SlideShare a Scribd company logo
1 of 63
Download to read offline
From : India JMV LPS LTD Noida (U.P.) Date : 25.07.2017
International Solar PV Power Presentation by JMV LPS LTD Place JMV Office in Noida Dt.25th
July2017
Thanks note to the all International guest visted our office to attend Solar PV and other renewable
Green method Presentaton for Generating Power Roof Top, Ground Mounted, Canal Top ,Water
Floating along with Hybrid Combination like Wind Power Generator Machine and High Energy Storage
Batteries.
Your self introduction for related to present Power Generation ,Transmission and distribution along with
presence of Solar PV Power Plant in your country ,this information is realy benefit to India and mile
stone how to work in your country to support More & More Solar Pv Power for Larger Power Production
Mega Watt up to your Home requirement in Watt/Kilo Watt Level.
You can utilize Solar Power base Products in your cities and Urban Solar Power LED Street Light ,Trafiic
Light ,out door CCTV Camera and many other Equipments.
The Solar PV Plant can be Install near to your Facility connecting to distribution line from if your Power
supply agencies or you can develop Stand along Off Grid with Battery Back for use when dark in Night.
The power generation through Solar PV is Economical for installation waste land can be utilige and your
are countributing carbon free environment to the world for that plz accept in advance big great Salute
for supporting our earth towards Green and Carbon Free Environment.
India belive Harmony with all Nabours and also support earth for peace and green life.
India also very much fast growing country who can surve Latest better in Design which meets
International all Electrical Standard with Economical in Cost as Compare to other Forward Countries.
India have team of Young Talent who can decide Fast and take dynamic decision to support india and
Their international Industries requirements.
Power Generation ,Transmisson ,Distribution Facilties for Indian and International Requirements.
Transportation for Passenger and Goods Bus,Train and Vechile which Complies International
Requirements.
Telecommunication Network Facilties for Indian and International Requirements.
Building and other Infrastructure for Cities Facilties for Indian and International Requirements.
JMV LPS LTD is Indian Company belive Make in India and Innovation of Products Fall under Earthing
and Protection to best Practice of Electrical Equipment instalation and Safety of Products along with
Human Being Products as below:
Maintenance Free Earthing(Copper Bonded ROD, Earthing Enhance Compound , Earth Pits) Follow UL
,IEC,IEEE
Exothermic Joints ( Permanent Welding with 100% Surface Contact Suitable all Bi-Metals) UL ,IEC,IEEE
Theft Free/Theft Protected Long Run in Drum Roll Copper Clad Steel/ Copper Clad Aluminum with or
Without Insultation. Follow IEC,IEEE
Surge Protection for Power and Communication Ports Follow IEC,IEEE
External Lightning Protection as per IEC 62305 and Early Stream Emision Type as per NFC17-
102/UNE21-186.
Cable Jointing Kit for all LT Cable (Quick Lock and Quick Open Reusable) condition up IP68 and Flame
Proof.
We would like Further extend our support to develop our relation with your Govt Project Official and
PVT Partners Handling above Segment along with our Special Support to Supply of Equipment Disaster
Management Early Warning ,Earth Quake,Flood Warning,Sea High Tide, and Lighting to keep your
people safe.
Thanking you again for Visiting our Office in India
With Regards Family JMV LPS LTD Team
Mr.Neeraj Saini Head of Company and Insparation for JMV Innovative Product for Earthing &
Protection.
Mr.Mahesh Chandra Manav Head of Branding and belive Make In India Govt of India Programme.
Mrs.Mousumi C From Sales
Ms.Manisha Singh from Technical and Design
Ms.Meenakshi from MD Desk and OPS
Contact us Sales@jmv.co.in; neeraj@jmv.co.in Visit webpage www.jmv.co.in T-91-1204590000
We have some photograp while presentation is somebody require plz share their Gmail IT for Sahring
drive related to photo.
Special Thanks from India
Central Institute for Rural Electrification (Rural Electrification Corporation
Ltd )
Solar Power
Generation -
Grid Enabling
10th July, 2017-04 August, 2017
ITP Participants
List
Sl. No. Name of the Executive Country Designation
ITEC /
SCAAP
1 Mr. G RAJESHWAR RAO CIRE, HYD Executive -
2 MR. MURIED SOFIZADA AFGHANISTAN
Power Engineer,
Substation Manager
ITEC
3 Mr. BINOD SHARMA BHUTAN TECHNICAL OFFICER ITEC
4 MS.TSHERING PELDEN BHUTAN Junior Engineer ITEC
5
DR. MUNA SABAH QASIM
ALJAWABIR
IRAQ
Director of follow up
division
ITEC
6 MR. SANI LAWAN NIGER
LABORATORY
ASISTANT
ITEC
7 MR.ALI SEYNI ABDOULAHI NIGER technical responsible ITEC
8 MR. STEPHEN SIRI SOUTH SUDAN ASSISTANT LECTURER ITEC
9 MR. THILANKA ALWIS SRI LANKA
Consultant (Chemical
and Process
Engineering)
ITEC
10 MR. THOI NGUYEN VIETNAM University Lecturer ITEC
11 MR.SALIFU GINDEH GAMBIA Mechanical Engineer SCAAP
12
MR.STEPHEN WEKESA
MANG'ENI
KENYA INSTRUCTOR SCAAP
13
MS.YUCABETH NYABOKE
NYAMWAYA
KENYA INSTRUCTOR SCAAP
14 MR MANYORI JUMA KAPESSA TANZANIA ELECTRICAL ENGINEER SCAAP
15 MR.JUMBE OMARI JUMBE TANZANIA Mechanical Engineer SCAAP
A Warm Welcome To
All
At JMV LPS LIMITED
Global Threat and Impact
Global Warming
Reducing Water Sources for Drinking
Ground Water Level Lowering
Increasing Carbon on Environment
Low Green Color on Earth(Tree)
Why This is happening
We feel that Nature is Free and Gifted
Thinking for ourself not for our future Generation
Our Thinking is very Limited to ourself and Surrounding
What We all have do
Use Nature Precisely and Think for Globe
Sun Wind Water and Earth
Maintain Harmony with all Four
Balance between Need and Greed
All Life are Equal Important and There is Limitation
Lesson to Gain Use and Save
Welcome SUN to Ground Let Use for All
Method of Present Power Generation
• Power Generation use of Coal , Gas, Liquid Fuel
• Power Generation use of Wind
• Power Generation use of Water(Hydro)
