Introduction
1. Lift Cycle Cost Analysis (“LCCA”) is a process of evaluating the economic
performance of a system over its entire life.
2. The objective to evaluate chiller water cooling plant system performance using
LCCA method as followings:-
a) Increased focus on sustainability and energy efficiency.
b) Investing in systems that save energy generally can be justified and quantified
in a financial manifestation
3. By comparing the life cycle costs of various design configurations, LCCA can explore
trade-offs between low initial costs and long-term cost savings, identify the most
cost-effective system for a given use, and determine how long it will take for a
specific system to “pay back” its incremental cost.
4. The evaluation criteria for LCCA of chilled water plant shall be as followings:-
a) Capital Cost
b) Operation Cost
c) Maintenance Cost
d) Technical Compliance
Evaluation Criteria
1. Capital Cost
➢ Total cost needed to bring a system to a commercially operable status.
2. Operation Cost
➢ Utilities Cost including electricity & water consumption.
3. Maintenance Cost
➢ Cost for implementation of comprehensive maintenance for cooling plant system and schedule
periodic maintenance on all the critical items of cooling plant system such as compressors,
cooling towers, pumps, condensers, air handlers, controls, filters and piping.
4. Technical Compliance
➢ Chillers performance.
i. Energy Efficiency.
ii. Project reference in Malaysia and South East Asia for example Singapore, Indonesia &
Thailand.
iii. Type of Refrigerant (Impact to environment, stable supply for next 25 years, cost)
➢ Chilled & Condenser Water Pumping System Performance.
➢ Cooling Tower System Performance.
➢ Accuracy of instruments (sensors & control devices), including frequency of calibration for each
instrument and its cost.
➢ Chilled water plant integrated energy performance without energy management system.
➢ Chilled water plant integrated energy performance with energy management system.
Evaluation Criteria
Sample of Chillers comparison using LCCA method:
LCCA EVALUATION SAMPLE
1. Commercial Comparison on Capital Cost
Description Bidder A Bidder B
Air Conditioning & Mechanical
Ventilation Services Price
RM 15,000,000.00 RM 15,500,000.00
Variance (RM) - +RM 500,00.00
Variance (%) +3.33%
Ranking for Capital Cost 1 2
LCCA EVALUATION SAMPLE
2. Commercial Comparison on Operation Cost
Description Bidder A Bidder B
Operation Cost per annum (Utilities Cost
for electricity consumption based on 100%
occupancy rate)
RM 1,200,000.00 RM 1,100,000.00
Variance (RM) +RM 100,000.00 -
Variance (%) +9.1% -
15 years Lift Cycle Operation Cost (based
on assumed occupancy rate)
RM18,000,000.00 RM16,500,000.00
Ranking for Operation Cost 2 1
LCCA EVALUATION SAMPLE
3. Commercial Comparison on Maintenance Cost
Description Bidder A Bidder B
Comprehensive Maintenance Cost per annum
(1st year after Defects Liability Period)
RM 200,000.00 RM 225,000.00
Variance (RM) - +RM 25,000.00
Variance (%) - +12.5%
5 years Comprehensive Maintenance Cost
(after Defects Liability Period)
RM 1,000,000.00 RM 1,125,000.00
15 years Comprehensive Maintenance Cost
(after Defects Liability Period)
RM 3,000,000.00 RM 3,375,000.00
Ranking for Maintenance Cost 1 2
LCCA EVALUATION SAMPLE
4. Comparison on Technical Compliance (1/2)
No. Criteria Requirement Bidder A Bidder B
1. Chiller Model Selection C brand / T brand / Y brand C brand T brand
2. Chiller Performance Data ANSI/AHRI Standard 550/590 Comply Comply
3.
Cooling Plant System
Performance
< 0.65 kW/RT
Comply
(0.58 – 0.65 kW/RT)
Comply
(0.56 – 0.63 kW/RT)
4.
Project Reference for
similar Chiller Equipment
Regional Area
2 project references in
Singapore
1 project reference in
Singapore, 8 project
references in Asia
Pacific.
5.
Cooling Plant Energy
Management System
Mandatory Requirement Yes Yes
6.
Project Reference for
Cooling Plant Energy
Management System
Regional Area
1 project reference in
Malaysia & 1 project
reference in Singapore
> 50 project references
in Malaysia)
LCCA EVALUATION SAMPLE
4. Comparison on Technical Compliance (2/2)
No. Criteria Requirement Bidder A Bidder B
7.
Chilled Water Pumping
System Performance
Malaysia Standard 1525:2014
a) > 73% eff. for flowrate between
100 m3/hr to 270 m3/hr
b) > 80% eff. for flowrate
exceeding 270 m3/hr
Comply Comply
8.
Condenser Water Pumping
System Performance Comply Comply
9.
Cooling Tower System
Performance
Cooling Technology Institute (CTI)
Certificate
Comply Comply
10.
Accuracy of sensors &
instruments for
measurement
Comply to GBI & BCA Green Mark
requirements
Comply Comply
11.
Chiller Equipment
Manufacturer Maintenance
Team
Sophisticated maintenance team
with technical know-how.
Fair Good
12.
ACMV specialist on Supply &
Installation Work
Sophisticated installation team
with technical know-how.
Good Good
LCCA EVALUATION SAMPLE
5. Summary of Comparison
Bidder
A. Capital
Cost
(Rank)
B. Operational
Cost
(Rank)
C. Maintenance
Cost
(Rank)
D. Technical
Comparison
(Rank)
15 years
Lift Cycle Cost
(RM)
Overall
Ranking
Bidder A 1 2 1 2 RM 36,000,000.00 2
Bidder B 2 1 2 1 RM 35,375,000.00 1
6. Conclusion
 Bidder B shall be recommended as Bidder B has scored the Highest
Ranking in the Lift Cycle Cost Analysis.
Thank you

