SlideShare a Scribd company logo
1 of 42
Download to read offline
www.dienhathe.xyz
www.dienhathe.vn
LeadingInnovation,CreatingTomorrow
Leading you Toward a Greater Future than you Imagine
LSIS is Leading the Industries from the Electric and Machinery Control to the Most
Advanced Ubiquitous Solution to Create Comfortable and Productive Industrial Society.
Contents
AboutRailwayBusiness
E&MTurnkeyProjectExecutionCapacity
08 Benefit of LSIS E&M Turnkey Solution
14 Project Managing and System Engineering Execution Capacity
Technology
Signalling
24 Centralized Traffic Control (CTC)
26 Automatic Train Control
28 Electrical Interlocking System (EIS)
30 Audio Frequency Track Circuit
32 Platform Screen Door
Communication
38 Communication Management System
40 Passenger Information System
42 Automatic Fare Collection
PowerT&DSolution
48 AC High Voltage Solution
51 AC Low-Medium Voltage Solution
52 DC Solution
53 Super Capacitor Energy Storage System
54 SCADA
MajorProjectRecord
MainLineProject
59 Korea Main line Project (HSR)
MetroProject
63 Seoul
66 Incheon
68 Provincial Areas
LRTProject
73 E&M Work
76 Others
OverseasRailwayProject
79 Overseas Railway Project
www.dienhathe.xyz
www.dienhathe.vn
LSIS
A Leader in the Field of Industrial Electrics and Automations,
Providing Total Solutions to Creat the Comfortable and Productive
Industrial Environment
As the most experienced leader in Korea railway system industry, LS Industrial Systems, with its accumulated
electric, electronic and informational technology, is providing various signalling control systems with increased
safety and reliability at home and to overseas.
RAILWAYSYSTEM SOLUTIONS
www.dienhathe.xyz
www.dienhathe.vn
E&MTurnkeyProjectExecutionCapacity
08
AboutRailwaysBusinessLSIS, with the best competencies in Korea and overseas, performs as a leading company
responsibleforoveralloperationofinfrastructureimplementationprojects.
RAILWAY SYSTEM SOLUTIONS
www.dienhathe.xyz
www.dienhathe.vn
E&MTurnkeyProject
ExecutionCapacity
Based on the technological power for signalling, communication and power fields, the railway
business of LS Industrial System is equipped with the expertise to carry out system engineering and
projectmanagingintheentirefieldsofE&Mforrailwayimplementationprojects.
Business Unit
SystemEngineering&ProjectManagement
PowerT&DUnit
Signalling&CommunicationUnit
R&DUnit
Manufacturing&CommissioningUnit
LeadingInnovation,CreatingTomorrow
RAILWAY SYSTEM SOLUTIONS
About Railway Business
www.dienhathe.xyz
www.dienhathe.vn
www.dienhathe.xyz
www.dienhathe.vn
LeadingInnovation,CreatingTomorrow
LSIS,asaconsortiumleader,designsandprovidesthemostappropriatesysteminallthestagesfromprojectplanning
totesting,commissioning andmaintenance.Atthesametime,
LSISoffershighlyreliableprojectperformance.
FromMacroMainLinetoMetro
FromHighSpeedRailwaytoLightRailTransit
BenefitofLSISE&MTurnkeySolution
RAILWAY SYSTEM SOLUTIONS
AboutRailwayBusiness
E&MTurnkeyProjectExecutionCapacity
12 13
For large-scale railway infrastructure implementation projects that require large capital investment and long
construction period, LSIS provides the following solutions to developers and engineering service providers for the
integrated E&M projects.
IntegratedManagementofProjectSchedule,ReducingConstructionPeriod
LoweringVariousTechnicalRisks
DrasticallyReducingProjectOperationPersonnel
DecreasingProjectCost
Project Execution : Separate Order Individual System
Project Execution : E&M Turnkey
www.dienhathe.xyz
www.dienhathe.vn
SystemEngineering
System Engineering Execution Background
This is a large-scale composite system of diverse interfaces with outside organizations and participation by various fields that
requiressystemizedengineeringtechniques.
Due to mutual interface between subsystems and integrated system implementation, it is necessary to predict problems in
advanceandtoestablishsolutions.
Overallsystemassurancemeasuresarenecessarytosatisfythefinalrequirements.
Itisnecessarytominimizerisksandtoobserveschedulebyusingthepreviouslyverifiedsystemandtechnologiesapplied.
Fromdesign,manufacturing,installationandtesttotestoperationandopeningofeachE&Msystem,systematicadjustment,control
andmanagementareprovidedfromtheviewpointofintegratedE&Msystemthroughoutthelifecycleofthesystem.
RAILWAY SYSTEM SOLUTIONS
AboutRailwayBusiness
E&MTurnkeyProjectExecutionCapacity
14 15
LeadingInnovation,CreatingTomorrow
Through systematic and integrated management of various business fields, LSIS guarantees
successful E&M system.
ProjectManagingandSystemEngineering
PM
-ThemostComprehensiveConcept
-IncludingAllofLegal,FinancialandTechnicalAspectsofContract
SE
-FocusonTechnicalAspect
-GeneralPerformanceIndexofOverallSystemandReliabileSafetyManagement
-DecidingOverallSystemStructure,InterfaceManagementandIntegrationAmongSubsystems
-SubsystemDesign,TestandTestOperation
-VerifyingOverallSystemPerformanceIndex
ProjectManagingandSystemEngineeringExecutionCapacity
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
AboutRailwayBusiness
E&MTurnkeyProjectExecutionCapacity
16 17
TheRoleofeachSETeam
System SE Team
ProposingE&MSystemEngineeringExecutionPlansThroughExperienceswithSimilarSystems
AdjustingSystemEngineeringExecutionMethods
ProvidingGuidelinesforSub-systemEngineerinavarietyoffields
CheckingReflectionofSystemRequirementsinSub-systemSpecifications
CheckingSEDocumentsprovidedbySub-systemEngineer
SupportingSystemTest&Commissioning
Sub-system SE Team
ConductingSystemEngineeringwithintheScopeofSub-system
ReportingconflictsoccurredwithotherSub-systemSuppliers
PreparingandSubmittingDatatoVerifyFulfillmentofRequirementsforeachSub-system
LeadingInnovation,CreatingTomorrow
www.dienhathe.xyz
www.dienhathe.vn
Technology
LSISdevelops/produceshigh-techcontrolequipmentneededforthesafeandefficientoperationoftrains
Signalling
20
RAILWAY SYSTEM SOLUTIONS
Communication
34
PowerT&DSolution
44
www.dienhathe.xyz
www.dienhathe.vn
Signalling
From KTX to automatically operated light rail transit, LSIS provides total solutions for railway
SignallingSystem design,engineering,manufacturing,installationmaintenanceandoperation
LSIS provides the most appropriate system and economic solution for each construction type, such
as new line implementation, linking different lines, extension of existing line and renovation of
existingline.
LSIS realizes the better and improved operation of railway infrastructures with system advanced
throughinvestmentinR&Dofnext-generationsignallingsystem,fieldtestandRAMScertification.
CentralizedTrafficControl
AutomaticTrainControl
ElectricalInterlockingSystem(EIS)
AudioFrequencyTrackCircuit
PlatformScreenDoor
LeadingInnovation,CreatingTomorrow
RAILWAY SYSTEM SOLUTIONS
Technology
www.dienhathe.xyz
www.dienhathe.vn
www.dienhathe.xyz
www.dienhathe.vn
LeadingInnovation,CreatingTomorrow
Management
withConsideration
ManagingtheSystem,ReducingtheRisk,EnhancingthePerformance.
Extensive train control device extensively and compositely monitors the complicated train operation status as well as high-speed train operation in some sections of
the existing lines and the entire high-speed railway sections. This monitoring operation is carried out on a real-time basis by the central control room. According to the
train operation plans set in computer, train operation is automatically controlled. When necessary, commands are appropriately controlled and administered
manually to ensure safety and efficiency of high-speed train operation. This device has been duplex-configured to improve safety, reliability and convenience of
maintenance. The key functions of extensive train control device include operation scheduling, train tracking, maintenance, statistics processing and signalling control.
This system consists of the main computer, communication computer, developer computer, commanding console, display panel and near-range communication
network.
RAILWAY SYSTEM SOLUTIONS
Technology
Signalling
24 25
This system monitors and controls overall train and passenger operations. LSIS provides various functions to satisfy
requirements for successful railway business.
TrainOperationManagement
OperationControl,RouteControl,DelayedTrainHandling
ManagementofInformationBroadcastingandVariousRecords,Etc.
Based on technological power built over 20 years since 1992, LSIS implements system to satisfy requirements of railway
business. In line with the changing IT environment, the advanced system is continuously upgraded.
AutomaticTrainControlbyAlgorithmOptimizedtoTrainOperation
FlexibleNetworkandSystemExpandability
SystemImplementationtoSatisfytheStandardizedTechnologicalCriteria
IntuitiveandUser-centricUserInterface
InstallationandTestOperationAbilitiesforVariousConditions,SuchasExisting,
NewandExtensionFacilities
ConvenientMaintenanceandLowLife-CycleCost
CTCConfiguration
Centralized Traffic Control
www.dienhathe.xyz
www.dienhathe.vn
Technology
forHumanSafety
WeCareforOurChildren'sTravel.WeConsiderOurTomorrow.
RAILWAY SYSTEM SOLUTIONS
Technology
Signalling
26 27
LeadingInnovation,CreatingTomorrow
Automatic train control device is divided into ground device that transmits allowable speed set by considering various conditions on the ground (position of the train in
front and track slope/ radius of curvature) to train device and train device that receives and displays information sent from ground device.
Ground devices include input/ output device and data processing device installed inside signalling machine room located on the trackside at intervals. Ground device
consists of track circuit device installed on the outdoor trackside, various marks, transmission cable and safety switch. The key functions are to detect the presence of
train with track circuit, to exchange signalling information with the adjacent track circuit, to identify signalling conditions, such as track conditions of route ahead and
direction of turnout opening, by interface with interlocking device, to automatically change the rear speed signallings according to train operation and to transmit train
signalling information to train through track circuit.
Train device is installed at the vehicle. This device consists of antenna, train speed detector, on-train computer, speedometer, recorder and on-train display unit. The
key functions are to receive ground signalling through antenna and to display the allowable speed in engine room, to create braking curve, to compare allowable
speed with the actual speed of train operation and to administer automatic braking in case the allowable speed is exceeded.
Automatic train control device is duplex-configured to improve reliability, safety and convenience of maintenance. This system is configured in fail-safe mode to ensure
safety at all times even in case of equipment breakdown.
Through the consortium project of KTX stage 1 and 2 train control system implementation between Seoul and Busan,
LSIS controls the 350km/h level trains.
The highly reliable ground and train devices of LSIS are installed and operated in a number of subway routes .
LSIS is making continuous investment to R&D of signalling system in order to develop ATC system for the 400km/h level
next-generation high-speed railway operation and CBTC (Communication Based Train Control) System for Metro/LRT.
With information obtained in the communication between train and track, train operation is automatically controlled by
compositely considering signalling conditions, route status, track conditions and operation environments.
CalculatingSafeSpeedProfileandTransmittingIttoTrain
ControllingTrainSpeedAccordingtoProfile
ImplementingGround/TrainFacilitiesandConfiguringDataTransmissionSystem
Automatic Train Control
Train Device
AutomaticTrainSpeedControl
OptimalSpeedDisplay
TrainConditionMonitoring
Self-diagnosisFunction
Ground Device
ObtainingSpeedInformationonaReal-timeBasis
DeliveringSpeedInformationtoTrainDevice
ControllingTrainOperation
MonitoringFieldSystemStatus
ATCSystemBasicStructure
www.dienhathe.xyz
www.dienhathe.vn
SolidCredibility
fromCustomers
WeProvideSolutionstoCustomersontheBasisofCredibleInfrastructure.
RAILWAY SYSTEM SOLUTIONS
Technology
Signalling
28 29
LeadingInnovation,CreatingTomorrow
For safe train operation within station and at the interim passing line, interlocking system prevents accidents by interlocking railway signalling, switches, track circuits
and train routes for cascading operation. In addition, safe train operation is ensured even when erroneous control is made due to operator’s mistake. This system is
configured in the 2 out of 3 mode and with electronic interlocking device outstanding in safety, reliability and convenience of maintenance that enables successful
interface with ATC (automatic train control device)/ CTC (centralized train control device) and convenient extension and improvement of equipments. 2 out of 3 mode,
which ensures a high level of safety, can be employed only in case 3 processes with the same data produce at least 2 matching results.
The key functions of interlocking system are to control signalling or speed information after investigating trains blocking route, conflicting routes and signalling status,
to prevent switch conversion by train in case the train occupies a turnout section (track locking), to prevent switch conversion within the route when a train approaches
(approach stick) and to prevent switch conversion within the route when a train occupies the route section (route locking) as well as to administer train overlapping
protection, to clear the locked track switch after train departure and to ensure protection against erroneous handling by operator.
Interlocking system consists of reverse control panel, electronic interlocking panel, information transmission device, display panel, repair device, field control module
and data link module, etc.
This system interlocks and controls trackside equipments for railway operator to determine train operation route.
A variety of field facilities, such as railway signalling, track converter and railway crossing, are interlocked for control to
ensure safety of train operation.
Computer Based Interlocking
Configuredwithduplexsystemoffail-safeH/W,computer-basedinterlockingadministersinterlockinglogic.
DirectFieldControl
MonitoringFieldFacilities,InterfacewithUpperLayerSystem
ProvidingInformationtoLCCandMS
ExecutingControlCommandfromCTCoraRemoteLocation
TransmittingBlockSectionInformationBetweenStations
Local Control Console (LCC)
LCCcontrolsfieldfacilitiesbyoperatoranddisplaysstatusoffieldfacilities.
Real-timeMonitoringofFieldStatusbyCommunicatingwithCBI
CommandtoCBItoConfiguretheRequiredRoute
ImplementingDuplexSystem
Maintenance Console (MS)
MSprovidesfieldfacilitymaintenanceandstatusmonitoringfunctions.
FieldStatusMonitoring
EditingDBUsedbyCBIandCreatingList
Electrical Interlocking System (EIS)
ElectronicIntrelockingSystemConfiguration
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
Technology
Signalling
30 31
LeadingInnovation,CreatingTomorrow
InnovationTowardFuture
LSISTechnologyLeadsUstotheWayofFuture.
WeLiveToday,ButWeSeeTomorrow.
With information obtained through the analog AF track circuit installed along railroad track, position of train in front is
calculated to enable safe operation.
Implemented in metropolitan subway, national railway and subway lines, this circuit transmits information to train.
Linked to train devices, audio frequency track circuit controls train operation.
LSIS is in the process of developing safer and more reliable system by improving information reception and decoding
with digital AF track circuit.
Direcion of Travel (AF Track Circuit Block Diagram)
Audio Frequency Track Circuit
Determines optimized train speed for the best safety and speed by calculating automatically the preceding train’s location without driver’s operation.
Adjusts train interval and transmits emergency brake data to trains through rails.
Receives and interprets driving orders, and automatically regulates train speed without driver’s operation.
AFTrackCircuitConfiguration
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
Technology
Signalling
32 33
LeadingInnovation,CreatingTomorrow
Installed at the platforms of subway / light rail stations, platform screen door is automatically opened and closed by train
position info. and signalling info. Linked to the communication and signalling facilities of LSIS, platform screen door
ensures safety of passengers, prevention noise and polutions.
More over it dramatically reducing matenance cost by helps unmanned station operation.
PlatformScreenDoorSystemStructure
Platform Screen Door
www.dienhathe.xyz
www.dienhathe.vn
Communication
LSIS implements wired and wireless network environments for train operation and therefore
facilitatesinformationexchangebetweenthecomplicatedsystems.
LSIS implements stable and convenient communication environment in train, station, tunnel and
bridge.
CommunicationManagementSystem
PassengerInformationSystem
AutomaticFareCollection
LeadingInnovation,CreatingTomorrow
RAILWAY SYSTEM SOLUTIONS
Technology
www.dienhathe.xyz
www.dienhathe.vn
www.dienhathe.xyz
www.dienhathe.vn
LeadingInnovation,CreatingTomorrow
Connecting
PeopletotheWorld
LSISRailSolutionsAddConveniencetoYourWayofLife.
RAILWAY SYSTEM SOLUTIONS
Technology
Communication
38 39
Digital Optical Transmission Facility
Network between facilities, such as of communication, signalling, AFC, power, passenger information system and administrative
computing
Wireless Train Facility
Wirelesscommunicationsystembetweentraincrewandcommandingofficers
Commanding Telephone Facility
Telephone line for commanding between control room (Operation, power, signalling, control, disaster prevention) and main line or
betweenstaffsoftherelateddivisions
Video Transmission Facility
Systemwithwhichcommandingofficerandstationcrewmonitorsafetyofpassengers
Communication Management System
SystemConfiguration
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
Technology
Communication
40 41
LeadingInnovation,CreatingTomorrow
SolutionsforBetterLife
LSISRailSolutionsMakePeople'sLifeMoreComfortable.
Providing information for passenger operation and implementing entertainment environment, LSIS creates train
stations that are modernized and equipped with IT environment.
ReceivingTrainInformationFromControlRoom
ManagingOverallTrainSchedulesandProvidingtheRelatedInformation
ProvidingEnvironmenttoOperateVariousMultimediaDevicesinTrainStation
Passenger Information System
SystemBasicFunction
