SlideShare a Scribd company logo
1 of 6
RESUME
Manoj K
House No. 238, F Block E-mail id:
manojkskr057@gmail.com
Sahakaranagar Mobile: 09663600545
Bangalore-560092 Land-Line: 09910363031
Career Objective
Wish to be a part of the growing organization as a Supply Chain Management Executive where I
can use my technical knowledge, professional experience and skills sets for taking complete care of all the Supply
Chain management issues. I am looking for the great opportunity that offers me challenging assignments,
professional development and career growth.
Apercu
 An engineer with B.E. (Mechanical Engineering) from BIT College of Engineering Bangalore.
 Possess excellent academic and professional study and professional experience.
 Outstanding ability to work under pressure.
 Excellent mathematical & logical approach towards problem solving.
Professional Experience
Organization: ASM TECHNOLOGIES LTD. BANGALORE (Deputed – APPLIED MATERIALS)
June 2014 to till Date
Production Control and Planning Engineer: Systematic Planning, Coordinating, and Directing of all manufacturing
activities by using SAP-MM module and influences to insure having goods made on time, of adequate quality, and
at reasonable cost. And also having a good knowledge on SAP-QM, MM and PLM Modules.
Professional Summary
 Having an experience of working in Semiconductor Industry, presently working as Purchasing and
Inventory management engineer for procuring & negotiating for materials.
 Worked directly with various end customers for critical, long lead time, End of Life items for exact
substitution for prototypes & final build for production.
 Responsible for the preparation and process purchase orders and documents in accordance with company
policies and procedures.
 Finalize Bill of material, upload it and maintain design file revisions throughout the design process
 Sending and analyzing Request for Quote (RFQ) to Vendor internationally.
 Obtained Quotes from Vendor in timely manner and negotiated as per Customer Requirement and usage.
 Negotiate for best purchasing package (in terms of quality, price, term, delivery and service) with
suppliers and sub-contractors assigned.
 Liaison with the production department to maintain optimum inventory.
 Implementing systems to avoid situations like over-stocking or out-of-stock which cause production and
financial losses.
 Developing reports on procurement and usage of material for top management.
 Planning and budgeting of purchase functions, involving cost estimation, contract negotiations.
 Monitor and co-ordinate deliveries of items between suppliers to ensure that all items are delivered to
site/store on time.
 Responsible for the preparation and process purchase orders and documents in accordance with company
policies and procedures.
 Material valuation, Account determination, Split Valuation. Logistics Invoice Verification, variances and
invoice blocks.
Project handled: (Applied Materials)
Roll Out of SAP MM (Plant)
Title: Roll out of the MM from Old Plant to New Plant
Standardized tools and programs accelerate data transfer in every roll-out project and improve quality.
Documentation of the template processes... From Old Plant 5050 to New Plant 5250.
Organization: Elkay Electro Mech Pvt Ltd. BANGALORE
Nov 2013 to May 2014
 Monitoring data management to keep accurate product, contract, pricing and invoicing information.
 Regular follow up with Material Management department for receipt of items.
 Inventory Management: Reviewing and Revising existing and non-existing Safety stock and MOQ
materials.
 To Prepare Monthly Production Plan and Monthly Material Requirement Plan.
 Assigning priorities to different activities based on project completion date.
Organization: BHARAT ELECTRONICS LTD. BANGALORE
Sep 2011 to Nov 2013
 Scheduling of various production activities starting from item level to assembly level.
 Regular follow up of production activities by Co-coordinating with various Dept. such as Sales, Design,
Purchase, Assembly of the Organization
 Creating the Purchase Requisition (PR) for purchase parts, Sub-contract Requisition (SCR) for Sub-contract
items and Service PR.
 Creating shortage list of items/sub-assemblies at various stages of project.
 Raising Engineering Change Request (ECR) for accommodation of design changes.
Project handled: (BEL)
1. MANUFACTURING AND INSTALLATION OF LIGHTINING PROTECTOR SYSTEM