• Power Generation use of Waste/Baggass
• Power Generation through Fly Wheel
• Power Generation Through Use Chemical & Nuclear
• Power Generation Through other Kinetic Energy
• Require Huge Infrastructure and Raw Material (Storing and Handling).
• Disposal has to Handle
• Impact on Environment (Pollution)
• Vibration and Sound Pollution
• Reducing Natural Resources for Burning to Generate Power .
• High Cost of Generation and Further Loss due to Long Transmission ,
distribution and Theft.
• Huge to Pay Cost for SCRAP and Threat for Disposal.
• Dependency with Huge Staff and Their Union
• High Maintenance and Protection from Accidents Incidental
• Payments Cycle Increase and Power Generation Reduce over Period of Time.
• Resale value Difficult
Follow Sun Power /Follow Green Power /Follow Free
Generation & Store of Power
Safe Practice in Earthing and Protection
• Solar Power Now Changing Many Phases
• Use with Genset
• Use with Wind Power
• Use with High Energy Storage(Battery)
• Installation on Ground/Cannel Mounted
• Installation on Roof (Building)
• Installation on Water (Floating)
• Installation on Building(BIPV Building Integrated
Transparent Photovoltaic Solar Glass
External/Internal Surge Source
An Arcing Fault is the flow of current through
the air between phase conductors or phase
conductors and neutral or ground.
Concentrated radiant energy is released at
the point of arcing an a small amount of time
resulting in Extremely High Temperature.
Fire Accident in Solar PV Power Plant
Reason Lose Contact Earthing Disorder and
Lightning
Solar Panel Fire Accident
More Picture Fire in Solar PV Power Plant
Damages Due To Lightning
Fire Component Level
Solar PV Power Plant
Surge in Systems and Result
Surge in DC Application
Sikhana to Padega Hi Follow Electrical Safety
Follow Safety in Electrical Installation Shocks
Earthing Design and Require Result
• For substation Large Power below 1.00Ohm
• For substation Small Power below 2.00Ohm
• SCADA/TELECOM and Automation For substation
Large Power below 0.50Ohm
• Tower and Other Structure between 8-15Ohm
• Lightning Surge Protection 50KA below 5Ohm or 100KA
between 8-15Ohm
• Follow Standard IEC /IEEE
• Recommended use of Hybrid Metal to Protect from Theft
Copper Clad Steel/Alumineum Clad Copper
• Exothermic weld IEEE 837
Products
Copper Clad Steel/ Aluminium Conductor
For Electrical Installation
The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper.
These conductors/ wires or strands are equipped with the strength of steel with the conductivity and copper
with the better corrosion resistance property. The concentric copper cladding is metallurgic ally bonded to a
steel core through a continuous, solid cladding process using pressure rolling for primary bonding. The
copper cladding thickness remains constant surrounding steel. We use different steel grades for the steel
core result in Dead Soft Annealed, High strength and Extra High Strength Characteristics.
The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in
Annealed and Hard drawn. We are delivering products with varied conductivity and tensile strength as per
the customer need. Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
Most Efficient Joint Process
It is efficient and superior to all existing surface –to-surface
mechanical retention connectors.
https://www.youtube.com/watch?v=ijdF5hK-MAk
What is Exothermic Welding System?
Copper to Bi-Metal and Aluminium
Types of Exothermic Joints:
Possible to join any bi metal except aluminum
Exothermic welding is a process of making maintain free highly molecular bonding process is superior in
performance connection to any known mechanical or compression-type surface-to-surface contact connector.
Exothermic weld connections provide current carrying (fusing) capacity equal to that of the conductor and will
not deteriorate with age.
 It offers Electrical connections between two or more copper to copper and copper to steel conductors.
 Highly portable method as it does not require any external power source or heat source, so it can be done
almost anywhere.
 It provides strong permanent molecular bond among metallic conductors that cannot loosen and further will
not deteriorate with age.
 Connection does not corrode with time and it offers permanent conductivity.
Copper Clad Steel Solid ROD and Conductor
LIGHTNING FORMATION
Facts About Lightning
• A strike can average 100 million volts of electricity
• Current of up to 200,000 amperes
• Can generate 54,000 oF
• 10/350MicroSec/50KA Fault Current/Discharge in Nano
Sec
Protection
Earthing Design100KA Fault Current/Joints Exothermic
/Flexible Down Conductor with Shortest Route & Less
Corner
• Lightning Protection Standard use in India
( IEC 62305-3 and 4)
Working Principle Angular No Compromise with Design
Max Protection 30Mtrs from One
No Product warranty from Manufacturer
High Maintenance Require
NFC17-102(2011) Now European Standard(ESE LA)
Working Principle Radius Compromise with Design
Possible with Increasing Qty of ESE
Max Protection 109 Mtr. Radius from One
Manufacturing Warranty and Test Certificate for Products
Available
Maintenance on Call Basis
Lightning Risk assessment Study is actually the
measure of risk of a lightning strike and probability
of damages. As Per IEC62305-2.
All these calculations are based on:
lightning strike density in that particular area (provided by OMV i.e. Ng = 8),
Danger for people,
Occupation coefficient of structure,
Relative location of site,
Fire Risk,
Associated services,
Electrical Lines,
Lightning Protection Level,
Surge Arrestor and
Dimensions of installation.
Lighting Strike Density (Ng)
It is the measure of lightning strikes per kilometre square per year in the
particular area.
Higher the lighting strike density, higher the probability of lightning strike which needs higher level of
lightning protection level.
Danger for People (h)
It is the factor of presence of people and panic in the building in case of a
lightning strike
No particular danger 1
Low panic level(<=2 floors, < 100
persons
2