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
Technology
Communication
42 43
LeadingInnovation,CreatingTomorrow
This system issues and supplements train tickets at each station. In addition, automatic fare collection system
administers access control and account settlement.
By computerizing accounting processing, statistical data collection and automatic device monitoring and information
processing, LSIS provides solution for efficient operation and management.
Automatic Fare Collection
SystemConfiguration
www.dienhathe.xyz
www.dienhathe.vn
PowerT&DSolution
In the power T&D field, LSIS provides one-stop solution through implementation of full line-up from
super high-voltage to power distribution units. Based on the highly reliable power solution
technology,LSISimplementscompactandsafefacilitiestoaddconveniencetorailwayoperation.
LSIS’s T&D solution is convenient in maintenance as it collectively supplies entire power-related
electrical facilities together with DC or AC power to substations and railway tracks. In addition, LSIS
provides electrical facility management and operation services to lower the possibility of unexpected
accidentsthatarefataltorailwayinfrastructures.
ACHighVoltageSolution
ACLow&MediumVoltageSolution
DCSolution
SuperCapacitorEnergyStorageSystem
SCADA
LeadingInnovation,CreatingTomorrow
RAILWAY SYSTEM SOLUTIONS
Technology
www.dienhathe.xyz
www.dienhathe.vn
www.dienhathe.xyz
www.dienhathe.vn
LeadingInnovation,CreatingTomorrow
LSIS provides compact and lightweight high voltage transformer and GIS which are large power facilities to ensure
perfectionintheirperformanceandimprovecost-effectivenessintermsoftransport/installation.
LSIS guarantees product performance with world class test environment built in LSIS test room and delivers products
incompliancewithIECandANSIstandards.
AC High Voltage Solution
HighVoltageTransformer
Completing the construction of high voltage transformer factory in ’10, LSIS now produces a full suite of power system
facilities from low voltage to high voltage transformers.
We utilize up-to-date magnetic field analysis method to reduce power loss and optimizes structural insulation
performance with electric field analysis.
Frequency:50/60Hz
Voltage :Upto550kV
Capacity:Upto500MVA (3Phases)~300MVA(SinglePhase)
InsulationClass:A(105°C)
CoolingMethod:ONAF/OFAF/OFWF
Standard:IEC60076/ANSI(IEEE)C57
Certification:KERI
Remark:ScottTRforRailroadUse
GasInsulatedSwitchgear
GIS of LSIS designed to reduce the use of SF6 gas regulated by carbon emission regulations requires less installation
space and offers cost-effectiveness with compact and lightweight design.
From 25.8kV to 362kV, LSIS delivers any GIS specification for power system environment linked with railway.
RatedVoltage:25.8/36/72.5/145/170/245/362kV
RatedCurrent:Upto4,000A
RatedShortTimeWithstandCurrent:Upto63kA/3s
RatedOperatingSequence:O-0.3s-CO-3min-CO
Standard:IEC62271-100,102,203
Certification:KERI,KEMA,GOST
OperatingMethod:Hydraulic,Motor
EnclosureCB:Single,3PhasesCommon
RAILWAY SYSTEM SOLUTIONS
Technology
PowerT&DSolution
48 49
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
Technology
PowerT&DSolution
50 51
LeadingInnovation,CreatingTomorrow
SF6GasFreeSwitchGear
SF6 free eco-friendly switchgear conforming to Kyoto Protocol
Reliability of insulation proven in the test of long-term over-voltage,
thermal shock, mechanical life and moisture penetration
RatedVoltage:25.8kV
RatedCurrent:Upto2,000A
RatedShortTimeWithstandCurrent:25kA/3s
DegreeofProtection:IP4X
Standard:IEC62271-200
Certification:KERI
CubicleGasInsulatedSwitchgear
Designed to be one-piece in structure and compact / maintenance free, offering
excellent economic viability for users.
RatedVoltage :25.8kV
RatedCurrent:630A
RatedShorttimeWithstandCurrent:20kA/s
RatedPowerFrequencyWithstandVoltage:60kV(r.m.s)/1min
RatedLightingImpulseWithstandVoltage:125kV(1.2X50μs
Components:ALTSPanel,MOFPanel,PTPanel,IncomingVCB,FeederVCB
AC Low & Medium Voltage Solution
MediumVoltageSwitchgear
Air-insulated compact switchgear housed in enclosure to ensure safety
RatedVoltage:7.2kV~36kV
RatedCurrent:Upto4,000A
RatedShortTimeWithstandCurrent:Upto40kA/3s
DegreeofProtection:IP4X
Standard:IEC62271-200
Certification:KERI,KEMA,CESI
LowVoltageSwitchgear
Designforcoordinatedprotection/Paneldesignsoftwareavailable
Modular panel design for ease of assembly
RatedVoltage:690V
RatedCurrent:Upto2,500A
RatedShortTimeWithstandCurrent:Upto50kA/3s
DegreeofProtection:IP4X,~Form46
Standard:IEC60439-1
Certification:ASTA
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
Technology
PowerT&DSolution
52 53
LeadingInnovation,CreatingTomorrow
DC Solution
It is an energy storage system designed to save energy
consumption by railway system by
converting mechanical energy produced during braking to
electrical energy.
It adds additional benefit of cost-effectiveness from energy
reduction to the image of railway
as a green mode of transportation.
Super Capacitor Energy Storage System
Rectifier
Free convection and silicone-based rectifier designed to convert AC to
DC. Large capacity and compact design ensures reduction of space
required for railway transformation system installation.
LargeCapacity:~DC1500V,~4000kW
WiringMethod:3PhaseDoubleWayBridgeSeries/Parallel
DCSwitchgear
Designed to protect DC-powered railway line and integrated with high
speed circuit breakers for rectifier, power feeder and backup application
to prevent safety incidents.
RatedVoltage :~DC1500V
RatedCurrent:~6000A
RatedBreakingCurrent:~100kA
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
Technology
PowerT&DSolution
54 55
LeadingInnovation,CreatingTomorrow
LSIS develops and supplies EMS, a core element of electric power monitoring field.
Power monitoring facility based on EMS platform completely monitors entire facilities regardless of the power
environment provided by your train infrastructures.
In addition, with open structure and design specialized to train, LSIS configures facilities by selecting server and
operating system according to user’s convenience.
TrainPlatform
FunctiontoDeterminePressurizationandDecompressionforElectricTrain
VariousKindofGateway,RTU,FEP
SCADA
www.dienhathe.xyz
www.dienhathe.vn
MajorProjectRecord
RAILWAY SYSTEM SOLUTIONS
MainLineProject
58
MetroProject
62
OverseasRailwayProject
78
LRTProject
72
www.dienhathe.xyz
www.dienhathe.vn
MainLineProject
RAILWAY SYSTEM SOLUTIONS
Major Project Record
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
MainLineProject
58 59
LeadingInnovation,CreatingTomorrow
Kyungbu HSR line is the 1st high speed rail line in Korea, stretching from Seoul Station, Bongrae-dong, Jung-uu, Seoul
to Busan Station, Choryang-dong, Dong-uu, Busan and went in operation on April 1, 2004.
Kyungbu HSR line project was planned to open the 1st leg (Seoul ~ Daegu with the conventional Daegu ~ Busan section
being electrified) by 2004 and the 2nd leg (Daegu ~ Kyungju ~ Busan) by 2010. Phase 1 of the Project was initiated in
June, 1992 and commissioned on April 1, 2004, with the Seoul ~ Daegu section newly built and Daegu ~ Busan section
and intra-city conventional railroad sections in Daejeon and Daegu electrified.
Phase 1 of the Project cost 12 trillion and 737.7 billion KRW in total.
Phase 2 of the Project that began in 2002 includes construction of Daegu ~ Kyungju ~ Busan section and intra-city
sections running through Daejeon and Daegu, with scheduled completion in 2010.
Upon completion of Phase 1 of the Kyungbu HSR line project, trip time between Seoul and Busan which took 4 hours 10
minutes in the past was reduced to 2 hours 40 minutes. Upon completion of Phase 2 in 2010, high-speed section will be
stretched along the entire line except for the intra-city sections in Daejeon and Daegu, further reducing the trip time
between Seoul and Busan to 2 hours 10 minutes. The line is aligned through Seoul ~ Gwangmyung ~ Cheonan ~ Asan ~
Daejeon ~ Dongdaegu ~ Kyungju ~ Busan and Osong (Chungbuk) ~ Gimcheon (Gyungbuk) ~ Woolsan stations were
added to the planned line alignment in November, 2003.
Total line length is now 409.8km and it is to be extended to 418.7km upon completion of Phase 2.
KoreaMainLineProject(HSR)
www.dienhathe.xyz
www.dienhathe.vn
Challenges of LSIS
Phase1oftheHSRProjectwasimplementedfromJune,’94toApril,’04andPhase2fromDecember,’06toDecember,10.
LedE&Mconsortiumexceptforcivil/architecturalworkinPhase1andHRSsignallingsystem[ATC+IXL]consortiumin
Phase2andwontheelectricalworkcontractinalimitedtenderingprocessawardedbytheKoreaRailNetworkAuthority.
MaximumOperatingSpeed:300km/h[DesignSpeed:350km/h]
Headway:3Minutes
Line:256km,(Phase1)(Phase2:Line:144km)
Stations:8Ea.(Phase1:4Ea.,Phase2:4Ea.)
HSRSignallingSystem
Phase1oftheHSRProjectwasimplementedfromJune,’94toApril,’04andPhase2fromDecember,’06toDecember,10.
LedE&Mconsortiumexceptforcivil/architecturalworkinPhase1andHRSsignallingsystem[ATC+IXL]consortiumin
Phase2andwontheelectricalworkcontractinalimitedtenderingprocessawardedbytheKoreaRailNetworkAuthority.
ConsortiumLeader[Phase2ofKyungbuHSRProject]
AutomaticTrainControlSystem[ATC,Onboard&WaysideSystems]
TrainTrafficManagementSystem[TMS]
SystemEngineering
SafetyFacilities
HSRMaintenanceandR/STowingCar
InkedthecontractinMarch,2004andcompleteddeliveryofitsproprietaryonboardATCmodulesonJune30,2005.
LSISDeliveredandInstalledOnboardATCModulesonHRSMaintenanceandR/STowingCars
HSRSLPImplementation
SLP(SpeedLimitPanel):Itisinstalledinsignallingequipmentroomanddesignedtolimittrainspeedto90km, 170km, or230kmin
specifiedsections.
DeliveredandinstalledSLPsignallingmodulesalongtheentireHSRline,eachsignallingofficeandstation,signallingequipment
room,Gurorailroadtrafficcontrolcenter,GwangmyungHSRcontrolroom,situationroomofKNR,Osongelectricofficeand
operationalcontrolroomofSiheungStation.
SignedthecontractonDec.27,2006andcompletedimplementationonDec.22,2007,focusingonHSRinterfacedevelopment.
HSRPhase2CTCImplementation
LocalizedandImplementedCTCforHSRPhase2
ImplementedCTCforHSRPhase2inPrimaryandBackupRailroadtrafficControlCenters
ScopeIncludedDelivery,InstallationandCommissioningofCTCSystem(IncludingS/W)
SignedtheContractonApr.9,2009andCompletedImplementationonNov.1,2010forCommercialOperation
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
MainLineProject
60 61
LeadingInnovation,CreatingTomorrow
KyungbuHSRElectricalSystem
KyungbuHSRPhase1
GISforTestTrackSection,NewCheongjuSubstation
KyungbuHSRSeoulR/SDepotTransmission/DistributionSystemWork
KyungbuHSRSeoulR/SDepotSSGIS
KyungbuHSRPhase1GISDeliveryandInstallationinPyungtaek,Ansan,Okchon,KimcheonSS,BusanR/SDepotSS
ApplicableSystem
- Delivered 170kV GIS and 72kV GIS
- Constructed 154kV Transmission / Distribution Line and Facilities Incidental to SS
KyungbuHSRPhase2
WoolsanSection:WoolsanSS,DangliSP,Bangnaeand2OtherPPs
DaeguSection :DaeguSS,Keumkuand2OtherPPs
BusanSS
ApplicableSystem
- 170kV GIS, 72kV GIS, 24kV C-GIS and Low-voltage Distribution System in General
- Completed Full Power System Lineup in Power Receiving / Transformation / Distribution and Implemented Proprietary HSR SS System
Line Overview
ThenumberofKTXpassengersincreased42%
from72,300personsinthe1styearofcommercial
operationto102,700asoftheendof2009.
Notably,thenumberofpassengersincumulative
termspassedthe200millionmarkonDec.19,
2009,5yearsand8monthsafterthebeginningof
commercialoperation.
ThefigureindicatesthateachKoreantookKTX4
timesonaverage.TheHSRlineisnowinoperation
withsuccessandPhase2ofthelineisscheduled
togoliveinthe2ndhalfof2010.
www.dienhathe.xyz
www.dienhathe.vn
MetroProject
RAILWAY SYSTEM SOLUTIONS
Major Project Record
Seoul Metro Phase 1 lines in which LSIS participated are Seoul Metro Line 3 and 4.
Seoul Metro Line 3 of Seoul Metro links Jichuk Station, Deokyang-Gu, Goyang City, Gyeonggi Province and Okeum
Station, Songpa-gu, Seoul, Seoul Metro Line 4 stretches from Danggogae Station, Nowon-gu, Seoul to Namtaeryong
Station, Seocho-gu, linking the northeastern corner and the southern district of Seoul.
1980.02.29Line3and4ConstructionKickedOffConcurrently
1985.10.18Line3and4CommecialOperationinEntirety
1994.04.01Line4ExtensionSectionCommecialOperation(Sadang~Namtaeryong3.4km)
1993.10.30Line3ExtensionSectionCommecialOperation(Yangjae~Suseo9km)
1993.04.21Line4ExtensionSectionCommecialOperation(Sanggye~Danggogae3.4km)
1990.07.13Line3ExtensionSectionCommecialOperation(Gupabal~Jichuk9km)
2010.02.18Line3ExtensionSectionCommecialOperation(Suseo~Okeum3km)
Seoul Metro Phase 2 lines are Seoul Metro Line 6, 7 and 8 of Seoul Metropolitan Rapid Transit (SMRT) .
Seoul Line 6 links Eungam Station, Eunpyong-gu, Seoul and Bonghwasan Station, Jungrang-gu.
Commissioning of Line 6 marked the completion of radiant web of subway networks in Seoul, linking the urban district
and the suburban area of Seoul directly.
1994.01.08Line6ConstructionKickedOff
2000.08.07Line6SangwolgokSectionCommecialOperation(Bonghwasan~Sangwolgok,6Stations)
2000.12.15Line6Sangwolgok~EungamSectionCommecialOperation(28Stations)
2001.03.09TheRemainingLine6SectionCommecialOperationinEntirety(Itaewon~Yaksu,4Stations)
SeoulMetroLine7ofSMRTlinksJangamStation,EuijeongbuCity,GyeonggiProvinceandOnsuStation,Guro-gu,Seoul.
1990.12.28 :ProjectKickedOff
1996.10.11 :Jangam~GeondaeipkuSectionCommecialOperation
2000.02.29 :Sinpung~OnsuSectionCommecialOperation
2000.08.01 :Geondaeipgu~SinpungSectionCommecialOperation
Seoul Metro Line 8 of SMRT links Amsa Station, Gangdong-gu, Seoul and Moran Station, Sujeong-gu, Seongnam City,
Gyeonggi Province.
1990.12.29 :ProjectKickedOff
1996.11.23 :Jamsil~MoranSectionCommecialOperation
1999.07.02 :Amsa~JamsilSectionCommecialOperation
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
MetroProject
62 63
LeadingInnovation,CreatingTomorrow
MetroProject(Seoul)
www.dienhathe.xyz
www.dienhathe.vn
SeoulMetroPhase2(Line6,7&8)
Line6
RemovedOldControlFacilitiesandDeliveredNewOne
(Line6-38Stations,35km)1996.07~2000.11
DeliveredSignallingFacilitiesBetween1996.11~2000.12.
Fabricated/Delivered/Tested/Commissionedthe
SysteminTechnologyPartnershipwithALSTOM
ImplementedElectricalPowerFacilitiesforLine6
Between1996.03~1999.12.
-ImplementedtheFacilitiesin12Substations
-Fabricated/Delivered/Tested/CommissionedAC&DC
Cubicle,TR,Rectifier,SCADASystem.
Line7,Line8
ImplementedControlSystem1992.12~1999.12(Line7-42
Stations,47km,Line8–17Stations,18km)
Fabricated,Delivered,TestedandCommissionedProprietarySolutionofLSIS
TheelectricalfacilityimplementationLSISwasresponsibleforimplementingAC&DCCubicle,TR,Rectifierin11substations.
ElectricalPowerSystem
LSISsuppliesthemostcompactandreliableAC
24KVSWGR(MCSG,C-GIS)foundinKoreaor
elsewherearoundtheworldandoffersproprietary
DC750VHSCB(HighSpeedCircuitBreaker)DC
SWGRrectifierpanelandTRforrectifier,etc.in
technologypartnershipwithservice-provenglobal
partners.
Line Overview
Seoulmetropolitansubwaylinesservingoneof
theworld’sbiggesturbanareawhichishometoa
populationofaround20millionpersonsnowrelies
onsystemsthatLSISdeliveredforcommercial
operation.
Challenges of LSIS
SeoulMetroPhase1(Line3&4)
ControlSystem
RemovedOldControlFacilitiesandDeliveredNewOne(Fabrication,Delivery,Testing,Commissioning)
WonContract Between1996.06~1998.03(Line3-31Stations,36km,Line4–25Stations,32.3km)
Fabricated,Delivered,TestedandCommissionedProprietarySolutionofLSIS
ElectricalPowerFacilities
Fabricated,Delivered,TestedandCommissionedElectricalPowerFacilitiesforIlsanLine(ExtensiontoLine3)andGwacheonLine(ExtensiontoLine4)
Line3(IlsanLine):~1996.01.9Stations,19.2km-long,LSISImplementedDCCubicle,TRandRectifierin7Substations
Line4(GwacheonLine) :~1994.04.10Stations,13.4km-long,LSISImplemented154&72.5kVGIS,DCCubicle,TRandRectifier
in5Substations
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
MetroProject
64 65
LeadingInnovation,CreatingTomorrow
MetroLine 3
MetroLine 4
MetroLine 6
MetroLine 7
Metro Line8
www.dienhathe.xyz
www.dienhathe.vn
Challenges of LSIS
IncheonLine1:SuppliedElectricalFacilitiestotheNewLine(Fabrication,Delivery,Testing,Commissioning)
1996.02.~1999.12.(23Stations,L:22.km)ElectricalFacilitiesfor8Substations
IncheonLine1SongdoExtension:ExtensiontotheExistingLine(Fabrication,Delivery,Testing,Commissioning)
2006.12.~2009.06.(6Stations,6.5km)ElectricalFacilitiesfor2Substations
ElectricalFacilitiesDeliveredbyLSIS
ACCubicleDCCubicleTRRectifierSCADASystem
Line Overview
Phase1and2ofIncheonMetroLine2areplannedtobecompletedsimultaneouslyby2014fornow,but,analternative
strategytocompletePhase1by2014firstandPhase2subsequentlyfrom2014to2018.Theprojectplanmaybesubjectto
change,dependingonthestatusofpreparationfor2014IncheonAsianGames.
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
MetroProject
66 67
LeadingInnovation,CreatingTomorrow
Incheon Metro Line 1 links Gyeyang Station, Gyulhyun-dong, Gyeyang-
gu, Incheon City and Int’l Biz. District Station, Songdo-dong, Yeonsu-gu.
It is the only line of Incheon Metro and a part of the Seoul Metropolitan
rapid transit network. It was planned to stretch across from the north to
the south of Incheon City to support the existing Gyeongin Line (Seoul
Metropolitan Line 1) and provide railroad transit access to new towns
built in Gyeyang-gu and Yeonsu-gu.
1999.10.06:Bakchon ~DongmakSectionCommecialOperation
1999.12.07:Gyulhyun~BakchonextensionsectionCommecialOperation
2007.03.16:Gyeyang~GyulhyunextensionsectionCommecialOperation
2009.06.01:Dongmak~nt’lBiz.DistrictextensionsectionCommecialOperation
MetroProject(Incheon)
Metro Line 1
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
MetroProject
68 69
LeadingInnovation,CreatingTomorrow
Busan Metro Line 1 is the urban transit line of Busan Transportation
Corporation, linking Sinpyong Station, Saha-gu, Busan City and Nopo Station,
Geumjeong-gu.BusanMetroLine1wasbuiltin4phases.
Initially, the line was built in 3 phases from Nopodong Station (Presently Nopo
station) to Seodaeshindong Station (Presently Seodaeshin station) and
extendedinPhase4uptoSinpyongStation.
The line Commecial Operation on Jul.19, 1985 and became what it look today
onJun.23,1994.Sinceitsgo-live,thelargestnumberofpassengershaveused
BusanMetroLine1exceptforthesubwaylinesinSeoulMetropolitanAreaand
extensionuptoDaedaepoisnowunderwaywithscheduledcompletionin2013.
BusanMetroLine2isthe2ndsubwaylineofBusan,crossingthecityfromthe
east to the west, starting from Hopo, Hwamyong, Deokcheon to Seomyeon,
GyeongseongUniv.,Gwanganri,andHaewoondae.
Busan Metro Line 2 was built in 3 phases: Phase 1 is 22.4km-long between