Title: LIGHTINING PROTECTOR SYSTEM FOR PROTECTION FROM LIGTHING.
Role: Estimating of the Lightening protector system with time study and method study.
Inspection of the structure in the subcontract region and finally installation of the structure at all coastal sites.
2. MANUFACTURING AND INSTALLATION OF VSAT STRUCUTRE
Title: VSAT STRUCTURE FOR INSTALLATION OF VSAT ANTENNA
Role: Estimating of the VSAT structure manufacturing with time study and method study. Inspection of the
structure in the subcontract region and finally installation of the structure in the sites at NEW MANGALORE,
PORBANDAR & GANDHINAGAR at coastal sites
Organization: Fabionix (IND) Pvt Ltd, LTD. BANGALORE
Sep 2010 to Sep 2011
 Inward Material, Stage Process, Final Finished Goods Planning and overall Scheduling as per customer
requirements in planned projects.
 Working for improving the process & productivity by Initiation, Participation and Implementation of best
practices like 5S, 3M, Poka–Yoke & Kaizens.
 Internal Audit Scheduling and Planning
Six Sigma Project Details:
Title: IMPROPER CABLE ROUTING FOR SHELTER OF COASTAL SURVELLIANCE SYTEMS – SEYCHELLES
Description: The aim of the project is reduction of cost and time by minimizing the length of the cable and bends.
Role: Lengths of the cable is decreased by changing the position of the equipment and calculating the required
length and calculating the Z value and standard deviation using the Minitab software and generating the product
performance graph and process maps.
Final result: Reduction of cost and bends in the cable lengths.
1. Reliability increased.
2. Installation cost decreased.
3. Cable length optimized
Skills
 Familiar with surface modeling like ANSYS
 Wide knowledge of CF DESIGN
CNC PART Programming,
MS OFFICE, MS EXCEL, MS POWERPOINT, MS PROJECT
 Experience in SAP End User Modules- PP,QM,MM,PLM
 Operating system- windows XP, windows vista or windows 7,10.
Technical Skill Set:
 Software skills: AUTOCAD, Oracle Supply Chain Planning, SAP R/3 ( PP & MM)
 Quality Tools: PPAP, QPAP, STRAGETIC PLANNING, 7 QC TOOLS & SIX SIGMA.
SAP PLM, MM Modules Related Knowledge:
 Creation of Manufactured Part and assigning the raw material.
 Creation of Purchased Part and its Document.
 Creation of BOM (Bill of Materials) for assembly.
 Creation of Documents like PL(Part List), GA(General Assembly), WL(Wire List), CGA(Composite General
Assembly), WD(Wire Drawing), KS(Key Sheet) etc.
 Creation and execution of ECR (Engineering Change Request).
 Enterprise structure definition (Creation of Plants, Storage Locations and Purchasing Org.)
 Logistics general IMG (Attributes of Material Types, Material and Vendor Master Customization etc.)
 Customization in SAP reference IMG - Materials Management, Purchasing Documents Release procedures
(PO, PR etc.),Price Determination Procedures (calculation schema)
 Master data, Material Master, Vendor Master Creation and evaluation, Purchase Info Record, Source List,
and Quota Arrangement.
 Procurement Process for Stock and direct consumption, Subcontracting and Consignment.
 Inventory Management (Goods receipt, Goods Issue, Stock Transfer, Consignments, Physical Inventory,
reservations).
Academic Credentials
 2010 B.E (Mechanical Engineering) from BIT College of Engineering, Bangalore with 66.54%
 2006 12th
(Science & Maths) from Govt PU College, Yelhanka Karnataka with 65.00%
 2004 10th
from Cauvery School, Sahakaranagar Karnataka with 77%.
Co-Curricular Activities & Awards
 Participated in various All India University-Level Technical Festivals.
 Consolation prize in REGIONAL GAMES & SPORTS meet.
 Team member of the VCS PROJECT in BEL, which got “BHARAT RAKSHA MANTRI AWARD” in Nov.2011.
 Certificate of successfully completing the course of got “Operations and Supply chain Management”
At NPTEL IIT Madras.
Personal Profile
Full Name : MANOJ KONDAIAH
Father’s Name : KONDAIAH
Sex : Male
Marital Status : Single
Nationality : Indian
Hobbies : Playing cricket, Cycling, Badminton
Cooking, Travelling, a little bit social work
Passport No : J7051887
Phone No. : +91-9663600545
Date of birth : 31st May 1989
Declaration:
I hereby declare that the above-mentioned information is correct up to my knowledge and I bear
the responsibility for the correctness of the above-mentioned particulars.
Place: Bangalore (Manoj.k)
Manoj
Manoj