More Related Content

What's hot

Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) SYED KHURSHID ALAM ARZOO
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load CalculationOrange Slides
 
Energy Conservation in Compressed Air System.
Energy Conservation in Compressed Air System.Energy Conservation in Compressed Air System.
Energy Conservation in Compressed Air System.AffanDabir
 
Cooling towers1
Cooling towers1Cooling towers1
Cooling towers1Dev Rao
 
Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systemsmichaeljmack
 
Cooling towers
Cooling towersCooling towers
Cooling towersctlin5
 
Heat Load Calculation
Heat Load CalculationHeat Load Calculation
Heat Load CalculationJitendra Jha
 
Heating Ventilation & Air Conditioning (HVAC)
Heating Ventilation & Air Conditioning (HVAC)Heating Ventilation & Air Conditioning (HVAC)
Heating Ventilation & Air Conditioning (HVAC)Joshua Joel
 
Stulz datacentre cooling
Stulz datacentre coolingStulz datacentre cooling
Stulz datacentre coolingNick Turunov
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance AC Repair Local
 

What's hot (20)

Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation) Hvac - presentation (Air conditioning presentation)
Hvac - presentation (Air conditioning presentation)
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load Calculation
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Energy Conservation in Compressed Air System.
Energy Conservation in Compressed Air System.Energy Conservation in Compressed Air System.
Energy Conservation in Compressed Air System.
 
Cooling towers1
Cooling towers1Cooling towers1
Cooling towers1
 
Introduction to hvac systems
Introduction to hvac systemsIntroduction to hvac systems
Introduction to hvac systems
 
Hvac basics
Hvac basicsHvac basics
Hvac basics
 
Cooling towers
Cooling towersCooling towers
Cooling towers
 
Air washer
Air washerAir washer
Air washer
 
Chiller water systems
Chiller water systemsChiller water systems
Chiller water systems
 
HVAC
HVACHVAC
HVAC
 
Energy audit
Energy auditEnergy audit
Energy audit
 
Hvac Basics
Hvac Basics Hvac Basics
Hvac Basics
 
Heat Load Calculation
Heat Load CalculationHeat Load Calculation
Heat Load Calculation
 
Air conditioning system
Air conditioning system Air conditioning system
Air conditioning system
 
Heating Ventilation & Air Conditioning (HVAC)
Heating Ventilation & Air Conditioning (HVAC)Heating Ventilation & Air Conditioning (HVAC)
Heating Ventilation & Air Conditioning (HVAC)
 
Stulz datacentre cooling
Stulz datacentre coolingStulz datacentre cooling
Stulz datacentre cooling
 
HVAC operation and Maintenance
HVAC operation and Maintenance HVAC operation and Maintenance
HVAC operation and Maintenance
 
Chiller ppt
Chiller pptChiller ppt
Chiller ppt
 
Hvac
HvacHvac
Hvac
 

Similar to Life cycle cost analysis for chilled water plant

Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit Darshan Vithani
 
Industrial energy auditing and reporting
Industrial energy auditing and reportingIndustrial energy auditing and reporting
Industrial energy auditing and reportingVignesh Sekar
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)ravindradatar
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSaveDharmalingam P
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Anish Maman
 
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET Journal
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
Energy Audit SGS Indonesia
Energy Audit SGS IndonesiaEnergy Audit SGS Indonesia
Energy Audit SGS Indonesiadedyayunda
 
