SlideShare a Scribd company logo
1 of 123
Download to read offline
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 
Today & Tomorrow 
June 2014
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 2 June 2014 / Rev. 0 
IPD 
EPC 
FM / O&M 
Construction 
Fabrication 
Instant Access 
(Dealership) 
QTECH 
(Trading) 
Service units 
Departments 
Calibration Laboratory 
Sulaibiya Testing Laboratory 
Projects Temporary Furniture Unit (PTFU) 
Temporary Facilities (Office Cabins) 
Fabrication Workshop 
Scaffolding 
Warehousing 
Welders Training & Certification 
Accommodation 
Administration 
Office Services 
Business Development 
Health, Safety & Environment 
Proposals 
Contracts 
Procurement 
Engineering 
Project Controls Services 
Insurance 
Quality Assurance/ Control 
Human Resources 
Information Technology 
Finance & Accounting 
Communications 
Equipment Assets 
Equipment Operations 
Operations 
Organization structured to serve and support operations 
Kharafi National General Overview
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 3 June 2014 / Rev. 0 
Business lines 
Infrastructure Project Development 
Engineering, Procurement & Construction 
Construction 
Facilities Management 
Fabrication Services 
§ 
Power 
§ 
Power 
§ 
Power 
§ 
Power 
§ 
Process Equipment 
§ 
Water 
§ 
Water 
§ 
Desalination Plants 
§ 
Refineries & Petrochemical Plants 
§ 
Pressure Vessels 
§ 
Wastewater 
§ 
Infrastructure 
§ 
Processing Plants 
§ 
Water Distribution 
§ 
Evaporators 
§ 
District Cooling 
§ 
District Cooling 
§ 
Refineries 
§ 
Sewage Treatment Plants 
§ 
Separators 
§ 
Renewable Energy 
§ 
Renewable Energy 
§ 
Gathering Centers 
§ 
Pumping & Lifting Stations 
§ 
Modular Skids 
§ 
Solid Waste Management 
§ 
Building Services (MEP) 
§ 
Petrochemical Plants 
§ 
Industrial Complexes 
§ 
Pressure Piping 
§ 
Enhanced Oil Recovery 
§ 
Social Infrastructure 
§ 
Pipeline 
§ 
Commercial Centers 
§ 
Tanks 
§ 
Mixed-use Development 
§ 
Environmental 
§ 
Enhanced Oil Recovery 
§ 
Residential Complexes 
§ 
Columns
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 4 June 2014 / Rev. 0 
INFRASTRUCTURE PROJECT DEVELOPMENT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 5 June 2014 / Rev. 0 
Infrastructure Project Development 
Wastewater Treatment and Reclamation 
District Cooling 
Renewable Energy 
Solid Waste Management 
Enhanced Oil Recovery 
Mixed-use Development 
BOT (Build-Operate-Transfer) Schemes 
BOO (Build-Own-Operate) Schemes 
PPPs (Public-Private-Partnerships) 
Joint Ventures and Consortia
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 6 June 2014 / Rev. 0 
Infrastructure Project Development 
SULAIBIYA WATER AND WASTEWATER TREATMENT AND RECLAMATION PLANT, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 7 June 2014 / Rev. 0 
Infrastructure Project Development 
ABU DHABI SEWAGE TREATMENT PLANT - BOOT PROJECT / ADWEA
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 8 June 2014 / Rev. 0 
Infrastructure Project Development 
ABU DHABI SEWAGE TREATMENT PLANT - BOOT PROJECT / ADWEA
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 9 June 2014 / Rev. 0 
EPC - 
Engineering, Procurement & Construction 
§ 
Desalination Plants 
§ 
Water Treatment 
§ 
Pipeline & Pumping Stations 
§ 
Water Distribution Networks 
§ 
Power Stations 
§ 
Gas Power Stations 
§ 
Power Transmission & 
Distribution 
§ 
Office & Residential 
§ 
Commercial Centers 
§ 
Educational Institutions 
§ 
Hospitals 
§ 
Hotels & Resorts 
§ 
Sewage Treatment Plants 
§ 
Solid Waste Management 
§ 
Pumping & Lifting Stations 
§ 
District Cooling 
§ 
Industrial Complexes 
§ 
Airports 
§ 
Transportation 
Engineering, Procurement & Construction
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 10 June 2014 / Rev. 0 
EPC – Power 
OPEN CYCLE GAS FIRED PLANTS – 2,000 MW, AL SHABAB AND DAMIETTA, EGYPT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 11 June 2014 / Rev. 0 