Hopo ~ Seomyeon ; Phase 2 is 16.7km-long between Seomyeon ~ Jangsan ;
and Phase 3 is 11.3km-long between Hopo ~ Bukjeong. The line starts from
Jangsan Station, Haewoondae-gu, Busan and ends at Yangsan Station,
Yangsan City, Gyungsangnamdo, crossing Haewoondae, Suyoung Junction,
Seomyeon, Jurye, Sasang and Hwamyongdong Stations. In comparison with
Line 1, Line 2 has fewer passengers, but, form a critical part of trunk line
linkingtheeastandthewestofBusanCityandcrossingmajoruniversitiesand
suburban districts of Busan, with quite a many passengers in commuting
hours. Notably, with the commissioning of Yangsan Line, Line 2 provides
Yangsan New Town which is the major bedtown of Busan with critical transit
accesstotheurbandistrictsofBusan.
ThelinealignmentfollowsmostlythetrunkrailroadlinefromSeomyeontoHopo
stations.
Challenges of LSIS
Fabrication,Delivery,InstallationandCommissioningoftheEntireSignallingSystemIncludingControlFacilities,WaysideFacilitiesand
OnboardModulesfortheNewBusanMetroLine2andItsExtension(IncludingControlFacilitiesofLine1)
BusanMetroLine2SignallingFacilities(1995.09~2002.08)
BusanMetroLine2Phase3Section1[Hopo~Jungbu]SignallingFacilities(2005.12~2008.01)
BusanMetroLine2SignallingFacilities
-SignallingFacility -TTCSystem,ATCSystem,SimulationSystem,ATCCarborneDevice,UPS
-TechnicalSupervision
-SpareParts,ConsumableParts,Tools&TestEquipment
-Inspection&Training5.TTCSystemforBusanUrbanTransitAuthorityLineNo.1
Line Overview
BusanUrbanTransitAuthorityisresponsibleforoperationand
thelineshavethe2ndmostpassengersnexttothesubway
linesinSeoulMetropolitanArea.
MetroProject(ProvincialAreas)
BusanMetroLine1and2Projects
Busan Metro Line 1
BusanMetro Line 2
www.dienhathe.xyz
www.dienhathe.vn
Gwangju Metro Line 1 is the urban transit line of
Gwangju Metro Corporation linking Nokdong Station,
Dong-Gu, Gwangju City and Pyongdong Station,
Gwangsan-gu. Phase 1 section (Nokdong ~ Sangmu)
Commecial Operation on Apr.28, 2004 and Phase 2
section (Kim, Dae-Jung Convention Center ~ Mareuk ~
Pyongdong)CommecialOperationonApr.11,2008.
LineLength:20.6km
Operator:GwangjuMetroCorporation(EntireSection)
TrackGauge:1,435mm(Std.Gauge)
TravelingDirection:RightSide
Stations:20
DoubleTrackSection:EntireSection
Electrification:EntireSection(DC1,500V)
SecuritySystem:ATC/ATO
Challenges of LSIS
Fabrication,Delivery,InstallationandCommissioningofCommunicationSystemforGwangjuMetroLine1
GwangjuLine1Phase1&2:Fabrication,Delivery,InstallationandCommissioningofElectricalPowerSystem(AsaSubcontractortothe
PrimeContractor)
LSISImplementedtheCommunicationSystemfrom2000.01to2007.12 theCommunicationFacilitiesDeliveredforGwangjuMetro
Line1Include:DigitalTransmissionSystem/OnboardRadioSystem/DispatcherTelephoneSystem/VideoTransmissionSystem
TheelectricalpowersystemofGwangjuLine1Phase2wasimplementedbetween2005.04.~2008.04.(20stations,20.5km)and
AC&DCcubicleswereincludedinthescopeofdelivery.
Line Overview
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
MetroProject
70 71
LeadingInnovation,CreatingTomorrow
DaeguMetroLine1stretches25.9kmfromthesouthwesternpartofDaeguandacrossthedowntowndistrictstothe
easterncorner.TheprojectkickedoffonDec.7,1991andCommecialOperationinpart(JincheonStation~Jungangro
Station)onNov.26,1997.TheentirelineCommecialOperationonMay2,1998,withextensionsectionputincommercial
operationonMay10,2002(DaegokStation~JincheonStation).
Thelinehasatotalof30stations,withAnshimandWolbaeR/Sdepotsandoperatingmediumelectrictrainsetsof6cars.
1991.12.07:DaeguMetroLine1KickedOff
1997.11.26:DaeguMetroLine1Phase1Jincheon~JungangroSectionCommecialOperation
1998.05.02:DaeguMetroLine1Phase2Jincheon~AnshimSectionCommecialOperation
2002.05.10:DaeguMetroLine1Jincheon~DaegokSectionCommecialOperation
DaeguMetroLine2stretches28.0kmfromthewesternpartofDaeguandacrossthedowntowndistrictstothesoutheastern
corner.TheprojectkickedoffonDec.19,1996andtheentirelineCommecialOperationonOct.18,2005.3.32km-long
extensionprojectkickedoffonJun.4,2007,withadditionof3stationsinKyungsanCity.Thelinehas26stationsintotaland
crossDalgubeolStreetcrossingthewesterncenterandtheeasterncenterofDaeguamongthemajortrunkroadsofthecity.
Ithasonly1R/SdeptatMunyangandoperatesmediumelectrictrainsetsof6cars.
1996.12.19:DaeguMetroLine2KickedOff
2005.10.18:DaeguMetroLine2Munyang~SawolSectionCommecialOperation
Challenges of LSIS
LSISdeliveredandimplementedTTC(Totaltrafficcontrol)systemassignallingsolutionforDaeguMetroLine1from
1994.05~1998.05forthecontractamountofaboutKRW1.8billion.Thesystemeliminatesneedsforhumaninterventionin
traintrafficcontroland automatesmonitoringandcontrolofsignallingfacilitiesatstationswithcomputerizedmodulesin
referencetotrainoperationplan.
ForDaeguMetroLine1and2aswellasKyungsanExtensionsection,
LSISwasresponsibleforimplementingelectricalsystems(fabrication,
delivery,testing,commissioningandextensiontotheexistinglines)with
followingmilestones:
DaeguLine1:1994.05.~1998.05.(30Stations,25.9km)10SSPowerSystems
DaeguLine2:2002.09.~2005.10.(26Stations,28.9km)9SSPowerSystems
DaeguLine2 KyungsanExtension:2009.06.~2012.(3Stations,3.3km)
1SSPowerSystem.
LSISSuppliedAC&DCCubicle,TR,RectifierandSCADASystemforEachLine.
Line Overview
MetroProject(ProvincialAreas)
DaeguMetroLine1&2Projects
MetroProject(ProvincialAreas)
GwangjuMetroLine1Project
Gwangju Metro Line 1
Daegu Metro Line 2
Metro Line 1
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
LRTProject
72 73
LeadingInnovation,CreatingTomorrow
LRTProject
RAILWAY SYSTEM SOLUTIONS
Major Project Record
Gwangmyeong LRT is a rapid transit line
built as a solution to meet urban transit
needs of Gwangmyeong City, Gyeonggi
Province and stretched between Cheolsan
Station of Seoul Metro Line 7 and Gwanak
StationofKyungbuLine.
Gwangmyeong LRT is an AGT (Automated
Guideway Transit) line supporting
automatedoperationandusesCrystalMoverSystemof
MitsubishiHeavyIndustries,Japan.Thesystemisalreadyusedin
StarLineofIncheonInt’lAirportwhichisapassengerlineconnected
totheboardingterminaloftheairport.
Operator:GwangmyeongLRTCo.,Ltd.(30YearConcessionRight)
Constructor:KoryoDevelopmentConsortium
ProjectSection:CheolsanStation(SeoulMetroLine7) ~SohaDistrict~
GwangmyeongStation(KyungbuHSR) ~GwanakStation(SeoulMetroLine1)(8stations)
LineLength:10.343km
KickOff:2010 CommercialOperation:2014
Scope of Engagement by LSIS
LSISSignedtheContractwithKoryoDevelopmentCo.,Ltd.inJan.,’10.
LSISwillfabricate,purchaseanddeliverallmechanical,electricaland
automationsystemsforLRToperationexceptforcivil/architectural
works,includingR/S,electricalpowerfacilities,trainsignallingsystem,
communicationsystem,PSDandcatenarysystem,etc.LSISwill
providesub-systemengineeringservicestoimplementindependentsystems
andintegratethem,providingtotalengineeringservicesfortrainoperationsystem.
LSISwilldeliverandimplementsystemsinthe10.343km-longline
and8stations.
LRTProject(E&MWork)
GwangmyeongLRT
Gwangmyeong LRT
www.dienhathe.xyz
www.dienhathe.vn
TheShuttleTrainlinewasbuilttoprovideconvenienttransitoptiontoairflightpassengerswhohadtotravelbetweenboarding
terminal built as a part of Phase 2 extension of Incheon Airport and passenger terminal. The shuttle train line Commecial
OperationonJun.20,2008andisthefirstofitskindthatwentintocommercialoperationinKorea.TheShuttleTrainofIncheon
Int’lAirportisunmannedandittravelsbetweenthestationslocatedinthebasementofIncheonAirportandboardingterminal
A at the headway of 5 minutes. The line is expected to be extended to boarding terminal B, C and D which are being planned
now.
LineLength:900m
No.ofStations:2
DoubleTrackSection:EntireSection(SingleLine-pair)
Electrification:EntireSection(DC750V)
Scope of Engagement by LSIS
Supply/InstallationandOperation/MaintenanceofIAT(IntraAirportTransit)SystemasaConsortiumLeader
ManagedConsortiumProjectControl,SystemIntegration,OperationandMaintenanceBetween03.11~08.05
LSISDeliveredandPerformed
-ElectricalPowerSystem(ACSWGR,DCSWGR,Rectifier,SCADA,Etc.)
-CommunicationSystem
-R/SMaintenanceFacility
-PlatformScreenDoors
-GuidewayInstallation
-SystemInstallation
-1stUnmannedLRTinKorea,
ProvideOperationServicesUponCompletionforCreditsGiventoitsManagement/MaintenanceCapabilitiesforRailroadSysteminGeneral
Line Overview
The1stunmannedandautomatedpassengertransitsystemofKoreaisnowincommercialoperationaftersuccessful
delivery.Ithaulsabout5~6,000personsatthemaximumperhourinasingledirectionwithheadwayof5minutes.Itserves
theneedsofpassengersfortransitsystembetweenboardingterminalsofIncheonInt’lAirportandLSISthatdeliveredthe
systemwithsuccessasaprojectconsortiumleadernowprovidesafullscopeofservicesfortheshuttletrainsystemfrom
operationtomaintenanceasamanagement/maintenanceservicecontractor.
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
LRTProject
74 75
LeadingInnovation,CreatingTomorrow
Incheon Metro Line 2 is the rapid transit line of Incheon Metro to link Oryu-Dong, Seo-Gu, Incheon and Incheon Grand
Park. The project kicked off in 2009, with go-live scheduled for the 1st half of 2014. It stretches 29.2km-long.
Scope of Engagement by LSIS
ProjectName:IncheonMetroLine2Project
Location:Oryu-dong,Seo-gu,IncheonCity~Woonyeon-dong,Namdong-gu
ProjectSection:Oryu-dong,Seo-gu~GeomdanJunction~GeomamStation(IncheonInt’lAirportRailway)~GajeongJunction~
Seoknam-dong~Gajwa-dong(Yeolwoomulro)~JuanStation(GyeonginLine)~IncheonCityHallStation(IncheonMetroLine1)~
Namdong-guOffice~IncheonGrandPark~Woonyeon-dong,Namdong-gu
ProjectScope:L=29.2km,27Stations,2R/SDepots
ProjectDuration:7YearsfromKickOff(2007~2014)
ProjectBaseYear:2007
CommercialOperationYear:2014
Challenges of LSIS
LSISorganizedprojectconsortiumwithHyundaiRotem,POSCOE&C,DaeahTIandSKC&CtowintheIncheonLine2E&M
turnkeycontractwhichisnowunderimplementation.
IncheonMetroLine2isnowunderconstructiontobecompletedin2014andintendedtoformapartofessentialtransit
infrastructureinsupportofthesuccessfulcompletionof2014IncheonAsianGames.
Intheprojectconsortium,LSISisresponsiblefordeliveringelectricalsystemfacilitiesandperformingelectricalworksona
turnkeybasisandprovidingengineeringservicesforPSDsystemsinallstations.
LSISwillprovidethefollowingelectricalsystemsto12substations:
12Substations:AC22.9kVPowerDistributionPanel
12Substations:DC750VDistributionPanel(HSCB)
12Substations:RectifierPanel
12Substations:TRPanelforRectifier
6EnergyStorages
SCADA
ElectricWork
LSISplanstoproduce/supplyallelectricalsystemproductsandperformtheentireelectricalwork.Inaddition,LSISisalso
responsibleforsupplying,installing,testingandcommissioningPSDsystemsfortheplatformsof27stationsforthecontract
amountofaroundKRW25billion.
Line Overview
EuijeongbuLRTCo.,Ltd.whichisthedeveloperoftheprojectwillhaveoperationalrightsfor30yearsfromproject
completion.TheLRTlineisintendedtoprovidealinkbetweenthenewresidentialdistrictstobedevelopednorthtoSeoul
andSeoulMetrosubwaylines,withscheduledgo-liveinthe2ndhalfof2011.
LRTProject(E&MWork)
IncheonLine2,ParticipateE&MConsortium
LRTProject(E&MWork)
IncheonInt’lAirportIATProject
www.dienhathe.xyz
www.dienhathe.vn
ProjectDescription:PrivateLRTLinePlanning/DevelopmentProject
Operator:EuijeongbuLRTCo.,Ltd.(For30Years)
Constructor:EuijeongbuLRTCo.,Ltd.
ProjectSection:Balgok~Heuiryog(SeoulMetroLine1)~Beomgol
~EuijeongbuStation~EuijeongbuCityHall~Heungseon~Jungang
~Dongo~Saemal~GyeonggiProvinceHall2~Hyoja~Gonje~
Eoryong~Songsan~Tapseok
Length:11.085km
Mode:AGT(AutomatedGuidewayTransit)
CommercialOperation:2011(Kick-offonJul.26,2007)
AGT (AutomatedGuidewayTransit):VAL208ofSiemens,Germany
-1Trainsetof2Cars,Total16Trainsets,Headwayof3Minutes
-236Passengersper1Trainset
-L:13.7m,W:2.08m,H:3.67m
-MinimumRadiusofCurvature:40m
Scope of Engagement by LSIS
ProjectEngagement:EuijeongbuLRTisaPrivateInvestmentProjectandLSISFundedtheProject
ScopeofWork:Design/Fabrication/Delivery/Installation/Testing/CommissioningofElectricalandCommunicationSystemsof
EuijeongbuLRT
’06.09.20LSIS&EuijeongbuLRTCo.,Ltd.SignedAgreement
’07.07.26ProjectKickedOff
ProjectDuration:’07.08.28~’11.08.27(48MonthsfromKickOff)
CommercialOperation:2011(TobeExtendedbyAbout10Months)
No.ofStations:15Stations+1R/SDepot
TotalLineLength:11Km
ScopeofElectricalPowerSystemDelivery:PowerSystem7S/S(AC&DCCubicle,TR,Rectifier,PLC),ElectricalWork
(Transformation/Distribution,DCDistribution),HeatingSystem
ScopeofCommunicationSystemDelivery:TrainRadio/OpticalTransmission/CCTV/PhoneSwitch/EmergencyPhone/PA/
TrainStopAnnouncementSystem/FiberOpticCableDesign/Fabrication/Delivery/Installation/Testing/Commissioning-private
investment-fundedFullyAutomatedLRTProjectand8Stations.
Line Overview
EuijeongbuLRTCo.,Ltd.whichisthedeveloperoftheprojectwillhaveoperationalrightsfor30yearsfromproject
completion.TheLRTlineisintendedtoprovidealinkbetweenthenewresidentialdistrictstobedevelopednorthtoSeoul
andSeoulMetrosubwaylines,withscheduledgo-liveinthe2ndhalfof2011.
LRTProject(Others)
EuijeongbuLRT
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
LRTProject
76 77
LeadingInnovation,CreatingTomorrow
Project Description
Length:23.9km
ProjectSection:Sasang~KimhaeAirport~Daejeo~Ubang~Buwon~Yonji
Scope of Engagement by LSIS
LSISImplementsDesign,Delivery,Installation,TestandCommissioningoftheFollowing
8Substaion:AC22.9kVPowerDistributionPanel
8Substation:DC750VPanel(HSCB)
8Substation:RectifierPanel
8Substation:TRPanelforRectifier
SCADA
ElectricWork
Yongin
Project Description
Length:18.47km
ProjectSection:Gugal~Dongbaek~Myongji~PublicStadium~Everland
Scope of Engagement by LSIS
LSISImplementsDesign,Delivery,Installation,TestandCommissioningoftheFollowing
11Substation:DC750VPanel(HSCB)
11Substation:RectifierPanel
11Substation:TRPanelforRectifier
LRTProject(Others)
Kimhae
www.dienhathe.xyz
www.dienhathe.vn
OverseasRailwayProject
RAILWAY SYSTEM SOLUTIONS
Major Project Record
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
OverseasRailwayProject
78 79
LeadingInnovation,CreatingTomorrow
The 1st railway electrical interlocking system implementation project that aKorea company won in Thailand. LSIS
established consortium with Thailand local IT company, that competed with global dominated company such as
Bombardier, Westinghouse, Alstom.
This project that was the first modernization of a Thailand railway has business impact for LSIS
This project is a turn-key project including design, delivery, installation, commisioning and maintenance of signalling
facilities and kicked off in October. 2001 and saw completion in April. 2005.
LSIS supplied EIS , signalling facillities to a total 14 stations from Ban Phachi station ; Capital city of Thailand to Bang
Sue station. CTC system to a total 52 stations.
Project:ThailandSt1RailwaySignalling&CommunictionSystemProject
HostCountry:Thailand
System:StateRailwayofThailand
Status:InOperation
StartStation:BangSueStation
EndStation:BanPhachiStation
Scope of Engagement by LSIS
ICB(Internationalcompetitivebidding)LGIS-JasmineConsortium
ProjectDuration:2001.10~2005.4(3Years6Months,Includingmaintenace)
ProejctScope:EIC,Signallingfacilitiesfor14stations, CTC52stations
SystemDescription
-CTC:52Stations
-EIC:14Stations
-BlockSystem:14Sets
-Levelcrossing:32Sets
-OpticTansmissionSystem:14Station
-Switch:127Sets
-TrackCircuit:150Sets
-SignallingDevice:342Sets
-PowerSupply:14Sets
OverseasRailwayProject
ThailandSt1RailwaySignalling&CommunictionSystemProject
CommercialOperation:April.2005
Client:StateRailwayofThailand
Operator:StateRailwayofThailand
Gauge:1,000mm
No.ofTracks:Triple&DoubleTrack
www.dienhathe.xyz
www.dienhathe.vn
RAILWAY SYSTEM SOLUTIONS
MajorProjectRecord
OverseasRailwayProject
80 81
LeadingInnovation,CreatingTomorrow
As a sequel to ST1 railway project, LSIS won the ST4 railway signalling and communication system project, beating
Bombardier, Westinghouse and Alstom.
The project is a turn-key project including design, delivery of signalling & communication system, installation,
commissioning and maintenance. It kicked off in Jul., 2009 and will see completion in 2010. LSIS supplies CBI, signalling
and communication system and CTC system for 7 stations in total from Chachoengsao to the south of Bangkok, the
capital of Thailand to Laem Chabang station.
Project:ThailandST4RailwaySignalling&CommunicationSystemProject
HostCountry:Thailand
System:StateRailwayofThailand
Status:InOperation
StartStation:ChachoengsaoStation
EndStation:LaemChabangStation
CommercialOperation:2011(Scheduled)
Client:TSCJointVenture
Operator:StateRailwayofThailand
Gauge:1,000mm
No.ofTracks:DoubleTrack
SignallingProtocol:LS-EIS520V
Scope of Engagement by LSIS
Projecttenderingmethod:ICB(InternationalCompetitiveBidding)
PrimeContractorwasTSCJointVentureandLSISWontheRailwaySignalling&
CommunicationSystemPortionoftheContract
ProjectDuration:2009.7~On-going(24Months)
SystemDescription
-CTC:7Stations
-CBI:7Stations(LS-EIS520V)
-BlockSystem:7Sets
-CommunicationSystem:7Sets
-OpticalTransmissionSystem:7Stations
-Switch:92Sets
-TrackCircuit:357Sets
-Signalling:131Sets
-PowerSupply:7Sets
State Railway of Thailand ST4 Double Track Line
Signalling & Communication System
OverseasRailwayProject
StateRailwayofThailandST4DoubleTrackLineSignalling&
CommunicationSystemProjectIt is the 1st railway signalling system implementation project that a Korean company won in Bangladesh that Alstom
and Siemens of Europe dominated. The project is a turn-key project including design, delivery, installation,
commissioning and maintenance of signalling facilities and kicked off in May, 2004 and saw completion in Nov. 2006.
LSIS supplied CBI and signalling facilities to a total of 10 stations from Bangladesh Sylhet transfer station to Azampur
station.
As a credit to its successful project delivery, LSIS also won additional signalling facility project for Akhaura transfer
station in 2005.
Project:Bangladesh10StationsModernizationProject
Hostcountry:Bangladesh
System:BangladeshRailway
Status:InOperation
StartStation:SylhetStation
EndStation:AzampurStation
CommercialOperation:Nov.2006
Scope of Engagement by LSIS
ProjectTenderingMethod:ICB(InternationalCompetitiveBidding)LSIS Submitted aBidSingle-handedly
ProjectDuration:2004.5~2006.11(2Years6Months)
SystemDescription:CBIfor11Stations(LG-EIS)
-BlockSystem:11Sets
-Crossing:6Sets
-Switch:126Sets
-TrackCircuit:201Sets
-Signalling:196Sets
-PowerSupply:11Sets
OverseasRailwayProject
BangladeshRailway11StationsModernizationProject
Client:BangladeshRailway
Operator:BangladeshRailway
System:BangladeshRailway
Gauge:1,000mm
No.ofTracks:SingleLine
SignallingProtocol:LG-EIS520
Bangladesh Railway 11 Stations Modernization
www.dienhathe.xyz
www.dienhathe.vn
www.dienhathe.xyz
www.dienhathe.vn

