1. CURRICULUM VITAE
KRISHNASAMY C
G2, Block B, Mount Vie Apartment
Kanadairpalayam, WestTambaram
Chennai - 600045
Ph.: (0)98406 80204, 044-22263230
Mail: jaikrish5578@yahoo.com
PROFESSIONAL QUALIFICATION:
B. Tech., in Mechanical Engineering(PT)
fromSRM University– Ramapuram,Chennai.
Completion- April 2012.
Bachelor of BusinessAdminstration(DE)
fromPondicherry University
Completion –January2001.
Diploma in Mechanical Engineeringwith60% of marks,
fromMotilal Nehru Govt.Polytechnic.Pondicherry
Completion –April 1994.
COMPUTER PROFICIENCY:
Design software - Pro/E, AutoCAD, Factory CAD.
Virtual Engineering software - VisMock-up,
Time StudyTool:MOST, ATS, ODS
General Software- MS-Office.
Managerial Skills:Communication,Decisiveness,Initiative,WorkEthic,HighLevel Energy,Integrity
Certificate Skills:CertifiedSix SigmaGreenBelt
PROFESSIONAL EXPERIENCE:
A competentanddrivenProfessional withanabilitytoworkindependentlyandhasexcellent
problemsolving,judgmentanddecisionmakingskills.Possessesanabilitytosee the bigpicture
whilstatthe same time focusingonthe tasksat hand,and managingmultipleprojects.Above all,
has a successful trackrecordof analysingandevaluatingresultsthroughcritical problemsolvingand
reasoning.Lookingforasuitable position.
Accomplishments:
2. As a LeadEngineer,Co-ordinatedthe assemblyProcessPlanningProjectWithin 5-member
teamand accountable forresultsintermsof qualityanddelivery
As an Onsite co-ordinatorinCIPL-Thiruvalur,leadcompleteaccountabilityforOrderto
Deliveryof PilotBuild777 E2 & 773 E2 OHT
Successfullycompletedthe Pilotbuildasperthe customerrequestedplanandschedule
Got appreciatedfromthe ProcessPartnerforthe valuable supportadheringthe NPI
methodology.
As a ProcessEngineerforManufacturing,managed10-memberteaminEDC and taken
accountabilityforVPPA Quality,Velocity&Delivery
As an Onsite co-ordinatorinCAMP-NC-USA,leadcomplete accountabilityforOrderto
Deliveryof VPPA toPilotBuild785C & 797,793,795 FAC RearAxle.
ExploredManufacturingknowledge andsharedtothe teamfor the betterqualitydeliveryof
the project
As a teammember,participatedin3Different6SigmaGreenBeltProjectandsupportedfor
results.Ex:iPQMS,Automationof SWES,Standardisation of APPWork.
SupportedasDesignEngineerforLarge Engine Components,Group Drawings,ECR’s,
conversionwork.
Mainlysupportedfordrawingof AFT.
Functions: Six Sigma Green belt around 20 years of rich hands on experience in Design, Digital
Manufacturing, Assembly process Planning, Layout planning, PFD, Torque Audit, Standard work
instruction, Responsible for product & process integration, ensuring DFMA, serviceability, safety &
ergonomics for Mining Trucks, Wheel Loader and Motor Grader NPI.Helping customers in developing
efficientprocesses&operationstobuildtheworldclassproductsinConstruction&Miningequipments.
Topics of interest: Six sigma,CaterpillarProductionSystem,Machine shopproductionplanning,
standardwork design,DFMA,SQC(Statistical Qualitycontrol)
WORKHISTORY
Detailsof Manufacturing EngineeringExperience: -
Lead Engineer- Manufacturing Engineering
CAT India
Jan 2014 -Jan 2015
Jan 2016 -Aug 2016
Standard Work Sheet creation,Torque Audit, Virtual Build, Build book,Time study validation.
Estimate the projectand execute the projectwith the support of team members with quality and velocity
APP Supports provided for US Facilities likeAurora, Decatur, UK Facilities likeGrenoble, Dortmund
Tool Validation, PFMEA, SFMEA, Time study analysis.
Process Standardization of SWES across all facilities.
Detailsof Manufacturing EngineeringExperience: -
3. Lead Engineer-Onsite Support- CAT India
CIPL- Thiruvalur Feb2015 -Dec 2015
Process engineer for NPI of Optimus OHT Machine (777E2, 773E2) manufacturing responsible for Planning and
executing the build fromdrawingto until production.