EPC – Power 
OPEN CYCLE GAS FIRED PLANTS – 1,000 MW, AL SHABAB, EGYPT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 12 June 2014 / Rev. 0 
EPC – Power 
OPEN CYCLE GAS FIRED PLANTS – 1,000 MW, AL SHABAB, EGYPT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 13 June 2014 / Rev. 0 
EPC – Power 
OPEN CYCLE GAS FIRED PLANT – 500 MW, DAMIETTA, EGYPT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 14 June 2014 / Rev. 0 
EPC – Water 
Ardiya Pumping Station, Kuwait 
Pumping & Lifting Station, Kuwait 
Saadiyat STP2, Abu Dhabi, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 15 June 2014 / Rev. 0 
EPC – Water 
A7 Pumping Station – Riggai, Kuwait
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 16 June 2014 / Rev. 0 
EPC – District Cooling 
AL SOWAH DISTRICT COOLING PLANT (50,000 TR)
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 17 June 2014 / Rev. 0 
EPC – Central Utility Plants (CUP) 
SABAH AL SALEM UNIVERSITY PROJECT CENTRAL UTILITY PLANT (CUP 1 & 2), KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 18 June 2014 / Rev. 0 
EPC – Infrast. & Environ. 
Dubai International Airport, UAE 
Marsa Alam International Airport, Egypt 
Addis Ababa International Airport, Ethiopia 
§ 
Kuwait International Airport 
§ 
Dubai International Airport 
§ 
Addis Ababa International Airport 
§ 
Marsa Alam International Airport 
§ 
Jebel Ali International Airport 
AIRPORTS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 19 June 2014 / Rev. 0 
EPC – Infrast. & Environ. 
AIRPORTS - JEBEL ALI INTERNATIONAL AIRPORT, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 20 June 2014 / Rev. 0 
EPC – Infrastructure 
INFRASTRUCTURE WORKS FOR ADNEC CAPITAL TOWER - UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 21 June 2014 / Rev. 0 
EPC – Building Services 
MEP WORKS - AL HAMRA TOWER, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 22 June 2014 / Rev. 0 
EPC – Building Services 
MEP WORKS - AL HAMRA TOWER, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 23 June 2014 / Rev. 0 
EPC – Building Services 
FOUR SEASONS HOTEL, LEBANON ADIA TOWER - ABU DHABI, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 24 June 2014 / Rev. 0 
EPC – Building Services 
MEP WORKS 
Central Bank of Kuwait HQ, Kuwait 
Al BabtainTower, Kuwait
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 25 June 2014 / Rev. 0 
CONSTRUCTION
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 26 June 2014 / Rev. 0 
Construction – Plants 
HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 27 June 2014 / Rev. 0 
Construction – Plants 
HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 28 June 2014 / Rev. 0 
Construction – Plants 
HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 29 June 2014 / Rev. 0 
Construction – Plants 
HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 30 June 2014 / Rev. 0 
Construction – Plants 
HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 31 June 2014 / Rev. 0 
Construction – Plants 
HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 32 June 2014 / Rev. 0 
Construction – Plants 
HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 33 June 2014 / Rev. 0 
Construction – Plants 
AROMATIC COMPLEX, TECNIMONT / PIC, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 34 June 2014 / Rev. 0 
Construction – Plants 
AROMATIC COMPLEX, TECNIMONT / PIC, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 35 June 2014 / Rev. 0 
Construction – Plants 
POLYETHYLENE EXPANSION, OLEFINS – II / FLUOR, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 36 June 2014 / Rev. 0 
Construction – Plants 
LARGE SCALE STEAM FLOOD PILOT, JO (KGOC / CHEVRON), KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 37 June 2014 / Rev. 0 
Construction – Plants 
ETHYLENE GLYCOL – II, OLEFINS - II, FLUOR, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 38 June 2014 / Rev. 0 
