SlideShare a Scribd company logo
1 of 22
Download to read offline
ANALYSIS & DESIGN OF CABLE
STAYED BACKWARDBRIDGE
INTRODUCTION
 Midas Civil is a Bridge Design & Analysis software that combines
powerful pre-and post-processing features with an extremely fast solver,
which makes bridge modelling and analysis simple, quick, and effective.
Also, there are several easy parameter modification tools available that
can be used for parametric analysis leading to optimized and economical
design.
 Midas Civil enables us to readily create nodes and elements as if we were
drawing drawings using the major functions of CAD programs. Powerful
automatic modelling functions such as Auto Mesh Generation and various
Bridge Wizards are introduced. The Bridge Wizards can create a complete
bridge model for you in a blink of an eye and you are able to make any
modification to the model to match with the real structure as much as
possible. Other modelling approaches such as CAD import, table format
modeling, and code format modelling are also available.
 Midas Civil has powerful design code checking and load rating features.
AASHTO LRFD & LRFR, CHBDC CSA, EUROCODE, and other codes
are available. The codes are constantly updated to make sure the users can
best take advantage of the code checking and rating features in the
program. The automatic report generation features give the users an
organized and detailed report that includes formulas and code references
and it gives the users the confidence in their result.
2
Suspension bridges can generally be classified as long span structures. Suspension
bridges comprise longitudinal deck (main girders) supported by hangers suspended
from cables. The cables are connected to anchors at each end. The analysis of a
suspension bridge is divided into completed state analysis and construction stage
analysis.
What is a Cable-Stayed Bridge?
A cable-stayed bridge is a cable supported bridge in which one or multiple pylons are
installed in the middle of the bridge and girder segments are connected to the pylons by
a cable. In cable-stayed bridges, the shape of pylons,the shape of girders, and the cable
arrangement can be freely designed; therefore, various structural systems can be
applied. For example, adjusting thetension of the cable forces can reduce the size of the
bending moment of the girder. This allows for a more economical design. Furthermore,
different cable arrangements and shapes for pylons can be planned for a more aesthetic
bridgedesign suitable for the surrounding environment. However, even with various
structural advantages, only a small number of cable-stayed bridges were designed and
built in the past due to limitations in materials and construction methods. Today, the
emergence of high-strength cables, the advancement of structural analysis software, the
establishment of wind-resistant design methodsthrough wind tunnel tests, and the
development of construction technology haveplaced cable-stayed bridges, along side
with suspension bridges, responsible forthe future of long-span bridges
Components of a Cable-Stayed Bridge
The main components of a cable-stayed bridge are as follows:
1.Pylon/Tower
2.Girder/Deck
3.Cable stay
4.Cable Anchorage
5.Support system.
PYLON/TOWER
Pylons, or towers, play the role of supporting the cables and transferring the loads transmitted through
the cables all the way to the ground.
The shape of thepylons/towers can be freely planned according to the shape of the cable stays.
Additionally, pylonsare designed in various shapes to emphasize aesthetics while providing structural
integrity.
6
GIRDER/DECK
Girders or decks of cable-stayed bridges can be designed using various shapes and
materials. Typical examples are steel girders, steel composite girders, and concrete girders.
Alternatively, there can be different types of girders for the main span and the approach
span
The shape of the girder should be carefully planned because the cable arrangement method,
spacing, anchorage design, analysis technique, and construction method are determined by
what kind of girder is planned.
7
8
TYPES OF GIRDERS
1. STEEL GIRDER
2. BOX GIRDER
3. TWIN BOX GIRDER
4. STEEL COMPOSITE GIRDER
5. EDGE I GIRDER
6. TRUSS GIRDER
7. CONCRETE GIRDER
CABLE STAY
Cables used on cable-stayed bridges are tension members that cannot resist bending or
compression, such as ropes, wires, and chains, and can only supportaxial tension. The
tensile strength of the cables is usually around 1,600 to 1,860MPa, but with advances in
technology, cables with higher tensile strength are being developed.
TYPES
1. LCS (Locked Coil Strand)
9
2.PWS (Parallel Wire Strand)
