1 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Aelux, A Division of WESCO
Turnkey Lighting Retrofit Solutions for the Energy Services
Companies Vertical
2 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
WESCO Branch Network
• Typical branch carries
$1 million in inventory,
100 supplier lines,
3,500 SKUs
• Branch inventory is tailored to
meet local demand
• Flexible, time-sensitive delivery
by local WESCO vehicles
• Late order cut-off times
for same-day shipment
• Emergency shipments direct to
customers
• Emergency 24/7 service is
available
475 Branches and 9 distribution centers in North America
and select International locations
3 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
About Us
• In 2015, WESCO acquired Aelux Lighting, a design-build lighting
retrofit company focused on large commercial & industrial clients
• An experienced team with more than 10 years of history working
together
• We share a common interest in the success of the project
outcomes, we work with you (our clients) as a partner
• We remain vendor agnostic to ensure we are able to provide the
most appropriate and cost-effective products and services
• We take full responsibility on delivering an engineered solution and
financial return on investment
4 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Our ESCO Vertical Focus
The WESCO/Aelux brand offers High Value to the National
ESCOs through the following points:
 Financial stability - a strong balance sheet
 Our bonding & insurance capabilities
 Transfer 100% of risk to Aelux – design-build solution
provider
 Our knowledge and experience working with ESCOs
 Our national footprint with a local presence with our branch
offices
 Our network of creditable electrical contractors (8A, MBE,
WBE etc) we can call upon
 Our product neutrality and purchasing capabilities to deliver
5 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Our Typical Process
PRELIMINARY ASSESSMENT
•Product review and sampling
•Budget analysis
•Financing and performance
contract options
•Rebate and grant opportunity overview
•Online “minute survey” for national
accounts
INVESTMENT GRADE AUDIT
•Experienced field audit
organization
•Detailed data capture
•Reliable product recommendations
•Accurate installation cost estimates
PROJECT ANALYSIS
•Specification based on audit findings
•“Good, Better, Best” solutions based on
initial cost, energy savings, and customer
preference
•Savings break out by load, controls impact,
and maintenance cost
•Verification of rebate eligibility and
availability
IMPLEMENTATION
•Full-service turnkey provider
•Grant writing and rebate
administration
•Contractor review and selection
•Dedicated project management team
•Seamless logistics for delivery, staging,
and recycling
•Daily progress reports
6 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Why Lighting?
+ Lighting retrofits tend to be low cost and high return
• Customers save 20-85% on the lighting portion of their energy bill
• Payback typically 6 months to 6 years
• ROI often 30%+
+ Operational Improvements
• Instant restrike
• Lower maintenance cost
• Increase in safety and productivity through better light levels and higher color temp.
+ Inefficient lighting is easily recognized by visitors, customers & employees
• Efficient lighting shows good corporate citizenship, enhances customer experience
and demonstrates commitment to comfort, health & safety
+ High utility rebates and tax incentives
• Above average regional rebates
7 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
1. Portfolio-Level Analysis
• Provide high level assessment for all facilities, prioritizing facilities with projects
that will meet corporate hurdle rates, using rate review, rebate analysis and online
“minute survey” tools.
• Develop corporate specification where desired to increase your buying power
and ensure energy efficiency is implemented across your portfolio with the same
high quality lighting solutions, optimizing the renovation process.
2. Investment-Grade Audits and Proposals
• Conduct on-site audits for facilities that are likely to meet investment criteria and
budget can be approved.
• Provide investment grade turnkey proposals for those sites utilizing your
approved lighting standards, spec & calculation methods.
3. Implementation
• Execute projects at approved sites, provide 3-bid support for labor if desired,
project management, rebate administration, etc.
7
Portfolio Level Lighting Program
8 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Financing Options
+ “Pay from Savings” or Performance Contracts
• On & Off-balance sheet options (e.g. capital or operating lease)
• Performance Contracts offer guaranteed savings at varying levels of actual
performance risk
• Performance contracts allow public and private entities to complete projects
without committing capital while transferring performance risk to the ESCO.
+ Traditional debt financing
+ In-rate partner program with ESCO’s
• Operating expense, paid for through utility bill in deregulated environments
• Size and usage requirements may be prohibitive (utility bill required to verify
eligibility)
9 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Project Stages
Preliminary
Project Analysis
Photometrics
review
Product
Evaluation
Energy Analysis
Scope
Development
Contractor
review
Lighting Survey
Procurement Logistic
Project
Management
Project
Progress
Communication
M&V, Final
Report
Preliminary
Project Analysis
Photometrics
Review
Scope
Development
Procurement
Energy Analysis
Product
Evaluation
Logistics
Project
Progress
Communication
Project
Management
M&V, Final
Report
Lighting Survey
Contractor
Review
10 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Street Lighting: Our Approach
PreliminaryAnalysis
Conduct
photometric
study
Assess
budgetary
economics
Calculate energy
& maintenance
savings
Identify grant and
rebate subsidies
Address
financing options
Conduct lighting
and controls
needs
assessment
InvestmentGradeAudit
Geo-tagging
physical pole
locations
Web-based
portal access to
view audited pole
locations
Customized data
collection
Physical asset
reconciliation
RFPDevelopment
Design
installation scope
of work
Solicit bids from
qualified
contractors
Define
installation
procedures &
requirements
Develop
measurement
and verification
protocol
ProjectManagement
Manage electrical
contractors to
scope
Coordinate
communication
with City and
stakeholders
Manage grant
and rebate
paperwork
Manage logistics
11 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Front to Back Integration
• Data from multiple auditors aggregated in
common database
• Audit records pushed to cloud; database
updated at pre-scheduled intervals
• Audit results updated to Project Portal; Google
Maps (GIS layer)
• Portal accessible by partners, customers
(password protected)
• Data available for export to .csv and excel
12 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Project Portal—Audit Process
Cobrahead
Decorative
Floods
13 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Project Portal—Installation Process
14 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
Our Software: Project Overview
The information contained herein is confidential in nature and considered proprietary to WESCO Distribution, Inc. It is intended for the exclusive use of the employees, contractors
and agents of client companies. We request that no oral or written disclosure of such information be made without the prior written approval by WESCO Distribution, Inc.
Savings criteria based on
agreed upon metrics
Easy to understand “Good | Better | Best” proposals
Create and analyze unlimited
projects within a facility
16 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x
CONTACT US
Lou Nazirides
Director of Business Development
Energy Services Solutions
610-240-9800
lnazirides@aelux.com

