!!!Qualification Summary:
! • Over 10 years Server project management experience,
• 1.5 years work experience in supplier chain as the procurement engineer for server
mechanical products.
!KEY SKILLS:
! • Good in communication skills
• Good to work with cross-function teams and multiple geographies team members.
• System platform sourcing, tooling & Unit parts Cost estimate / analysis
• Mechanical supplier qualification / audit & quality management
• Fluent English
!PROFESSIONAL EXPERIENCE
!Apr. 2012 ~ Present
Wistron Corp.
Director of Mechanical Product management
!Main Rule
Enterprise Mechanical product management
!Responsibility:
! • Assign team members for the new kick off projects
• Performs general mechanical product management with different function
teams and customers
• Identify risk and development risk mitigation plans.
• Provide the product status timely to review the performance.
• Build up sustaining support procedure for server regression and sustaining projects
for IPC mechanical product.
• Handle Dell Poweredge mechanical product developing.
• Offer a full evaluation report to help customer for the decision making
!Contribution:
! • Launched Dell project on time in the compressed schedule.
• Decline the communication gap with Dell assigned mechanical vendor.
• Get the 1st green light in Dell QBR (ME portion)
!Apr. 2010 ~ Apr. 2012
Wistron Corp.
Director of Product management
!Main Rule
TV product management
!Responsibility:
!! • Shorten the TV developing L/T from 6 months to 4.5 months and got Sony 1st mid
range OEM TV business.
• Lead the “SKD” project communicate with factory and design team to drive down the
transportation cost, simplify the production procedure in Mexico to save labor cost.
• Performs general management function throughout different phases of product life-
cycle.
• Co-work with R&D to defines and implements complex system requirements for cus-
tomers, prepares studies and analyzes existing systems. Determines system speci-
fications, input/output processes and working parameters for hardware/software
compatibility. Coordinates design of subsystems and integration of total system.
• Identify risk and development risk mitigation plans.
!Contribution:
• Successfully launched LG CEM product in Mexico within 2 months after
project award.
• Cost down 10% for TV products.
• Success lunched Sony LCD TV, Westinghouse LCD TV, Fujitsu Desktop and HP
Desktop products.
• Successful transfer tooling to Mexico for local injection and MP on time
• 5% transportation cost saving and 4 manpower cut from the production line.
• 2008 2H LCD TV achieve break even from US 15 loss
• Successful launched LGE CEM project mass production within 2.5 months after
project awarded.
!Jun. 2008 ~ Apr. 2010
Wistron Corp.
Director of Product management
!Main Rule
HP Server product management
!Responsibility:
!
April,2005 ~ June,2006
IBM
Procurement Specialist
!
Main Rule
Mechanical Procurement Engineer
Responsibility:
• Support xTDC for xSeries server mechanical schedule handling and parts approval
• Review tooling cost and manage it to achieve tooling cost budget
• Support GCM for Kingfish Level 6 mechanical cost review.
!Contribution:
• Lunch 1st xServer project X301, X3200, X3250 with lower tooling cost as 300K.
Successfully cost down the tooling cost from US400K to 300K.
• Kingfish supplier cost down US10 from original quote after the review
!
April, 2002~April, 2005
Wistron Corp.
Product manager
!Main Rule
Mechanical Product development management
!Responsibility:
• Handle Desktop RFQ and project developing
• Handle Server project developing and RFQ
• The interface to communicate with customer for all ME related issues. Daily mail
communication and weekly conf. call to control the project developing.
!Contribution:
• Get Wistron 1st HP server ODM project for the 1st year , then award the other 4
projects at the 2nd year. ML110 G2, ML110 G3 and DL120G3
• Get Wistron internal Best Team Award in year 2005.
• Get promotion from specialist to manager in year 2004.
!
April, 2001~April, 2002
Lite-on Enclosure
Account Specialist
!Main Rule
Account management and Project Management
!Responsibility:
• Handle server product new RFQs
• In charge of server chassis product developing and quote for MSI account
Contribution:
• Lunch MSI first server product
!
July, 2000~April, 2001
GVC Corp.
Account Specialist
!Main Rule
Account management and Project Management
!Responsibility:
• Provide Level 6 and M/B solution to US brand customer
• AR and fulfilment planning
Contribution:
• Get back overdue AR 200K in 2wks after taking over Micron account
!
October, 1997 ~February, 2000
Arima Corp.
Assistant
!Responsibility:
• Assist Compaq IPO engineer for new product FAI
• Handle excess material re-sell business
!Contribution:
• Sell the excess HDD to broker to solve the financial burden of Arima and Compeq
for customer buy and sell stocks.
!
Education
!
September, 1994 ~ June, 1997
Bachelor of International Business
DoungHai University
!
Principle studied in International Business, Economics, Business Management,
Accounting.

