SlideShare a Scribd company logo
1 of 7
ÇALIK
     YESILIRMAK ELECTRIC
DISTRIBUTION COMPANY (YEDAS)




                 İLKNUR YILMAZ
  PLANNING INVESTMENT AND FACILITY COORDINATOR
OVERVİEW TO THE COMPANY
 ÇALIK YEDAŞ is an affiliate company of Çalık Holding which has a variety
 of sectors:
 Textile,construction, telecommunication,finance media and mining.
  21st distribution region in the mid Blacksea Region.
 Operation area consists of five provinces in the region:
 Samsun,Ordu, Çorum,Amasya,Sinop.
YEDAS is connected to the transmission grid at 34.5 kV voltage level
through 25 central stations (154/34.5 kV )
Totally 40.000 km2 service area ( %4 of Turkey)
 3.000.000 population in the region (%5,1 of Turkey)
 Totally 1.600.000 million customers in the region (%4.7 of Turkey)
% 84 is household customers, %11 is commercial customers
Totally 4.5 Twh energy consumption (%3 of Turkey)
 1700 MVA Installed Power (%4 of Turkey)
 Loss rate is %8.28 (as of the end of 2011)
 Totally Staff Number: 2026
 YEDAS is the first electricity distribution company in Turkey which has
 been rewarded of EFQM 3 star excellence certificate.
ÇALIK YEDASs’ PRIORITIES IN THE ELECTRIC DISTRIBUTION SECTOR
ÇALIK YEDASs’ nvestment budget is 100 MTL/year
Strentghten the existing network infrastructure
Increase the network capacity and operation flexibility
Prove the sustainability for the supply ,technical quality and customer satisfaction
Decrease the technical and commercial losses in the network
ÇALIK YEDAS IS AWARE OF ONLY STRENGTHENED NETWORK IS NOT ENOUGH FOR
THE SUCCESS OF NETWORK OPERATIONS.
SMART MANAGEMENT OF THE NETWORK WILL ADD A VALUE TO WHOLE
INFRASTRUCTURE INVESTMENTS
ÇALIK YEDASs TECHNOLOGICAL INVESTMENTS
 SAP has been activeted with all modules in May 2011
 SAP-ISU (Industrial Solutions For Utilites) has been completed in October ,2012
All customer numbers,meters, addresses and LV network connectivities has been
transferred into ISU system from the existing Abone.Net software
Currently, billing, customer/metering informations , customer connections, customer
complaints/requirements are managed and reported through these IT systems.
The cost of these systems is roughly 18 MTL.
 The mechanical meters has been replacing with the digital ones since 2011. (Total
611.000 meters)
ÇALIK YEDASs TECHNOLOGICAL INVESTMENTS

 AMR infrastructure has been founded in 2012.
 60.000 customer meters will have been included in AMR system by the end of
2015. ( Forecasted budget is 28 MTL)
 Whole HV and LV network has been modelled and analysised in digital
environment (Dig Silent) to determine 5 and 10 years network investment
requirements.
 SCADA/DMS Project started in September,2012 and it’s still going on.
Project Budget is 13 MTL for 2012 and 2013 ( 5 MTL has been spent in 2012)
Project is being executed by General Electric Digital Energy.
133 numbers of Central area substations ( 900 feeders) in 5 provinces will have been
controlled and monitored by the end of 2013.
DMS Modules which will be used in DMS System
          Outage Management
          Load Flow Analysis
          Network Management
          Fault Restoration and Isolation

SCADA/DMS System will be integrated with SAP/CRM/ISU /PM and GIS.
ÇALIK YEDASs TECHNOLOGICAL INVESTMENTS

 Whole customer addresses and LV connectivities has been included into GIS
system in 2012.
 Remaining HV connectivities and line characteristic parameters/lenghts will have
been included in GIS system by the end of 2013.
Total budget of GIS system is 12 MTL

ÇALIK YEDASs’ SMART GRID VISION BY THE END OF 2015
 Realize a strong integration between SAP/ISU/CRM ,GIS, AMR and SCADA/DMS
for the effective network and workforce management
 Include the all meters of important customers into AMR system
 Establish a strong asset management system using GIS
 Establish asset risk management system using GIS and SCADA/DMS
 Develop and adapt the existing technological systems considering the electrical
vehicles and distributed generation systems
EXPECTATIONS
EMRA
 Awarness of successful technological investments require enough time to realize
them ( Process analysises, system conceptive,etc.)
 Give reasonable time to DisCOs to complete the whole integrated distribution
management systems instead of applying penalties.
 Revise the investment budgets as DisCOs can realize their technological systems
accordingly international quality standards.
 Resolve the uncertainity on the technological investments which have been
realized prior to unbundling.
USTDA
 Establish a strong technology connection between DisCOs in US and Turkey
 Lead DisCOs in Turkey to make a proper IT requirement analysis and determine
priorities
 Lead DisCOs to transfer the proper technology at the right time.
TECHNİCAL SUPPORTERS
 Pay attention the proper technological requirements of DisCOs more than
commercial profits
 Make workshops with DisCOs and direct them to advise the best technological
solutions.
THANK YOU

