SlideShare a Scribd company logo
1 of 3
Download to read offline
Curriculum Vitae
KIRAN KUMAR BEKAL
Abudhabi, UAE
Mob:+ (971) 559210118
E-Mail: kirankumarbekal@gmail.com
Equipment Installation & Commissioning | Building Management System / IBMS
Professional Profile
 A result oriented and competent Electronics & communication engineering professional with
experience and knowledge in the project life-cycle that includes project design, planning,
equipment installation & commissioning, testing and integration, technical engineering support
and quality assurance.
 Hands on technical knowledge and experience in building management system activities.
Exposure in handling installation, erection operations of Central Plant Air Conditioners (AHU,
ERU, FAHU, FCU, HEAT EXCHANGER, Split Unit, Package Unit, CHW Pumps…) CCTV & Access
Control Systems - operations & maintenance of the same.
 Demonstrated excellence in Site Supervision, Drawing, B.O.Q preparation, installations &
servicing construction methodologies. Relevant experience in delivering projects within
deadlines & given timeframe consistently under pressure to enhance customer satisfaction.
 Prompt decision maker with the capability to wade through crisis situations with great
objectivity. Good communication skills facilitating effective Liaison with external agencies,
clients, architects & consultants on determining technical specifications, approvals and direction
for smooth execution.
 Excellent analytical & negotiation skills with proven track record of delivering quality results. An
effective communicator & team leader combined with flexible & detail oriented attitude. Ability
to handle multiple functions and activities in a high pressure environment.
Key Skills
 Installation & Commissioning
 Testing & Integration
 Building Automation Systems
 HVAC Controllers
 CCTV
 Access Control Systems
 Project Operations & Management
Professional Experience
 Operation Engineer-BMS Systems (ELV-Systems)
Agthia Group-PJSC, Abudhabi-UAE -(Innovation Direct Employee Service-Abudhabi)
Since May 2015 to Till Date
 Project Engineer-BMS Systems
Pacific Controls Systems LLC- Dubai, UAE.
Since November 2010 to March 2012
Key Roles:
 Serve as BMS Engineer and monitoring BMS/CMS mode test, cause and effect test and
integration with OCS (Overall control system)
 System integration & Commissioning. Design BMS using Niagara platform. Tridium Niagara AX
(DDC Integration Platform)- used for resource estimation.
 Carry out the technical review, approval and process of all technical submittals such as drawings,
materials, method statement, work procedures, etc. for constructability and code compliance
 Carrying out the inspection of works carried out by contractor in respect of the works relative to
BMS/CMS field devices installations as per the approved drawings and proper quality is
maintained.
 Obtaining approval of drawings to ensure effective management, including the control of site
progress, resolutions of site problems, control of site meetings, etc.
 Involving in the planning of HVAC equipment BMS start-up & operational, functional &
integration tests and ensuring that all devices are installed before BMS start up.
 Ensured proper maintenance of site records, inclusive of daily site diaries in an approved format
and formal monthly progress.
 Participating in technical co-ordination and progress meetings & site co-ordination discussions
with consultants & sub-contractors
 Conveying technical expertise through process analysis, control philosophy and functional
specification management responsible for Execution as per drawings & design, final validation of
system operation
 Lead HVAC project operations entailing inspection, testing & commissioning and final handover
of HVAC with complete project management accountability
 Testing and commissioning of DDC panels (Direct Digital Controllers) for the Red line stations as
well as preparing progress reports, BMS schematics, riser diagrams and various schedules to
coordinate with the Main Contractors.
Education Qualification
 M.Tech in Digital Electronics & Communication-71% ( VTU 2012-2014)
 B.Tech in Electronics & Communication-64% (MG University 2005-2009)
Personal Details
Date of Birth: 4st
November 1987
Gender: Male
Linguistic Knowledge: English, Hindi, Malayalam, Kannada & Thulu.
Nationality: Indian
Passport No: G37692
Visa: Employment Visa (Residence UAE)
UAE Driving Licence No: 2249580
Declaration
I hereby declare that the information furnished above is true to the best of my Knowledge.
KIRAN KUMAR BEKAL

More Related Content

What's hot (20)

MJP Resume
MJP ResumeMJP Resume
MJP Resume
 
2015_JPOD Exec Summary
2015_JPOD Exec Summary2015_JPOD Exec Summary
2015_JPOD Exec Summary
 
Maria Hygine M Micosa
Maria Hygine M MicosaMaria Hygine M Micosa
Maria Hygine M Micosa
 
Resume Rafael Balboa
Resume  Rafael BalboaResume  Rafael Balboa
Resume Rafael Balboa
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
jmfresumechange1
jmfresumechange1jmfresumechange1
jmfresumechange1
 
Igor Kudevitsky Resume Short
Igor Kudevitsky Resume Short Igor Kudevitsky Resume Short
Igor Kudevitsky Resume Short
 