More Related Content

What's hot

Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds
 
Larry Finley Resume
Larry Finley ResumeLarry Finley Resume
Larry Finley ResumeLarry Finley
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)jmusiel
 
Vincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena
 
NettiePPetersresume (1) (1)
NettiePPetersresume (1) (1)NettiePPetersresume (1) (1)
NettiePPetersresume (1) (1)Nettie Peters
 
Resume - Alden Onoya
Resume - Alden OnoyaResume - Alden Onoya
Resume - Alden OnoyaAlden Onoya
 
Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016Gar Cooley
 
Product Design Using Solidworks
Product Design Using SolidworksProduct Design Using Solidworks
Product Design Using SolidworksBess Ho
 

What's hot (20)

Turnover Engineer
Turnover EngineerTurnover Engineer
Turnover Engineer
 
Ashish k nair
Ashish k nairAshish k nair
Ashish k nair
 
RESUME
RESUMERESUME
RESUME
 
Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016Kim Reynolds Resume LF 2P 6 20 2016
Kim Reynolds Resume LF 2P 6 20 2016
 
Don Conaway resume
Don Conaway resumeDon Conaway resume
Don Conaway resume
 
Larry Finley Resume
Larry Finley ResumeLarry Finley Resume
Larry Finley Resume
 
Cyndee_Blenkush_Resume
Cyndee_Blenkush_ResumeCyndee_Blenkush_Resume
Cyndee_Blenkush_Resume
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)
 
revised 5-27-2014 resume
revised 5-27-2014 resumerevised 5-27-2014 resume
revised 5-27-2014 resume
 
Vincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product DevelopmentVincent Spena - Agile and Lean Methods for Hardware Product Development
Vincent Spena - Agile and Lean Methods for Hardware Product Development
 
Michael R.3
Michael R.3Michael R.3
Michael R.3
 
2013 sps
2013 sps2013 sps
2013 sps
 
NettiePPetersresume (1) (1)
NettiePPetersresume (1) (1)NettiePPetersresume (1) (1)
NettiePPetersresume (1) (1)
 
JD_CV_15
JD_CV_15JD_CV_15
JD_CV_15
 
CV
CVCV
CV
 
Michael Resume
Michael ResumeMichael Resume
Michael Resume
 
Responsibilities
ResponsibilitiesResponsibilities
Responsibilities
 
Resume - Alden Onoya
Resume - Alden OnoyaResume - Alden Onoya
Resume - Alden Onoya
 
Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016Ge cooley resume 1 29-2016
Ge cooley resume 1 29-2016
 
Product Design Using Solidworks
Product Design Using SolidworksProduct Design Using Solidworks
Product Design Using Solidworks
 

Viewers also liked

Updated resume of soman bhowmick 2k16
Updated resume of soman bhowmick 2k16Updated resume of soman bhowmick 2k16
Updated resume of soman bhowmick 2k16soman bhowmick
 
Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!NatasaSkorda
 
1° tempo chakra Muladhara
1° tempo chakra Muladhara1° tempo chakra Muladhara
1° tempo chakra Muladharamister5
 
SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...
SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...
SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...Jailson Alves da Nobrega
 
Discovering, Detecting and Attacking Liberal Media Bias
Discovering, Detecting and Attacking Liberal Media BiasDiscovering, Detecting and Attacking Liberal Media Bias
Discovering, Detecting and Attacking Liberal Media BiasAccuracy in Media
 
Gi fi technology
Gi  fi technologyGi  fi technology
Gi fi technologychandrika95
 

Viewers also liked (9)

Updated resume of soman bhowmick 2k16
Updated resume of soman bhowmick 2k16Updated resume of soman bhowmick 2k16
Updated resume of soman bhowmick 2k16
 
De eierdoostheorie 2039302
De eierdoostheorie   2039302De eierdoostheorie   2039302
De eierdoostheorie 2039302
 
Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!Η βιβλιοπαρουσίασή μας!!
Η βιβλιοπαρουσίασή μας!!
 