3.MS (Multi Strand)
- CABLE ANCHORAGES
1. Cable Anchorages at Girders
2. Cable Anchorages at Pylons
3. Steel Pylon Anchorage
Saddle type ; Anchor girder type ; Bearing plate type ; Pin socket type
4 Concrete Pylon Anchorage
Saddle type ; Overlapped type ; Inside type ; Insider with bracket & link type
11
Support System
The boundary conditions between the crossbeams of a pylon and the stiffened
girders affect the behavior of the entire bridge structure. The boundary
conditions are classified into three categories: a floating system without a
support, a support system, and a frame system with stiffened girders and
pylons.
1. Floating System
2. . Shoe System
3. Frame System
- Design of Cable-Stayed Bridges
The design of a cable-stayed bridge requires considerable insight as there are many
factors to be considered during design, including the many irregularities of the bridge
itself. The conceptual review items required for design are as follows:
1. Structural Analysis of Cable-Stayed Bridges
2. Structural Analysis for the Initial Shape
Zero Displacement Method
Force Equilibrium Method
Force Method
3. Construction Stage Analysis
13
14
Efficiency and Economy
1. Cable-stayed bridges are efficient in cost, materials, and construction time.
2. Theyhave better efficiency than other bridge systems
3.An additional advantage of cable-stayed bridges is their larger efficient span
range from 100-meter spans (328 feet) to over 1,000-meter spans(3,280 feet).
4.Cable-stayed bridges have a combination of elegance, slenderness, and a
feelingof robustness.
5.The national infrastructure’s demand for more bridges requires the priority of
efficiency and economy.
The main system advantages are:
Fast and relatively easy construction, requiring
less time to build:-
1.Less expensive
2.Multiple design options
3.Large efficient span range
4.Strong and resilient structures
5.Attractive appearance
The main system disadvantages are:
 1.Still inferior to suspension bridges for super-long spans
 2.Requires checking deformations at all conditions
 3.Requires experience in both design and construction.
4.Cable-stayed bridges do have a maximum length to consider.
5.This design option can become unstable in specific environments.
Presentation title
DURGAM CHERUVU CABLE STAYED BRIDGE
The city experienced a boom in traffic due to the increasing number of cars owned, and the Jubilee Hills
to Madhapur commute, which historically took 30minutes, began to take 40–60 minutes. The
Government of Telangana then put forward a proposal of a bridge through DURGAM CHERUVU to
ease traffic inthe area and cut down travel time to 10 minutes.
CONSTRUCTION
According to the original plan, the bridge was supposed to have 3-5 pillars holding the road but due to
some environmental concerns, the government wasforced to settle for a cable-suspension bridge with 2
pillars holding the cables. Construction tenders were opened in early 2019 and L&T (Larson and
Toubro)ended up winning the contract and the construction began on 9 March 2019.
 ANALYSIS OF BRIDGE
 Cable-stayed bridges are structural systems effectively composing cables, main girders and
towers. This bridge form has a beautiful appearance and easily fits in with the surrounding
environment due to the fact that various structural systems can be created by changing the
tower shapes and cable arrangements.
 Cable-stayed bridges are structures that require a high degree of technology for both design
and construction, and hence demand sophisticated structural analysis and design techniques
when compared with other types of conventionalbridges.
 In addition to static analysis for dead and live loads, a dynamic analysis must also be
performed to determine eigenvalues. Also moving load, earthquake load and wind load
analyses are essentially required for designing a cable-stayed bridge.
 BACKGROUND OF BRIDGE
 The city experienced a boom in traffic due to the increasing number of cars owned, and the
Jubilee Hills to Madhapur commute, which historically took 30 minutes, began to take 40–60
minutes. The Government of Telangana then put forward a proposal of a bridge through
Durgam Cheruvu to ease traffic in the area and cut down travel time to 10 minutes.
 CONCLUSION
 The overall introduction about the CABLE STAYED BRIDGE, component parts,
Methodologies, and an Overview of Brief Historical Development is done.
 Introduction to an existed structure which is constructed a cable stayed bridge in Hyderabad
called DURGAM CHERUVU BRIDGE and its overview is recorded in this paper
 The next analysis of this CABLE BRIDGE going to done for Next review by using the
software MIDAS CIVIL.
THANK YOU