More Related Content

Viewers also liked

Driving Traffic to your Website with Paid Advertising - AMA UHD Conference
Driving Traffic to your Website with Paid Advertising - AMA UHD ConferenceDriving Traffic to your Website with Paid Advertising - AMA UHD Conference
Driving Traffic to your Website with Paid Advertising - AMA UHD ConferenceSchipul - The Web Marketing Company
 
Esco market breakdown
Esco market breakdownEsco market breakdown
Esco market breakdownsedmoore
 
Defectos viales y responsabilidad legal glennon
Defectos viales y responsabilidad legal glennonDefectos viales y responsabilidad legal glennon
Defectos viales y responsabilidad legal glennonSierra Francisco Justo
 
8 d 24_ricardo_pinto - Calendario
8 d 24_ricardo_pinto - Calendario8 d 24_ricardo_pinto - Calendario
8 d 24_ricardo_pinto - CalendarioNuno Duarte
 
Léo publicidade & propaganda
Léo publicidade & propagandaLéo publicidade & propaganda
Léo publicidade & propagandaleoonnis
 
CONCEPT OF SUPPLY SCHEDULE OR CURVE
CONCEPT OF SUPPLY SCHEDULE OR CURVECONCEPT OF SUPPLY SCHEDULE OR CURVE
CONCEPT OF SUPPLY SCHEDULE OR CURVEumailaila
 
Brochure November 2014 low-res
Brochure November 2014 low-resBrochure November 2014 low-res
Brochure November 2014 low-resChristopher Mobbs
 
Recursos web aplicados a la investigación
Recursos web aplicados a la investigaciónRecursos web aplicados a la investigación
Recursos web aplicados a la investigaciónmarinellmontes
 
Tecnologías de la información y comunicación1
Tecnologías de la información y comunicación1Tecnologías de la información y comunicación1
Tecnologías de la información y comunicación194e
 
Desafíos de la educación preescolar
Desafíos de la educación preescolarDesafíos de la educación preescolar
Desafíos de la educación preescolarbrenemc
 

Viewers also liked (20)

Driving Traffic to your Website with Paid Advertising - AMA UHD Conference
Driving Traffic to your Website with Paid Advertising - AMA UHD ConferenceDriving Traffic to your Website with Paid Advertising - AMA UHD Conference
Driving Traffic to your Website with Paid Advertising - AMA UHD Conference
 
Esco market breakdown
Esco market breakdownEsco market breakdown
Esco market breakdown
 
Data quality
Data qualityData quality
Data quality
 
Defectos viales y responsabilidad legal glennon
Defectos viales y responsabilidad legal glennonDefectos viales y responsabilidad legal glennon
Defectos viales y responsabilidad legal glennon
 
