their varying needs in a cost effect ive and efficient manner with special emphasis on excellence and innovat ion. The main object of the Company is to acquire or take over those propert ies, right s and liabilit ies of WAPDA AEB Gujranwala and to carry on expand and extend the business and act ivities of such board or any part thereof including, without limitation, the business of a public elect ricity dist ribution and supplier. i.e. the business of elect ricity dist ribution. Authorized share capital of the Company is 5 Billion ordinary shares of Rupees 10 each totaling Rs.50 Billion. To acquire or take over those propert ies, right s and liabilit ies of the Grid stat ions of the Pakistan WAPDA and the t ransmission lines in relat ion. To carry on all or any of the business of purchasing,import ing, t ransforming, convert ing, dist ribut ing, supplying, export ing and dealing in elect ricity and all other forms of energy and product s or services associated therewith and of promot ing the conversat ion and efficient ly use of elect ricity and all other forms of energy.
  • 11. WAPDA POWER HISTORY At the t ime of independence, Pakistan inherited 60MW of power generat ion capability for a populat ion of 31.5 million, yielding 4.5 unit s per capita consumpt ion. Twelve years later, when WAPDA was created in 1959, the generat ion capacity had increased to 119 MW. By that t ime count ry had entered the phase of development , which required a dependable and sold infrast ructure, elect ricity being it s most significant part . The task of power development was undertaken by WAPDA for execut ing a number of hydel and thermal generat ion project s, a matching t ransmission network and a distribut ion system, which could sustain the load of rapidly increasing demand of elect ricity. The effect s of WAPDA's professional approach to find the solut ion to mult ifarious problems did not take long to show. After first five years of it s operat ion by 1964-65, the elect ricity generat ion capability rose to 636 MW from 119 in 1959, and power generat ion to about 2,500 MKWH from 781 MKWH. Number of consumers in 1959 to 688 thousand in 1965. As many as 609 villages had elect ricity supplied to them by 1959, increasing to 1882 in 1965. The rapid progress witnessed a new life to the social, technical and economic st ructures of the count ry, mechanized agriculture started, indust rializat ion picked up and general living standards improved. The task of accelerat ing the pace of power development picked up speed and by 1970, in another five years the generat ing capability rose from 636 MW to 1331 MW with installat ion of a number of thermal and hydel power unit s. In the year 1980 the system capacity touched 3000 MW which rapidly rose to over 7000 MW in 1990-91. Now the total generat ion capacity from WAPDA's own hydel and thermal sources after complet ion of Chashma Hydro Power Plant plus generat ion from independent power procedures stands at 15764 MW.