More Related Content

What's hot

FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONDiaa Hilal
 
Design a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 studentsDesign a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 studentsAshvini Kumar
 
Bhilai- an industrial town
Bhilai- an industrial townBhilai- an industrial town
Bhilai- an industrial townSaumya Gupta
 
Planning of chandigarh by le corbusier
Planning of chandigarh by le corbusierPlanning of chandigarh by le corbusier
Planning of chandigarh by le corbusierctlachu
 
Railway station-design
Railway station-designRailway station-design
Railway station-designTehreem Saher
 
46721953 magarpatta-city
46721953 magarpatta-city46721953 magarpatta-city
46721953 magarpatta-cityBhairavi Gupta
 
Integrated approach to sustainable development of indian railway stations t...
Integrated approach to sustainable development of indian railway stations   t...Integrated approach to sustainable development of indian railway stations   t...
Integrated approach to sustainable development of indian railway stations t...satyalaxmi naidu
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge pptSAI KIRAN
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle SlabAkshay Gawade
 
Mysore Town Planning By Akash Thottarath
Mysore Town Planning By Akash ThottarathMysore Town Planning By Akash Thottarath
Mysore Town Planning By Akash ThottarathAkash Thottarath
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5Sandhya Singh
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case studyRithika Ravishankar
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
 
ARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISITARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISITahergirish0
 

What's hot (20)

FINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATIONFINAL PROJECT TRAIN STATION
FINAL PROJECT TRAIN STATION
 
PUNE BYE LAWS
PUNE BYE LAWSPUNE BYE LAWS
PUNE BYE LAWS
 
Design a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 studentsDesign a hostel complex to accommodate 1000 students
Design a hostel complex to accommodate 1000 students
 
Ews housing (2)
Ews housing (2)Ews housing (2)
Ews housing (2)
 
Bhilai- an industrial town
Bhilai- an industrial townBhilai- an industrial town
Bhilai- an industrial town
 
Filler slab
Filler slabFiller slab
Filler slab
 
Planning of chandigarh by le corbusier
Planning of chandigarh by le corbusierPlanning of chandigarh by le corbusier
Planning of chandigarh by le corbusier
 
Railway station-design
Railway station-designRailway station-design
Railway station-design
 
46721953 magarpatta-city
46721953 magarpatta-city46721953 magarpatta-city
46721953 magarpatta-city
 
Integrated approach to sustainable development of indian railway stations t...
Integrated approach to sustainable development of indian railway stations   t...Integrated approach to sustainable development of indian railway stations   t...
Integrated approach to sustainable development of indian railway stations t...
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
Sri Rangam
Sri RangamSri Rangam
Sri Rangam
 
Mysore Town Planning By Akash Thottarath
Mysore Town Planning By Akash ThottarathMysore Town Planning By Akash Thottarath
Mysore Town Planning By Akash Thottarath
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5
 
Belapur Incremental housing - A case study
Belapur Incremental housing - A case studyBelapur Incremental housing - A case study
Belapur Incremental housing - A case study
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
 
Space frame
Space frameSpace frame
Space frame
 
ARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISITARCHITECTURAL SITE VISIT
ARCHITECTURAL SITE VISIT
 

Similar to Presentation PPT.pdf

IRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge SoftwareIRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge SoftwareIRJET Journal
 
IRJET- A Review on Comparative Study between Girder Bridge and Extradosed...
IRJET-  	  A Review on Comparative Study between Girder Bridge and Extradosed...IRJET-  	  A Review on Comparative Study between Girder Bridge and Extradosed...
IRJET- A Review on Comparative Study between Girder Bridge and Extradosed...IRJET Journal
 
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...IAEME Publication
 
THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...
THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...
THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...IAEME Publication
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET Journal
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
IRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving Load
IRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving LoadIRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving Load
IRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving LoadIRJET Journal
 