More Related Content

What's hot

Passenger Counting / People Counting Applications and Devices
Passenger Counting / People Counting Applications and DevicesPassenger Counting / People Counting Applications and Devices
Passenger Counting / People Counting Applications and DevicesEurotech
 
BP_07-08_Fairchild_Digital Power On The Move
BP_07-08_Fairchild_Digital Power On The MoveBP_07-08_Fairchild_Digital Power On The Move
BP_07-08_Fairchild_Digital Power On The MoveSteve Mappus
 
Smart Traffic Congestion Control System
Smart Traffic Congestion Control SystemSmart Traffic Congestion Control System
Smart Traffic Congestion Control SystemMuzzamil Shaikh
 
IoT and M2M Services for the Railway Market
IoT and M2M Services for the Railway MarketIoT and M2M Services for the Railway Market
IoT and M2M Services for the Railway MarketEurotech
 
Real time vehicle counting in complex scene for traffic flow estimation using...
Real time vehicle counting in complex scene for traffic flow estimation using...Real time vehicle counting in complex scene for traffic flow estimation using...
Real time vehicle counting in complex scene for traffic flow estimation using...Journal Papers
 
Intelligent traffic signal control system using embedded system
Intelligent traffic signal control system using embedded systemIntelligent traffic signal control system using embedded system
Intelligent traffic signal control system using embedded systemAlexander Decker
 
Tech reportese01 09
Tech reportese01 09Tech reportese01 09
Tech reportese01 09liangflying
 

What's hot (8)

Passenger Counting / People Counting Applications and Devices
Passenger Counting / People Counting Applications and DevicesPassenger Counting / People Counting Applications and Devices
Passenger Counting / People Counting Applications and Devices
 
BP_07-08_Fairchild_Digital Power On The Move
BP_07-08_Fairchild_Digital Power On The MoveBP_07-08_Fairchild_Digital Power On The Move
BP_07-08_Fairchild_Digital Power On The Move
 
Smart Traffic Congestion Control System
Smart Traffic Congestion Control SystemSmart Traffic Congestion Control System
Smart Traffic Congestion Control System
 
IoT and M2M Services for the Railway Market
IoT and M2M Services for the Railway MarketIoT and M2M Services for the Railway Market
IoT and M2M Services for the Railway Market
 
Real time vehicle counting in complex scene for traffic flow estimation using...
Real time vehicle counting in complex scene for traffic flow estimation using...Real time vehicle counting in complex scene for traffic flow estimation using...
Real time vehicle counting in complex scene for traffic flow estimation using...
 
Intelligent traffic signal control system using embedded system
Intelligent traffic signal control system using embedded systemIntelligent traffic signal control system using embedded system
Intelligent traffic signal control system using embedded system
 
Tech reportese01 09
Tech reportese01 09Tech reportese01 09
Tech reportese01 09
 
M2M Strategies
M2M StrategiesM2M Strategies
M2M Strategies
 

Similar to Ls catalog thiet bi tu dong lsis rw_f_dienhathe.vn

Mauri presentaz ok def pdf
Mauri presentaz ok def pdfMauri presentaz ok def pdf
Mauri presentaz ok def pdfEnzo Pirone
 
0702_metro_optical
0702_metro_optical0702_metro_optical
0702_metro_opticalhungtru
 
VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...
VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...
VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...voltriosolutions
 
Ekeeda - Mechatronics Engineering - Introduction to Mechatronics
Ekeeda - Mechatronics Engineering - Introduction to MechatronicsEkeeda - Mechatronics Engineering - Introduction to Mechatronics
Ekeeda - Mechatronics Engineering - Introduction to MechatronicsEkeedaPvtLtd
 
Engage with...Romax | Driving the Electric Revolution Webinar
Engage with...Romax | Driving the Electric Revolution WebinarEngage with...Romax | Driving the Electric Revolution Webinar
Engage with...Romax | Driving the Electric Revolution WebinarKTN
 
Welcome new business year 2021 2022 with link vue system
Welcome new business year 2021 2022 with link vue system Welcome new business year 2021 2022 with link vue system
Welcome new business year 2021 2022 with link vue system Mahesh Chandra Manav
 
LEC General Information Brochure
LEC General Information BrochureLEC General Information Brochure
LEC General Information BrochureLee DuBois
 
Software Solutions for Energy Communities
Software Solutions for Energy CommunitiesSoftware Solutions for Energy Communities
Software Solutions for Energy CommunitiesQuentin Gemine
 
Qiang Yu Resume
Qiang Yu Resume Qiang Yu Resume
Qiang Yu Resume Qiang Yu
 
Maximize your business and machine performance
Maximize your business and machine performanceMaximize your business and machine performance
Maximize your business and machine performanceSchneider Electric
 
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...Feasible Interfacing and Programming of Industrial Control Technology Unit wi...
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...theijes
 
AGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICESAGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICESSinan Saadoun
 
Iconsys Brochure 2
Iconsys Brochure 2Iconsys Brochure 2
Iconsys Brochure 2Nick Darrall
 
Mitsubishi servo system family catalog
Mitsubishi servo system family catalogMitsubishi servo system family catalog
Mitsubishi servo system family catalogDien Ha The
 

Similar to Ls catalog thiet bi tu dong lsis rw_f_dienhathe.vn (20)

Mauri presentaz ok def pdf
Mauri presentaz ok def pdfMauri presentaz ok def pdf
Mauri presentaz ok def pdf
 
FULL SPEED AHEAD WITH MESSUNG SERVO & MOTION CONTROL AUTOMATION
FULL SPEED AHEAD WITH MESSUNG SERVO & MOTION CONTROL AUTOMATIONFULL SPEED AHEAD WITH MESSUNG SERVO & MOTION CONTROL AUTOMATION
FULL SPEED AHEAD WITH MESSUNG SERVO & MOTION CONTROL AUTOMATION
 
Richmond Engineering Brochure
Richmond Engineering BrochureRichmond Engineering Brochure
Richmond Engineering Brochure
 
0702_metro_optical
0702_metro_optical0702_metro_optical
0702_metro_optical
 
Teramatrix
TeramatrixTeramatrix
Teramatrix
 
VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...
VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...
VOLTRIO SOLUTIONS PVT LTD is a automation product engineering service organiz...
 
Ekeeda - Mechatronics Engineering - Introduction to Mechatronics
Ekeeda - Mechatronics Engineering - Introduction to MechatronicsEkeeda - Mechatronics Engineering - Introduction to Mechatronics
Ekeeda - Mechatronics Engineering - Introduction to Mechatronics
 
Engage with...Romax | Driving the Electric Revolution Webinar
Engage with...Romax | Driving the Electric Revolution WebinarEngage with...Romax | Driving the Electric Revolution Webinar
Engage with...Romax | Driving the Electric Revolution Webinar
 
Welcome new business year 2021 2022 with link vue system
Welcome new business year 2021 2022 with link vue system Welcome new business year 2021 2022 with link vue system
Welcome new business year 2021 2022 with link vue system
 
LEC General Information Brochure
LEC General Information BrochureLEC General Information Brochure
LEC General Information Brochure
 
Software Solutions for Energy Communities
Software Solutions for Energy CommunitiesSoftware Solutions for Energy Communities
Software Solutions for Energy Communities
 
Qiang Yu Resume
Qiang Yu Resume Qiang Yu Resume
Qiang Yu Resume
 
Maximize your business and machine performance
Maximize your business and machine performanceMaximize your business and machine performance
Maximize your business and machine performance
 
Dipankar Chakraborty
Dipankar ChakrabortyDipankar Chakraborty
Dipankar Chakraborty
 
Full speed ahead with messung servo & motion control automation
Full speed ahead with messung servo & motion control automationFull speed ahead with messung servo & motion control automation
Full speed ahead with messung servo & motion control automation
 
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...Feasible Interfacing and Programming of Industrial Control Technology Unit wi...
Feasible Interfacing and Programming of Industrial Control Technology Unit wi...
 
AGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICESAGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICES
 
Iconsys Brochure 2
Iconsys Brochure 2Iconsys Brochure 2
Iconsys Brochure 2
 
MAS Profile
MAS ProfileMAS Profile
MAS Profile
 
Mitsubishi servo system family catalog
Mitsubishi servo system family catalogMitsubishi servo system family catalog
Mitsubishi servo system family catalog
 

More from Dien Ha The

Vnd feb 2020 price list schneider (1)
Vnd feb 2020 price list schneider (1)Vnd feb 2020 price list schneider (1)
Vnd feb 2020 price list schneider (1)Dien Ha The
 
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comResize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comDien Ha The
 
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comDien Ha The
 
Fed e-quick-start-manual-bientanfuji-dienhathe.com
Fed e-quick-start-manual-bientanfuji-dienhathe.comFed e-quick-start-manual-bientanfuji-dienhathe.com
Fed e-quick-start-manual-bientanfuji-dienhathe.comDien Ha The
 
Ls bang gia ls ap dung 20 04-2019
Ls bang gia ls ap dung 20 04-2019Ls bang gia ls ap dung 20 04-2019
Ls bang gia ls ap dung 20 04-2019Dien Ha The
 
Mitsubishi graphic operation terminal got2000 series parts library book
Mitsubishi graphic operation terminal got2000 series parts library bookMitsubishi graphic operation terminal got2000 series parts library book
Mitsubishi graphic operation terminal got2000 series parts library bookDien Ha The
 
Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653
Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653
Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653Dien Ha The
 
Mitsubishi graphic operation terminal got2000 series gt2103 new product release
Mitsubishi graphic operation terminal got2000 series gt2103 new product releaseMitsubishi graphic operation terminal got2000 series gt2103 new product release
Mitsubishi graphic operation terminal got2000 series gt2103 new product releaseDien Ha The
 
Mitsubishi graphic operation terminal got2000 series got mobile function quic...
Mitsubishi graphic operation terminal got2000 series got mobile function quic...Mitsubishi graphic operation terminal got2000 series got mobile function quic...
Mitsubishi graphic operation terminal got2000 series got mobile function quic...Dien Ha The
 
Mitsubishi graphic operation terminal got2000 series drive control interactiv...
Mitsubishi graphic operation terminal got2000 series drive control interactiv...Mitsubishi graphic operation terminal got2000 series drive control interactiv...
Mitsubishi graphic operation terminal got2000 series drive control interactiv...Dien Ha The
 
Mitsubishi inverter option catalog
Mitsubishi inverter option catalogMitsubishi inverter option catalog
Mitsubishi inverter option catalogDien Ha The
 
Mitsubishi low voltage ws-v series mccb and elcb
Mitsubishi low voltage ws-v series mccb and elcbMitsubishi low voltage ws-v series mccb and elcb
Mitsubishi low voltage ws-v series mccb and elcbDien Ha The
 
Mitsubishi graphic operation terminal got2000 series (concise)
Mitsubishi graphic operation terminal got2000 series (concise)Mitsubishi graphic operation terminal got2000 series (concise)
Mitsubishi graphic operation terminal got2000 series (concise)Dien Ha The
 
Mitsubishi low voltage ws-v series comparison of previous and new models
Mitsubishi low voltage ws-v series comparison of previous and new modelsMitsubishi low voltage ws-v series comparison of previous and new models
Mitsubishi low voltage ws-v series comparison of previous and new modelsDien Ha The
 
Mitsubishi inverter inverter family
Mitsubishi inverter inverter familyMitsubishi inverter inverter family
Mitsubishi inverter inverter familyDien Ha The
 
Mitsubishi low voltage miniature circuit breakers din series
Mitsubishi low voltage miniature circuit breakers din seriesMitsubishi low voltage miniature circuit breakers din series
Mitsubishi low voltage miniature circuit breakers din seriesDien Ha The
 
Mitsubishi inverter freqrol-hc2 series
Mitsubishi inverter freqrol-hc2 seriesMitsubishi inverter freqrol-hc2 series
Mitsubishi inverter freqrol-hc2 seriesDien Ha The
 
Mitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsu
Mitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsuMitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsu
Mitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsuDien Ha The
 
Mitsubishi inverter freqrol-f700 pj series
Mitsubishi inverter freqrol-f700 pj seriesMitsubishi inverter freqrol-f700 pj series
Mitsubishi inverter freqrol-f700 pj seriesDien Ha The
 
Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125
Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125
Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125Dien Ha The
 

More from Dien Ha The (20)

Vnd feb 2020 price list schneider (1)
Vnd feb 2020 price list schneider (1)Vnd feb 2020 price list schneider (1)
Vnd feb 2020 price list schneider (1)
 
Resize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.comResize bientanfuji-dienhathe.com
Resize bientanfuji-dienhathe.com
 
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.comFed e-quick-start-up-guide-bientanfuji-dienhathe.com
Fed e-quick-start-up-guide-bientanfuji-dienhathe.com
 
Fed e-quick-start-manual-bientanfuji-dienhathe.com
Fed e-quick-start-manual-bientanfuji-dienhathe.comFed e-quick-start-manual-bientanfuji-dienhathe.com
Fed e-quick-start-manual-bientanfuji-dienhathe.com
 
Ls bang gia ls ap dung 20 04-2019
Ls bang gia ls ap dung 20 04-2019Ls bang gia ls ap dung 20 04-2019
Ls bang gia ls ap dung 20 04-2019
 
Mitsubishi graphic operation terminal got2000 series parts library book
Mitsubishi graphic operation terminal got2000 series parts library bookMitsubishi graphic operation terminal got2000 series parts library book
Mitsubishi graphic operation terminal got2000 series parts library book
 
Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653
Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653
Mitsubishi inverter fr-a700-instruction-manualbasic-160425031653
 
Mitsubishi graphic operation terminal got2000 series gt2103 new product release
Mitsubishi graphic operation terminal got2000 series gt2103 new product releaseMitsubishi graphic operation terminal got2000 series gt2103 new product release
Mitsubishi graphic operation terminal got2000 series gt2103 new product release
 
Mitsubishi graphic operation terminal got2000 series got mobile function quic...
Mitsubishi graphic operation terminal got2000 series got mobile function quic...Mitsubishi graphic operation terminal got2000 series got mobile function quic...
Mitsubishi graphic operation terminal got2000 series got mobile function quic...
 
Mitsubishi graphic operation terminal got2000 series drive control interactiv...
Mitsubishi graphic operation terminal got2000 series drive control interactiv...Mitsubishi graphic operation terminal got2000 series drive control interactiv...
Mitsubishi graphic operation terminal got2000 series drive control interactiv...
 
Mitsubishi inverter option catalog
Mitsubishi inverter option catalogMitsubishi inverter option catalog
Mitsubishi inverter option catalog
 
Mitsubishi low voltage ws-v series mccb and elcb
Mitsubishi low voltage ws-v series mccb and elcbMitsubishi low voltage ws-v series mccb and elcb
Mitsubishi low voltage ws-v series mccb and elcb
 
Mitsubishi graphic operation terminal got2000 series (concise)
Mitsubishi graphic operation terminal got2000 series (concise)Mitsubishi graphic operation terminal got2000 series (concise)
Mitsubishi graphic operation terminal got2000 series (concise)
 
Mitsubishi low voltage ws-v series comparison of previous and new models
Mitsubishi low voltage ws-v series comparison of previous and new modelsMitsubishi low voltage ws-v series comparison of previous and new models
Mitsubishi low voltage ws-v series comparison of previous and new models
 
Mitsubishi inverter inverter family
Mitsubishi inverter inverter familyMitsubishi inverter inverter family
Mitsubishi inverter inverter family
 
Mitsubishi low voltage miniature circuit breakers din series
Mitsubishi low voltage miniature circuit breakers din seriesMitsubishi low voltage miniature circuit breakers din series
Mitsubishi low voltage miniature circuit breakers din series
 
Mitsubishi inverter freqrol-hc2 series
Mitsubishi inverter freqrol-hc2 seriesMitsubishi inverter freqrol-hc2 series
Mitsubishi inverter freqrol-hc2 series
 
Mitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsu
Mitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsuMitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsu
Mitsubishi low voltage mccb and elcb(ws-v series) y0720-version 1-mitsu
 
Mitsubishi inverter freqrol-f700 pj series
Mitsubishi inverter freqrol-f700 pj seriesMitsubishi inverter freqrol-f700 pj series
Mitsubishi inverter freqrol-f700 pj series
 
Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125
Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125
Mitsubishi inverter catalog-mitsubishi-inverter-option-160426021125
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Ls catalog thiet bi tu dong lsis rw_f_dienhathe.vn

