SISTEM SERI VS PARALEL
BTP’S DEVELOPMENT OBJECTIVES
q Developing the R & D and training center for renewable energy-based in
electricity- technology
q Create a model of opSmizing the uSlizaSon of NRE as local energy resources for
electricity
q Improving the quality of human resources in the field of renewable
energy technology utilization
q Integrating the R & D and training of NRE technology utilization center
with tourism educaSon in science and technology and Agro Techno Park to
improve "Expediency functions and infrastructure“
q Reinforcing a point of interest of Yogyakarta in contact with technology,
and becoming a component of economic developers in southern region
of Yogyakarta and Central Java (Pacitan, Wonogiri, Wonosari)
17
10. 9/15/17
10
THE INSTALLED SYSTEMS IN BARON
TECHNO PARK 2012-2015
1. IMPLEMENTATION MODEL OF HYBRID SYSTEM BASED ON New and Renewable Energy :
• 2 units of Photovoltaic power generaOon with capacity: 36 and 15 KWP respecOvely
• 4 units of wind power generaOon with capacity: 10 , 5 , 4 and 1 KW respecOvely
• Diesel power generaOon using Biodiesel with capacity 25 KVA
• Bacery bank, with capacity 288 KVAH
• Hybrid power controller(HPC) with capacity 25 KVA
• 5 Parameters weather staOon (wind sped, wind direcOon, solar radiaOon, ambient
temperature and humidity) On line monitoring system
2. Biodiesel Processing unit with capacity 150 kg/batch
3. 2 Units R.O. DesalinaOon system with capacity 10 ton/day each.
4. Ice maker and cold storage
5. 2 Units Fuel Cell , with capacity : 2.5 KW
6. 1 unit House with Composite material
7. 2.unit Techno camp model
8. Renewable Energy informaOon center
9. Sundial and view post
Kontribusi Energi
Juli 2017
1
2
3
Energi Fotovoltaik
Energi beban
Energi Angin
Kontribusi Energi pada sistem
PLTH antara PLTS dan PLTB
pada bulan Juli 2017 adalah
sebagai berikut:
PLTS (36 kWp) 3,202 kWh
PLTB (5 kVA) 251 kWH
Untuk mencatu beban sebesar
2,145 kWh
Kelebihan energi yang masuk
pada komponen penyimpan
energi Baterai sebesar : 1308
kWh.
Terlihat bahwa sistem masih
under load, Tegangan baterai
rata-rata 259.73 Volt.
SYSTEM PERFORMANCE EVALUATION
JULY 2017
11. 9/15/17
11
• Karakteristik operasi PLTH Harian bulan Agustus 2017, tegangan baterai selalu diatas
250 Volt, dengan rata-rata tegangan sebesar 259, 73 Volt, tegangan maximum 268 Volt.
• Energi beban harian rata-rata :69.16 kWh, Maximum : 110 kWh
• Energi Fotovoltaik harian rata-rata :103 kWh, Maksimum ; 144.17 kWh
• Energi PLTB harian rata-rata :5.89 kWh, Maximum : 26.96 kWh
• Beban terdiri dari suplai listrik gedung utama (penerangan, Air conditioner dll) serta
mesin Desalinasi Reverse Osmosis.
0.00
50.00
100.00
150.00
200.00
250.00
300.00
0.00
20.00
40.00
60.00
80.00
100.00
120.00
140.00
160.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Kesetimbangan Energi
Agustus 2017
Energi Angin (kWh) Energi PV (kWh) Energi Beban (kWh) Tegangan baterai harian rata-rat(Volt)
VoltkWh
PELATIHAN DI B.T.P (1/2)
q Pelatihan dilaksanakan tiap tahun sejak 2013
q Peserta Pelatihan 2013
q 240 siswa SMP dibagi dalam 4 sesi (2 hari, per hari 2 sesi)
q Materi/silabus
q Pengertian Energi Secara Umum
q Energi Baru dan Terbarukan
q Energi Listrik
q Energi Bahan Bakar
q Peserta Pelatihan 2014 dan 2015
q 120 siswa SMP (1 hari, 2 sesi)
q 120 siswa SMA/SMK (1 hari, 2 sesi)
q Materi/silabus (SMA/SMK)
q Baterei (Tipe dan Jenis Baterei, Bateri yang dipakai di BTP)
q PLTS (Sistem PLTS, Komponen PLTS, Prinsip Kerja PLTS)
q PLTB (Sistem PLTB, Komponen PLTB, Prinsip Kerja PLTB)
q PLT Hibrid (Sistem PLTH, Komponen PLTH, Prinsip Kerja PLTH)
q Biofuel (Proses produski Biodiesel)
21
12. 9/15/17
12
PELATIHAN DI B.T.P (2/2)
q Peserta Pelatihan 2016
q 50 siswa SMA/SMK (1 hari)
q 40 peserta dari Masyarakat (dari 2 desa PLTS, 20 peserta per desa, 1 hari per desa)
q 25 peserta dari Industri (2 Gelombang, 3 hari per Gelombang)
q Materi/silabus pelatihan untuk Masyarakat
q PLTS (Sistem PLTS, Komponen PLTS, Prinsip Kerja PLTS, Perawatan PLTS), Penekanan
pada Perawatan PLTS
q Materi/silabus pelatihan untuk peserta dari Industri
q Overview Sistem PLTS,
q Dasar Konversi Energi Surya
q Penyimpanan Energi
q Inverter
q Proteksi dan Keselamatan Kerja
q Perencanaan dan Desain Ssitem PLTS
q Prosedur Instalasi, O&M, dan Trouble Shooting
q Inspeksi, Pengujian dan Komisioning
q Praktek
q Overview Baron Teknopark