More Related Content

What's hot

Making Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a RealityMaking Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a RealitySchneider Electric India
 
Energy Event Index: Weather risk forecasts for power utilities
Energy Event Index: Weather risk forecasts for power utilitiesEnergy Event Index: Weather risk forecasts for power utilities
Energy Event Index: Weather risk forecasts for power utilitiesSchneider Electric
 
IIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the futureIIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the futureSchneider Electric
 
Schneider Electric Facilities Management Survey
Schneider Electric Facilities Management SurveySchneider Electric Facilities Management Survey
Schneider Electric Facilities Management SurveySchneider Electric
 
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy ConsumptionSchneider Electric
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)Schneider Electric
 
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...Schneider Electric
 
I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015Barry Gander
 
[Case study] Kissimmee Utility Authority: Best compilation of products from o...
[Case study] Kissimmee Utility Authority: Best compilation of products from o...[Case study] Kissimmee Utility Authority: Best compilation of products from o...
[Case study] Kissimmee Utility Authority: Best compilation of products from o...Schneider Electric
 
2010 Aug Evse Capabilities
2010 Aug   Evse Capabilities2010 Aug   Evse Capabilities
2010 Aug Evse Capabilitiesmdixon888
 
The Future of Machine Building is NOW!
The Future of Machine Building is NOW!The Future of Machine Building is NOW!
The Future of Machine Building is NOW!Schneider Electric
 
Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine Schneider Electric India
 
MxVision WeatherSentry® Web Services for Utilities
MxVision WeatherSentry® Web Services for UtilitiesMxVision WeatherSentry® Web Services for Utilities
MxVision WeatherSentry® Web Services for UtilitiesSchneider Electric
 
Advanced Metering Infrastructure
Advanced Metering InfrastructureAdvanced Metering Infrastructure
Advanced Metering InfrastructureMatsBerglind
 
Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504Tom Noble
 
How Service-Oriented Drive Deployments improve VSD Driveline Uptime
How Service-Oriented Drive Deployments improve VSD Driveline UptimeHow Service-Oriented Drive Deployments improve VSD Driveline Uptime
How Service-Oriented Drive Deployments improve VSD Driveline UptimeSchneider Electric
 
Asset Lifecycle Management: flexible infrastructures enabling future change
Asset Lifecycle Management: flexible infrastructures enabling future changeAsset Lifecycle Management: flexible infrastructures enabling future change
Asset Lifecycle Management: flexible infrastructures enabling future changeSchneider Electric
 
International Standards: The Challenges for an Interoperable Smart Grid
International Standards: The Challenges for an Interoperable Smart GridInternational Standards: The Challenges for an Interoperable Smart Grid
International Standards: The Challenges for an Interoperable Smart GridSchneider Electric
 

What's hot (20)

Making Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a RealityMaking Smart & Intelligent Buildings a Reality
Making Smart & Intelligent Buildings a Reality
 
Energy Event Index: Weather risk forecasts for power utilities
Energy Event Index: Weather risk forecasts for power utilitiesEnergy Event Index: Weather risk forecasts for power utilities
Energy Event Index: Weather risk forecasts for power utilities
 
IIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the futureIIoT and how Smart Machines help shape the future
IIoT and how Smart Machines help shape the future
 
Technology Showcase Our Promise to every Customer
Technology Showcase Our Promise to every CustomerTechnology Showcase Our Promise to every Customer
Technology Showcase Our Promise to every Customer
 
Energy Performance
Energy Performance Energy Performance
Energy Performance
 
Schneider Electric Facilities Management Survey
Schneider Electric Facilities Management SurveySchneider Electric Facilities Management Survey
Schneider Electric Facilities Management Survey
 
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
 
ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)ADMS (Advanced Distribution Management System)
ADMS (Advanced Distribution Management System)
 
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
[Case study] Fortum Finland: Gaining real-time intelligence to administer and...
 