Construction – Plants 
FACILITY UPGRADE (AMALGAMATION PROJECT), KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 39 June 2014 / Rev. 0 
Construction – Plants 
FUEL GAS PIPELINE PROJECT (PART A), KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 40 June 2014 / Rev. 0 
FACILITIES MANAGEMENT / 
INSTITUTIONAL & COMMERCIAL
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 41 June 2014 / Rev. 0 
FM – Institutional & Commercial 
SEIF PALACE, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 42 June 2014 / Rev. 0 
FM – Institutional & Commercial 
BAYAN PALACE, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 43 June 2014 / Rev. 0 
FM – Institutional & Commercial 
ADMINISTRATION BUILDING AT BAYAN PALACE, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 44 June 2014 / Rev. 0 
FM – Institutional & Commercial 
ADMINISTRATION BUILDING AT BAYAN PALACE, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 45 June 2014 / Rev. 0 
FM – Institutional & Commercial 
LIBERATION TOWER, KUWAIT ADIA TOWER - ABU DHABI, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 46 June 2014 / Rev. 0 
FM – Institutional & Commercial 
THE AVENUES, KUWAIT MARINA MALL, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 47 June 2014 / Rev. 0 
FM – Institutional & Commercial 
ARWA PRINTING PRESS, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 48 June 2014 / Rev. 0 
FM – Institutional & Commercial 
LEBANESE UNIVERSITY CAMPUS, BEIRUT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 49 June 2014 / Rev. 0 
FACILITIES MANAGEMENT / 
INDUSTRIAL SERVICES
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 50 June 2014 / Rev. 0 
§ 
Sewage Treatment Plants 
§ 
Reclamation Plants 
§ 
Pumping & Lifting Stations 
§ 
Water Distribution Network 
§ 
Storm Water Drain Network 
§ 
Oil Fields 
§ 
Gathering Centers 
§ 
Booster Stations 
§ 
Refineries 
§ 
Petrochemical Plants 
§ 
Pipelines & Well Heads 
FM - Industrial Services Operation 
§ 
Power Plants 
§ 
Diesel Power Plants 
§ 
Water Desalination Plants 
FM - Industrial Services Operation
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 51 June 2014 / Rev. 0 
FM - Industrial Services Operation 
Kharafi National-Industrial Services is a leading “One Stop Shop for Industrial Maintenance & Value Added Services” in the region.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 52 June 2014 / Rev. 0 
FM – Industrial Services 
MAINTENANCE - OIL & GAS PLANTS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 53 June 2014 / Rev. 0 
FM – Industrial Services 
MAINTENANCE - OIL & GAS PLANTS 
Tank Roof Replacement 
Valve Maintenance 
High pressure Piping Works 
Hydro jet Cleaning 
Cable laying & Instr. Works 
De- Sludging Works
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 54 June 2014 / Rev. 0 
FM - Upstream 
PRODUCTION FACILITIES MAINTENANCE, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 55 June 2014 / Rev. 0 
FM - Upstream 
PRODUCTION FACILITIES MAINTENANCE, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 56 June 2014 / Rev. 0 
FM - Downstream 
MINA AL AHMADI REFINERY 
STEAM FLOOD FACILITIES - JOINT OPERATIONS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 57 June 2014 / Rev. 0 
BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE 
FM – Industrial Services
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 58 June 2014 / Rev. 0 
BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE 
FM – Industrial Services
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 59 June 2014 / Rev. 0 
BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE 
FM – Industrial Services
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 60 June 2014 / Rev. 0 
FM – Industrial Services 
SHUTDOWN WORKS - SHUAIBA REFINERY - GRTA, KUWAIT
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 61 June 2014 / Rev. 0 
FM – Industrial Services 