More Related Content

What's hot

Suriyakumar CV_23092016
Suriyakumar CV_23092016Suriyakumar CV_23092016
Suriyakumar CV_23092016Suriya Kumar
 
Looking for a Suitable Position
Looking for a Suitable PositionLooking for a Suitable Position
Looking for a Suitable PositionMadan Mohan Reddy
 
Resume as Procurement Engineer
Resume as Procurement EngineerResume as Procurement Engineer
Resume as Procurement EngineerKarthick MK
 
Resume Alok kumar
Resume Alok kumarResume Alok kumar
Resume Alok kumarAlok kumar
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Aniket Dalvi
 
Resume - Industrial Engineer
Resume - Industrial EngineerResume - Industrial Engineer
Resume - Industrial Engineeronkarpathak_123
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resumeSteve Majors
 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum
 
Ajit_ Resume - Updated
Ajit_ Resume - UpdatedAjit_ Resume - Updated
Ajit_ Resume - UpdatedAJIT GEORGE P.
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaarvindblr
 
RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 Varun Rawal
 

What's hot (18)

CV
CVCV
CV
 
Suriyakumar CV_23092016
Suriyakumar CV_23092016Suriyakumar CV_23092016
Suriyakumar CV_23092016
 
Resume_Mohan Kumar Gubbala
Resume_Mohan Kumar GubbalaResume_Mohan Kumar Gubbala
Resume_Mohan Kumar Gubbala
 
kunal_resume
kunal_resumekunal_resume
kunal_resume
 
Looking for a Suitable Position
Looking for a Suitable PositionLooking for a Suitable Position
Looking for a Suitable Position
 
Resume as Procurement Engineer
Resume as Procurement EngineerResume as Procurement Engineer
Resume as Procurement Engineer
 
Resume Alok kumar
Resume Alok kumarResume Alok kumar
Resume Alok kumar
 
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
Project Engineer- (Design, Engineering, Planning & Coordination - Projects)
 
Ganesh - CSSBB
Ganesh - CSSBBGanesh - CSSBB
Ganesh - CSSBB
 
Resume - Industrial Engineer
Resume - Industrial EngineerResume - Industrial Engineer
Resume - Industrial Engineer
 
Steve Majors resume
Steve Majors resumeSteve Majors resume
Steve Majors resume
 
MEP procurement engineer
MEP procurement engineerMEP procurement engineer
MEP procurement engineer
 
Taha Anjum Updated CV
Taha Anjum Updated CVTaha Anjum Updated CV
Taha Anjum Updated CV
 
P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------P.MAHADEVAN - RESUME------
P.MAHADEVAN - RESUME------
 
Ajit_ Resume - Updated
Ajit_ Resume - UpdatedAjit_ Resume - Updated
Ajit_ Resume - Updated
 
Mitesh Chauhan CV
Mitesh Chauhan CVMitesh Chauhan CV
Mitesh Chauhan CV
 
Resume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-californiaResume arvind-manufacturing engineer-california
Resume arvind-manufacturing engineer-california
 
RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015 RESUME_MECHANICAL_VARUN RAWAL 2015
RESUME_MECHANICAL_VARUN RAWAL 2015
 

Viewers also liked

Apalancamiento de marca
Apalancamiento de marca Apalancamiento de marca
Apalancamiento de marca analuddy
 
ο μυστράς!!
ο μυστράς!!ο μυστράς!!
ο μυστράς!!70athinon
 
Zωγραφίζω για τα παραολυμπιακά αθλήματα
Zωγραφίζω για τα παραολυμπιακά αθλήματα Zωγραφίζω για τα παραολυμπιακά αθλήματα
Zωγραφίζω για τα παραολυμπιακά αθλήματα 70athinon
 
