1. Khaled Abd El Hamed Sakr
Personal data:
Name: Khaled Abd El Hamed Sakr
Date of Birth: 7 July1982.
Address: Nozha, Cairo, Egypt
Nationality: Egyptian.
E-Mail Address: khaledsakr82@gmail.com
Mobile:
002 01021399170
--------------------------------------------------------------------------
Education:-
BSc of Electronic & Communication (2004)
From: Tanta University.
Faculty: Engineering.
Department: Electronic & Communication.
Bachelor Degree: Good
Special Courses;
CCNA: Cisco Certified Network Associate.
Mobile course
MCSE: Microsoft Certified System Engineer
Networking Fundamentals
Design electronic circuit.
Maintenance & Production of computers
2. Language:-
Language Read Write Conversation
English Excellent Excellent Excellent
Arabic Mother Language
Computer and Networking Skills:-
Network Fundamentals
Microsoft Exchange 2010
Configuring windows server 2003 and 2010
Microsoft Word, Excel and PowerPoint.
C++ and FORTRAN programming language
Experience: (11 Years)
Work as( Installation engineer) in Ericsson egypt (from 9/2009 till now)
Scope of work:
Work as IE (installation eng.) responsible for exp. Project wish provide the installation team with SID
(site installation document) and update ETE network around Egypt. Responsible for track materials in
ware house to create MR’s according to available stock. Update ETE database up on survey or request
order from ETE.
Work as (Field engineer ) in Ericsson egypt (from 9/2009 till 8/2011)
Scope of work:
-Responsible for installation of new sites for VFE (Vodafone) and (Etisalat) ETE sites
-Installation for RBS2206, 2116, RBS2216, BBS2116, PBC6500, BBS2000, BBS2000i, BBS2202,
Ericsson M.L TN, TRM9202)
3. -Check E1 from HUB to site
- Configuration software for all RBS types, by OMT program
And take print screen reports
-Configuration & uploaded parameters for MMU BY M.L. program and take print screen reports
-Preparing template report & photos
Work as Mux planner engineer in Ericsson egypt (from 8/2011 till now)
Job Title : MUX Planner engineer in Etisalat Project
Job Description : Responsible for all implementation issues
1. Prepare installation Steps for Cutover Plan (Offloading & LOS) issues.
2. Put all advices related to Cutover Plan ( rearrangement & Link Upgrade needed & TN Upgrade &
install Emerson Cabinet in Sites
3. Prepare XXC’s Cutover Plan to reroute Sites
4. Prepare IUB ( IP over ETH & TDM ) daily to Expansion BW of Sites
5. Prepare TX availability for increasing the Capacity of Sites ( New or Expansion )
6. Prepare Consolidation Sheet for Next period for { 3G New , 2G Expansion & 3G Expansion ( ETH &
TDM )}
7. Prepare all Patches Needed for ( IUB ( TDM & ETH ) for Next Target
8. Create New Sites in MUX ( Multi Cross Connection ) Sheet as per Etisalat’s instructions
9. Revise Cutover Plan done and Update MUX Sheet with deleting old XXC & creation of New XXC
according to new Cutover Plan
10. Prepare all needed routes to Migrate sites from TDM & IP Over ETH
11. Prepare all VLANS & IPs for all sites
12. Prepare Summary Sheet which involves on all data related to all sites
13. Prepare adaptive Modulation & reallocation sheet for sites
14. Prepare Rehoming sheet for Sites
15. Put Good ideas to improve the Work
16. Good understanding & negotiation With team work & Customer
17. Prepare Good presentation to optimize the Work and avoid the mistakes
18. Full Support to the work 24/7 to avoid th
Scope of work:
-Responsible for create E1 routing for any roll out site (new site) or EXP site
-Responsible for off loading plan for any area
-Responsible for LOS plan
-Responsible for availability on install any site in area & free BW
Company:Company: UNION AIRE GROUP.
Job Title:Job Title: production Manager.
Job TenureJob Tenure: Dec. 2008-tomarch 2010
Scope of work:
Manufacturing of air condition
-I responsible for line production for electronic board of air condition
4. - I responsible for maintenance for PCB
---------------------------------------------------------
Company:Company: Shams Company for electronic saving lamp.
Job Title:Job Title: production Manager.
Job TenureJob Tenure: April 2006-to-Nov.2008
Scope of work:
Manufacturing of electronic saving lamp
-I responsible for line production for electronic saving lamp
- I responsible for maintenance for PCB
---------------------------------------------------
Company:Company: BAHGAT Group
Job Title:Job Title: Electronic maintenance engineer
Job TenureJob Tenure: Nov 2004 to March 2006
Scope of work:
Maintenance of all HOME equipment as (TV, Refrigerator, washer, receiver)
-I responsible for maintenance of electronic equipment as TV, receiver & any electronic
board
References
• References are available on request.
Hard working, self-motivated, able to work under stress and ready For
travelling abroad