I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015I canada americana abb smart cities march 2015
I canada americana abb smart cities march 2015
 
[Case study] Kissimmee Utility Authority: Best compilation of products from o...
[Case study] Kissimmee Utility Authority: Best compilation of products from o...[Case study] Kissimmee Utility Authority: Best compilation of products from o...
[Case study] Kissimmee Utility Authority: Best compilation of products from o...
 
2010 Aug Evse Capabilities
2010 Aug   Evse Capabilities2010 Aug   Evse Capabilities
2010 Aug Evse Capabilities
 
The Future of Machine Building is NOW!
The Future of Machine Building is NOW!The Future of Machine Building is NOW!
The Future of Machine Building is NOW!
 
Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine Green Machines - How OEMs can improve the energy efficiency of machine
Green Machines - How OEMs can improve the energy efficiency of machine
 
MxVision WeatherSentry® Web Services for Utilities
MxVision WeatherSentry® Web Services for UtilitiesMxVision WeatherSentry® Web Services for Utilities
MxVision WeatherSentry® Web Services for Utilities
 
Advanced Metering Infrastructure
Advanced Metering InfrastructureAdvanced Metering Infrastructure
Advanced Metering Infrastructure
 
Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504Tunnel Car Wash Solution 0106BR0504
Tunnel Car Wash Solution 0106BR0504
 
How Service-Oriented Drive Deployments improve VSD Driveline Uptime
How Service-Oriented Drive Deployments improve VSD Driveline UptimeHow Service-Oriented Drive Deployments improve VSD Driveline Uptime
How Service-Oriented Drive Deployments improve VSD Driveline Uptime
 
Asset Lifecycle Management: flexible infrastructures enabling future change
Asset Lifecycle Management: flexible infrastructures enabling future changeAsset Lifecycle Management: flexible infrastructures enabling future change
Asset Lifecycle Management: flexible infrastructures enabling future change
 
International Standards: The Challenges for an Interoperable Smart Grid
International Standards: The Challenges for an Interoperable Smart GridInternational Standards: The Challenges for an Interoperable Smart Grid
International Standards: The Challenges for an Interoperable Smart Grid
 

Similar to U.S - Turkey Smart Grid Workshop - İlknur Yılmaz

Grid Protection Systems - New Technologies
Grid Protection Systems - New TechnologiesGrid Protection Systems - New Technologies
Grid Protection Systems - New TechnologiesIPPAI
 
Automating power distribution
Automating power distributionAutomating power distribution
Automating power distributionNavas Azeez
 
Nokia_IP-MPLS_SmartGrid_Application_Note_EN
Nokia_IP-MPLS_SmartGrid_Application_Note_ENNokia_IP-MPLS_SmartGrid_Application_Note_EN
Nokia_IP-MPLS_SmartGrid_Application_Note_ENJuan Boggiano
 
Data transmission through power line
Data transmission through power lineData transmission through power line
Data transmission through power lineIAEME Publication
 
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminarBusiness Finland
 
Managing national broadband infrastructure at Turk Telekom with oracle spati...
Managing national broadband infrastructure at  Turk Telekom with oracle spati...Managing national broadband infrastructure at  Turk Telekom with oracle spati...
Managing national broadband infrastructure at Turk Telekom with oracle spati...murat hançeroğlu
 
BSI Smart Grid Technologies Review
BSI Smart Grid Technologies ReviewBSI Smart Grid Technologies Review
BSI Smart Grid Technologies ReviewGerry Locke
 
Addressing utility challenges with MV/LV Monitoring and Control Solution
Addressing utility challenges with MV/LV Monitoring and Control SolutionAddressing utility challenges with MV/LV Monitoring and Control Solution
Addressing utility challenges with MV/LV Monitoring and Control SolutionLandis+Gyr
 
Information technology in power sectors
Information technology in power sectorsInformation technology in power sectors
Information technology in power sectorsGanesh Kumar Gawande
 
M2M Presentation at Telecom Council of Silicon Valley
M2M Presentation at Telecom Council of Silicon ValleyM2M Presentation at Telecom Council of Silicon Valley
M2M Presentation at Telecom Council of Silicon ValleyDaniel Kellmereit
 
[whitepaper] Cellular Technology simplifies Smart Water Meter Deployments
[whitepaper] Cellular Technology simplifies Smart Water Meter Deployments [whitepaper] Cellular Technology simplifies Smart Water Meter Deployments
[whitepaper] Cellular Technology simplifies Smart Water Meter Deployments Orange Business Services
 
Resume May 2015 - SmartMeter&Grid
Resume May 2015 - SmartMeter&GridResume May 2015 - SmartMeter&Grid
Resume May 2015 - SmartMeter&GridMark Hudson
 