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube StructureIRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube StructureIRJET Journal
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)Ton Watanapong
 
The influence of cable sag on the dynamic behaviour of cable stayed suspensio...
The influence of cable sag on the dynamic behaviour of cable stayed suspensio...The influence of cable sag on the dynamic behaviour of cable stayed suspensio...
The influence of cable sag on the dynamic behaviour of cable stayed suspensio...eSAT Journals
 
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaComposite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaSuhas Khedkar
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridgesSravan Kumar
 
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridgesCivil Engineers
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET Journal
 
IRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET Journal
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Rajesh Prasad
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
 
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGEANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGEIRJET Journal
 
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...IRJET Journal
 

Similar to Presentation PPT.pdf (20)

IRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge SoftwareIRJET- Study on Cable Stayed Bridge using Csibridge Software
IRJET- Study on Cable Stayed Bridge using Csibridge Software
 
IRJET- A Review on Comparative Study between Girder Bridge and Extradosed...
IRJET-  	  A Review on Comparative Study between Girder Bridge and Extradosed...IRJET-  	  A Review on Comparative Study between Girder Bridge and Extradosed...
IRJET- A Review on Comparative Study between Girder Bridge and Extradosed...
 
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
STATIC AND DYNAMIC ANALYSIS OF CABLE-STAYED SUSPENSION HYBRID BRIDGE & VALIDA...
 
THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...
THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...
THE EFFECT OF LATERAL CONFIGURATION ON STATIC AND DYNAMIC BEHAVIOUR OF LONG S...
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
IRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving Load
IRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving LoadIRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving Load
IRJET- Analysis of Long Span Suspension Bridge under Wind Load and Moving Load
 
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube StructureIRJET-  	  Comparative Analysis of RCC Structure and Tube-in-Tube Structure
IRJET- Comparative Analysis of RCC Structure and Tube-in-Tube Structure
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
Full paper 2014 trb 93rd arsta bridge, oh-sl-mss, sweden 07 (draft)
 
The influence of cable sag on the dynamic behaviour of cable stayed suspensio...
The influence of cable sag on the dynamic behaviour of cable stayed suspensio...The influence of cable sag on the dynamic behaviour of cable stayed suspensio...
The influence of cable sag on the dynamic behaviour of cable stayed suspensio...
 
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore SaxenaComposite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
Composite construction in Bridge Deck systems by Suhas Khedkar Kishore Saxena
 
segmental construction of bridges
segmental construction of bridgessegmental construction of bridges
segmental construction of bridges
 
Segmnetal construction of bridges
Segmnetal construction of bridgesSegmnetal construction of bridges
Segmnetal construction of bridges
 
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla StructuresIRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
IRJET - Analysis and Design of Steel Box Girder Bridge using Tekla Structures
 
IRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for Bridges
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...
 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
 
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGEANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
 
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
 

Recently uploaded

DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfJohn Sterrett
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home ServiceSapana Sha
 
Data Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxData Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxFurkanTasci3
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...Suhani Kapoor
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort servicejennyeacort
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...ThinkInnovation
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)jennyeacort
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 

Recently uploaded (20)

E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
DBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdfDBA Basics: Getting Started with Performance Tuning.pdf
DBA Basics: Getting Started with Performance Tuning.pdf
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service9654467111 Call Girls In Munirka Hotel And Home Service
9654467111 Call Girls In Munirka Hotel And Home Service
 
Data Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptxData Science Jobs and Salaries Analysis.pptx
Data Science Jobs and Salaries Analysis.pptx
 
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
(PARI) Call Girls Wanowrie ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
VIP High Profile Call Girls Amravati Aarushi 8250192130 Independent Escort Se...
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
 
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
Predictive Analysis - Using Insight-informed Data to Determine Factors Drivin...
 