O&M - POWER PLANTS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 62 June 2014 / Rev. 0 
FM – Industrial Services 
O&M - POWER PLANTS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 63 June 2014 / Rev. 0 
FM – Industrial Services 
O&M - POWER PLANTS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 64 June 2014 / Rev. 0 
FM – Industrial Services 
O&M - GIS SUBSTATIONS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 65 June 2014 / Rev. 0 
FM – Industrial Services 
OPERATION & MAINTENANCE OF PUMPING & LIFTING STATIONS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 66 June 2014 / Rev. 0 
FM – Industrial Services 
OPERATION & MAINTENANCE OF PUMPING & LIFTING STATIONS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 67 June 2014 / Rev. 0 
FM – Industrial Services 
OPERATION & MAINTENANCE OF SULAIBIYA WWTRP
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 68 June 2014 / Rev. 0 
FM – Industrial Services 
OPERATION & MAINTENANCE OF ADWEA WWTP (WATHBA & SAAD), ABU DHABI
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 69 June 2014 / Rev. 0 
Service Units & Departments 
Health, Safety & Environment 
Procurement & Material Control 
Human Recourses 
Equipment 
Operations 
Quality Assurance / Control 
Scaffolding Services 
Project Control Services 
Calibration Laboratory 
Engineering Services 
Camp 
Facilities 
ABJ Engineering & Contracting Co. 
Kuwait 
ABJ Industries PJSC 
UAE 
Gulf National Insulation Systems 
Kuwait 
Gulf National Insulation Systems 
UAE 
Group Supporting Companies
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 70 June 2014 / Rev. 0 
§ 
All employees undergo a Safety Induction Training course before they assume their responsibilities. Safety awareness is further intensified by: 
• 
Safety Tool Box Talks 
• 
Pre-task safety briefing 
• 
Job Safety Analysis 
• 
Risk Assessments 
• 
Confined Space Entry 
§ 
Rigging, Scaffolding and First Aid training are conducted by Third Party & certified. 
§ 
With an objective to continual improvement, the safety management system elements are now certified by OHSAS 18001:2007 standard. 
Health, Safety & Environment
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 71 June 2014 / Rev. 0 
Health, Safety & Environment
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 72 June 2014 / Rev. 0 
Human Resources 
Multinational Workforce is recruited through our existing agencies network world-wide. 
Interviews and trade tests are conducted and supervised directly by our Project Staff. 
Candidates are sourced ahead of time, based on project manpower projections. 
Systematic re-certification of welders at work place to cope with new welding technology. 
Continuous reassessment of qualification training and skill development programmes for all personnel.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 73 June 2014 / Rev. 0 
Human Resources 
Manpower Summary 
Total Manpower: 29,579 
Directors / Chief Dev. Officer / COO 
15 
Operations Managers / 
Project Director 
11 
Department Managers / 
Unit Managers / Unit Head 
106 
Manager of Projects / 
Snr. Project Managers 
37 
Projects Managers / Construction Managers 
70 
Services & Support Staff 
1,897 
Field Operations 
(Engineers / Supervisors) 
1,189 
Foremen 
1,063 
Skilled Craftsman 
8,932 
Plant / Equipment / 
Crane Operators / Drivers 
2,031 
Trade Helpers 
2,046 
Labourers 
2,280 
General Site Services & Warehouse Man 
1,185 
ABJ Engineering & Cont. Co. - Kuwait 
5,548 
Kharafi National – UAE 
2,102 
Kharafi National – Egypt 
715 
Kharafi National – Lebanon 
352 
Non Manual: 3,325 
Subsidiaries: 8,717 
Manual: 17,537
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 74 June 2014 / Rev. 0 
Note: * We have deployed over 12,000 employees in Habshan-5 Process Plant Project, Abu Dhabi for GASCO, UAE in its peak and the Project has been completed in June, 2013 