Medium risk of panic (< 1000 persons) 5
Difficult to evacuate (disabled people,
hospitals)
5
High risk of panic (> 1000 persons) 10
Hazard for surroundings or environment 20
Contamination of surroundings or
environment
50
Occupancy Coefficient (Lf1)
It is the risk reduction factor with respect to theoccupancy of the building / installation. For example, loss due to lighting strike is higher in
hospital as compared to a store / warehouse.
Structure unoccupied 0.1
Structure normally occupied 0.01
Relative Location of Site (Cd)
It is the risk reduction factor with respect to the location and surrounding of the building / installation. For example, chance of lighting strike is
minimized if the building is near to a high tower.
Structure surrounded by higher objects
or trees
0.25
Structure surrounded by similar or
lower objects
0.5
Isolated structure-No other objects
nearby
1
Isolated structure on top of a hill or a
hillock
2
Fire Risk (rf)
It is the risk reduction factor with respect to the flammability of the material present in the building / installation. For example, in case of lighting strike, loss will be very high at a
gas station as compare to the cement store.
Explosion 1
High 0.1
Ordinary 0.01
Low 0.001
Risk Assessment Calculator as per IS/IEC 62305
PASSIVE PROTECTION SYSTEM
The Simple Rod air terminal is composed from a metallic rod with 2 to 8 m height
dominating the structure to protect, and linked to 2 down conductors minimum,
and 2 earthing systems. The protection radius ensured by this air terminal which is
limited to 30 m more or less (Protection level IV, height = 60 m), especially
dedicated to the protection of small structures or areas like towers, chimneys,
tanks, water tower, antenna masts…
The EN 62305-3 standard describes the installation procedure for these air
terminals.
13 Simple Rods, 13 down conductors, and 13 earthing systems are necessary to
ensure the protection below :
The meshed cage protection is composed from a meshing in roof surface and in
the front face around the building. Surrounding the roof surface, and on high
points, capture points are positioned. A conductors’ network is placed at the outer
perimeter of the roof. This network is completed by transverse conductors. The
size of the meshing is 5 to meters, and depends on the efficiency needed for the
protection. On the front face of the building, the down conductors are linked at the
top to the meshing of the roof. And, down, to specific earthing systems. The
distance between two conductors is 10 to 25 meters, and depend on the efficiency
needed for the protection. The EN 62305-3 describes the installation procedure for
this method.
Generally, this method is heavy and expensive, due to the complexity of the
structures to protect.
26 capture points, 26 down conductors and a grounded loop earthing system are
necessaries to ensure the protection of the structure here below :
The catenary wires protection is a method closed to the meshed cage
principle, because it is constituted with meshing of the conductors far
from the structure to protect, to avoid any contact with lightning
current. Catenary wires are located over the structure to protect,
connected to down conductors and specific earthing systems. The
width of the meshing and distance between the down conductors must
respect the same rules as for the meshed cage. The EN 62305-3
describes the installation procedure for this method.
Generally, this method is heavy and expensive, due to the complexity of the
structures to protect.
The ESE air terminal is a terminal which enables to generate artificially an upward leader
earlier than a simple rod, with an ionization system, in order to establish a special impact on
its point. The capture of the lightning strike being faster than a simple rod, this technology
enables to benefit from larger protection areas, ensuring protection for large dimensions
structures.
The generated protection radius depends on the early streamer emission value of the air
terminal (Δt in µs), its height, and the efficiency of the protection. The protection radius
ensured by this type of air terminal is 120 m (Protection level IV, height = 60 m , early streamer
emission time 60µs) The NFC 17-102 standard describes the installation procedure for this
type of air terminal.
The installation of this type of air terminal is easy and cheaper than other technologies. It can
protect whole buildings with one E.S.E. air terminal. It enables the protection of a structure
and its environment, the protection of opened areas and well integrate in the architecture of a
structure without aesthetic alteration.
1 ESE, 2 down conductors and 2 earthing systems are necessary to ensure the protection below :
Installation
ESE AT with radius protection form 32 mtr to 107 mtr.
DMC Insulator .
GI/FRP Mast .
Down Conductor Copper / Copper Cadmium
Cable 70 sq. mm
Copper Bonded Ground Earthing
Step – 1
Step – 2
Step – 3
Joint all phase wire/ cable with the help of
crimping tools and lugs
Fixed the separation sheet between all wires/
cables
Close the filled Silicon enclosure from top and
bottom , complete installation is done.
Thimble
Separation Sheet
Gel / Silicon
Features :
Provides cable with cable connections and jointing wires in switchboard / electric boxes Being a
jelly it can be easily fit into molds of any shape and size.
Helps in safeguarding electrical connections and also protects electrical connection joints from
catching fire, sparking and leakage current.
Eradicates all the possibilities of fire, electric shocks and sparks, etc. causes due to improper
electrical connection joints and safeguards structure, equipment and person.
Offers safety to your electrical joints from ageing, corrosion, moisture and also observes leakage
current.
Advantages :
Nontoxic
Insulating
Highly reliable operation
Maintenance Free
Repairable
Cost Effective
High repeat value
Elasticity
Shape retention
JMV’s Clients
Neeraj Saini
Mobile+919910398538
Manav Chandra
Mobile +91 9910398999
manav@jmv.co.in