AnupamaSinhaITResume
AnupamaSinhaITResumeAnupamaSinhaITResume
AnupamaSinhaITResume
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Doc2015
Doc2015Doc2015
Doc2015
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Quality Engineer
Quality EngineerQuality Engineer
Quality Engineer
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Gregory d sleeper profile
Gregory d sleeper profileGregory d sleeper profile
Gregory d sleeper profile
 
Maintenance Planner
Maintenance PlannerMaintenance Planner
Maintenance Planner
 
Resume 06212015
Resume 06212015Resume 06212015
Resume 06212015
 
Ericresume1
Ericresume1Ericresume1
Ericresume1
 
Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
 

Viewers also liked

Top nãoficção 24092012
Top nãoficção 24092012Top nãoficção 24092012
Top nãoficção 24092012
Andreia1987
 
Great sales managers role and focus 1
Great sales managers role and focus 1Great sales managers role and focus 1
Great sales managers role and focus 1
Anthony Chaine
 

Viewers also liked (16)

Improve Aid For Ethiopian-Israelis
Improve Aid For Ethiopian-IsraelisImprove Aid For Ethiopian-Israelis
Improve Aid For Ethiopian-Israelis
 
Aritmeticas spinner CGCS
Aritmeticas spinner CGCSAritmeticas spinner CGCS
Aritmeticas spinner CGCS
 
Mastery Journey Timeline
Mastery Journey TimelineMastery Journey Timeline
Mastery Journey Timeline
 
Guía entorno socioeconómico
Guía entorno socioeconómicoGuía entorno socioeconómico
Guía entorno socioeconómico
 
Top nãoficção 24092012
Top nãoficção 24092012Top nãoficção 24092012
Top nãoficção 24092012
 
Calidad en la atención al ciudadano usuario (jennifer voukidis 17 5-16)
Calidad en la atención al ciudadano usuario (jennifer voukidis 17 5-16)Calidad en la atención al ciudadano usuario (jennifer voukidis 17 5-16)
Calidad en la atención al ciudadano usuario (jennifer voukidis 17 5-16)
 
Lori Pirrone - Hofstra University Graduate
Lori Pirrone - Hofstra University GraduateLori Pirrone - Hofstra University Graduate
Lori Pirrone - Hofstra University Graduate
 
Tutorial Eclipse
Tutorial Eclipse Tutorial Eclipse
Tutorial Eclipse
 
Corrosión 10%
Corrosión 10%Corrosión 10%
Corrosión 10%
 
Lori Pirrone - Experienced Consultant
 Lori Pirrone - Experienced Consultant Lori Pirrone - Experienced Consultant
Lori Pirrone - Experienced Consultant
 
Great sales managers role and focus 1
Great sales managers role and focus 1Great sales managers role and focus 1
Great sales managers role and focus 1
 
Servoaccionamientos
ServoaccionamientosServoaccionamientos
Servoaccionamientos
 
Bodratti proyecto para la recuperacion de residuos sólidos (1)
Bodratti   proyecto para la recuperacion de residuos sólidos (1)Bodratti   proyecto para la recuperacion de residuos sólidos (1)
Bodratti proyecto para la recuperacion de residuos sólidos (1)
 
Streptococcus
Streptococcus Streptococcus
Streptococcus
 
Reshma raj02
Reshma raj02Reshma raj02
Reshma raj02
 
Planificacion centro-de-interpretacion(1)
Planificacion centro-de-interpretacion(1)Planificacion centro-de-interpretacion(1)
Planificacion centro-de-interpretacion(1)
 

Similar to KIRAN KUMAR BEKAL

ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
Fahim Mohamed
 
CV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.docCV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.doc
salman shaikh
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
Syed Shihabdeen
 
Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1
Sami Ahmed
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
Vikram Prabhakar
 
SIYA RAHMAN RESUME
SIYA RAHMAN RESUMESIYA RAHMAN RESUME
SIYA RAHMAN RESUME
Siya Rahman
 

Similar to KIRAN KUMAR BEKAL (20)

Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
ELV Project Engineer
ELV Project EngineerELV Project Engineer
ELV Project Engineer
 
CV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.docCV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.doc
 
2016 CV May 2016
2016 CV May 20162016 CV May 2016
2016 CV May 2016
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
 
mohamed sobhi cv
mohamed sobhi cvmohamed sobhi cv
mohamed sobhi cv
 
Mohd Ehsan Resume
Mohd Ehsan ResumeMohd Ehsan Resume
Mohd Ehsan Resume
 
Resume_Justin
Resume_JustinResume_Justin
Resume_Justin
 
Vinoth ELV CV
Vinoth ELV CVVinoth ELV CV
Vinoth ELV CV
 
Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1Sami Uddin Ahmed Zia resume1
Sami Uddin Ahmed Zia resume1
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Civili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CVCivili Engr Aldophus Bethune CV
Civili Engr Aldophus Bethune CV
 