Electricity Demand Side Management (DSM) and End-use Efficiency
Electricity Demand Side Management (DSM) and End-use EfficiencyElectricity Demand Side Management (DSM) and End-use Efficiency
Electricity Demand Side Management (DSM) and End-use Efficiencyeecfncci
 
Electricity Demand Side Management and End-use efficiency
Electricity Demand Side Management and End-use efficiencyElectricity Demand Side Management and End-use efficiency
Electricity Demand Side Management and End-use efficiencyeecfncci
 
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET Journal
 
Comparative Analysis of HVAC System Based on Life Cycle Cost Analysis
Comparative Analysis of HVAC System Based on Life Cycle Cost AnalysisComparative Analysis of HVAC System Based on Life Cycle Cost Analysis
Comparative Analysis of HVAC System Based on Life Cycle Cost AnalysisIJERA Editor
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...guest3e1229f
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Alliance To Save Energy
 
Energy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantEnergy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantIRJET Journal
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programZondits
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant OptimizationJoePessa
 

Similar to Life cycle cost analysis for chilled water plant (20)

Reasdfg
ReasdfgReasdfg
Reasdfg
 
Case Study of Energy Audit
Case Study of Energy Audit Case Study of Energy Audit
Case Study of Energy Audit
 
Industrial energy auditing and reporting
Industrial energy auditing and reportingIndustrial energy auditing and reporting
Industrial energy auditing and reporting
 
Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)Mandatory Energy Audit for Designated Consumers (BEE)
Mandatory Energy Audit for Designated Consumers (BEE)
 
Energy audit and career opportunities -EnSave
Energy audit  and career opportunities -EnSaveEnergy audit  and career opportunities -EnSave
Energy audit and career opportunities -EnSave
 
Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)Industrial energy efficiency techniques and energy management (1)
Industrial energy efficiency techniques and energy management (1)
 
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration PlantIRJET-Detailed Energy Audit in a Captive Cogeneration Plant
IRJET-Detailed Energy Audit in a Captive Cogeneration Plant
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
Energy Audit SGS Indonesia
Energy Audit SGS IndonesiaEnergy Audit SGS Indonesia
Energy Audit SGS Indonesia
 
energy audit
energy auditenergy audit
energy audit
 
Electricity Demand Side Management (DSM) and End-use Efficiency
Electricity Demand Side Management (DSM) and End-use EfficiencyElectricity Demand Side Management (DSM) and End-use Efficiency
Electricity Demand Side Management (DSM) and End-use Efficiency
 
Electricity Demand Side Management and End-use efficiency
Electricity Demand Side Management and End-use efficiencyElectricity Demand Side Management and End-use efficiency
Electricity Demand Side Management and End-use efficiency
 
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT CollegeIRJET - Energy Audit and Electrical Power Consumption of ADIT College
IRJET - Energy Audit and Electrical Power Consumption of ADIT College
 
Comparative Analysis of HVAC System Based on Life Cycle Cost Analysis
Comparative Analysis of HVAC System Based on Life Cycle Cost AnalysisComparative Analysis of HVAC System Based on Life Cycle Cost Analysis
Comparative Analysis of HVAC System Based on Life Cycle Cost Analysis
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Energy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plantEnergy Auditing of Thermal Power plant
Energy Auditing of Thermal Power plant
 
Case studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response programCase studies of installation inspections of a demand response program
Case studies of installation inspections of a demand response program
 
Chilled Water Plant Optimization
Chilled Water Plant OptimizationChilled Water Plant Optimization
Chilled Water Plant Optimization
 