Human Resources 
Workforce Growth (2008-2013) 
2008 
2009 
2010 
2011 
2012 
2013 
2014 
Non-Manual 
2,631 
3,750 
3,814 
4,216 
4,278 
4,327 
3,852 
Manual 
20,250 
21,610 
27,358 
28,929 
30,058 
30,808 
25,727 
Total 
22,881 
25,360 
31,172 
33,145 
34,336 
35,135 
29,579 
0 
5,000 
10,000 
15,000 
20,000 
25,000 
30,000 
35,000 
40,000
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 75 June 2014 / Rev. 0 
Quality Management System 
Well established procedures in place for every part of the business and their continuous update with internal auditing to verify the implementation 
Functional support of Quality Control to projects 
Establishment of Welding Services Unit, to train welders and develop their skills in anticipation of shortage of trained welders in the region 
Calibration and Testing Laboratories to ensure that calibration/ testing is done on time and that results of calibration/ testing are accurate 
Six Sigma program implementation
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 76 June 2014 / Rev. 0 
Quality Certifications - Organization 
Quality Management System 
ISO Certification/ Accreditation: 
ISO 9001:2008 
Quality Management System 
ISO 17025 
General Requirements for the Competence of Testing and Calibration Laboratories.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 77 June 2014 / Rev. 0 
Quality Certifications - Fabrication 
Quality Management System 
ASME & National Board’s Certification Stamps: 
ASME Code 
: U 
Manufacture of Pressure Vessels – ASME Section VIII Division I 
ASME Code 
: U2 
Manufacture of Pressure Vessels – ASME Section VIII Division II 
ASME Code 
: PP 
Fabrication and Assembly of Pressure Piping 
ASME Code 
: S 
Manufacture of Power Boilers 
National Board 
: R 
Repair/ Alteration of Pressure Vessels 
National Board 
: NB 
Registered Boilers/ Pressure Vessels
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 78 June 2014 / Rev. 0 
Quality Management System 
Quality Control - Overview 
Quality Control 
Technical Work Instructions for Piping, Pipeline, Tanks, Welding, Painting , Civil, Electrical and Instrumentation, Operation & Maintenance…..etc. Project Quality Plan, ITPs, and Method Statements Orientations and Trainings 
QC Module in ERP Oracle 
Common database for fabrication and field activities 
Welders Training School & Certifications
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 79 June 2014 / Rev. 0 
Quality Management System 
Calibration Laboratory (Calibration & Monitoring of Measuring Equipment) 
Investment of over KD 2 million in Master Equipment & Instruments 
Number of Instruments – currently over 6000 
Capabilities: Electrical, Mechanical, Linear, Mass, Pressure, Temperature 
Recent additions 
§ 
Thermal Imaging Cameras 
§ 
GPRS [Ground Penetration Radar System] 
§ 
Moisture & Density Measurement in Soil 
using Radioactive Gamma rays 
External Customers 
§ 
M/s. Siemens, Equate, Schlumberger, 
Hempel Paints, Hyundai Engineering & 
Construction Co., SK Engineering…..etc.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 80 June 2014 / Rev. 0 
Quality Management System 
Sulaibiya Testing Laboratory 
Investment of over KD 300,000/- Equipment 
Testing Water, Waste water & Sludge samples 
Checking ~ 87 chemical & microbiological parameters 
Customer : Sulaibiya Sewage Treatment & Reclamation Plant 
ISO 17025 accreditation by United Kingdom Accreditation Service - UKAS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 81 June 2014 / Rev. 0 
Projects Control 
Progress Monitoring is Carried out as Follows: 
Actual returns for quantities installed and man-hours spent are collected daily. 
Progress verification is carried weekly. 
Productivity and performance indicators are reported on a weekly and monthly basis. 
Key Factors to our Cost Control Approach are: 
Forecast of quantities and man-hours. 