Telco Global Connect 8
Telco Global Connect 8Telco Global Connect 8
Telco Global Connect 8Sadiq Malik
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridTata Power Delhi Distribution Limited
 
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...IRJET Journal
 
Major Acquisitions (2012-13) In IT Industry By Nirav Khandhedia
Major Acquisitions (2012-13) In IT Industry By Nirav KhandhediaMajor Acquisitions (2012-13) In IT Industry By Nirav Khandhedia
Major Acquisitions (2012-13) In IT Industry By Nirav KhandhediaNirav Khandhedia
 

Similar to U.S - Turkey Smart Grid Workshop - İlknur Yılmaz (20)

Grid Protection Systems - New Technologies
Grid Protection Systems - New TechnologiesGrid Protection Systems - New Technologies
Grid Protection Systems - New Technologies
 
Automating power distribution
Automating power distributionAutomating power distribution
Automating power distribution
 
MIDAS Folder
MIDAS FolderMIDAS Folder
MIDAS Folder
 
Nokia_IP-MPLS_SmartGrid_Application_Note_EN
Nokia_IP-MPLS_SmartGrid_Application_Note_ENNokia_IP-MPLS_SmartGrid_Application_Note_EN
Nokia_IP-MPLS_SmartGrid_Application_Note_EN
 
Data transmission through power line
Data transmission through power lineData transmission through power line
Data transmission through power line
 
The Best Measure of SCADA Success
The Best Measure of SCADA SuccessThe Best Measure of SCADA Success
The Best Measure of SCADA Success
 
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
30 11-2011 mart grid Jani Valtari Cleen Finpro seminar
 
Managing national broadband infrastructure at Turk Telekom with oracle spati...
Managing national broadband infrastructure at  Turk Telekom with oracle spati...Managing national broadband infrastructure at  Turk Telekom with oracle spati...
Managing national broadband infrastructure at Turk Telekom with oracle spati...
 
BSI Smart Grid Technologies Review
BSI Smart Grid Technologies ReviewBSI Smart Grid Technologies Review
BSI Smart Grid Technologies Review
 
Addressing utility challenges with MV/LV Monitoring and Control Solution
Addressing utility challenges with MV/LV Monitoring and Control SolutionAddressing utility challenges with MV/LV Monitoring and Control Solution
Addressing utility challenges with MV/LV Monitoring and Control Solution
 
Information technology in power sectors
Information technology in power sectorsInformation technology in power sectors
Information technology in power sectors
 
M2M Presentation at Telecom Council of Silicon Valley
M2M Presentation at Telecom Council of Silicon ValleyM2M Presentation at Telecom Council of Silicon Valley
M2M Presentation at Telecom Council of Silicon Valley
 
[whitepaper] Cellular Technology simplifies Smart Water Meter Deployments
[whitepaper] Cellular Technology simplifies Smart Water Meter Deployments [whitepaper] Cellular Technology simplifies Smart Water Meter Deployments
[whitepaper] Cellular Technology simplifies Smart Water Meter Deployments
 
LTE MTC evolution
LTE MTC evolutionLTE MTC evolution
LTE MTC evolution
 
Resume May 2015 - SmartMeter&Grid
Resume May 2015 - SmartMeter&GridResume May 2015 - SmartMeter&Grid
Resume May 2015 - SmartMeter&Grid
 
Telco Global Connect 8
Telco Global Connect 8Telco Global Connect 8
Telco Global Connect 8
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
 
Ami system using dlms
Ami system using dlmsAmi system using dlms
Ami system using dlms
 
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
Introduction of 132/11 kV Digitally Optimized Substation for Protection, Cont...
 
Major Acquisitions (2012-13) In IT Industry By Nirav Khandhedia
Major Acquisitions (2012-13) In IT Industry By Nirav KhandhediaMajor Acquisitions (2012-13) In IT Industry By Nirav Khandhedia
Major Acquisitions (2012-13) In IT Industry By Nirav Khandhedia
 

Recently uploaded

Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 

Recently uploaded (20)

Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort ServiceHot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
Hot Sexy call girls in Panjabi Bagh 🔝 9953056974 🔝 Delhi escort Service
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 