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
Call Us ➥97111√47426🤳Call Girls in Aerocity (Delhi NCR)
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
VIP Call Girls Service Charbagh { Lucknow Call Girls Service 9548273370 } Boo...
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 

Presentation PPT.pdf

  • 1. ANALYSIS & DESIGN OF CABLE STAYED BACKWARDBRIDGE
  • 2. INTRODUCTION  Midas Civil is a Bridge Design & Analysis software that combines powerful pre-and post-processing features with an extremely fast solver, which makes bridge modelling and analysis simple, quick, and effective. Also, there are several easy parameter modification tools available that can be used for parametric analysis leading to optimized and economical design.  Midas Civil enables us to readily create nodes and elements as if we were drawing drawings using the major functions of CAD programs. Powerful automatic modelling functions such as Auto Mesh Generation and various Bridge Wizards are introduced. The Bridge Wizards can create a complete bridge model for you in a blink of an eye and you are able to make any modification to the model to match with the real structure as much as possible. Other modelling approaches such as CAD import, table format modeling, and code format modelling are also available.  Midas Civil has powerful design code checking and load rating features. AASHTO LRFD & LRFR, CHBDC CSA, EUROCODE, and other codes are available. The codes are constantly updated to make sure the users can best take advantage of the code checking and rating features in the program. The automatic report generation features give the users an organized and detailed report that includes formulas and code references and it gives the users the confidence in their result. 2
  • 3. Suspension bridges can generally be classified as long span structures. Suspension bridges comprise longitudinal deck (main girders) supported by hangers suspended from cables. The cables are connected to anchors at each end. The analysis of a suspension bridge is divided into completed state analysis and construction stage analysis. What is a Cable-Stayed Bridge? A cable-stayed bridge is a cable supported bridge in which one or multiple pylons are installed in the middle of the bridge and girder segments are connected to the pylons by a cable. In cable-stayed bridges, the shape of pylons,the shape of girders, and the cable arrangement can be freely designed; therefore, various structural systems can be applied. For example, adjusting thetension of the cable forces can reduce the size of the bending moment of the girder. This allows for a more economical design. Furthermore, different cable arrangements and shapes for pylons can be planned for a more aesthetic bridgedesign suitable for the surrounding environment. However, even with various structural advantages, only a small number of cable-stayed bridges were designed and built in the past due to limitations in materials and construction methods. Today, the emergence of high-strength cables, the advancement of structural analysis software, the establishment of wind-resistant design methodsthrough wind tunnel tests, and the development of construction technology haveplaced cable-stayed bridges, along side with suspension bridges, responsible forthe future of long-span bridges
  • 4.
  • 5. Components of a Cable-Stayed Bridge The main components of a cable-stayed bridge are as follows: 1.Pylon/Tower 2.Girder/Deck 3.Cable stay 4.Cable Anchorage 5.Support system.
  • 6. PYLON/TOWER Pylons, or towers, play the role of supporting the cables and transferring the loads transmitted through the cables all the way to the ground. The shape of thepylons/towers can be freely planned according to the shape of the cable stays. Additionally, pylonsare designed in various shapes to emphasize aesthetics while providing structural integrity. 6
  • 7. GIRDER/DECK Girders or decks of cable-stayed bridges can be designed using various shapes and materials. Typical examples are steel girders, steel composite girders, and concrete girders. Alternatively, there can be different types of girders for the main span and the approach span The shape of the girder should be carefully planned because the cable arrangement method, spacing, anchorage design, analysis technique, and construction method are determined by what kind of girder is planned. 7
  • 8. 8 TYPES OF GIRDERS 1. STEEL GIRDER 2. BOX GIRDER 3. TWIN BOX GIRDER 4. STEEL COMPOSITE GIRDER 5. EDGE I GIRDER 6. TRUSS GIRDER 7. CONCRETE GIRDER
  • 9. CABLE STAY Cables used on cable-stayed bridges are tension members that cannot resist bending or compression, such as ropes, wires, and chains, and can only supportaxial tension. The tensile strength of the cables is usually around 1,600 to 1,860MPa, but with advances in technology, cables with higher tensile strength are being developed. TYPES 1. LCS (Locked Coil Strand) 9