Forecast of balance commitments for materials and subcontracts. 
Forecast of staff and indirect costs.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 82 June 2014 / Rev. 0 
Engineering Services 
§ 
Thermoflow 
§ 
Aspentech 
§ 
ETap 
Specialist Design 
§ 
X Steel 
§ 
Spoolgen 
§ 
Autocad,Civil,MEP 
§ 
Aveva PDMS 
Process 
Detail Design 
§ 
RIPAC 
§ 
Candy 
§ 
On Screen 
Take offs 
§ 
Acad Take offs 
Material Take Offs 
§ 
Materials Data Base 
§ 
ERP Modules 
§ 
Primavera 
Bills of Quantity 
Tracking 
Commissioning Support 
Post Award Detail Design & Engineering Support 
Pre Award Tendering Support 
FEED Packages 
Concept Design 
Technology Selection 
ENGINEERING SOFTWARE EMPLOYED ENGINEERING SUPPORT SERVICES 
§ 
Pipeflow 
§ 
Ceasar II 
§ 
Staad III 
§ 
Robot 
§ 
Elite 
§ 
Hass 
§ 
HVACOMP 
§ 
HAP 
§ 
Etab
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 83 June 2014 / Rev. 0 
Kharafi National follows Integrated Procurement & Materials Management system in line with the ISO 9001 : 2008 requirement covering the following: 
§ 
Procurement & Material subcontract (Local & Overseas). 
§ 
Logistics, expediting, Factory Acceptance Test (FAT) & transportation. 
§ 
Vendor Management (Supplier evaluation, Prequalification and performance measurement). Multinational staff strength over 100 (including experienced Engineers, Supervisors and Buyers.) 
Procurement
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 84 June 2014 / Rev. 0 
Over US$ 750 Million worth of materials procured annually. In excess of 30,000 Material Requisition closed annually. Approved supplier strength of over 3,000 (one-third being overseas suppliers). KN adopts structured criteria for evaluating and re-evaluating suppliers based on their ability to supply products that meet the Organization's requirement and Periodic evaluation is conducted on the performance of the suppliers. KN conducts ‘Due Diligence’ on supplier premises as part of the supplier evaluation to enlist them as an approved vendor. 
Procurement
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 85 June 2014 / Rev. 0 
Extensive Knowledge of Local and International Markets. Purchase Orders / Subcontracts are awarded to Companies who supply quality products, competitive back to back basis and on time delivery. 
e-Procurement, utilization of B2B e- markets, Strategic Sourcing & Online negotiations with suppliers. 
Automated Procurement workflows through Oracle E-Business Suite ERP System. 
Compliance with the Purchase Order/ project schedule requirements are ensured through expediting/ inspection at manufacturer’s/ supplier’s premises in an orderly & systematic way for highlighting deviations, delay or damages if any, prior to shipment. 
Procurement
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 86 June 2014 / Rev. 0 
Procurement Trend 
Inline with the transformation of KN from a Traditional Contractor to an Operational Investor with EPC , Commissioning and FM capabilities, the Value of Procurement Increased Year on Year with increase in Turnover / Growth of KN
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 87 June 2014 / Rev. 0 
Serving Warehousing requirements for More than 150 Projects / Cost Centers across diversified business lines in Middle East & Africa. Central Stores in Kuwait with 48,000 Sq Meters of area (Including 17,000 Sq Meters of Closed Stores, 31,000 Sq. Meters of Open Yard) having Heavy duty multi storied racking with State of art modern material handling facilities, Safety and Security systems. In excess of 160,000 items handled across various Projects and we adopt Efficient Codification & Standardization practices. 
Material Control
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 88 June 2014 / Rev. 0 
Over US$ 750 Million worth of KN Procured materials handled annually and Over US$ 1 Billion worth of Client Supplied Free Issue Materials handled annually. Total Monthly Receiving Transactions over 5500 and Issues/Transfer Transactions over 4500. Effective utilization of Oracle ERP Inventory Modules with Experienced resources to handle Computerized Transactions & Inventory Management. Utilization of Temperature controlled Stores and importance for material storage & preservation as per manufacturers recommendations. Utilization of Selective Inventory Control / Vendor Managed Inventory / Consigned Stock. 