PradeepKombilath
PradeepKombilathPradeepKombilath
PradeepKombilath
 
Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 
Pramod Kumar Das
Pramod Kumar Das Pramod Kumar Das
Pramod Kumar Das
 
SIYA RAHMAN RESUME
SIYA RAHMAN RESUMESIYA RAHMAN RESUME
SIYA RAHMAN RESUME
 
Pradeep ramakrishnan cv 2018
Pradeep ramakrishnan   cv 2018Pradeep ramakrishnan   cv 2018
Pradeep ramakrishnan cv 2018
 
MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)MEPF Rroject Manager ( Execution, Desing,servises)
MEPF Rroject Manager ( Execution, Desing,servises)
 

KIRAN KUMAR BEKAL

  • 1. Curriculum Vitae KIRAN KUMAR BEKAL Abudhabi, UAE Mob:+ (971) 559210118 E-Mail: kirankumarbekal@gmail.com Equipment Installation & Commissioning | Building Management System / IBMS Professional Profile  A result oriented and competent Electronics & communication engineering professional with experience and knowledge in the project life-cycle that includes project design, planning, equipment installation & commissioning, testing and integration, technical engineering support and quality assurance.  Hands on technical knowledge and experience in building management system activities. Exposure in handling installation, erection operations of Central Plant Air Conditioners (AHU, ERU, FAHU, FCU, HEAT EXCHANGER, Split Unit, Package Unit, CHW Pumps…) CCTV & Access Control Systems - operations & maintenance of the same.  Demonstrated excellence in Site Supervision, Drawing, B.O.Q preparation, installations & servicing construction methodologies. Relevant experience in delivering projects within deadlines & given timeframe consistently under pressure to enhance customer satisfaction.  Prompt decision maker with the capability to wade through crisis situations with great objectivity. Good communication skills facilitating effective Liaison with external agencies, clients, architects & consultants on determining technical specifications, approvals and direction for smooth execution.  Excellent analytical & negotiation skills with proven track record of delivering quality results. An effective communicator & team leader combined with flexible & detail oriented attitude. Ability to handle multiple functions and activities in a high pressure environment. Key Skills  Installation & Commissioning  Testing & Integration  Building Automation Systems  HVAC Controllers  CCTV  Access Control Systems  Project Operations & Management Professional Experience  Operation Engineer-BMS Systems (ELV-Systems) Agthia Group-PJSC, Abudhabi-UAE -(Innovation Direct Employee Service-Abudhabi) Since May 2015 to Till Date
  • 2.  Project Engineer-BMS Systems Pacific Controls Systems LLC- Dubai, UAE. Since November 2010 to March 2012 Key Roles:  Serve as BMS Engineer and monitoring BMS/CMS mode test, cause and effect test and integration with OCS (Overall control system)  System integration & Commissioning. Design BMS using Niagara platform. Tridium Niagara AX (DDC Integration Platform)- used for resource estimation.  Carry out the technical review, approval and process of all technical submittals such as drawings, materials, method statement, work procedures, etc. for constructability and code compliance  Carrying out the inspection of works carried out by contractor in respect of the works relative to BMS/CMS field devices installations as per the approved drawings and proper quality is maintained.  Obtaining approval of drawings to ensure effective management, including the control of site progress, resolutions of site problems, control of site meetings, etc.  Involving in the planning of HVAC equipment BMS start-up & operational, functional & integration tests and ensuring that all devices are installed before BMS start up.  Ensured proper maintenance of site records, inclusive of daily site diaries in an approved format and formal monthly progress.  Participating in technical co-ordination and progress meetings & site co-ordination discussions with consultants & sub-contractors  Conveying technical expertise through process analysis, control philosophy and functional specification management responsible for Execution as per drawings & design, final validation of system operation  Lead HVAC project operations entailing inspection, testing & commissioning and final handover of HVAC with complete project management accountability  Testing and commissioning of DDC panels (Direct Digital Controllers) for the Red line stations as well as preparing progress reports, BMS schematics, riser diagrams and various schedules to coordinate with the Main Contractors. Education Qualification  M.Tech in Digital Electronics & Communication-71% ( VTU 2012-2014)  B.Tech in Electronics & Communication-64% (MG University 2005-2009) Personal Details Date of Birth: 4st November 1987 Gender: Male Linguistic Knowledge: English, Hindi, Malayalam, Kannada & Thulu. Nationality: Indian Passport No: G37692 Visa: Employment Visa (Residence UAE)
  • 3. UAE Driving Licence No: 2249580 Declaration I hereby declare that the information furnished above is true to the best of my Knowledge. KIRAN KUMAR BEKAL