1° tempo chakra Muladhara
1° tempo chakra Muladhara1° tempo chakra Muladhara
1° tempo chakra Muladhara
 
SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...
SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...
SIMULAÇÃO NUMÉRICA MULTIPASSE DO CAMPO DE TEMPERATURAS DE JUNTAS SOLDADAS DO ...
 
Discovering, Detecting and Attacking Liberal Media Bias
Discovering, Detecting and Attacking Liberal Media BiasDiscovering, Detecting and Attacking Liberal Media Bias
Discovering, Detecting and Attacking Liberal Media Bias
 
Gi fi technology
Gi  fi technologyGi  fi technology
Gi fi technology
 
Lecturas para segundo ciclo
Lecturas para segundo cicloLecturas para segundo ciclo
Lecturas para segundo ciclo
 
Kerajaan Pajang
Kerajaan PajangKerajaan Pajang
Kerajaan Pajang
 

Similar to Over 10 Years Server Project Management

Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016Ken Probst
 
Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016Kelly McGraw
 
Luongo pmp resume
Luongo pmp resumeLuongo pmp resume
Luongo pmp resumeMark Luongo
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00Upendra Kancheti
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00Upendra Kancheti
 
Resume_Arindom-March-3rd
Resume_Arindom-March-3rdResume_Arindom-March-3rd
Resume_Arindom-March-3rdArindom Biswas
 
Shiva_Singh_Resume
Shiva_Singh_ResumeShiva_Singh_Resume
Shiva_Singh_Resumeshiva singh
 
Resume_Arindom_Updated
Resume_Arindom_UpdatedResume_Arindom_Updated
Resume_Arindom_UpdatedArindom Biswas
 
Blaine Wolff Resume
Blaine Wolff ResumeBlaine Wolff Resume
Blaine Wolff Resumebwolff52
 
Kumar bablu resume_rev2
Kumar bablu resume_rev2Kumar bablu resume_rev2
Kumar bablu resume_rev2Bablu Kumar
 
Suma_Halkude_Resume
Suma_Halkude_ResumeSuma_Halkude_Resume
Suma_Halkude_ResumeSuma Halkude
 

Similar to Over 10 Years Server Project Management (20)

Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
PJTabac_CV
PJTabac_CVPJTabac_CV
PJTabac_CV
 
Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016Kelly McGraw's Resume 2016
Kelly McGraw's Resume 2016
 
Resume
ResumeResume
Resume
 
Luongo pmp resume
Luongo pmp resumeLuongo pmp resume
Luongo pmp resume
 
ArunMF2015
ArunMF2015ArunMF2015
ArunMF2015
 
ArunMF2015
ArunMF2015ArunMF2015
ArunMF2015
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
 
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
upendra_8_years_Exp_in_Automotive_Embedded_Systems_Software_V00
 
CV-Peter-Sterckx
CV-Peter-SterckxCV-Peter-Sterckx
CV-Peter-Sterckx
 
Resume_Arindom-March-3rd
Resume_Arindom-March-3rdResume_Arindom-March-3rd
Resume_Arindom-March-3rd
 
Sindhu_CV
Sindhu_CVSindhu_CV
Sindhu_CV
 
Shiva_Singh_Resume
Shiva_Singh_ResumeShiva_Singh_Resume
Shiva_Singh_Resume
 
MSQ_Resume_19092016
MSQ_Resume_19092016MSQ_Resume_19092016
MSQ_Resume_19092016
 
Resume_Arindom_Updated
Resume_Arindom_UpdatedResume_Arindom_Updated
Resume_Arindom_Updated
 
Blaine Wolff Resume
Blaine Wolff ResumeBlaine Wolff Resume
Blaine Wolff Resume
 
Kumar bablu resume_rev2
Kumar bablu resume_rev2Kumar bablu resume_rev2
Kumar bablu resume_rev2
 