More Related Content

What's hot

Microsun Corporate Presentation 2019
Microsun Corporate Presentation 2019Microsun Corporate Presentation 2019
Microsun Corporate Presentation 2019YashJain697
 
residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...
residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...
residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...SunEdison
 
Exergy profile for Solar Services
Exergy profile for Solar ServicesExergy profile for Solar Services
Exergy profile for Solar ServicesTarun Rathore
 
Solar product business plan
Solar product business planSolar product business plan
Solar product business planIndrajith Nair
 
Seminar report on solar tree (by Vikas)
Seminar report on solar tree (by Vikas)Seminar report on solar tree (by Vikas)
Seminar report on solar tree (by Vikas)dreamervikas
 
Eco Sun Wind.Ppt 2 28 09
Eco Sun Wind.Ppt 2 28 09Eco Sun Wind.Ppt 2 28 09
Eco Sun Wind.Ppt 2 28 09rclassic
 
SOLAR TREE technical seminar report doc
SOLAR TREE technical seminar report docSOLAR TREE technical seminar report doc
SOLAR TREE technical seminar report docMohsin Khan
 
solar tree report
solar tree reportsolar tree report
solar tree reportGopinath J
 
Lss module 1 chpt 2 investigating energy
Lss module 1 chpt 2 investigating energyLss module 1 chpt 2 investigating energy
Lss module 1 chpt 2 investigating energyBetsy Eng
 
Lobel solar pv catalog
Lobel solar pv catalogLobel solar pv catalog
Lobel solar pv catalogChintan Gandhi
 
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projectsallearthrenewables
 

What's hot (20)

SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANTSOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
SOLAR ENERGY CSP TECHNOLOGY TECHNICAL CONSULTANT
 
Energy Efficient Lighting
Energy Efficient LightingEnergy Efficient Lighting
Energy Efficient Lighting
 
energy efficient lighting sysytem
energy efficient lighting sysytemenergy efficient lighting sysytem
energy efficient lighting sysytem
 
Profile
ProfileProfile
Profile
 
Microsun Corporate Presentation 2019
Microsun Corporate Presentation 2019Microsun Corporate Presentation 2019
Microsun Corporate Presentation 2019
 
residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...
residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...
residential solar system, Rooftop Solar, Solar Rooftop, Best Solar company in...
 
Exergy profile for Solar Services
Exergy profile for Solar ServicesExergy profile for Solar Services
Exergy profile for Solar Services
 
Solar product business plan
Solar product business planSolar product business plan
Solar product business plan
 
OHMS ENERGY SOLAR
OHMS ENERGY SOLAROHMS ENERGY SOLAR
OHMS ENERGY SOLAR
 
Seminar report on solar tree (by Vikas)
Seminar report on solar tree (by Vikas)Seminar report on solar tree (by Vikas)
Seminar report on solar tree (by Vikas)
 
Eco Sun Wind.Ppt 2 28 09
Eco Sun Wind.Ppt 2 28 09Eco Sun Wind.Ppt 2 28 09
Eco Sun Wind.Ppt 2 28 09
 
solar tree seminar report
solar tree seminar reportsolar tree seminar report
solar tree seminar report
 
MANTECH Solar Company Profile
MANTECH Solar Company ProfileMANTECH Solar Company Profile
MANTECH Solar Company Profile
 
SOLAR TREE technical seminar report doc
SOLAR TREE technical seminar report docSOLAR TREE technical seminar report doc
SOLAR TREE technical seminar report doc
 
Eco Sun Wind
Eco Sun WindEco Sun Wind
Eco Sun Wind
 
solar tree report
solar tree reportsolar tree report
solar tree report
 
Lss module 1 chpt 2 investigating energy
Lss module 1 chpt 2 investigating energyLss module 1 chpt 2 investigating energy
Lss module 1 chpt 2 investigating energy
 
Lobel solar pv catalog
Lobel solar pv catalogLobel solar pv catalog
Lobel solar pv catalog
 
Maximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial ProjectsMaximizing Power Production for Small Commercial Projects
Maximizing Power Production for Small Commercial Projects
 
Solar tree
Solar treeSolar tree
Solar tree
 

Similar to Solar PV Power Presentation by JMV LPS LTD

Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Nilam Shah
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Nilam Shah
 
Agar green chahiye to jaag jayiye (2)
Agar green chahiye to jaag jayiye (2)Agar green chahiye to jaag jayiye (2)
Agar green chahiye to jaag jayiye (2)Mahesh Chandra Manav
 
RenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial PropertiesRenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial Propertiesiandiamond
 
Ratan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdfRatan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdfkrishna mohan
 
Ratan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdfRatan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdfkrishna mohan
 
power generation by footstep
power generation by footstep power generation by footstep
power generation by footstep VINAY GARG
 
Jmv presentation smart process plant
Jmv  presentation  smart process plantJmv  presentation  smart process plant
Jmv presentation smart process plantMahesh Chandra Manav
 
I.M.B Company Profile .pdf
I.M.B Company Profile .pdfI.M.B Company Profile .pdf
I.M.B Company Profile .pdfITIMBCG
 
Exorg Group Solar Division
Exorg Group Solar DivisionExorg Group Solar Division
Exorg Group Solar DivisionBiju Soman
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdfsanjay vashishtha
 

Similar to Solar PV Power Presentation by JMV LPS LTD (20)

Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
 
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
Grid-Connected Solar Rooftop Systems: Financial Viability/Benefits, Installat...
 