8 d 24_ricardo_pinto - Calendario
8 d 24_ricardo_pinto - Calendario8 d 24_ricardo_pinto - Calendario
8 d 24_ricardo_pinto - Calendario
 
Tarea2
Tarea2Tarea2
Tarea2
 
lalman_verma
lalman_vermalalman_verma
lalman_verma
 
Léo publicidade & propaganda
Léo publicidade & propagandaLéo publicidade & propaganda
Léo publicidade & propaganda
 
CONCEPT OF SUPPLY SCHEDULE OR CURVE
CONCEPT OF SUPPLY SCHEDULE OR CURVECONCEPT OF SUPPLY SCHEDULE OR CURVE
CONCEPT OF SUPPLY SCHEDULE OR CURVE
 
Imagen de grua
Imagen de gruaImagen de grua
Imagen de grua
 
Brochure November 2014 low-res
Brochure November 2014 low-resBrochure November 2014 low-res
Brochure November 2014 low-res
 
Ppblog
PpblogPpblog
Ppblog
 
Aspectos legales y éticos de la seguridad informática 101
Aspectos legales y éticos de la seguridad informática 101Aspectos legales y éticos de la seguridad informática 101
Aspectos legales y éticos de la seguridad informática 101
 
Nvk seminar
Nvk seminarNvk seminar
Nvk seminar
 
Recursos web aplicados a la investigación
Recursos web aplicados a la investigaciónRecursos web aplicados a la investigación
Recursos web aplicados a la investigación
 
Moodle
MoodleMoodle
Moodle
 
latihan 4
latihan 4latihan 4
latihan 4
 
Tecnologías de la información y comunicación1
Tecnologías de la información y comunicación1Tecnologías de la información y comunicación1
Tecnologías de la información y comunicación1
 
Desafíos de la educación preescolar
Desafíos de la educación preescolarDesafíos de la educación preescolar
Desafíos de la educación preescolar
 
Politica demog
Politica demogPolitica demog
Politica demog
 

Similar to Aelux_ESCO_Verticle_LinkedIn

Esound Ireland Brochure
Esound Ireland BrochureEsound Ireland Brochure
Esound Ireland Brochuregarretflower
 
Esound Brochure
Esound BrochureEsound Brochure
Esound BrochureDevan2012
 
Esound Quick Brochure
Esound Quick BrochureEsound Quick Brochure
Esound Quick Brochurediegobelmonte
 
Esound Brochure
Esound BrochureEsound Brochure
Esound Brochurekkdeacon
 
Eckerson Embedded Webcast
Eckerson Embedded WebcastEckerson Embedded Webcast
Eckerson Embedded WebcastOpenText
 
CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015Nathan Ting
 
204290 collaborative cpm scheduling system in the waste water treatment indus...
204290 collaborative cpm scheduling system in the waste water treatment indus...204290 collaborative cpm scheduling system in the waste water treatment indus...
204290 collaborative cpm scheduling system in the waste water treatment indus...p6academy
 
Full Resume of Kenneth Osmond
Full Resume of Kenneth OsmondFull Resume of Kenneth Osmond
Full Resume of Kenneth OsmondKenneth Osmond
 
Flexiant and 451 Research Discuss the Service Provider Path from VPS to IaaS
Flexiant and 451 Research Discuss the Service Provider Path from VPS to IaaSFlexiant and 451 Research Discuss the Service Provider Path from VPS to IaaS
Flexiant and 451 Research Discuss the Service Provider Path from VPS to IaaSFlexiant
 
Modernize project controls to ensure project success aecom
Modernize project controls to ensure project success   aecomModernize project controls to ensure project success   aecom
Modernize project controls to ensure project success aecomAconex
 
On-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdfOn-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdfTrident Utilities
 
KEOGH Introduction 2010
KEOGH Introduction 2010KEOGH Introduction 2010
KEOGH Introduction 2010jlemire
 
Journey to the cloud in banking and finance webinar
Journey to the cloud in banking and finance webinarJourney to the cloud in banking and finance webinar
Journey to the cloud in banking and finance webinarcontinohq
 

Similar to Aelux_ESCO_Verticle_LinkedIn (20)

Esound Ireland Brochure
Esound Ireland BrochureEsound Ireland Brochure
Esound Ireland Brochure
 
ZachryGroup_HighVoltageSolutions_1P
ZachryGroup_HighVoltageSolutions_1PZachryGroup_HighVoltageSolutions_1P
ZachryGroup_HighVoltageSolutions_1P
 