  • 2. LeadingInnovation,CreatingTomorrow Leading you Toward a Greater Future than you Imagine LSIS is Leading the Industries from the Electric and Machinery Control to the Most Advanced Ubiquitous Solution to Create Comfortable and Productive Industrial Society. Contents AboutRailwayBusiness E&MTurnkeyProjectExecutionCapacity 08 Benefit of LSIS E&M Turnkey Solution 14 Project Managing and System Engineering Execution Capacity Technology Signalling 24 Centralized Traffic Control (CTC) 26 Automatic Train Control 28 Electrical Interlocking System (EIS) 30 Audio Frequency Track Circuit 32 Platform Screen Door Communication 38 Communication Management System 40 Passenger Information System 42 Automatic Fare Collection PowerT&DSolution 48 AC High Voltage Solution 51 AC Low-Medium Voltage Solution 52 DC Solution 53 Super Capacitor Energy Storage System 54 SCADA MajorProjectRecord MainLineProject 59 Korea Main line Project (HSR) MetroProject 63 Seoul 66 Incheon 68 Provincial Areas LRTProject 73 E&M Work 76 Others OverseasRailwayProject 79 Overseas Railway Project www.dienhathe.xyz www.dienhathe.vn
  • 3. LSIS A Leader in the Field of Industrial Electrics and Automations, Providing Total Solutions to Creat the Comfortable and Productive Industrial Environment As the most experienced leader in Korea railway system industry, LS Industrial Systems, with its accumulated electric, electronic and informational technology, is providing various signalling control systems with increased safety and reliability at home and to overseas. RAILWAYSYSTEM SOLUTIONS www.dienhathe.xyz www.dienhathe.vn
  • 4. E&MTurnkeyProjectExecutionCapacity 08 AboutRailwaysBusinessLSIS, with the best competencies in Korea and overseas, performs as a leading company responsibleforoveralloperationofinfrastructureimplementationprojects. RAILWAY SYSTEM SOLUTIONS www.dienhathe.xyz www.dienhathe.vn
  • 5. E&MTurnkeyProject ExecutionCapacity Based on the technological power for signalling, communication and power fields, the railway business of LS Industrial System is equipped with the expertise to carry out system engineering and projectmanagingintheentirefieldsofE&Mforrailwayimplementationprojects. Business Unit SystemEngineering&ProjectManagement PowerT&DUnit Signalling&CommunicationUnit R&DUnit Manufacturing&CommissioningUnit LeadingInnovation,CreatingTomorrow RAILWAY SYSTEM SOLUTIONS About Railway Business www.dienhathe.xyz www.dienhathe.vn
  • 7. LeadingInnovation,CreatingTomorrow LSIS,asaconsortiumleader,designsandprovidesthemostappropriatesysteminallthestagesfromprojectplanning totesting,commissioning andmaintenance.Atthesametime, LSISoffershighlyreliableprojectperformance. FromMacroMainLinetoMetro FromHighSpeedRailwaytoLightRailTransit BenefitofLSISE&MTurnkeySolution RAILWAY SYSTEM SOLUTIONS AboutRailwayBusiness E&MTurnkeyProjectExecutionCapacity 12 13 For large-scale railway infrastructure implementation projects that require large capital investment and long construction period, LSIS provides the following solutions to developers and engineering service providers for the integrated E&M projects. IntegratedManagementofProjectSchedule,ReducingConstructionPeriod LoweringVariousTechnicalRisks DrasticallyReducingProjectOperationPersonnel DecreasingProjectCost Project Execution : Separate Order Individual System Project Execution : E&M Turnkey www.dienhathe.xyz www.dienhathe.vn
  • 8. SystemEngineering System Engineering Execution Background This is a large-scale composite system of diverse interfaces with outside organizations and participation by various fields that requiressystemizedengineeringtechniques. Due to mutual interface between subsystems and integrated system implementation, it is necessary to predict problems in advanceandtoestablishsolutions. Overallsystemassurancemeasuresarenecessarytosatisfythefinalrequirements. Itisnecessarytominimizerisksandtoobserveschedulebyusingthepreviouslyverifiedsystemandtechnologiesapplied. Fromdesign,manufacturing,installationandtesttotestoperationandopeningofeachE&Msystem,systematicadjustment,control andmanagementareprovidedfromtheviewpointofintegratedE&Msystemthroughoutthelifecycleofthesystem. RAILWAY SYSTEM SOLUTIONS AboutRailwayBusiness E&MTurnkeyProjectExecutionCapacity 14 15 LeadingInnovation,CreatingTomorrow Through systematic and integrated management of various business fields, LSIS guarantees successful E&M system. ProjectManagingandSystemEngineering PM -ThemostComprehensiveConcept -IncludingAllofLegal,FinancialandTechnicalAspectsofContract SE -FocusonTechnicalAspect -GeneralPerformanceIndexofOverallSystemandReliabileSafetyManagement -DecidingOverallSystemStructure,InterfaceManagementandIntegrationAmongSubsystems -SubsystemDesign,TestandTestOperation -VerifyingOverallSystemPerformanceIndex ProjectManagingandSystemEngineeringExecutionCapacity www.dienhathe.xyz www.dienhathe.vn
  • 9. RAILWAY SYSTEM SOLUTIONS AboutRailwayBusiness E&MTurnkeyProjectExecutionCapacity 16 17 TheRoleofeachSETeam System SE Team ProposingE&MSystemEngineeringExecutionPlansThroughExperienceswithSimilarSystems AdjustingSystemEngineeringExecutionMethods ProvidingGuidelinesforSub-systemEngineerinavarietyoffields CheckingReflectionofSystemRequirementsinSub-systemSpecifications CheckingSEDocumentsprovidedbySub-systemEngineer SupportingSystemTest&Commissioning Sub-system SE Team ConductingSystemEngineeringwithintheScopeofSub-system ReportingconflictsoccurredwithotherSub-systemSuppliers PreparingandSubmittingDatatoVerifyFulfillmentofRequirementsforeachSub-system LeadingInnovation,CreatingTomorrow www.dienhathe.xyz www.dienhathe.vn
  • 11. Signalling From KTX to automatically operated light rail transit, LSIS provides total solutions for railway SignallingSystem design,engineering,manufacturing,installationmaintenanceandoperation LSIS provides the most appropriate system and economic solution for each construction type, such as new line implementation, linking different lines, extension of existing line and renovation of existingline. LSIS realizes the better and improved operation of railway infrastructures with system advanced throughinvestmentinR&Dofnext-generationsignallingsystem,fieldtestandRAMScertification. CentralizedTrafficControl AutomaticTrainControl ElectricalInterlockingSystem(EIS) AudioFrequencyTrackCircuit PlatformScreenDoor LeadingInnovation,CreatingTomorrow RAILWAY SYSTEM SOLUTIONS Technology www.dienhathe.xyz www.dienhathe.vn
  • 13. LeadingInnovation,CreatingTomorrow Management withConsideration ManagingtheSystem,ReducingtheRisk,EnhancingthePerformance. Extensive train control device extensively and compositely monitors the complicated train operation status as well as high-speed train operation in some sections of the existing lines and the entire high-speed railway sections. This monitoring operation is carried out on a real-time basis by the central control room. According to the train operation plans set in computer, train operation is automatically controlled. When necessary, commands are appropriately controlled and administered manually to ensure safety and efficiency of high-speed train operation. This device has been duplex-configured to improve safety, reliability and convenience of maintenance. The key functions of extensive train control device include operation scheduling, train tracking, maintenance, statistics processing and signalling control. This system consists of the main computer, communication computer, developer computer, commanding console, display panel and near-range communication network. RAILWAY SYSTEM SOLUTIONS Technology Signalling 24 25 This system monitors and controls overall train and passenger operations. LSIS provides various functions to satisfy requirements for successful railway business. TrainOperationManagement OperationControl,RouteControl,DelayedTrainHandling ManagementofInformationBroadcastingandVariousRecords,Etc. Based on technological power built over 20 years since 1992, LSIS implements system to satisfy requirements of railway business. In line with the changing IT environment, the advanced system is continuously upgraded. AutomaticTrainControlbyAlgorithmOptimizedtoTrainOperation FlexibleNetworkandSystemExpandability SystemImplementationtoSatisfytheStandardizedTechnologicalCriteria IntuitiveandUser-centricUserInterface InstallationandTestOperationAbilitiesforVariousConditions,SuchasExisting, NewandExtensionFacilities ConvenientMaintenanceandLowLife-CycleCost CTCConfiguration Centralized Traffic Control www.dienhathe.xyz www.dienhathe.vn
  • 14. Technology forHumanSafety WeCareforOurChildren'sTravel.WeConsiderOurTomorrow. RAILWAY SYSTEM SOLUTIONS Technology Signalling 26 27 LeadingInnovation,CreatingTomorrow Automatic train control device is divided into ground device that transmits allowable speed set by considering various conditions on the ground (position of the train in front and track slope/ radius of curvature) to train device and train device that receives and displays information sent from ground device. Ground devices include input/ output device and data processing device installed inside signalling machine room located on the trackside at intervals. Ground device consists of track circuit device installed on the outdoor trackside, various marks, transmission cable and safety switch. The key functions are to detect the presence of train with track circuit, to exchange signalling information with the adjacent track circuit, to identify signalling conditions, such as track conditions of route ahead and direction of turnout opening, by interface with interlocking device, to automatically change the rear speed signallings according to train operation and to transmit train signalling information to train through track circuit. Train device is installed at the vehicle. This device consists of antenna, train speed detector, on-train computer, speedometer, recorder and on-train display unit. The key functions are to receive ground signalling through antenna and to display the allowable speed in engine room, to create braking curve, to compare allowable speed with the actual speed of train operation and to administer automatic braking in case the allowable speed is exceeded. Automatic train control device is duplex-configured to improve reliability, safety and convenience of maintenance. This system is configured in fail-safe mode to ensure safety at all times even in case of equipment breakdown. Through the consortium project of KTX stage 1 and 2 train control system implementation between Seoul and Busan, LSIS controls the 350km/h level trains. The highly reliable ground and train devices of LSIS are installed and operated in a number of subway routes . LSIS is making continuous investment to R&D of signalling system in order to develop ATC system for the 400km/h level next-generation high-speed railway operation and CBTC (Communication Based Train Control) System for Metro/LRT. With information obtained in the communication between train and track, train operation is automatically controlled by compositely considering signalling conditions, route status, track conditions and operation environments. CalculatingSafeSpeedProfileandTransmittingIttoTrain ControllingTrainSpeedAccordingtoProfile ImplementingGround/TrainFacilitiesandConfiguringDataTransmissionSystem Automatic Train Control Train Device AutomaticTrainSpeedControl OptimalSpeedDisplay TrainConditionMonitoring Self-diagnosisFunction Ground Device ObtainingSpeedInformationonaReal-timeBasis DeliveringSpeedInformationtoTrainDevice ControllingTrainOperation MonitoringFieldSystemStatus ATCSystemBasicStructure www.dienhathe.xyz www.dienhathe.vn
  • 15. SolidCredibility fromCustomers WeProvideSolutionstoCustomersontheBasisofCredibleInfrastructure. RAILWAY SYSTEM SOLUTIONS Technology Signalling 28 29 LeadingInnovation,CreatingTomorrow For safe train operation within station and at the interim passing line, interlocking system prevents accidents by interlocking railway signalling, switches, track circuits and train routes for cascading operation. In addition, safe train operation is ensured even when erroneous control is made due to operator’s mistake. This system is configured in the 2 out of 3 mode and with electronic interlocking device outstanding in safety, reliability and convenience of maintenance that enables successful interface with ATC (automatic train control device)/ CTC (centralized train control device) and convenient extension and improvement of equipments. 2 out of 3 mode, which ensures a high level of safety, can be employed only in case 3 processes with the same data produce at least 2 matching results. The key functions of interlocking system are to control signalling or speed information after investigating trains blocking route, conflicting routes and signalling status, to prevent switch conversion by train in case the train occupies a turnout section (track locking), to prevent switch conversion within the route when a train approaches (approach stick) and to prevent switch conversion within the route when a train occupies the route section (route locking) as well as to administer train overlapping protection, to clear the locked track switch after train departure and to ensure protection against erroneous handling by operator. Interlocking system consists of reverse control panel, electronic interlocking panel, information transmission device, display panel, repair device, field control module and data link module, etc. This system interlocks and controls trackside equipments for railway operator to determine train operation route. A variety of field facilities, such as railway signalling, track converter and railway crossing, are interlocked for control to ensure safety of train operation. Computer Based Interlocking Configuredwithduplexsystemoffail-safeH/W,computer-basedinterlockingadministersinterlockinglogic. DirectFieldControl MonitoringFieldFacilities,InterfacewithUpperLayerSystem ProvidingInformationtoLCCandMS ExecutingControlCommandfromCTCoraRemoteLocation TransmittingBlockSectionInformationBetweenStations Local Control Console (LCC) LCCcontrolsfieldfacilitiesbyoperatoranddisplaysstatusoffieldfacilities. Real-timeMonitoringofFieldStatusbyCommunicatingwithCBI CommandtoCBItoConfiguretheRequiredRoute ImplementingDuplexSystem Maintenance Console (MS) MSprovidesfieldfacilitymaintenanceandstatusmonitoringfunctions. FieldStatusMonitoring EditingDBUsedbyCBIandCreatingList Electrical Interlocking System (EIS) ElectronicIntrelockingSystemConfiguration www.dienhathe.xyz www.dienhathe.vn
  • 16. RAILWAY SYSTEM SOLUTIONS Technology Signalling 30 31 LeadingInnovation,CreatingTomorrow InnovationTowardFuture LSISTechnologyLeadsUstotheWayofFuture. WeLiveToday,ButWeSeeTomorrow. With information obtained through the analog AF track circuit installed along railroad track, position of train in front is calculated to enable safe operation. Implemented in metropolitan subway, national railway and subway lines, this circuit transmits information to train. Linked to train devices, audio frequency track circuit controls train operation. LSIS is in the process of developing safer and more reliable system by improving information reception and decoding with digital AF track circuit. Direcion of Travel (AF Track Circuit Block Diagram) Audio Frequency Track Circuit Determines optimized train speed for the best safety and speed by calculating automatically the preceding train’s location without driver’s operation. Adjusts train interval and transmits emergency brake data to trains through rails. Receives and interprets driving orders, and automatically regulates train speed without driver’s operation. AFTrackCircuitConfiguration www.dienhathe.xyz www.dienhathe.vn
  • 17. RAILWAY SYSTEM SOLUTIONS Technology Signalling 32 33 LeadingInnovation,CreatingTomorrow Installed at the platforms of subway / light rail stations, platform screen door is automatically opened and closed by train position info. and signalling info. Linked to the communication and signalling facilities of LSIS, platform screen door ensures safety of passengers, prevention noise and polutions. More over it dramatically reducing matenance cost by helps unmanned station operation. PlatformScreenDoorSystemStructure Platform Screen Door www.dienhathe.xyz www.dienhathe.vn
  • 18. Communication LSIS implements wired and wireless network environments for train operation and therefore facilitatesinformationexchangebetweenthecomplicatedsystems. LSIS implements stable and convenient communication environment in train, station, tunnel and bridge. CommunicationManagementSystem PassengerInformationSystem AutomaticFareCollection LeadingInnovation,CreatingTomorrow RAILWAY SYSTEM SOLUTIONS Technology www.dienhathe.xyz www.dienhathe.vn
  • 20. LeadingInnovation,CreatingTomorrow Connecting PeopletotheWorld LSISRailSolutionsAddConveniencetoYourWayofLife. RAILWAY SYSTEM SOLUTIONS Technology Communication 38 39 Digital Optical Transmission Facility Network between facilities, such as of communication, signalling, AFC, power, passenger information system and administrative computing Wireless Train Facility Wirelesscommunicationsystembetweentraincrewandcommandingofficers Commanding Telephone Facility Telephone line for commanding between control room (Operation, power, signalling, control, disaster prevention) and main line or betweenstaffsoftherelateddivisions Video Transmission Facility Systemwithwhichcommandingofficerandstationcrewmonitorsafetyofpassengers Communication Management System SystemConfiguration www.dienhathe.xyz www.dienhathe.vn
  • 21. RAILWAY SYSTEM SOLUTIONS Technology Communication 40 41 LeadingInnovation,CreatingTomorrow SolutionsforBetterLife LSISRailSolutionsMakePeople'sLifeMoreComfortable. Providing information for passenger operation and implementing entertainment environment, LSIS creates train stations that are modernized and equipped with IT environment. ReceivingTrainInformationFromControlRoom ManagingOverallTrainSchedulesandProvidingtheRelatedInformation ProvidingEnvironmenttoOperateVariousMultimediaDevicesinTrainStation Passenger Information System SystemBasicFunction www.dienhathe.xyz www.dienhathe.vn