Material Control
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 89 June 2014 / Rev. 0 
Equipment Operations 
Kharafi National own, manage and operate Equipment fleet in all countries where KN operates, keeping same policy, standard and discipline. Currently equipment in excess of 6,100 construction equipment/plant. Currently more than 2,100 trained, experienced and qualified staff available at the equipment division.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 90 June 2014 / Rev. 0 
Equipment Operations
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 91 June 2014 / Rev. 0 
Equipment Operations
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 92 June 2014 / Rev. 0 
Equipment Operations
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 93 June 2014 / Rev. 0 
Equipment Operations
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 94 June 2014 / Rev. 0 
Scaffolding Services
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 95 June 2014 / Rev. 0 
Scaffolding Services
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 96 June 2014 / Rev. 0 
Scaffolding Services 
Shuaiba Refinery – GRTA, KNPC, Kuwait
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 97 June 2014 / Rev. 0 
Electrical Laboratory 
High Voltage Laboratory 
Fluke Laboratory 
Pressure Laboratory 
Capabilities 
Calibration Laboratory
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 98 June 2014 / Rev. 0 
Balance Laboratory 
Chemical Laboratory 
Temperature Laboratory 
Dimension & Vibration Laboratory 
Calibration Laboratory 
Capabilities
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 99 June 2014 / Rev. 0 
IR Thermography Inspection 
Power Quality Analysis 
Validation of Welding Machines 
Cable / Pipe Detection 
Calibration Laboratory 
Specialized Services
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 100 June 2014 / Rev. 0 
INFRARED 
NORMAL 
LV Fuse Carrier Problem 
Problem in Pump Coupling 
Problem in Busbar Termination 
Calibration Laboratory 
Thermal imaging camera
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 101 June 2014 / Rev. 0 
Camp Facilities in Kuwait & UAE 
Shuaiba 
Capacity-10,000 
Sulaibiya Capacity- 3,500 
Mahboula Capacity- 2,400 
Amghara Capacity- 500 
Abdally 
Capacity- 1,000 
Kuwait Total = 17,400 
Al Wathba Abu Dhabi Capacity- 2,200 
Al Ain, Abu Dhabi 
Capacity- 525 
Mussafah, Abu Dhabi 
Capacity- 750 
Dubai Investment Park 
Capacity- 100 
UAE 
Total = 12,375 
Saadiyat , Abu Dhabi 
Capacity- 700 
Habshan-Abu Dhabi 
Capacity- 8,000 
Madinet Zayed, 
Abu Dhabi 
Capacity- 100
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 102 June 2014 / Rev. 0 
Camp Facilities – Sulaibiya, Kuwait
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 103 June 2014 / Rev. 0 
Camp Facilities – Sulaibiya, Kuwait
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 104 June 2014 / Rev. 0 
Camp Facilities – Sulaibiya, Kuwait
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 105 June 2014 / Rev. 0 
Camp Facilities – Shuaiba, Kuwait
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 106 June 2014 / Rev. 0 
Camp Facilities - Habshan, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 107 June 2014 / Rev. 0 
Camp Facilities - Habshan, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 108 June 2014 / Rev. 0 
Camp Facilities - Habshan, UAE
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 109 June 2014 / Rev. 0 
Aerial view of Mina Abdullah Facilities 
ABJ Fabrication Facilities
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 110 June 2014 / Rev. 0 
ABJ Fabrication Facilities 
ABJ Engineering & Contracting Company fabricates a wide range of heavy industrial products for the oil and gas, petrochemical, chemical, fertilizer, power, water and related industrial sectors in Kuwait and beyond. 