Esound Brochure
Esound BrochureEsound Brochure
Esound Brochure
 
Esound Quick Brochure
Esound Quick BrochureEsound Quick Brochure
Esound Quick Brochure
 
Esound Brochure
Esound BrochureEsound Brochure
Esound Brochure
 
Eckerson Embedded Webcast
Eckerson Embedded WebcastEckerson Embedded Webcast
Eckerson Embedded Webcast
 
Energy costs reduction
Energy costs reductionEnergy costs reduction
Energy costs reduction
 
Self Guide Es Finance
Self Guide Es FinanceSelf Guide Es Finance
Self Guide Es Finance
 
CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015CellEngineering_CapabilityStatement_2015
CellEngineering_CapabilityStatement_2015
 
204290 collaborative cpm scheduling system in the waste water treatment indus...
204290 collaborative cpm scheduling system in the waste water treatment indus...204290 collaborative cpm scheduling system in the waste water treatment indus...
204290 collaborative cpm scheduling system in the waste water treatment indus...
 
Full Resume of Kenneth Osmond
Full Resume of Kenneth OsmondFull Resume of Kenneth Osmond
Full Resume of Kenneth Osmond
 
Flexiant and 451 Research Discuss the Service Provider Path from VPS to IaaS
Flexiant and 451 Research Discuss the Service Provider Path from VPS to IaaSFlexiant and 451 Research Discuss the Service Provider Path from VPS to IaaS
Flexiant and 451 Research Discuss the Service Provider Path from VPS to IaaS
 
Modernize project controls to ensure project success aecom
Modernize project controls to ensure project success   aecomModernize project controls to ensure project success   aecom
Modernize project controls to ensure project success aecom
 
Singlepoint AWS Well-Architected Review
Singlepoint AWS Well-Architected ReviewSinglepoint AWS Well-Architected Review
Singlepoint AWS Well-Architected Review
 
On-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdfOn-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdf
 
Evsi 6262013
Evsi 6262013Evsi 6262013
Evsi 6262013
 
National Retail 2012
National Retail 2012National Retail 2012
National Retail 2012
 
KEOGH Introduction 2010
KEOGH Introduction 2010KEOGH Introduction 2010
KEOGH Introduction 2010
 
The SPH EPC Way
The SPH EPC WayThe SPH EPC Way
The SPH EPC Way
 
Journey to the cloud in banking and finance webinar
Journey to the cloud in banking and finance webinarJourney to the cloud in banking and finance webinar
Journey to the cloud in banking and finance webinar
 