MSAresume2016TWO
MSAresume2016TWOMSAresume2016TWO
MSAresume2016TWOKatie Falbo
 
EDUC 5101 3rd Adobe Connect Class Session Presentation
EDUC 5101 3rd Adobe Connect Class Session PresentationEDUC 5101 3rd Adobe Connect Class Session Presentation
EDUC 5101 3rd Adobe Connect Class Session PresentationRobert Power
 
FOREIGN EXCHANGE MARKET
FOREIGN EXCHANGE MARKETFOREIGN EXCHANGE MARKET
FOREIGN EXCHANGE MARKETArushi Verma
 

Viewers also liked (11)

1
11
1
 
Apalancamiento de marca
Apalancamiento de marca Apalancamiento de marca
Apalancamiento de marca
 
ο μυστράς!!
ο μυστράς!!ο μυστράς!!
ο μυστράς!!
 
Zωγραφίζω για τα παραολυμπιακά αθλήματα
Zωγραφίζω για τα παραολυμπιακά αθλήματα Zωγραφίζω για τα παραολυμπιακά αθλήματα
Zωγραφίζω για τα παραολυμπιακά αθλήματα
 
MSAresume2016TWO
MSAresume2016TWOMSAresume2016TWO
MSAresume2016TWO
 
Potestad tributaria
Potestad tributariaPotestad tributaria
Potestad tributaria
 
Fotos Sortida 9
Fotos Sortida 9Fotos Sortida 9
Fotos Sortida 9
 
HolidaydoorsDec09
HolidaydoorsDec09HolidaydoorsDec09
HolidaydoorsDec09
 
EDUC 5101 3rd Adobe Connect Class Session Presentation
EDUC 5101 3rd Adobe Connect Class Session PresentationEDUC 5101 3rd Adobe Connect Class Session Presentation
EDUC 5101 3rd Adobe Connect Class Session Presentation
 
Guia para-padres-manual-de-internet-sano
Guia para-padres-manual-de-internet-sanoGuia para-padres-manual-de-internet-sano
Guia para-padres-manual-de-internet-sano
 
FOREIGN EXCHANGE MARKET
FOREIGN EXCHANGE MARKETFOREIGN EXCHANGE MARKET
FOREIGN EXCHANGE MARKET
 

Similar to Manoj (20)

resume
resumeresume
resume
 
Srikanth Resume
Srikanth ResumeSrikanth Resume
Srikanth Resume
 
Suchendran H - P
Suchendran H - PSuchendran H - P
Suchendran H - P
 
Muralidhar
MuralidharMuralidhar
Muralidhar
 
CV new
CV newCV new
CV new
 
Resume - SAP MM
Resume - SAP MMResume - SAP MM
Resume - SAP MM
 
Resume
ResumeResume
Resume
 
CV
CVCV
CV
 
Resume Vivek R Singh - August 2019
Resume Vivek R Singh - August 2019Resume Vivek R Singh - August 2019
Resume Vivek R Singh - August 2019
 
manjiri_resume_new (1)
manjiri_resume_new (1)manjiri_resume_new (1)
manjiri_resume_new (1)
 
Resume 1
Resume 1Resume 1
Resume 1
 
Resume 1
Resume 1Resume 1
Resume 1
 
Resume 1
Resume 1Resume 1
Resume 1
 
SRS - Resume ( Revised )
SRS - Resume ( Revised )SRS - Resume ( Revised )
SRS - Resume ( Revised )
 
Abbas_Renewable energy_Solar_3 years
Abbas_Renewable energy_Solar_3 yearsAbbas_Renewable energy_Solar_3 years
Abbas_Renewable energy_Solar_3 years
 
Abbas renewable energy solar_3 years
Abbas renewable energy solar_3 yearsAbbas renewable energy solar_3 years
Abbas renewable energy solar_3 years
 
ravikiran sajja Resume
ravikiran sajja Resumeravikiran sajja Resume
ravikiran sajja Resume
 
Anirban chakraborty(m eng., cssgb)
Anirban chakraborty(m eng., cssgb)Anirban chakraborty(m eng., cssgb)
Anirban chakraborty(m eng., cssgb)
 