  • 22. RAILWAY SYSTEM SOLUTIONS Technology Communication 42 43 LeadingInnovation,CreatingTomorrow This system issues and supplements train tickets at each station. In addition, automatic fare collection system administers access control and account settlement. By computerizing accounting processing, statistical data collection and automatic device monitoring and information processing, LSIS provides solution for efficient operation and management. Automatic Fare Collection SystemConfiguration www.dienhathe.xyz www.dienhathe.vn
  • 23. PowerT&DSolution In the power T&D field, LSIS provides one-stop solution through implementation of full line-up from super high-voltage to power distribution units. Based on the highly reliable power solution technology,LSISimplementscompactandsafefacilitiestoaddconveniencetorailwayoperation. LSIS’s T&D solution is convenient in maintenance as it collectively supplies entire power-related electrical facilities together with DC or AC power to substations and railway tracks. In addition, LSIS provides electrical facility management and operation services to lower the possibility of unexpected accidentsthatarefataltorailwayinfrastructures. ACHighVoltageSolution ACLow&MediumVoltageSolution DCSolution SuperCapacitorEnergyStorageSystem SCADA LeadingInnovation,CreatingTomorrow RAILWAY SYSTEM SOLUTIONS Technology www.dienhathe.xyz www.dienhathe.vn
  • 25. LeadingInnovation,CreatingTomorrow LSIS provides compact and lightweight high voltage transformer and GIS which are large power facilities to ensure perfectionintheirperformanceandimprovecost-effectivenessintermsoftransport/installation. LSIS guarantees product performance with world class test environment built in LSIS test room and delivers products incompliancewithIECandANSIstandards. AC High Voltage Solution HighVoltageTransformer Completing the construction of high voltage transformer factory in ’10, LSIS now produces a full suite of power system facilities from low voltage to high voltage transformers. We utilize up-to-date magnetic field analysis method to reduce power loss and optimizes structural insulation performance with electric field analysis. Frequency:50/60Hz Voltage :Upto550kV Capacity:Upto500MVA (3Phases)~300MVA(SinglePhase) InsulationClass:A(105°C) CoolingMethod:ONAF/OFAF/OFWF Standard:IEC60076/ANSI(IEEE)C57 Certification:KERI Remark:ScottTRforRailroadUse GasInsulatedSwitchgear GIS of LSIS designed to reduce the use of SF6 gas regulated by carbon emission regulations requires less installation space and offers cost-effectiveness with compact and lightweight design. From 25.8kV to 362kV, LSIS delivers any GIS specification for power system environment linked with railway. RatedVoltage:25.8/36/72.5/145/170/245/362kV RatedCurrent:Upto4,000A RatedShortTimeWithstandCurrent:Upto63kA/3s RatedOperatingSequence:O-0.3s-CO-3min-CO Standard:IEC62271-100,102,203 Certification:KERI,KEMA,GOST OperatingMethod:Hydraulic,Motor EnclosureCB:Single,3PhasesCommon RAILWAY SYSTEM SOLUTIONS Technology PowerT&DSolution 48 49 www.dienhathe.xyz www.dienhathe.vn
  • 26. RAILWAY SYSTEM SOLUTIONS Technology PowerT&DSolution 50 51 LeadingInnovation,CreatingTomorrow SF6GasFreeSwitchGear SF6 free eco-friendly switchgear conforming to Kyoto Protocol Reliability of insulation proven in the test of long-term over-voltage, thermal shock, mechanical life and moisture penetration RatedVoltage:25.8kV RatedCurrent:Upto2,000A RatedShortTimeWithstandCurrent:25kA/3s DegreeofProtection:IP4X Standard:IEC62271-200 Certification:KERI CubicleGasInsulatedSwitchgear Designed to be one-piece in structure and compact / maintenance free, offering excellent economic viability for users. RatedVoltage :25.8kV RatedCurrent:630A RatedShorttimeWithstandCurrent:20kA/s RatedPowerFrequencyWithstandVoltage:60kV(r.m.s)/1min RatedLightingImpulseWithstandVoltage:125kV(1.2X50μs Components:ALTSPanel,MOFPanel,PTPanel,IncomingVCB,FeederVCB AC Low & Medium Voltage Solution MediumVoltageSwitchgear Air-insulated compact switchgear housed in enclosure to ensure safety RatedVoltage:7.2kV~36kV RatedCurrent:Upto4,000A RatedShortTimeWithstandCurrent:Upto40kA/3s DegreeofProtection:IP4X Standard:IEC62271-200 Certification:KERI,KEMA,CESI LowVoltageSwitchgear Designforcoordinatedprotection/Paneldesignsoftwareavailable Modular panel design for ease of assembly RatedVoltage:690V RatedCurrent:Upto2,500A RatedShortTimeWithstandCurrent:Upto50kA/3s DegreeofProtection:IP4X,~Form46 Standard:IEC60439-1 Certification:ASTA www.dienhathe.xyz www.dienhathe.vn
  • 27. RAILWAY SYSTEM SOLUTIONS Technology PowerT&DSolution 52 53 LeadingInnovation,CreatingTomorrow DC Solution It is an energy storage system designed to save energy consumption by railway system by converting mechanical energy produced during braking to electrical energy. It adds additional benefit of cost-effectiveness from energy reduction to the image of railway as a green mode of transportation. Super Capacitor Energy Storage System Rectifier Free convection and silicone-based rectifier designed to convert AC to DC. Large capacity and compact design ensures reduction of space required for railway transformation system installation. LargeCapacity:~DC1500V,~4000kW WiringMethod:3PhaseDoubleWayBridgeSeries/Parallel DCSwitchgear Designed to protect DC-powered railway line and integrated with high speed circuit breakers for rectifier, power feeder and backup application to prevent safety incidents. RatedVoltage :~DC1500V RatedCurrent:~6000A RatedBreakingCurrent:~100kA www.dienhathe.xyz www.dienhathe.vn
  • 28. RAILWAY SYSTEM SOLUTIONS Technology PowerT&DSolution 54 55 LeadingInnovation,CreatingTomorrow LSIS develops and supplies EMS, a core element of electric power monitoring field. Power monitoring facility based on EMS platform completely monitors entire facilities regardless of the power environment provided by your train infrastructures. In addition, with open structure and design specialized to train, LSIS configures facilities by selecting server and operating system according to user’s convenience. TrainPlatform FunctiontoDeterminePressurizationandDecompressionforElectricTrain VariousKindofGateway,RTU,FEP SCADA www.dienhathe.xyz www.dienhathe.vn
  • 30. MainLineProject RAILWAY SYSTEM SOLUTIONS Major Project Record RAILWAY SYSTEM SOLUTIONS MajorProjectRecord MainLineProject 58 59 LeadingInnovation,CreatingTomorrow Kyungbu HSR line is the 1st high speed rail line in Korea, stretching from Seoul Station, Bongrae-dong, Jung-uu, Seoul to Busan Station, Choryang-dong, Dong-uu, Busan and went in operation on April 1, 2004. Kyungbu HSR line project was planned to open the 1st leg (Seoul ~ Daegu with the conventional Daegu ~ Busan section being electrified) by 2004 and the 2nd leg (Daegu ~ Kyungju ~ Busan) by 2010. Phase 1 of the Project was initiated in June, 1992 and commissioned on April 1, 2004, with the Seoul ~ Daegu section newly built and Daegu ~ Busan section and intra-city conventional railroad sections in Daejeon and Daegu electrified. Phase 1 of the Project cost 12 trillion and 737.7 billion KRW in total. Phase 2 of the Project that began in 2002 includes construction of Daegu ~ Kyungju ~ Busan section and intra-city sections running through Daejeon and Daegu, with scheduled completion in 2010. Upon completion of Phase 1 of the Kyungbu HSR line project, trip time between Seoul and Busan which took 4 hours 10 minutes in the past was reduced to 2 hours 40 minutes. Upon completion of Phase 2 in 2010, high-speed section will be stretched along the entire line except for the intra-city sections in Daejeon and Daegu, further reducing the trip time between Seoul and Busan to 2 hours 10 minutes. The line is aligned through Seoul ~ Gwangmyung ~ Cheonan ~ Asan ~ Daejeon ~ Dongdaegu ~ Kyungju ~ Busan and Osong (Chungbuk) ~ Gimcheon (Gyungbuk) ~ Woolsan stations were added to the planned line alignment in November, 2003. Total line length is now 409.8km and it is to be extended to 418.7km upon completion of Phase 2. KoreaMainLineProject(HSR) www.dienhathe.xyz www.dienhathe.vn
  • 31. Challenges of LSIS Phase1oftheHSRProjectwasimplementedfromJune,’94toApril,’04andPhase2fromDecember,’06toDecember,10. LedE&Mconsortiumexceptforcivil/architecturalworkinPhase1andHRSsignallingsystem[ATC+IXL]consortiumin Phase2andwontheelectricalworkcontractinalimitedtenderingprocessawardedbytheKoreaRailNetworkAuthority. MaximumOperatingSpeed:300km/h[DesignSpeed:350km/h] Headway:3Minutes Line:256km,(Phase1)(Phase2:Line:144km) Stations:8Ea.(Phase1:4Ea.,Phase2:4Ea.) HSRSignallingSystem Phase1oftheHSRProjectwasimplementedfromJune,’94toApril,’04andPhase2fromDecember,’06toDecember,10. LedE&Mconsortiumexceptforcivil/architecturalworkinPhase1andHRSsignallingsystem[ATC+IXL]consortiumin Phase2andwontheelectricalworkcontractinalimitedtenderingprocessawardedbytheKoreaRailNetworkAuthority. ConsortiumLeader[Phase2ofKyungbuHSRProject] AutomaticTrainControlSystem[ATC,Onboard&WaysideSystems] TrainTrafficManagementSystem[TMS] SystemEngineering SafetyFacilities HSRMaintenanceandR/STowingCar InkedthecontractinMarch,2004andcompleteddeliveryofitsproprietaryonboardATCmodulesonJune30,2005. LSISDeliveredandInstalledOnboardATCModulesonHRSMaintenanceandR/STowingCars HSRSLPImplementation SLP(SpeedLimitPanel):Itisinstalledinsignallingequipmentroomanddesignedtolimittrainspeedto90km, 170km, or230kmin specifiedsections. DeliveredandinstalledSLPsignallingmodulesalongtheentireHSRline,eachsignallingofficeandstation,signallingequipment room,Gurorailroadtrafficcontrolcenter,GwangmyungHSRcontrolroom,situationroomofKNR,Osongelectricofficeand operationalcontrolroomofSiheungStation. SignedthecontractonDec.27,2006andcompletedimplementationonDec.22,2007,focusingonHSRinterfacedevelopment. HSRPhase2CTCImplementation LocalizedandImplementedCTCforHSRPhase2 ImplementedCTCforHSRPhase2inPrimaryandBackupRailroadtrafficControlCenters ScopeIncludedDelivery,InstallationandCommissioningofCTCSystem(IncludingS/W) SignedtheContractonApr.9,2009andCompletedImplementationonNov.1,2010forCommercialOperation RAILWAY SYSTEM SOLUTIONS MajorProjectRecord MainLineProject 60 61 LeadingInnovation,CreatingTomorrow KyungbuHSRElectricalSystem KyungbuHSRPhase1 GISforTestTrackSection,NewCheongjuSubstation KyungbuHSRSeoulR/SDepotTransmission/DistributionSystemWork KyungbuHSRSeoulR/SDepotSSGIS KyungbuHSRPhase1GISDeliveryandInstallationinPyungtaek,Ansan,Okchon,KimcheonSS,BusanR/SDepotSS ApplicableSystem - Delivered 170kV GIS and 72kV GIS - Constructed 154kV Transmission / Distribution Line and Facilities Incidental to SS KyungbuHSRPhase2 WoolsanSection:WoolsanSS,DangliSP,Bangnaeand2OtherPPs DaeguSection :DaeguSS,Keumkuand2OtherPPs BusanSS ApplicableSystem - 170kV GIS, 72kV GIS, 24kV C-GIS and Low-voltage Distribution System in General - Completed Full Power System Lineup in Power Receiving / Transformation / Distribution and Implemented Proprietary HSR SS System Line Overview ThenumberofKTXpassengersincreased42% from72,300personsinthe1styearofcommercial operationto102,700asoftheendof2009. Notably,thenumberofpassengersincumulative termspassedthe200millionmarkonDec.19, 2009,5yearsand8monthsafterthebeginningof commercialoperation. ThefigureindicatesthateachKoreantookKTX4 timesonaverage.TheHSRlineisnowinoperation withsuccessandPhase2ofthelineisscheduled togoliveinthe2ndhalfof2010. www.dienhathe.xyz www.dienhathe.vn
  • 32. MetroProject RAILWAY SYSTEM SOLUTIONS Major Project Record Seoul Metro Phase 1 lines in which LSIS participated are Seoul Metro Line 3 and 4. Seoul Metro Line 3 of Seoul Metro links Jichuk Station, Deokyang-Gu, Goyang City, Gyeonggi Province and Okeum Station, Songpa-gu, Seoul, Seoul Metro Line 4 stretches from Danggogae Station, Nowon-gu, Seoul to Namtaeryong Station, Seocho-gu, linking the northeastern corner and the southern district of Seoul. 1980.02.29Line3and4ConstructionKickedOffConcurrently 1985.10.18Line3and4CommecialOperationinEntirety 1994.04.01Line4ExtensionSectionCommecialOperation(Sadang~Namtaeryong3.4km) 1993.10.30Line3ExtensionSectionCommecialOperation(Yangjae~Suseo9km) 1993.04.21Line4ExtensionSectionCommecialOperation(Sanggye~Danggogae3.4km) 1990.07.13Line3ExtensionSectionCommecialOperation(Gupabal~Jichuk9km) 2010.02.18Line3ExtensionSectionCommecialOperation(Suseo~Okeum3km) Seoul Metro Phase 2 lines are Seoul Metro Line 6, 7 and 8 of Seoul Metropolitan Rapid Transit (SMRT) . Seoul Line 6 links Eungam Station, Eunpyong-gu, Seoul and Bonghwasan Station, Jungrang-gu. Commissioning of Line 6 marked the completion of radiant web of subway networks in Seoul, linking the urban district and the suburban area of Seoul directly. 1994.01.08Line6ConstructionKickedOff 2000.08.07Line6SangwolgokSectionCommecialOperation(Bonghwasan~Sangwolgok,6Stations) 2000.12.15Line6Sangwolgok~EungamSectionCommecialOperation(28Stations) 2001.03.09TheRemainingLine6SectionCommecialOperationinEntirety(Itaewon~Yaksu,4Stations) SeoulMetroLine7ofSMRTlinksJangamStation,EuijeongbuCity,GyeonggiProvinceandOnsuStation,Guro-gu,Seoul. 1990.12.28 :ProjectKickedOff 1996.10.11 :Jangam~GeondaeipkuSectionCommecialOperation 2000.02.29 :Sinpung~OnsuSectionCommecialOperation 2000.08.01 :Geondaeipgu~SinpungSectionCommecialOperation Seoul Metro Line 8 of SMRT links Amsa Station, Gangdong-gu, Seoul and Moran Station, Sujeong-gu, Seongnam City, Gyeonggi Province. 1990.12.29 :ProjectKickedOff 1996.11.23 :Jamsil~MoranSectionCommecialOperation 1999.07.02 :Amsa~JamsilSectionCommecialOperation RAILWAY SYSTEM SOLUTIONS MajorProjectRecord MetroProject 62 63 LeadingInnovation,CreatingTomorrow MetroProject(Seoul) www.dienhathe.xyz www.dienhathe.vn
  • 33. SeoulMetroPhase2(Line6,7&8) Line6 RemovedOldControlFacilitiesandDeliveredNewOne (Line6-38Stations,35km)1996.07~2000.11 DeliveredSignallingFacilitiesBetween1996.11~2000.12. Fabricated/Delivered/Tested/Commissionedthe SysteminTechnologyPartnershipwithALSTOM ImplementedElectricalPowerFacilitiesforLine6 Between1996.03~1999.12. -ImplementedtheFacilitiesin12Substations -Fabricated/Delivered/Tested/CommissionedAC&DC Cubicle,TR,Rectifier,SCADASystem. Line7,Line8 ImplementedControlSystem1992.12~1999.12(Line7-42 Stations,47km,Line8–17Stations,18km) Fabricated,Delivered,TestedandCommissionedProprietarySolutionofLSIS TheelectricalfacilityimplementationLSISwasresponsibleforimplementingAC&DCCubicle,TR,Rectifierin11substations. ElectricalPowerSystem LSISsuppliesthemostcompactandreliableAC 24KVSWGR(MCSG,C-GIS)foundinKoreaor elsewherearoundtheworldandoffersproprietary DC750VHSCB(HighSpeedCircuitBreaker)DC SWGRrectifierpanelandTRforrectifier,etc.in technologypartnershipwithservice-provenglobal partners. Line Overview Seoulmetropolitansubwaylinesservingoneof theworld’sbiggesturbanareawhichishometoa populationofaround20millionpersonsnowrelies onsystemsthatLSISdeliveredforcommercial operation. Challenges of LSIS SeoulMetroPhase1(Line3&4) ControlSystem RemovedOldControlFacilitiesandDeliveredNewOne(Fabrication,Delivery,Testing,Commissioning) WonContract Between1996.06~1998.03(Line3-31Stations,36km,Line4–25Stations,32.3km) Fabricated,Delivered,TestedandCommissionedProprietarySolutionofLSIS ElectricalPowerFacilities Fabricated,Delivered,TestedandCommissionedElectricalPowerFacilitiesforIlsanLine(ExtensiontoLine3)andGwacheonLine(ExtensiontoLine4) Line3(IlsanLine):~1996.01.9Stations,19.2km-long,LSISImplementedDCCubicle,TRandRectifierin7Substations Line4(GwacheonLine) :~1994.04.10Stations,13.4km-long,LSISImplemented154&72.5kVGIS,DCCubicle,TRandRectifier in5Substations RAILWAY SYSTEM SOLUTIONS MajorProjectRecord MetroProject 64 65 LeadingInnovation,CreatingTomorrow MetroLine 3 MetroLine 4 MetroLine 6 MetroLine 7 Metro Line8 www.dienhathe.xyz www.dienhathe.vn
  • 34. Challenges of LSIS IncheonLine1:SuppliedElectricalFacilitiestotheNewLine(Fabrication,Delivery,Testing,Commissioning) 1996.02.~1999.12.(23Stations,L:22.km)ElectricalFacilitiesfor8Substations IncheonLine1SongdoExtension:ExtensiontotheExistingLine(Fabrication,Delivery,Testing,Commissioning) 2006.12.~2009.06.(6Stations,6.5km)ElectricalFacilitiesfor2Substations ElectricalFacilitiesDeliveredbyLSIS ACCubicleDCCubicleTRRectifierSCADASystem Line Overview Phase1and2ofIncheonMetroLine2areplannedtobecompletedsimultaneouslyby2014fornow,but,analternative strategytocompletePhase1by2014firstandPhase2subsequentlyfrom2014to2018.Theprojectplanmaybesubjectto change,dependingonthestatusofpreparationfor2014IncheonAsianGames. RAILWAY SYSTEM SOLUTIONS MajorProjectRecord MetroProject 66 67 LeadingInnovation,CreatingTomorrow Incheon Metro Line 1 links Gyeyang Station, Gyulhyun-dong, Gyeyang- gu, Incheon City and Int’l Biz. District Station, Songdo-dong, Yeonsu-gu. It is the only line of Incheon Metro and a part of the Seoul Metropolitan rapid transit network. It was planned to stretch across from the north to the south of Incheon City to support the existing Gyeongin Line (Seoul Metropolitan Line 1) and provide railroad transit access to new towns built in Gyeyang-gu and Yeonsu-gu. 1999.10.06:Bakchon ~DongmakSectionCommecialOperation 1999.12.07:Gyulhyun~BakchonextensionsectionCommecialOperation 2007.03.16:Gyeyang~GyulhyunextensionsectionCommecialOperation 2009.06.01:Dongmak~nt’lBiz.DistrictextensionsectionCommecialOperation MetroProject(Incheon) Metro Line 1 www.dienhathe.xyz www.dienhathe.vn