Belive i am carbon free drive
Belive i am carbon free driveBelive i am carbon free drive
Belive i am carbon free drive
 
Belive i am carbon free drive
Belive i am carbon free driveBelive i am carbon free drive
Belive i am carbon free drive
 
Belive i am carbon free drive
Belive i am carbon free driveBelive i am carbon free drive
Belive i am carbon free drive
 
Presentation1
Presentation1Presentation1
Presentation1
 
Presentation1
Presentation1Presentation1
Presentation1
 
Agar green chahiye to jaag jayiye (2)
Agar green chahiye to jaag jayiye (2)Agar green chahiye to jaag jayiye (2)
Agar green chahiye to jaag jayiye (2)
 
RenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial PropertiesRenergyCo: Solar PV for Commercial Properties
RenergyCo: Solar PV for Commercial Properties
 
Ratan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdfRatan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdf
 
Ratan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdfRatan Raj Multi Services ....pdf
Ratan Raj Multi Services ....pdf
 
GreenTech Solar_Profile
GreenTech Solar_ProfileGreenTech Solar_Profile
GreenTech Solar_Profile
 
power generation by footstep
power generation by footstep power generation by footstep
power generation by footstep
 
Jmv presentation smart process plant
Jmv  presentation  smart process plantJmv  presentation  smart process plant
Jmv presentation smart process plant
 
I.M.B Company Profile .pdf
I.M.B Company Profile .pdfI.M.B Company Profile .pdf
I.M.B Company Profile .pdf
 
Exorg Group Solar Division
Exorg Group Solar DivisionExorg Group Solar Division
Exorg Group Solar Division
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdf
 
WATTSCORE ENERGY
WATTSCORE ENERGYWATTSCORE ENERGY
WATTSCORE ENERGY
 
Tayf1
Tayf1Tayf1
Tayf1
 
Roof top brochure
Roof top brochureRoof top brochure
Roof top brochure
 

More from Mahesh Chandra Manav

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...Mahesh Chandra Manav
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfMahesh Chandra Manav
 
Indian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periortyIndian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periortyMahesh Chandra Manav
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue systemMahesh Chandra Manav
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstMahesh Chandra Manav
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue systemMahesh Chandra Manav
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)Mahesh Chandra Manav
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionMahesh Chandra Manav
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationMahesh Chandra Manav
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueMahesh Chandra Manav
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemMahesh Chandra Manav
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue systemMahesh Chandra Manav
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue systemMahesh Chandra Manav
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Mahesh Chandra Manav
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021Mahesh Chandra Manav
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleMahesh Chandra Manav
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VueMahesh Chandra Manav
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...Mahesh Chandra Manav
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingMahesh Chandra Manav
 

More from Mahesh Chandra Manav (20)

The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
The Ministry of Road Transport and Highways with Electric Vehicle Charging an...
 
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdfBuilding Automation,Networking & Communication Presentation by LVS 2022.pdf
Building Automation,Networking & Communication Presentation by LVS 2022.pdf
 
Indian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periortyIndian railway&amp;metro rail,others electrical safety first periorty
Indian railway&amp;metro rail,others electrical safety first periorty
 
National green building code 2021 india kaya kool hey hum by link vue system
National green building code 2021 india  kaya kool hey hum by link vue systemNational green building code 2021 india  kaya kool hey hum by link vue system
National green building code 2021 india kaya kool hey hum by link vue system
 
Lightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety firstLightning it's not joke kills or destry only safety first
Lightning it's not joke kills or destry only safety first
 
Electric vehicle charging information. by linkvue system
Electric vehicle charging   information. by linkvue systemElectric vehicle charging   information. by linkvue system
Electric vehicle charging information. by linkvue system
 
Solar power and our application (2)
Solar power and our application (2)Solar power and our application (2)
Solar power and our application (2)
 
Link vue system and solar pv power plant protection
Link vue system and solar pv power plant protectionLink vue system and solar pv power plant protection
Link vue system and solar pv power plant protection
 
Electrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and TerminationElectrical Failure ,Short Circuit Reason Cables and Termination
Electrical Failure ,Short Circuit Reason Cables and Termination
 
High speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vueHigh speed electric sky pods for passenger and cargo presentation by link vue
High speed electric sky pods for passenger and cargo presentation by link vue
 
Presentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue systemPresentation for power plant 2021 by link vue system
Presentation for power plant 2021 by link vue system
 
Building management system from link vue system
Building management system  from link vue systemBuilding management system  from link vue system
Building management system from link vue system
 
Safe you and your team from corona virus 2021 by link vue system
Safe you and your team from corona virus 2021 by link vue  systemSafe you and your team from corona virus 2021 by link vue  system
Safe you and your team from corona virus 2021 by link vue system
 
Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)Electric bus best public transport(hum safar)
Electric bus best public transport(hum safar)
 
War is not a Solution
War is not a SolutionWar is not a Solution
War is not a Solution
 
A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021A green corridor carbon free road transportation india 2021
A green corridor carbon free road transportation india 2021
 
India great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicleIndia great intiative a carbon free silent road transportaion electric vehicle
India great intiative a carbon free silent road transportaion electric vehicle
 
Plug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link VuePlug&Socket for All Equipment's&System from Link Vue
Plug&Socket for All Equipment's&System from Link Vue
 
Platform touch voltage protection membrane system and other railways buildin...
Platform touch voltage protection membrane system  and other railways buildin...Platform touch voltage protection membrane system  and other railways buildin...
Platform touch voltage protection membrane system and other railways buildin...
 
Aaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man WalkingAaab Khela HOBO a Dead Man Walking
Aaab Khela HOBO a Dead Man Walking
 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Solar PV Power Presentation by JMV LPS LTD

  • 1. From : India JMV LPS LTD Noida (U.P.) Date : 25.07.2017 International Solar PV Power Presentation by JMV LPS LTD Place JMV Office in Noida Dt.25th July2017 Thanks note to the all International guest visted our office to attend Solar PV and other renewable Green method Presentaton for Generating Power Roof Top, Ground Mounted, Canal Top ,Water Floating along with Hybrid Combination like Wind Power Generator Machine and High Energy Storage Batteries. Your self introduction for related to present Power Generation ,Transmission and distribution along with presence of Solar PV Power Plant in your country ,this information is realy benefit to India and mile stone how to work in your country to support More & More Solar Pv Power for Larger Power Production Mega Watt up to your Home requirement in Watt/Kilo Watt Level. You can utilize Solar Power base Products in your cities and Urban Solar Power LED Street Light ,Trafiic Light ,out door CCTV Camera and many other Equipments. The Solar PV Plant can be Install near to your Facility connecting to distribution line from if your Power supply agencies or you can develop Stand along Off Grid with Battery Back for use when dark in Night. The power generation through Solar PV is Economical for installation waste land can be utilige and your are countributing carbon free environment to the world for that plz accept in advance big great Salute for supporting our earth towards Green and Carbon Free Environment. India belive Harmony with all Nabours and also support earth for peace and green life. India also very much fast growing country who can surve Latest better in Design which meets International all Electrical Standard with Economical in Cost as Compare to other Forward Countries. India have team of Young Talent who can decide Fast and take dynamic decision to support india and Their international Industries requirements. Power Generation ,Transmisson ,Distribution Facilties for Indian and International Requirements. Transportation for Passenger and Goods Bus,Train and Vechile which Complies International Requirements. Telecommunication Network Facilties for Indian and International Requirements. Building and other Infrastructure for Cities Facilties for Indian and International Requirements. JMV LPS LTD is Indian Company belive Make in India and Innovation of Products Fall under Earthing and Protection to best Practice of Electrical Equipment instalation and Safety of Products along with Human Being Products as below: Maintenance Free Earthing(Copper Bonded ROD, Earthing Enhance Compound , Earth Pits) Follow UL ,IEC,IEEE
  • 2. Exothermic Joints ( Permanent Welding with 100% Surface Contact Suitable all Bi-Metals) UL ,IEC,IEEE Theft Free/Theft Protected Long Run in Drum Roll Copper Clad Steel/ Copper Clad Aluminum with or Without Insultation. Follow IEC,IEEE Surge Protection for Power and Communication Ports Follow IEC,IEEE External Lightning Protection as per IEC 62305 and Early Stream Emision Type as per NFC17- 102/UNE21-186. Cable Jointing Kit for all LT Cable (Quick Lock and Quick Open Reusable) condition up IP68 and Flame Proof. We would like Further extend our support to develop our relation with your Govt Project Official and PVT Partners Handling above Segment along with our Special Support to Supply of Equipment Disaster Management Early Warning ,Earth Quake,Flood Warning,Sea High Tide, and Lighting to keep your people safe. Thanking you again for Visiting our Office in India With Regards Family JMV LPS LTD Team Mr.Neeraj Saini Head of Company and Insparation for JMV Innovative Product for Earthing & Protection. Mr.Mahesh Chandra Manav Head of Branding and belive Make In India Govt of India Programme. Mrs.Mousumi C From Sales Ms.Manisha Singh from Technical and Design Ms.Meenakshi from MD Desk and OPS Contact us Sales@jmv.co.in; neeraj@jmv.co.in Visit webpage www.jmv.co.in T-91-1204590000 We have some photograp while presentation is somebody require plz share their Gmail IT for Sahring drive related to photo. Special Thanks from India Central Institute for Rural Electrification (Rural Electrification Corporation Ltd )
  • 3. Solar Power Generation - Grid Enabling 10th July, 2017-04 August, 2017 ITP Participants List Sl. No. Name of the Executive Country Designation ITEC / SCAAP 1 Mr. G RAJESHWAR RAO CIRE, HYD Executive - 2 MR. MURIED SOFIZADA AFGHANISTAN Power Engineer, Substation Manager ITEC 3 Mr. BINOD SHARMA BHUTAN TECHNICAL OFFICER ITEC 4 MS.TSHERING PELDEN BHUTAN Junior Engineer ITEC 5 DR. MUNA SABAH QASIM ALJAWABIR IRAQ Director of follow up division ITEC 6 MR. SANI LAWAN NIGER LABORATORY ASISTANT ITEC 7 MR.ALI SEYNI ABDOULAHI NIGER technical responsible ITEC 8 MR. STEPHEN SIRI SOUTH SUDAN ASSISTANT LECTURER ITEC 9 MR. THILANKA ALWIS SRI LANKA Consultant (Chemical and Process Engineering) ITEC 10 MR. THOI NGUYEN VIETNAM University Lecturer ITEC 11 MR.SALIFU GINDEH GAMBIA Mechanical Engineer SCAAP 12 MR.STEPHEN WEKESA MANG'ENI KENYA INSTRUCTOR SCAAP 13 MS.YUCABETH NYABOKE NYAMWAYA KENYA INSTRUCTOR SCAAP 14 MR MANYORI JUMA KAPESSA TANZANIA ELECTRICAL ENGINEER SCAAP 15 MR.JUMBE OMARI JUMBE TANZANIA Mechanical Engineer SCAAP
  • 4.
  • 5. A Warm Welcome To All At JMV LPS LIMITED
  • 6. Global Threat and Impact Global Warming Reducing Water Sources for Drinking Ground Water Level Lowering Increasing Carbon on Environment Low Green Color on Earth(Tree) Why This is happening We feel that Nature is Free and Gifted Thinking for ourself not for our future Generation Our Thinking is very Limited to ourself and Surrounding What We all have do Use Nature Precisely and Think for Globe Sun Wind Water and Earth Maintain Harmony with all Four Balance between Need and Greed All Life are Equal Important and There is Limitation Lesson to Gain Use and Save
  • 7. Welcome SUN to Ground Let Use for All