U.S - Turkey Smart Grid Workshop - İlknur Yılmaz

  • 1. ÇALIK YESILIRMAK ELECTRIC DISTRIBUTION COMPANY (YEDAS) İLKNUR YILMAZ PLANNING INVESTMENT AND FACILITY COORDINATOR
  • 2. OVERVİEW TO THE COMPANY ÇALIK YEDAŞ is an affiliate company of Çalık Holding which has a variety of sectors: Textile,construction, telecommunication,finance media and mining. 21st distribution region in the mid Blacksea Region. Operation area consists of five provinces in the region: Samsun,Ordu, Çorum,Amasya,Sinop. YEDAS is connected to the transmission grid at 34.5 kV voltage level through 25 central stations (154/34.5 kV ) Totally 40.000 km2 service area ( %4 of Turkey)  3.000.000 population in the region (%5,1 of Turkey)  Totally 1.600.000 million customers in the region (%4.7 of Turkey) % 84 is household customers, %11 is commercial customers Totally 4.5 Twh energy consumption (%3 of Turkey)  1700 MVA Installed Power (%4 of Turkey)  Loss rate is %8.28 (as of the end of 2011)  Totally Staff Number: 2026 YEDAS is the first electricity distribution company in Turkey which has been rewarded of EFQM 3 star excellence certificate.
  • 3. ÇALIK YEDASs’ PRIORITIES IN THE ELECTRIC DISTRIBUTION SECTOR ÇALIK YEDASs’ nvestment budget is 100 MTL/year Strentghten the existing network infrastructure Increase the network capacity and operation flexibility Prove the sustainability for the supply ,technical quality and customer satisfaction Decrease the technical and commercial losses in the network ÇALIK YEDAS IS AWARE OF ONLY STRENGTHENED NETWORK IS NOT ENOUGH FOR THE SUCCESS OF NETWORK OPERATIONS. SMART MANAGEMENT OF THE NETWORK WILL ADD A VALUE TO WHOLE INFRASTRUCTURE INVESTMENTS ÇALIK YEDASs TECHNOLOGICAL INVESTMENTS  SAP has been activeted with all modules in May 2011  SAP-ISU (Industrial Solutions For Utilites) has been completed in October ,2012 All customer numbers,meters, addresses and LV network connectivities has been transferred into ISU system from the existing Abone.Net software Currently, billing, customer/metering informations , customer connections, customer complaints/requirements are managed and reported through these IT systems. The cost of these systems is roughly 18 MTL.  The mechanical meters has been replacing with the digital ones since 2011. (Total 611.000 meters)
  • 4. ÇALIK YEDASs TECHNOLOGICAL INVESTMENTS  AMR infrastructure has been founded in 2012.  60.000 customer meters will have been included in AMR system by the end of 2015. ( Forecasted budget is 28 MTL)  Whole HV and LV network has been modelled and analysised in digital environment (Dig Silent) to determine 5 and 10 years network investment requirements.  SCADA/DMS Project started in September,2012 and it’s still going on. Project Budget is 13 MTL for 2012 and 2013 ( 5 MTL has been spent in 2012) Project is being executed by General Electric Digital Energy. 133 numbers of Central area substations ( 900 feeders) in 5 provinces will have been controlled and monitored by the end of 2013. DMS Modules which will be used in DMS System  Outage Management  Load Flow Analysis  Network Management  Fault Restoration and Isolation SCADA/DMS System will be integrated with SAP/CRM/ISU /PM and GIS.
  • 5. ÇALIK YEDASs TECHNOLOGICAL INVESTMENTS  Whole customer addresses and LV connectivities has been included into GIS system in 2012.  Remaining HV connectivities and line characteristic parameters/lenghts will have been included in GIS system by the end of 2013. Total budget of GIS system is 12 MTL ÇALIK YEDASs’ SMART GRID VISION BY THE END OF 2015  Realize a strong integration between SAP/ISU/CRM ,GIS, AMR and SCADA/DMS for the effective network and workforce management  Include the all meters of important customers into AMR system  Establish a strong asset management system using GIS  Establish asset risk management system using GIS and SCADA/DMS  Develop and adapt the existing technological systems considering the electrical vehicles and distributed generation systems
  • 6. EXPECTATIONS EMRA  Awarness of successful technological investments require enough time to realize them ( Process analysises, system conceptive,etc.)  Give reasonable time to DisCOs to complete the whole integrated distribution management systems instead of applying penalties.  Revise the investment budgets as DisCOs can realize their technological systems accordingly international quality standards.  Resolve the uncertainity on the technological investments which have been realized prior to unbundling. USTDA  Establish a strong technology connection between DisCOs in US and Turkey  Lead DisCOs in Turkey to make a proper IT requirement analysis and determine priorities  Lead DisCOs to transfer the proper technology at the right time. TECHNİCAL SUPPORTERS  Pay attention the proper technological requirements of DisCOs more than commercial profits  Make workshops with DisCOs and direct them to advise the best technological solutions.