  • 35. RAILWAY SYSTEM SOLUTIONS MajorProjectRecord MetroProject 68 69 LeadingInnovation,CreatingTomorrow Busan Metro Line 1 is the urban transit line of Busan Transportation Corporation, linking Sinpyong Station, Saha-gu, Busan City and Nopo Station, Geumjeong-gu.BusanMetroLine1wasbuiltin4phases. Initially, the line was built in 3 phases from Nopodong Station (Presently Nopo station) to Seodaeshindong Station (Presently Seodaeshin station) and extendedinPhase4uptoSinpyongStation. The line Commecial Operation on Jul.19, 1985 and became what it look today onJun.23,1994.Sinceitsgo-live,thelargestnumberofpassengershaveused BusanMetroLine1exceptforthesubwaylinesinSeoulMetropolitanAreaand extensionuptoDaedaepoisnowunderwaywithscheduledcompletionin2013. BusanMetroLine2isthe2ndsubwaylineofBusan,crossingthecityfromthe east to the west, starting from Hopo, Hwamyong, Deokcheon to Seomyeon, GyeongseongUniv.,Gwanganri,andHaewoondae. Busan Metro Line 2 was built in 3 phases: Phase 1 is 22.4km-long between Hopo ~ Seomyeon ; Phase 2 is 16.7km-long between Seomyeon ~ Jangsan ; and Phase 3 is 11.3km-long between Hopo ~ Bukjeong. The line starts from Jangsan Station, Haewoondae-gu, Busan and ends at Yangsan Station, Yangsan City, Gyungsangnamdo, crossing Haewoondae, Suyoung Junction, Seomyeon, Jurye, Sasang and Hwamyongdong Stations. In comparison with Line 1, Line 2 has fewer passengers, but, form a critical part of trunk line linkingtheeastandthewestofBusanCityandcrossingmajoruniversitiesand suburban districts of Busan, with quite a many passengers in commuting hours. Notably, with the commissioning of Yangsan Line, Line 2 provides Yangsan New Town which is the major bedtown of Busan with critical transit accesstotheurbandistrictsofBusan. ThelinealignmentfollowsmostlythetrunkrailroadlinefromSeomyeontoHopo stations. Challenges of LSIS Fabrication,Delivery,InstallationandCommissioningoftheEntireSignallingSystemIncludingControlFacilities,WaysideFacilitiesand OnboardModulesfortheNewBusanMetroLine2andItsExtension(IncludingControlFacilitiesofLine1) BusanMetroLine2SignallingFacilities(1995.09~2002.08) BusanMetroLine2Phase3Section1[Hopo~Jungbu]SignallingFacilities(2005.12~2008.01) BusanMetroLine2SignallingFacilities -SignallingFacility -TTCSystem,ATCSystem,SimulationSystem,ATCCarborneDevice,UPS -TechnicalSupervision -SpareParts,ConsumableParts,Tools&TestEquipment -Inspection&Training5.TTCSystemforBusanUrbanTransitAuthorityLineNo.1 Line Overview BusanUrbanTransitAuthorityisresponsibleforoperationand thelineshavethe2ndmostpassengersnexttothesubway linesinSeoulMetropolitanArea. MetroProject(ProvincialAreas) BusanMetroLine1and2Projects Busan Metro Line 1 BusanMetro Line 2 www.dienhathe.xyz www.dienhathe.vn
  • 36. Gwangju Metro Line 1 is the urban transit line of Gwangju Metro Corporation linking Nokdong Station, Dong-Gu, Gwangju City and Pyongdong Station, Gwangsan-gu. Phase 1 section (Nokdong ~ Sangmu) Commecial Operation on Apr.28, 2004 and Phase 2 section (Kim, Dae-Jung Convention Center ~ Mareuk ~ Pyongdong)CommecialOperationonApr.11,2008. LineLength:20.6km Operator:GwangjuMetroCorporation(EntireSection) TrackGauge:1,435mm(Std.Gauge) TravelingDirection:RightSide Stations:20 DoubleTrackSection:EntireSection Electrification:EntireSection(DC1,500V) SecuritySystem:ATC/ATO Challenges of LSIS Fabrication,Delivery,InstallationandCommissioningofCommunicationSystemforGwangjuMetroLine1 GwangjuLine1Phase1&2:Fabrication,Delivery,InstallationandCommissioningofElectricalPowerSystem(AsaSubcontractortothe PrimeContractor) LSISImplementedtheCommunicationSystemfrom2000.01to2007.12 theCommunicationFacilitiesDeliveredforGwangjuMetro Line1Include:DigitalTransmissionSystem/OnboardRadioSystem/DispatcherTelephoneSystem/VideoTransmissionSystem TheelectricalpowersystemofGwangjuLine1Phase2wasimplementedbetween2005.04.~2008.04.(20stations,20.5km)and AC&DCcubicleswereincludedinthescopeofdelivery. Line Overview RAILWAY SYSTEM SOLUTIONS MajorProjectRecord MetroProject 70 71 LeadingInnovation,CreatingTomorrow DaeguMetroLine1stretches25.9kmfromthesouthwesternpartofDaeguandacrossthedowntowndistrictstothe easterncorner.TheprojectkickedoffonDec.7,1991andCommecialOperationinpart(JincheonStation~Jungangro Station)onNov.26,1997.TheentirelineCommecialOperationonMay2,1998,withextensionsectionputincommercial operationonMay10,2002(DaegokStation~JincheonStation). Thelinehasatotalof30stations,withAnshimandWolbaeR/Sdepotsandoperatingmediumelectrictrainsetsof6cars. 1991.12.07:DaeguMetroLine1KickedOff 1997.11.26:DaeguMetroLine1Phase1Jincheon~JungangroSectionCommecialOperation 1998.05.02:DaeguMetroLine1Phase2Jincheon~AnshimSectionCommecialOperation 2002.05.10:DaeguMetroLine1Jincheon~DaegokSectionCommecialOperation DaeguMetroLine2stretches28.0kmfromthewesternpartofDaeguandacrossthedowntowndistrictstothesoutheastern corner.TheprojectkickedoffonDec.19,1996andtheentirelineCommecialOperationonOct.18,2005.3.32km-long extensionprojectkickedoffonJun.4,2007,withadditionof3stationsinKyungsanCity.Thelinehas26stationsintotaland crossDalgubeolStreetcrossingthewesterncenterandtheeasterncenterofDaeguamongthemajortrunkroadsofthecity. Ithasonly1R/SdeptatMunyangandoperatesmediumelectrictrainsetsof6cars. 1996.12.19:DaeguMetroLine2KickedOff 2005.10.18:DaeguMetroLine2Munyang~SawolSectionCommecialOperation Challenges of LSIS LSISdeliveredandimplementedTTC(Totaltrafficcontrol)systemassignallingsolutionforDaeguMetroLine1from 1994.05~1998.05forthecontractamountofaboutKRW1.8billion.Thesystemeliminatesneedsforhumaninterventionin traintrafficcontroland automatesmonitoringandcontrolofsignallingfacilitiesatstationswithcomputerizedmodulesin referencetotrainoperationplan. ForDaeguMetroLine1and2aswellasKyungsanExtensionsection, LSISwasresponsibleforimplementingelectricalsystems(fabrication, delivery,testing,commissioningandextensiontotheexistinglines)with followingmilestones: DaeguLine1:1994.05.~1998.05.(30Stations,25.9km)10SSPowerSystems DaeguLine2:2002.09.~2005.10.(26Stations,28.9km)9SSPowerSystems DaeguLine2 KyungsanExtension:2009.06.~2012.(3Stations,3.3km) 1SSPowerSystem. LSISSuppliedAC&DCCubicle,TR,RectifierandSCADASystemforEachLine. Line Overview MetroProject(ProvincialAreas) DaeguMetroLine1&2Projects MetroProject(ProvincialAreas) GwangjuMetroLine1Project Gwangju Metro Line 1 Daegu Metro Line 2 Metro Line 1 www.dienhathe.xyz www.dienhathe.vn
  • 37. RAILWAY SYSTEM SOLUTIONS MajorProjectRecord LRTProject 72 73 LeadingInnovation,CreatingTomorrow LRTProject RAILWAY SYSTEM SOLUTIONS Major Project Record Gwangmyeong LRT is a rapid transit line built as a solution to meet urban transit needs of Gwangmyeong City, Gyeonggi Province and stretched between Cheolsan Station of Seoul Metro Line 7 and Gwanak StationofKyungbuLine. Gwangmyeong LRT is an AGT (Automated Guideway Transit) line supporting automatedoperationandusesCrystalMoverSystemof MitsubishiHeavyIndustries,Japan.Thesystemisalreadyusedin StarLineofIncheonInt’lAirportwhichisapassengerlineconnected totheboardingterminaloftheairport. Operator:GwangmyeongLRTCo.,Ltd.(30YearConcessionRight) Constructor:KoryoDevelopmentConsortium ProjectSection:CheolsanStation(SeoulMetroLine7) ~SohaDistrict~ GwangmyeongStation(KyungbuHSR) ~GwanakStation(SeoulMetroLine1)(8stations) LineLength:10.343km KickOff:2010 CommercialOperation:2014 Scope of Engagement by LSIS LSISSignedtheContractwithKoryoDevelopmentCo.,Ltd.inJan.,’10. LSISwillfabricate,purchaseanddeliverallmechanical,electricaland automationsystemsforLRToperationexceptforcivil/architectural works,includingR/S,electricalpowerfacilities,trainsignallingsystem, communicationsystem,PSDandcatenarysystem,etc.LSISwill providesub-systemengineeringservicestoimplementindependentsystems andintegratethem,providingtotalengineeringservicesfortrainoperationsystem. LSISwilldeliverandimplementsystemsinthe10.343km-longline and8stations. LRTProject(E&MWork) GwangmyeongLRT Gwangmyeong LRT www.dienhathe.xyz www.dienhathe.vn
  • 38. TheShuttleTrainlinewasbuilttoprovideconvenienttransitoptiontoairflightpassengerswhohadtotravelbetweenboarding terminal built as a part of Phase 2 extension of Incheon Airport and passenger terminal. The shuttle train line Commecial OperationonJun.20,2008andisthefirstofitskindthatwentintocommercialoperationinKorea.TheShuttleTrainofIncheon Int’lAirportisunmannedandittravelsbetweenthestationslocatedinthebasementofIncheonAirportandboardingterminal A at the headway of 5 minutes. The line is expected to be extended to boarding terminal B, C and D which are being planned now. LineLength:900m No.ofStations:2 DoubleTrackSection:EntireSection(SingleLine-pair) Electrification:EntireSection(DC750V) Scope of Engagement by LSIS Supply/InstallationandOperation/MaintenanceofIAT(IntraAirportTransit)SystemasaConsortiumLeader ManagedConsortiumProjectControl,SystemIntegration,OperationandMaintenanceBetween03.11~08.05 LSISDeliveredandPerformed -ElectricalPowerSystem(ACSWGR,DCSWGR,Rectifier,SCADA,Etc.) -CommunicationSystem -R/SMaintenanceFacility -PlatformScreenDoors -GuidewayInstallation -SystemInstallation -1stUnmannedLRTinKorea, ProvideOperationServicesUponCompletionforCreditsGiventoitsManagement/MaintenanceCapabilitiesforRailroadSysteminGeneral Line Overview The1stunmannedandautomatedpassengertransitsystemofKoreaisnowincommercialoperationaftersuccessful delivery.Ithaulsabout5~6,000personsatthemaximumperhourinasingledirectionwithheadwayof5minutes.Itserves theneedsofpassengersfortransitsystembetweenboardingterminalsofIncheonInt’lAirportandLSISthatdeliveredthe systemwithsuccessasaprojectconsortiumleadernowprovidesafullscopeofservicesfortheshuttletrainsystemfrom operationtomaintenanceasamanagement/maintenanceservicecontractor. RAILWAY SYSTEM SOLUTIONS MajorProjectRecord LRTProject 74 75 LeadingInnovation,CreatingTomorrow Incheon Metro Line 2 is the rapid transit line of Incheon Metro to link Oryu-Dong, Seo-Gu, Incheon and Incheon Grand Park. The project kicked off in 2009, with go-live scheduled for the 1st half of 2014. It stretches 29.2km-long. Scope of Engagement by LSIS ProjectName:IncheonMetroLine2Project Location:Oryu-dong,Seo-gu,IncheonCity~Woonyeon-dong,Namdong-gu ProjectSection:Oryu-dong,Seo-gu~GeomdanJunction~GeomamStation(IncheonInt’lAirportRailway)~GajeongJunction~ Seoknam-dong~Gajwa-dong(Yeolwoomulro)~JuanStation(GyeonginLine)~IncheonCityHallStation(IncheonMetroLine1)~ Namdong-guOffice~IncheonGrandPark~Woonyeon-dong,Namdong-gu ProjectScope:L=29.2km,27Stations,2R/SDepots ProjectDuration:7YearsfromKickOff(2007~2014) ProjectBaseYear:2007 CommercialOperationYear:2014 Challenges of LSIS LSISorganizedprojectconsortiumwithHyundaiRotem,POSCOE&C,DaeahTIandSKC&CtowintheIncheonLine2E&M turnkeycontractwhichisnowunderimplementation. IncheonMetroLine2isnowunderconstructiontobecompletedin2014andintendedtoformapartofessentialtransit infrastructureinsupportofthesuccessfulcompletionof2014IncheonAsianGames. Intheprojectconsortium,LSISisresponsiblefordeliveringelectricalsystemfacilitiesandperformingelectricalworksona turnkeybasisandprovidingengineeringservicesforPSDsystemsinallstations. LSISwillprovidethefollowingelectricalsystemsto12substations: 12Substations:AC22.9kVPowerDistributionPanel 12Substations:DC750VDistributionPanel(HSCB) 12Substations:RectifierPanel 12Substations:TRPanelforRectifier 6EnergyStorages SCADA ElectricWork LSISplanstoproduce/supplyallelectricalsystemproductsandperformtheentireelectricalwork.Inaddition,LSISisalso responsibleforsupplying,installing,testingandcommissioningPSDsystemsfortheplatformsof27stationsforthecontract amountofaroundKRW25billion. Line Overview EuijeongbuLRTCo.,Ltd.whichisthedeveloperoftheprojectwillhaveoperationalrightsfor30yearsfromproject completion.TheLRTlineisintendedtoprovidealinkbetweenthenewresidentialdistrictstobedevelopednorthtoSeoul andSeoulMetrosubwaylines,withscheduledgo-liveinthe2ndhalfof2011. LRTProject(E&MWork) IncheonLine2,ParticipateE&MConsortium LRTProject(E&MWork) IncheonInt’lAirportIATProject www.dienhathe.xyz www.dienhathe.vn
  • 39. ProjectDescription:PrivateLRTLinePlanning/DevelopmentProject Operator:EuijeongbuLRTCo.,Ltd.(For30Years) Constructor:EuijeongbuLRTCo.,Ltd. ProjectSection:Balgok~Heuiryog(SeoulMetroLine1)~Beomgol ~EuijeongbuStation~EuijeongbuCityHall~Heungseon~Jungang ~Dongo~Saemal~GyeonggiProvinceHall2~Hyoja~Gonje~ Eoryong~Songsan~Tapseok Length:11.085km Mode:AGT(AutomatedGuidewayTransit) CommercialOperation:2011(Kick-offonJul.26,2007) AGT (AutomatedGuidewayTransit):VAL208ofSiemens,Germany -1Trainsetof2Cars,Total16Trainsets,Headwayof3Minutes -236Passengersper1Trainset -L:13.7m,W:2.08m,H:3.67m -MinimumRadiusofCurvature:40m Scope of Engagement by LSIS ProjectEngagement:EuijeongbuLRTisaPrivateInvestmentProjectandLSISFundedtheProject ScopeofWork:Design/Fabrication/Delivery/Installation/Testing/CommissioningofElectricalandCommunicationSystemsof EuijeongbuLRT ’06.09.20LSIS&EuijeongbuLRTCo.,Ltd.SignedAgreement ’07.07.26ProjectKickedOff ProjectDuration:’07.08.28~’11.08.27(48MonthsfromKickOff) CommercialOperation:2011(TobeExtendedbyAbout10Months) No.ofStations:15Stations+1R/SDepot TotalLineLength:11Km ScopeofElectricalPowerSystemDelivery:PowerSystem7S/S(AC&DCCubicle,TR,Rectifier,PLC),ElectricalWork (Transformation/Distribution,DCDistribution),HeatingSystem ScopeofCommunicationSystemDelivery:TrainRadio/OpticalTransmission/CCTV/PhoneSwitch/EmergencyPhone/PA/ TrainStopAnnouncementSystem/FiberOpticCableDesign/Fabrication/Delivery/Installation/Testing/Commissioning-private investment-fundedFullyAutomatedLRTProjectand8Stations. Line Overview EuijeongbuLRTCo.,Ltd.whichisthedeveloperoftheprojectwillhaveoperationalrightsfor30yearsfromproject completion.TheLRTlineisintendedtoprovidealinkbetweenthenewresidentialdistrictstobedevelopednorthtoSeoul andSeoulMetrosubwaylines,withscheduledgo-liveinthe2ndhalfof2011. LRTProject(Others) EuijeongbuLRT RAILWAY SYSTEM SOLUTIONS MajorProjectRecord LRTProject 76 77 LeadingInnovation,CreatingTomorrow Project Description Length:23.9km ProjectSection:Sasang~KimhaeAirport~Daejeo~Ubang~Buwon~Yonji Scope of Engagement by LSIS LSISImplementsDesign,Delivery,Installation,TestandCommissioningoftheFollowing 8Substaion:AC22.9kVPowerDistributionPanel 8Substation:DC750VPanel(HSCB) 8Substation:RectifierPanel 8Substation:TRPanelforRectifier SCADA ElectricWork Yongin Project Description Length:18.47km ProjectSection:Gugal~Dongbaek~Myongji~PublicStadium~Everland Scope of Engagement by LSIS LSISImplementsDesign,Delivery,Installation,TestandCommissioningoftheFollowing 11Substation:DC750VPanel(HSCB) 11Substation:RectifierPanel 11Substation:TRPanelforRectifier LRTProject(Others) Kimhae www.dienhathe.xyz www.dienhathe.vn
  • 40. OverseasRailwayProject RAILWAY SYSTEM SOLUTIONS Major Project Record RAILWAY SYSTEM SOLUTIONS MajorProjectRecord OverseasRailwayProject 78 79 LeadingInnovation,CreatingTomorrow The 1st railway electrical interlocking system implementation project that aKorea company won in Thailand. LSIS established consortium with Thailand local IT company, that competed with global dominated company such as Bombardier, Westinghouse, Alstom. This project that was the first modernization of a Thailand railway has business impact for LSIS This project is a turn-key project including design, delivery, installation, commisioning and maintenance of signalling facilities and kicked off in October. 2001 and saw completion in April. 2005. LSIS supplied EIS , signalling facillities to a total 14 stations from Ban Phachi station ; Capital city of Thailand to Bang Sue station. CTC system to a total 52 stations. Project:ThailandSt1RailwaySignalling&CommunictionSystemProject HostCountry:Thailand System:StateRailwayofThailand Status:InOperation StartStation:BangSueStation EndStation:BanPhachiStation Scope of Engagement by LSIS ICB(Internationalcompetitivebidding)LGIS-JasmineConsortium ProjectDuration:2001.10~2005.4(3Years6Months,Includingmaintenace) ProejctScope:EIC,Signallingfacilitiesfor14stations, CTC52stations SystemDescription -CTC:52Stations -EIC:14Stations -BlockSystem:14Sets -Levelcrossing:32Sets -OpticTansmissionSystem:14Station -Switch:127Sets -TrackCircuit:150Sets -SignallingDevice:342Sets -PowerSupply:14Sets OverseasRailwayProject ThailandSt1RailwaySignalling&CommunictionSystemProject CommercialOperation:April.2005 Client:StateRailwayofThailand Operator:StateRailwayofThailand Gauge:1,000mm No.ofTracks:Triple&DoubleTrack www.dienhathe.xyz www.dienhathe.vn
  • 41. RAILWAY SYSTEM SOLUTIONS MajorProjectRecord OverseasRailwayProject 80 81 LeadingInnovation,CreatingTomorrow As a sequel to ST1 railway project, LSIS won the ST4 railway signalling and communication system project, beating Bombardier, Westinghouse and Alstom. The project is a turn-key project including design, delivery of signalling & communication system, installation, commissioning and maintenance. It kicked off in Jul., 2009 and will see completion in 2010. LSIS supplies CBI, signalling and communication system and CTC system for 7 stations in total from Chachoengsao to the south of Bangkok, the capital of Thailand to Laem Chabang station. Project:ThailandST4RailwaySignalling&CommunicationSystemProject HostCountry:Thailand System:StateRailwayofThailand Status:InOperation StartStation:ChachoengsaoStation EndStation:LaemChabangStation CommercialOperation:2011(Scheduled) Client:TSCJointVenture Operator:StateRailwayofThailand Gauge:1,000mm No.ofTracks:DoubleTrack SignallingProtocol:LS-EIS520V Scope of Engagement by LSIS Projecttenderingmethod:ICB(InternationalCompetitiveBidding) PrimeContractorwasTSCJointVentureandLSISWontheRailwaySignalling& CommunicationSystemPortionoftheContract ProjectDuration:2009.7~On-going(24Months) SystemDescription -CTC:7Stations -CBI:7Stations(LS-EIS520V) -BlockSystem:7Sets -CommunicationSystem:7Sets -OpticalTransmissionSystem:7Stations -Switch:92Sets -TrackCircuit:357Sets -Signalling:131Sets -PowerSupply:7Sets State Railway of Thailand ST4 Double Track Line Signalling & Communication System OverseasRailwayProject StateRailwayofThailandST4DoubleTrackLineSignalling& CommunicationSystemProjectIt is the 1st railway signalling system implementation project that a Korean company won in Bangladesh that Alstom and Siemens of Europe dominated. The project is a turn-key project including design, delivery, installation, commissioning and maintenance of signalling facilities and kicked off in May, 2004 and saw completion in Nov. 2006. LSIS supplied CBI and signalling facilities to a total of 10 stations from Bangladesh Sylhet transfer station to Azampur station. As a credit to its successful project delivery, LSIS also won additional signalling facility project for Akhaura transfer station in 2005. Project:Bangladesh10StationsModernizationProject Hostcountry:Bangladesh System:BangladeshRailway Status:InOperation StartStation:SylhetStation EndStation:AzampurStation CommercialOperation:Nov.2006 Scope of Engagement by LSIS ProjectTenderingMethod:ICB(InternationalCompetitiveBidding)LSIS Submitted aBidSingle-handedly ProjectDuration:2004.5~2006.11(2Years6Months) SystemDescription:CBIfor11Stations(LG-EIS) -BlockSystem:11Sets -Crossing:6Sets -Switch:126Sets -TrackCircuit:201Sets -Signalling:196Sets -PowerSupply:11Sets OverseasRailwayProject BangladeshRailway11StationsModernizationProject Client:BangladeshRailway Operator:BangladeshRailway System:BangladeshRailway Gauge:1,000mm No.ofTracks:SingleLine SignallingProtocol:LG-EIS520 Bangladesh Railway 11 Stations Modernization www.dienhathe.xyz www.dienhathe.vn