Recently uploaded

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

Life cycle cost analysis for chilled water plant

  • 1. GREEN AND COMPETITIVE By Ir. Kok Jing Shun +6019 7780578 LIFT CYCLE COST ANALYSIS FOR CHILLED WATER PLANT
  • 2. Introduction 1. Lift Cycle Cost Analysis (“LCCA”) is a process of evaluating the economic performance of a system over its entire life. 2. The objective to evaluate chiller water cooling plant system performance using LCCA method as followings:- a) Increased focus on sustainability and energy efficiency. b) Investing in systems that save energy generally can be justified and quantified in a financial manifestation 3. By comparing the life cycle costs of various design configurations, LCCA can explore trade-offs between low initial costs and long-term cost savings, identify the most cost-effective system for a given use, and determine how long it will take for a specific system to “pay back” its incremental cost. 4. The evaluation criteria for LCCA of chilled water plant shall be as followings:- a) Capital Cost b) Operation Cost c) Maintenance Cost d) Technical Compliance
  • 3. Evaluation Criteria 1. Capital Cost ➢ Total cost needed to bring a system to a commercially operable status. 2. Operation Cost ➢ Utilities Cost including electricity & water consumption. 3. Maintenance Cost ➢ Cost for implementation of comprehensive maintenance for cooling plant system and schedule periodic maintenance on all the critical items of cooling plant system such as compressors, cooling towers, pumps, condensers, air handlers, controls, filters and piping. 4. Technical Compliance ➢ Chillers performance. i. Energy Efficiency. ii. Project reference in Malaysia and South East Asia for example Singapore, Indonesia & Thailand. iii. Type of Refrigerant (Impact to environment, stable supply for next 25 years, cost) ➢ Chilled & Condenser Water Pumping System Performance. ➢ Cooling Tower System Performance. ➢ Accuracy of instruments (sensors & control devices), including frequency of calibration for each instrument and its cost. ➢ Chilled water plant integrated energy performance without energy management system. ➢ Chilled water plant integrated energy performance with energy management system.
  • 4. Evaluation Criteria Sample of Chillers comparison using LCCA method:
  • 5. LCCA EVALUATION SAMPLE 1. Commercial Comparison on Capital Cost Description Bidder A Bidder B Air Conditioning & Mechanical Ventilation Services Price RM 15,000,000.00 RM 15,500,000.00 Variance (RM) - +RM 500,00.00 Variance (%) +3.33% Ranking for Capital Cost 1 2
  • 6. LCCA EVALUATION SAMPLE 2. Commercial Comparison on Operation Cost Description Bidder A Bidder B Operation Cost per annum (Utilities Cost for electricity consumption based on 100% occupancy rate) RM 1,200,000.00 RM 1,100,000.00 Variance (RM) +RM 100,000.00 - Variance (%) +9.1% - 15 years Lift Cycle Operation Cost (based on assumed occupancy rate) RM18,000,000.00 RM16,500,000.00 Ranking for Operation Cost 2 1
  • 7. LCCA EVALUATION SAMPLE 3. Commercial Comparison on Maintenance Cost Description Bidder A Bidder B Comprehensive Maintenance Cost per annum (1st year after Defects Liability Period) RM 200,000.00 RM 225,000.00 Variance (RM) - +RM 25,000.00 Variance (%) - +12.5% 5 years Comprehensive Maintenance Cost (after Defects Liability Period) RM 1,000,000.00 RM 1,125,000.00 15 years Comprehensive Maintenance Cost (after Defects Liability Period) RM 3,000,000.00 RM 3,375,000.00 Ranking for Maintenance Cost 1 2
  • 8. LCCA EVALUATION SAMPLE 4. Comparison on Technical Compliance (1/2) No. Criteria Requirement Bidder A Bidder B 1. Chiller Model Selection C brand / T brand / Y brand C brand T brand 2. Chiller Performance Data ANSI/AHRI Standard 550/590 Comply Comply 3. Cooling Plant System Performance < 0.65 kW/RT Comply (0.58 – 0.65 kW/RT) Comply (0.56 – 0.63 kW/RT) 4. Project Reference for similar Chiller Equipment Regional Area 2 project references in Singapore 1 project reference in Singapore, 8 project references in Asia Pacific. 5. Cooling Plant Energy Management System Mandatory Requirement Yes Yes 6. Project Reference for Cooling Plant Energy Management System Regional Area 1 project reference in Malaysia & 1 project reference in Singapore > 50 project references in Malaysia)
  • 9. LCCA EVALUATION SAMPLE 4. Comparison on Technical Compliance (2/2) No. Criteria Requirement Bidder A Bidder B 7. Chilled Water Pumping System Performance Malaysia Standard 1525:2014 a) > 73% eff. for flowrate between 100 m3/hr to 270 m3/hr b) > 80% eff. for flowrate exceeding 270 m3/hr Comply Comply 8. Condenser Water Pumping System Performance Comply Comply 9. Cooling Tower System Performance Cooling Technology Institute (CTI) Certificate Comply Comply 10. Accuracy of sensors & instruments for measurement Comply to GBI & BCA Green Mark requirements Comply Comply 11. Chiller Equipment Manufacturer Maintenance Team Sophisticated maintenance team with technical know-how. Fair Good 12. ACMV specialist on Supply & Installation Work Sophisticated installation team with technical know-how. Good Good
  • 10. LCCA EVALUATION SAMPLE 5. Summary of Comparison Bidder A. Capital Cost (Rank) B. Operational Cost (Rank) C. Maintenance Cost (Rank) D. Technical Comparison (Rank) 15 years Lift Cycle Cost (RM) Overall Ranking Bidder A 1 2 1 2 RM 36,000,000.00 2 Bidder B 2 1 2 1 RM 35,375,000.00 1 6. Conclusion  Bidder B shall be recommended as Bidder B has scored the Highest Ranking in the Lift Cycle Cost Analysis.