  • 8. Method of Present Power Generation • Power Generation use of Coal , Gas, Liquid Fuel • Power Generation use of Wind • Power Generation use of Water(Hydro) • Power Generation use of Waste/Baggass • Power Generation through Fly Wheel • Power Generation Through Use Chemical & Nuclear • Power Generation Through other Kinetic Energy • Require Huge Infrastructure and Raw Material (Storing and Handling). • Disposal has to Handle • Impact on Environment (Pollution) • Vibration and Sound Pollution • Reducing Natural Resources for Burning to Generate Power . • High Cost of Generation and Further Loss due to Long Transmission , distribution and Theft. • Huge to Pay Cost for SCRAP and Threat for Disposal. • Dependency with Huge Staff and Their Union • High Maintenance and Protection from Accidents Incidental • Payments Cycle Increase and Power Generation Reduce over Period of Time. • Resale value Difficult
  • 9. Follow Sun Power /Follow Green Power /Follow Free Generation & Store of Power Safe Practice in Earthing and Protection
  • 10.
  • 11. • Solar Power Now Changing Many Phases • Use with Genset • Use with Wind Power • Use with High Energy Storage(Battery) • Installation on Ground/Cannel Mounted • Installation on Roof (Building) • Installation on Water (Floating) • Installation on Building(BIPV Building Integrated Transparent Photovoltaic Solar Glass
  • 12.
  • 13.
  • 14.
  • 16. An Arcing Fault is the flow of current through the air between phase conductors or phase conductors and neutral or ground. Concentrated radiant energy is released at the point of arcing an a small amount of time resulting in Extremely High Temperature.
  • 17.
  • 18. Fire Accident in Solar PV Power Plant Reason Lose Contact Earthing Disorder and Lightning
  • 19. Solar Panel Fire Accident
  • 20. More Picture Fire in Solar PV Power Plant
  • 21. Damages Due To Lightning
  • 23. Solar PV Power Plant
  • 24. Surge in Systems and Result
  • 25. Surge in DC Application
  • 26. Sikhana to Padega Hi Follow Electrical Safety
  • 27. Follow Safety in Electrical Installation Shocks
  • 28.
  • 29. Earthing Design and Require Result • For substation Large Power below 1.00Ohm • For substation Small Power below 2.00Ohm • SCADA/TELECOM and Automation For substation Large Power below 0.50Ohm • Tower and Other Structure between 8-15Ohm • Lightning Surge Protection 50KA below 5Ohm or 100KA between 8-15Ohm • Follow Standard IEC /IEEE • Recommended use of Hybrid Metal to Protect from Theft Copper Clad Steel/Alumineum Clad Copper • Exothermic weld IEEE 837
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 38. Copper Clad Steel/ Aluminium Conductor For Electrical Installation The Copper Clad Steel Grounding Conductor is made up of steel with the coating of 99.99% pure copper. These conductors/ wires or strands are equipped with the strength of steel with the conductivity and copper with the better corrosion resistance property. The concentric copper cladding is metallurgic ally bonded to a steel core through a continuous, solid cladding process using pressure rolling for primary bonding. The copper cladding thickness remains constant surrounding steel. We use different steel grades for the steel core result in Dead Soft Annealed, High strength and Extra High Strength Characteristics. The Copper Clad Steel Wire yields a composite conductivity of 21%, 30% and 40% IACS, and available in Annealed and Hard drawn. We are delivering products with varied conductivity and tensile strength as per the customer need. Further, the wire can be processed to be silver plated or tinned copper clad steel wire.
  • 39. Most Efficient Joint Process It is efficient and superior to all existing surface –to-surface mechanical retention connectors. https://www.youtube.com/watch?v=ijdF5hK-MAk
  • 40. What is Exothermic Welding System? Copper to Bi-Metal and Aluminium Types of Exothermic Joints: Possible to join any bi metal except aluminum Exothermic welding is a process of making maintain free highly molecular bonding process is superior in performance connection to any known mechanical or compression-type surface-to-surface contact connector. Exothermic weld connections provide current carrying (fusing) capacity equal to that of the conductor and will not deteriorate with age.  It offers Electrical connections between two or more copper to copper and copper to steel conductors.  Highly portable method as it does not require any external power source or heat source, so it can be done almost anywhere.  It provides strong permanent molecular bond among metallic conductors that cannot loosen and further will not deteriorate with age.  Connection does not corrode with time and it offers permanent conductivity.
  • 41. Copper Clad Steel Solid ROD and Conductor
  • 42.
  • 44. Facts About Lightning • A strike can average 100 million volts of electricity • Current of up to 200,000 amperes • Can generate 54,000 oF • 10/350MicroSec/50KA Fault Current/Discharge in Nano Sec Protection Earthing Design100KA Fault Current/Joints Exothermic /Flexible Down Conductor with Shortest Route & Less Corner
  • 45. • Lightning Protection Standard use in India ( IEC 62305-3 and 4) Working Principle Angular No Compromise with Design Max Protection 30Mtrs from One No Product warranty from Manufacturer High Maintenance Require NFC17-102(2011) Now European Standard(ESE LA) Working Principle Radius Compromise with Design Possible with Increasing Qty of ESE Max Protection 109 Mtr. Radius from One Manufacturing Warranty and Test Certificate for Products Available Maintenance on Call Basis
  • 46. Lightning Risk assessment Study is actually the measure of risk of a lightning strike and probability of damages. As Per IEC62305-2. All these calculations are based on: lightning strike density in that particular area (provided by OMV i.e. Ng = 8), Danger for people, Occupation coefficient of structure, Relative location of site, Fire Risk, Associated services, Electrical Lines, Lightning Protection Level, Surge Arrestor and Dimensions of installation.