Rajan_SG_CV (1)
Rajan_SG_CV (1)Rajan_SG_CV (1)
Rajan_SG_CV (1)
 
kusum_1_gs
kusum_1_gskusum_1_gs
kusum_1_gs
 

Manoj

  • 1. RESUME Manoj K House No. 238, F Block E-mail id: manojkskr057@gmail.com Sahakaranagar Mobile: 09663600545 Bangalore-560092 Land-Line: 09910363031 Career Objective Wish to be a part of the growing organization as a Supply Chain Management Executive where I can use my technical knowledge, professional experience and skills sets for taking complete care of all the Supply Chain management issues. I am looking for the great opportunity that offers me challenging assignments, professional development and career growth. Apercu  An engineer with B.E. (Mechanical Engineering) from BIT College of Engineering Bangalore.  Possess excellent academic and professional study and professional experience.  Outstanding ability to work under pressure.  Excellent mathematical & logical approach towards problem solving. Professional Experience Organization: ASM TECHNOLOGIES LTD. BANGALORE (Deputed – APPLIED MATERIALS) June 2014 to till Date Production Control and Planning Engineer: Systematic Planning, Coordinating, and Directing of all manufacturing activities by using SAP-MM module and influences to insure having goods made on time, of adequate quality, and at reasonable cost. And also having a good knowledge on SAP-QM, MM and PLM Modules. Professional Summary  Having an experience of working in Semiconductor Industry, presently working as Purchasing and Inventory management engineer for procuring & negotiating for materials.  Worked directly with various end customers for critical, long lead time, End of Life items for exact substitution for prototypes & final build for production.  Responsible for the preparation and process purchase orders and documents in accordance with company policies and procedures.  Finalize Bill of material, upload it and maintain design file revisions throughout the design process  Sending and analyzing Request for Quote (RFQ) to Vendor internationally.  Obtained Quotes from Vendor in timely manner and negotiated as per Customer Requirement and usage.  Negotiate for best purchasing package (in terms of quality, price, term, delivery and service) with suppliers and sub-contractors assigned.  Liaison with the production department to maintain optimum inventory.  Implementing systems to avoid situations like over-stocking or out-of-stock which cause production and financial losses.  Developing reports on procurement and usage of material for top management.  Planning and budgeting of purchase functions, involving cost estimation, contract negotiations.  Monitor and co-ordinate deliveries of items between suppliers to ensure that all items are delivered to site/store on time.
  • 2.  Responsible for the preparation and process purchase orders and documents in accordance with company policies and procedures.  Material valuation, Account determination, Split Valuation. Logistics Invoice Verification, variances and invoice blocks. Project handled: (Applied Materials) Roll Out of SAP MM (Plant) Title: Roll out of the MM from Old Plant to New Plant Standardized tools and programs accelerate data transfer in every roll-out project and improve quality. Documentation of the template processes... From Old Plant 5050 to New Plant 5250. Organization: Elkay Electro Mech Pvt Ltd. BANGALORE Nov 2013 to May 2014  Monitoring data management to keep accurate product, contract, pricing and invoicing information.  Regular follow up with Material Management department for receipt of items.  Inventory Management: Reviewing and Revising existing and non-existing Safety stock and MOQ materials.  To Prepare Monthly Production Plan and Monthly Material Requirement Plan.  Assigning priorities to different activities based on project completion date. Organization: BHARAT ELECTRONICS LTD. BANGALORE Sep 2011 to Nov 2013  Scheduling of various production activities starting from item level to assembly level.  Regular follow up of production activities by Co-coordinating with various Dept. such as Sales, Design, Purchase, Assembly of the Organization  Creating the Purchase Requisition (PR) for purchase parts, Sub-contract Requisition (SCR) for Sub-contract items and Service PR.  Creating shortage list of items/sub-assemblies at various stages of project.  