Aelux_ESCO_Verticle_LinkedIn

  • 1. 1 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Aelux, A Division of WESCO Turnkey Lighting Retrofit Solutions for the Energy Services Companies Vertical
  • 2. 2 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x WESCO Branch Network • Typical branch carries $1 million in inventory, 100 supplier lines, 3,500 SKUs • Branch inventory is tailored to meet local demand • Flexible, time-sensitive delivery by local WESCO vehicles • Late order cut-off times for same-day shipment • Emergency shipments direct to customers • Emergency 24/7 service is available 475 Branches and 9 distribution centers in North America and select International locations
  • 3. 3 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x About Us • In 2015, WESCO acquired Aelux Lighting, a design-build lighting retrofit company focused on large commercial & industrial clients • An experienced team with more than 10 years of history working together • We share a common interest in the success of the project outcomes, we work with you (our clients) as a partner • We remain vendor agnostic to ensure we are able to provide the most appropriate and cost-effective products and services • We take full responsibility on delivering an engineered solution and financial return on investment
  • 4. 4 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Our ESCO Vertical Focus The WESCO/Aelux brand offers High Value to the National ESCOs through the following points:  Financial stability - a strong balance sheet  Our bonding & insurance capabilities  Transfer 100% of risk to Aelux – design-build solution provider  Our knowledge and experience working with ESCOs  Our national footprint with a local presence with our branch offices  Our network of creditable electrical contractors (8A, MBE, WBE etc) we can call upon  Our product neutrality and purchasing capabilities to deliver
  • 5. 5 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Our Typical Process PRELIMINARY ASSESSMENT •Product review and sampling •Budget analysis •Financing and performance contract options •Rebate and grant opportunity overview •Online “minute survey” for national accounts INVESTMENT GRADE AUDIT •Experienced field audit organization •Detailed data capture •Reliable product recommendations •Accurate installation cost estimates PROJECT ANALYSIS •Specification based on audit findings •“Good, Better, Best” solutions based on initial cost, energy savings, and customer preference •Savings break out by load, controls impact, and maintenance cost •Verification of rebate eligibility and availability IMPLEMENTATION •Full-service turnkey provider •Grant writing and rebate administration •Contractor review and selection •Dedicated project management team •Seamless logistics for delivery, staging, and recycling •Daily progress reports
  • 6. 6 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Why Lighting? + Lighting retrofits tend to be low cost and high return • Customers save 20-85% on the lighting portion of their energy bill • Payback typically 6 months to 6 years • ROI often 30%+ + Operational Improvements • Instant restrike • Lower maintenance cost • Increase in safety and productivity through better light levels and higher color temp. + Inefficient lighting is easily recognized by visitors, customers & employees • Efficient lighting shows good corporate citizenship, enhances customer experience and demonstrates commitment to comfort, health & safety + High utility rebates and tax incentives • Above average regional rebates
  • 7. 7 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x 1. Portfolio-Level Analysis • Provide high level assessment for all facilities, prioritizing facilities with projects that will meet corporate hurdle rates, using rate review, rebate analysis and online “minute survey” tools. • Develop corporate specification where desired to increase your buying power and ensure energy efficiency is implemented across your portfolio with the same high quality lighting solutions, optimizing the renovation process. 2. Investment-Grade Audits and Proposals • Conduct on-site audits for facilities that are likely to meet investment criteria and budget can be approved. • Provide investment grade turnkey proposals for those sites utilizing your approved lighting standards, spec & calculation methods. 3. Implementation • Execute projects at approved sites, provide 3-bid support for labor if desired, project management, rebate administration, etc. 7 Portfolio Level Lighting Program
  • 8. 8 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Financing Options + “Pay from Savings” or Performance Contracts • On & Off-balance sheet options (e.g. capital or operating lease) • Performance Contracts offer guaranteed savings at varying levels of actual performance risk • Performance contracts allow public and private entities to complete projects without committing capital while transferring performance risk to the ESCO. + Traditional debt financing + In-rate partner program with ESCO’s • Operating expense, paid for through utility bill in deregulated environments • Size and usage requirements may be prohibitive (utility bill required to verify eligibility)
  • 9. 9 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Project Stages Preliminary Project Analysis Photometrics review Product Evaluation Energy Analysis Scope Development Contractor review Lighting Survey Procurement Logistic Project Management Project Progress Communication M&V, Final Report Preliminary Project Analysis Photometrics Review Scope Development Procurement Energy Analysis Product Evaluation Logistics Project Progress Communication Project Management M&V, Final Report Lighting Survey Contractor Review
  • 10. 10 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Street Lighting: Our Approach PreliminaryAnalysis Conduct photometric study Assess budgetary economics Calculate energy & maintenance savings Identify grant and rebate subsidies Address financing options Conduct lighting and controls needs assessment InvestmentGradeAudit Geo-tagging physical pole locations Web-based portal access to view audited pole locations Customized data collection Physical asset reconciliation RFPDevelopment Design installation scope of work Solicit bids from qualified contractors Define installation procedures & requirements Develop measurement and verification protocol ProjectManagement Manage electrical contractors to scope Coordinate communication with City and stakeholders Manage grant and rebate paperwork Manage logistics
  • 11. 11 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Front to Back Integration • Data from multiple auditors aggregated in common database • Audit records pushed to cloud; database updated at pre-scheduled intervals • Audit results updated to Project Portal; Google Maps (GIS layer) • Portal accessible by partners, customers (password protected) • Data available for export to .csv and excel
  • 12. 12 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Project Portal—Audit Process Cobrahead Decorative Floods
  • 13. 13 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Project Portal—Installation Process
  • 14. 14 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x Our Software: Project Overview
  • 15. The information contained herein is confidential in nature and considered proprietary to WESCO Distribution, Inc. It is intended for the exclusive use of the employees, contractors and agents of client companies. We request that no oral or written disclosure of such information be made without the prior written approval by WESCO Distribution, Inc. Savings criteria based on agreed upon metrics Easy to understand “Good | Better | Best” proposals Create and analyze unlimited projects within a facility
  • 16. 16 WESCO Confidential – Do not copy or distribute without express permission from WESCO Distribution, Inc. x CONTACT US Lou Nazirides Director of Business Development Energy Services Solutions 610-240-9800 lnazirides@aelux.com

Editor's Notes

  1. 1. Differences: construction is spec/bid
  2. Give examples of each: Customizable audit app—JCI for DVRPC Auditing Assistance—Urban Energy for Scottsdale ISD Good Better Best—everyone! Branded Proposals—that Chris White group in NY Lead Generation—just starting first campaign around Duke/Progress rebate program Subcontracting Opps—NW Edison