NPI Responsibilities include implementing Design for Assembly, design for serviceability and structuring the Virtual-
MBOM to M-BOM, SWES, PFD, and Torque Tool, build tool selection & control plan.
Assembly linebalancing,Virtual MBOMto refine design concepts,Virtual Sequence Validation to enhancesafety,Quality
and velocity performances of the assembly process.
Completed comparison study and havemadeprocess design for NPI productwhich matches with currentProductprocess
flow.
Supported the lineassembly build (Pilot) to assembler and gave solutions on the spot and rectify the lineissues while
pilotbuild for both 777 E2 & 773 E2
Detailsof Manufacturing EngineeringExperience: -
Lead Engineer-Onsite Support- CAT India
CAMP-NorthCarolina USA*
Oct-2010- Apr 2011
May 2011 -May 2012*
June 2012- Dec 2013
As an Onsite Co-Coordinator for this Project, lead a 5 Members team in Cat-India by providing the VPPA
projectsandguidingthe teamby technicallyandstrategically.
Getting the Output from the Off-shore team as per the plan and deliver to the customer end without
affectingthe pilotbuildplanfromcustomerend.
SupportedRearAxle ManufacturingUnitforabout10 DifferentModelsOHT
NPIsupportsuccessfullycompletedfor4Modelsduringmytenure at onsite
SupportcontinuesfromOffshore forthe restof the 6 Modelsaftermy Onsite tenure wasover.
BasedonourQuality&Commitmentwe havebeenadded5more teammembersinadditiontothe previous
numbersandbecome 10-memberteam.
GainedPractical knowledgeof PilotLine Assemblyforthe RearAxles.
Got BestPerformance-2012for the dedicatedsupport.
DesignEngineer CAT India
Mar 2005 -Sep2010
Created2D – 3D Drawingsasper CAT-Standardsforthe Large Engine Components
SupportedforLafayette Engine Centre USA.
Major work relatedtoGroupdrawing creationusingPro/E
Lead EngineeringChange Request(ECR) 4-memberteam
Hose RoutingsforFluidlines inLarge Engines
Lead 3-memberteamforAftertreatmentComponentsMossville USA
AdheringCPSstandardsdrawingqualityanddeliverontime toprocesspartner
Engineer-Design& Development
PondyDie Castings(P) ltd., July-2003 to Feb2005
4. UsingAuto-Cad& Pro/E I have beenworkedforsome of the projectsforthe companieslike Delphi-
TVS ltd,Hi-TechArai ltd, Alstomltd.
2D drawing- 3D model creation
Designchangesfromthe customerforthe 3D modelsaftergettingapproval fromthe
customer
Accuratelyestimate costof variousprojectforpresentationtoclientsforfinal approval
givenforthe correct tool planfor the customer& to monitorthe projectcompletionas
perschedule.
Follow-upwiththe Die makersasperthe schedule togetthe assignedDie at righttime
Travelledtootherplaceslike Chennai &Madurai for Die monitoringtoensure thatthe
actual processison schedule.
DesignEngineer
Doux Systems(P) ltd. Jan/2002 to June 2003
Completedsome of the Industrial Automotive ComponentslikeLucas-TVS,FALindustriesltd..,
Visteon Ford.
Componentslike
StarterMotor FixingBracket
Honda MountingBracket
CompressorMounting
RegulatorMoulding
As a TeachingfacultyIhandledclassesforPro/Eincollegeslike:
I.F.E.TEngineeringCollege- Villipuram-TN
MailamEngineeringCollege-Mailam-TN
DesignAssistant
AlchemyDataSystems(P) ltd. Nov/2000 to June 2001
TrainedStudentsinAuto-Cad2000 Package
GivenCounsellingforthe studentsregardingthe Course
Completedsome Auto-CadProjectslikeIndustrial Layout,ProductionDrawings
Done Line drawingsrepresentingthe layoutof shopfloor
Production Supervisor
AnishEnterprises(AnUnitof Balaji DistilleriesGroupLtd.) Dec 1994 -Dec 1999
MaintainingandControllingof 60 employeesinvolvedinsheetmetal punchingwork
Supervisingthe production of metal capsforliquorbottles
Controllingof PowerPress20T and30 T
Enforcingthe productionlayoutandgettingthe productionoutputinrighttime and
reportingtothe superiors.
Certificate Courses
Certificate CoursesInAuto-CadfromAutodesk
DiplomaCoursesInPro/EfromDoux Systems
Personal Details
5. Date of Birth: 12.06.1975
Marital Status: Married
Passport Details:H0279402(Valid upto 01/09/2018)