Raising Engineering Change Request (ECR) for accommodation of design changes. Project handled: (BEL) 1. MANUFACTURING AND INSTALLATION OF LIGHTINING PROTECTOR SYSTEM Title: LIGHTINING PROTECTOR SYSTEM FOR PROTECTION FROM LIGTHING. Role: Estimating of the Lightening protector system with time study and method study. Inspection of the structure in the subcontract region and finally installation of the structure at all coastal sites. 2. MANUFACTURING AND INSTALLATION OF VSAT STRUCUTRE Title: VSAT STRUCTURE FOR INSTALLATION OF VSAT ANTENNA Role: Estimating of the VSAT structure manufacturing with time study and method study. Inspection of the structure in the subcontract region and finally installation of the structure in the sites at NEW MANGALORE, PORBANDAR & GANDHINAGAR at coastal sites Organization: Fabionix (IND) Pvt Ltd, LTD. BANGALORE Sep 2010 to Sep 2011  Inward Material, Stage Process, Final Finished Goods Planning and overall Scheduling as per customer
  • 3. requirements in planned projects.  Working for improving the process & productivity by Initiation, Participation and Implementation of best practices like 5S, 3M, Poka–Yoke & Kaizens.  Internal Audit Scheduling and Planning Six Sigma Project Details: Title: IMPROPER CABLE ROUTING FOR SHELTER OF COASTAL SURVELLIANCE SYTEMS – SEYCHELLES Description: The aim of the project is reduction of cost and time by minimizing the length of the cable and bends. Role: Lengths of the cable is decreased by changing the position of the equipment and calculating the required length and calculating the Z value and standard deviation using the Minitab software and generating the product performance graph and process maps. Final result: Reduction of cost and bends in the cable lengths. 1. Reliability increased. 2. Installation cost decreased. 3. Cable length optimized Skills  Familiar with surface modeling like ANSYS  Wide knowledge of CF DESIGN CNC PART Programming, MS OFFICE, MS EXCEL, MS POWERPOINT, MS PROJECT  Experience in SAP End User Modules- PP,QM,MM,PLM  Operating system- windows XP, windows vista or windows 7,10. Technical Skill Set:  Software skills: AUTOCAD, Oracle Supply Chain Planning, SAP R/3 ( PP & MM)  Quality Tools: PPAP, QPAP, STRAGETIC PLANNING, 7 QC TOOLS & SIX SIGMA. SAP PLM, MM Modules Related Knowledge:  Creation of Manufactured Part and assigning the raw material.  Creation of Purchased Part and its Document.  Creation of BOM (Bill of Materials) for assembly.  Creation of Documents like PL(Part List), GA(General Assembly), WL(Wire List), CGA(Composite General Assembly), WD(Wire Drawing), KS(Key Sheet) etc.  Creation and execution of ECR (Engineering Change Request).  Enterprise structure definition (Creation of Plants, Storage Locations and Purchasing Org.)  Logistics general IMG (Attributes of Material Types, Material and Vendor Master Customization etc.)  Customization in SAP reference IMG - Materials Management, Purchasing Documents Release procedures (PO, PR etc.),Price Determination Procedures (calculation schema)  Master data, Material Master, Vendor Master Creation and evaluation, Purchase Info Record, Source List, and Quota Arrangement.  Procurement Process for Stock and direct consumption, Subcontracting and Consignment.  Inventory Management (Goods receipt, Goods Issue, Stock Transfer, Consignments, Physical Inventory, reservations).
  • 4. Academic Credentials  2010 B.E (Mechanical Engineering) from BIT College of Engineering, Bangalore with 66.54%  2006 12th (Science & Maths) from Govt PU College, Yelhanka Karnataka with 65.00%  2004 10th from Cauvery School, Sahakaranagar Karnataka with 77%. Co-Curricular Activities & Awards  Participated in various All India University-Level Technical Festivals.  Consolation prize in REGIONAL GAMES & SPORTS meet.  Team member of the VCS PROJECT in BEL, which got “BHARAT RAKSHA MANTRI AWARD” in Nov.2011.  Certificate of successfully completing the course of got “Operations and Supply chain Management” At NPTEL IIT Madras. Personal Profile Full Name : MANOJ KONDAIAH Father’s Name : KONDAIAH Sex : Male Marital Status : Single Nationality : Indian Hobbies : Playing cricket, Cycling, Badminton Cooking, Travelling, a little bit social work Passport No : J7051887 Phone No. : +91-9663600545 Date of birth : 31st May 1989 Declaration: I hereby declare that the above-mentioned information is correct up to my knowledge and I bear the responsibility for the correctness of the above-mentioned particulars. Place: Bangalore (Manoj.k)