  • 47. Lighting Strike Density (Ng) It is the measure of lightning strikes per kilometre square per year in the particular area. Higher the lighting strike density, higher the probability of lightning strike which needs higher level of lightning protection level. Danger for People (h) It is the factor of presence of people and panic in the building in case of a lightning strike No particular danger 1 Low panic level(<=2 floors, < 100 persons 2 Medium risk of panic (< 1000 persons) 5 Difficult to evacuate (disabled people, hospitals) 5 High risk of panic (> 1000 persons) 10 Hazard for surroundings or environment 20 Contamination of surroundings or environment 50 Occupancy Coefficient (Lf1) It is the risk reduction factor with respect to theoccupancy of the building / installation. For example, loss due to lighting strike is higher in hospital as compared to a store / warehouse. Structure unoccupied 0.1 Structure normally occupied 0.01 Relative Location of Site (Cd) It is the risk reduction factor with respect to the location and surrounding of the building / installation. For example, chance of lighting strike is minimized if the building is near to a high tower. Structure surrounded by higher objects or trees 0.25 Structure surrounded by similar or lower objects 0.5 Isolated structure-No other objects nearby 1 Isolated structure on top of a hill or a hillock 2 Fire Risk (rf) It is the risk reduction factor with respect to the flammability of the material present in the building / installation. For example, in case of lighting strike, loss will be very high at a gas station as compare to the cement store. Explosion 1 High 0.1 Ordinary 0.01 Low 0.001
  • 48. Risk Assessment Calculator as per IS/IEC 62305
  • 50. The Simple Rod air terminal is composed from a metallic rod with 2 to 8 m height dominating the structure to protect, and linked to 2 down conductors minimum, and 2 earthing systems. The protection radius ensured by this air terminal which is limited to 30 m more or less (Protection level IV, height = 60 m), especially dedicated to the protection of small structures or areas like towers, chimneys, tanks, water tower, antenna masts… The EN 62305-3 standard describes the installation procedure for these air terminals. 13 Simple Rods, 13 down conductors, and 13 earthing systems are necessary to ensure the protection below :
  • 51. The meshed cage protection is composed from a meshing in roof surface and in the front face around the building. Surrounding the roof surface, and on high points, capture points are positioned. A conductors’ network is placed at the outer perimeter of the roof. This network is completed by transverse conductors. The size of the meshing is 5 to meters, and depends on the efficiency needed for the protection. On the front face of the building, the down conductors are linked at the top to the meshing of the roof. And, down, to specific earthing systems. The distance between two conductors is 10 to 25 meters, and depend on the efficiency needed for the protection. The EN 62305-3 describes the installation procedure for this method. Generally, this method is heavy and expensive, due to the complexity of the structures to protect. 26 capture points, 26 down conductors and a grounded loop earthing system are necessaries to ensure the protection of the structure here below :
  • 52. The catenary wires protection is a method closed to the meshed cage principle, because it is constituted with meshing of the conductors far from the structure to protect, to avoid any contact with lightning current. Catenary wires are located over the structure to protect, connected to down conductors and specific earthing systems. The width of the meshing and distance between the down conductors must respect the same rules as for the meshed cage. The EN 62305-3 describes the installation procedure for this method. Generally, this method is heavy and expensive, due to the complexity of the structures to protect.
  • 53. The ESE air terminal is a terminal which enables to generate artificially an upward leader earlier than a simple rod, with an ionization system, in order to establish a special impact on its point. The capture of the lightning strike being faster than a simple rod, this technology enables to benefit from larger protection areas, ensuring protection for large dimensions structures. The generated protection radius depends on the early streamer emission value of the air terminal (Δt in µs), its height, and the efficiency of the protection. The protection radius ensured by this type of air terminal is 120 m (Protection level IV, height = 60 m , early streamer emission time 60µs) The NFC 17-102 standard describes the installation procedure for this type of air terminal. The installation of this type of air terminal is easy and cheaper than other technologies. It can protect whole buildings with one E.S.E. air terminal. It enables the protection of a structure and its environment, the protection of opened areas and well integrate in the architecture of a structure without aesthetic alteration. 1 ESE, 2 down conductors and 2 earthing systems are necessary to ensure the protection below :
  • 54.
  • 55. Installation ESE AT with radius protection form 32 mtr to 107 mtr. DMC Insulator . GI/FRP Mast . Down Conductor Copper / Copper Cadmium Cable 70 sq. mm Copper Bonded Ground Earthing
  • 56. Step – 1 Step – 2 Step – 3 Joint all phase wire/ cable with the help of crimping tools and lugs Fixed the separation sheet between all wires/ cables Close the filled Silicon enclosure from top and bottom , complete installation is done. Thimble Separation Sheet Gel / Silicon
  • 57. Features : Provides cable with cable connections and jointing wires in switchboard / electric boxes Being a jelly it can be easily fit into molds of any shape and size. Helps in safeguarding electrical connections and also protects electrical connection joints from catching fire, sparking and leakage current. Eradicates all the possibilities of fire, electric shocks and sparks, etc. causes due to improper electrical connection joints and safeguards structure, equipment and person. Offers safety to your electrical joints from ageing, corrosion, moisture and also observes leakage current. Advantages : Nontoxic Insulating Highly reliable operation Maintenance Free Repairable Cost Effective High repeat value Elasticity Shape retention
  • 58.
  • 59.
  • 60.
  • 61.