  • 10. 2.PWS (Parallel Wire Strand) 3.MS (Multi Strand)
  • 11. - CABLE ANCHORAGES 1. Cable Anchorages at Girders 2. Cable Anchorages at Pylons 3. Steel Pylon Anchorage Saddle type ; Anchor girder type ; Bearing plate type ; Pin socket type 4 Concrete Pylon Anchorage Saddle type ; Overlapped type ; Inside type ; Insider with bracket & link type 11
  • 12. Support System The boundary conditions between the crossbeams of a pylon and the stiffened girders affect the behavior of the entire bridge structure. The boundary conditions are classified into three categories: a floating system without a support, a support system, and a frame system with stiffened girders and pylons. 1. Floating System 2. . Shoe System 3. Frame System
  • 13. - Design of Cable-Stayed Bridges The design of a cable-stayed bridge requires considerable insight as there are many factors to be considered during design, including the many irregularities of the bridge itself. The conceptual review items required for design are as follows: 1. Structural Analysis of Cable-Stayed Bridges 2. Structural Analysis for the Initial Shape Zero Displacement Method Force Equilibrium Method Force Method 3. Construction Stage Analysis 13
  • 14. 14
  • 15. Efficiency and Economy 1. Cable-stayed bridges are efficient in cost, materials, and construction time. 2. Theyhave better efficiency than other bridge systems 3.An additional advantage of cable-stayed bridges is their larger efficient span range from 100-meter spans (328 feet) to over 1,000-meter spans(3,280 feet). 4.Cable-stayed bridges have a combination of elegance, slenderness, and a feelingof robustness. 5.The national infrastructure’s demand for more bridges requires the priority of efficiency and economy.
  • 16. The main system advantages are: Fast and relatively easy construction, requiring less time to build:- 1.Less expensive 2.Multiple design options 3.Large efficient span range 4.Strong and resilient structures 5.Attractive appearance
  • 17. The main system disadvantages are:  1.Still inferior to suspension bridges for super-long spans  2.Requires checking deformations at all conditions  3.Requires experience in both design and construction. 4.Cable-stayed bridges do have a maximum length to consider. 5.This design option can become unstable in specific environments. Presentation title
  • 18. DURGAM CHERUVU CABLE STAYED BRIDGE The city experienced a boom in traffic due to the increasing number of cars owned, and the Jubilee Hills to Madhapur commute, which historically took 30minutes, began to take 40–60 minutes. The Government of Telangana then put forward a proposal of a bridge through DURGAM CHERUVU to ease traffic inthe area and cut down travel time to 10 minutes. CONSTRUCTION According to the original plan, the bridge was supposed to have 3-5 pillars holding the road but due to some environmental concerns, the government wasforced to settle for a cable-suspension bridge with 2 pillars holding the cables. Construction tenders were opened in early 2019 and L&T (Larson and Toubro)ended up winning the contract and the construction began on 9 March 2019.
  • 19.
  • 20.  ANALYSIS OF BRIDGE  Cable-stayed bridges are structural systems effectively composing cables, main girders and towers. This bridge form has a beautiful appearance and easily fits in with the surrounding environment due to the fact that various structural systems can be created by changing the tower shapes and cable arrangements.  Cable-stayed bridges are structures that require a high degree of technology for both design and construction, and hence demand sophisticated structural analysis and design techniques when compared with other types of conventionalbridges.  In addition to static analysis for dead and live loads, a dynamic analysis must also be performed to determine eigenvalues. Also moving load, earthquake load and wind load analyses are essentially required for designing a cable-stayed bridge.
  • 21.  BACKGROUND OF BRIDGE  The city experienced a boom in traffic due to the increasing number of cars owned, and the Jubilee Hills to Madhapur commute, which historically took 30 minutes, began to take 40–60 minutes. The Government of Telangana then put forward a proposal of a bridge through Durgam Cheruvu to ease traffic in the area and cut down travel time to 10 minutes.  CONCLUSION  The overall introduction about the CABLE STAYED BRIDGE, component parts, Methodologies, and an Overview of Brief Historical Development is done.  Introduction to an existed structure which is constructed a cable stayed bridge in Hyderabad called DURGAM CHERUVU BRIDGE and its overview is recorded in this paper  The next analysis of this CABLE BRIDGE going to done for Next review by using the software MIDAS CIVIL.