Angela.Jackson.2016
Angela.Jackson.2016Angela.Jackson.2016
Angela.Jackson.2016
 
Suma_Halkude_Resume
Suma_Halkude_ResumeSuma_Halkude_Resume
Suma_Halkude_Resume
 
Resume_SameerajaKVL
Resume_SameerajaKVLResume_SameerajaKVL
Resume_SameerajaKVL
 

Over 10 Years Server Project Management

  • 1. !!!Qualification Summary: ! • Over 10 years Server project management experience, • 1.5 years work experience in supplier chain as the procurement engineer for server mechanical products. !KEY SKILLS: ! • Good in communication skills • Good to work with cross-function teams and multiple geographies team members. • System platform sourcing, tooling & Unit parts Cost estimate / analysis • Mechanical supplier qualification / audit & quality management • Fluent English !PROFESSIONAL EXPERIENCE !Apr. 2012 ~ Present Wistron Corp. Director of Mechanical Product management !Main Rule Enterprise Mechanical product management !Responsibility: ! • Assign team members for the new kick off projects • Performs general mechanical product management with different function teams and customers • Identify risk and development risk mitigation plans. • Provide the product status timely to review the performance. • Build up sustaining support procedure for server regression and sustaining projects for IPC mechanical product. • Handle Dell Poweredge mechanical product developing. • Offer a full evaluation report to help customer for the decision making !Contribution: ! • Launched Dell project on time in the compressed schedule. • Decline the communication gap with Dell assigned mechanical vendor. • Get the 1st green light in Dell QBR (ME portion) !Apr. 2010 ~ Apr. 2012 Wistron Corp. Director of Product management !Main Rule TV product management !Responsibility: !! • Shorten the TV developing L/T from 6 months to 4.5 months and got Sony 1st mid range OEM TV business. • Lead the “SKD” project communicate with factory and design team to drive down the transportation cost, simplify the production procedure in Mexico to save labor cost. • Performs general management function throughout different phases of product life- cycle.
  • 2. • Co-work with R&D to defines and implements complex system requirements for cus- tomers, prepares studies and analyzes existing systems. Determines system speci- fications, input/output processes and working parameters for hardware/software compatibility. Coordinates design of subsystems and integration of total system. • Identify risk and development risk mitigation plans. !Contribution: • Successfully launched LG CEM product in Mexico within 2 months after project award. • Cost down 10% for TV products. • Success lunched Sony LCD TV, Westinghouse LCD TV, Fujitsu Desktop and HP Desktop products. • Successful transfer tooling to Mexico for local injection and MP on time • 5% transportation cost saving and 4 manpower cut from the production line. • 2008 2H LCD TV achieve break even from US 15 loss • Successful launched LGE CEM project mass production within 2.5 months after project awarded. !Jun. 2008 ~ Apr. 2010 Wistron Corp. Director of Product management !Main Rule HP Server product management !Responsibility: ! April,2005 ~ June,2006 IBM Procurement Specialist ! Main Rule Mechanical Procurement Engineer Responsibility: • Support xTDC for xSeries server mechanical schedule handling and parts approval • Review tooling cost and manage it to achieve tooling cost budget • Support GCM for Kingfish Level 6 mechanical cost review. !Contribution: • Lunch 1st xServer project X301, X3200, X3250 with lower tooling cost as 300K. Successfully cost down the tooling cost from US400K to 300K. • Kingfish supplier cost down US10 from original quote after the review ! April, 2002~April, 2005 Wistron Corp. Product manager !Main Rule Mechanical Product development management !Responsibility: • Handle Desktop RFQ and project developing • Handle Server project developing and RFQ • The interface to communicate with customer for all ME related issues. Daily mail communication and weekly conf. call to control the project developing. !Contribution: • Get Wistron 1st HP server ODM project for the 1st year , then award the other 4 projects at the 2nd year. ML110 G2, ML110 G3 and DL120G3
  • 3. • Get Wistron internal Best Team Award in year 2005. • Get promotion from specialist to manager in year 2004. ! April, 2001~April, 2002 Lite-on Enclosure Account Specialist !Main Rule Account management and Project Management !Responsibility: • Handle server product new RFQs • In charge of server chassis product developing and quote for MSI account Contribution: • Lunch MSI first server product ! July, 2000~April, 2001 GVC Corp. Account Specialist !Main Rule Account management and Project Management !Responsibility: • Provide Level 6 and M/B solution to US brand customer • AR and fulfilment planning Contribution: • Get back overdue AR 200K in 2wks after taking over Micron account ! October, 1997 ~February, 2000 Arima Corp. Assistant !Responsibility: • Assist Compaq IPO engineer for new product FAI • Handle excess material re-sell business !Contribution: • Sell the excess HDD to broker to solve the financial burden of Arima and Compeq for customer buy and sell stocks. ! Education ! September, 1994 ~ June, 1997 Bachelor of International Business DoungHai University ! Principle studied in International Business, Economics, Business Management, Accounting.