The Company designs, manufactures and installs pressure vessels, pressure piping, heavy structural steel works, tanks, modular skids, evaporators, separators and HRSG among a host of customized heavy duty products for large-scale projects in Kuwait and UAE.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 111 June 2014 / Rev. 0 
ABJ Fabrication Facilities
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 112 June 2014 / Rev. 0 
ABJ Fabrication Facilities 
Strengths 
Our current manpower is 2,027 skilled labor 
Our current production covers the fabrication of the following: 
§ 
Process Equipment 
§ 
Vessels & Pressure Vessels 
§ 
Evaporators for MSF Desalination Plants 
§ 
Skids Mounted Process Modules 
§ 
Pressure / Process Piping 
§ 
Structural Steel 
§ 
High Capacity 24 Hrs radiography vaults for NDT of pipe fabrication. 
A large number of highly experienced staff in engineering design, production of fabrication drawings in accordance with international codes and standards.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 113 June 2014 / Rev. 0 
ABJ Fabrication Facilities 
Electric Furnace – Temp – 800º C 
Transportation
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 114 June 2014 / Rev. 0 
ABJ Fabrication Facilities 
DESALINATION UNITS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 115 June 2014 / Rev. 0 
ABJ Fabrication Facilities 
SEPARATORS / COLUMNS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 116 June 2014 / Rev. 0 
ABJ Fabrication Facilities 
PRESSURE PIPING
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 117 June 2014 / Rev. 0 
ABJ Fabrication Facilities 
MODULAR SKIDS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 118 June 2014 / Rev. 0 
Jaber Al Ahmed International Stadium, Kuwait 
Nelson Mandela Stadium, South Africa 
ABJ Fabrication Facilities 
SPORT STADIUMS
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 119 June 2014 / Rev. 0 
Gulf National Insulation Systems 
Aromatics Complex Project 
GNIS is a Specialized Insulation Company set up in 2006 between KN & Riva Mariani Group of Italy. 
GNIS has a 5,500 m2 capacity set up with MAB Facility. 
A 1,000 m2 State of the Art, Full Computerized Workshop. 
Capacity up to 20,000 m2 / month of Fabricated Cladding Materials. 
304 + 20 Strong Fully trained and experienced work force.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 120 June 2014 / Rev. 0 
Gulf National Insulation Systems
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 121 June 2014 / Rev. 0 
Ethylene Glycol – 2, Kuwait 
Ethylene Glycol – 2, Kuwait 
Gulf National Insulation Systems
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 122 June 2014 / Rev. 0 
Main Clients References 
Ministry of Electricity & Water, Kuwait 
Kuwait Petrochemical Industries Company 
Ministry of Public Works, Kuwait 
Kuwait Gulf Oil Company 
Kuwait National Petroleum Company 
Saudi Arabian Chevron Inc. 
Kuwait Oil Company 
Ansaldo Industrial S.p.A. 
Equate Petrochemicals, Kuwait 
International Bechtel Company, Ltd.
AWI 106 Att. 8 Rev. 3 02 Jan. 2011 123 June 2014 / Rev. 0 
Main Clients References 
Tecnimont S.p.A., Italy 
Fluor International Ltd., USA 
Saipem S.p.A., Italy 
Kellogg Brown & Root – KBR, USA 
Fisia, Italy 
Hyundai Engineering & Construction Co., South Korea 
Technip, Italy 
Samsung Corporation, South Korea 
Foster Wheeler, Italy 
SK Engineering & Contracting Company, South Korea 
Petrofac International Ltd., UK 
Daelim Industrial Company Ltd., South Korea 
Costain Oil & Gas - UK 
ABB Lummus Heat Transfer B.V., Netherlands 
JGC Corporation, Japan 
Polimex Cekop, Poland 
Mitsui Engineering & Shipbuilding Company, Japan 
Cegelec, France

More Related Content

Viewers also liked

2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUTReza Bassawon
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROADReza Bassawon
 
2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELSReza Bassawon
 
Alta survey handbook by bock & clark
Alta survey handbook by bock & clarkAlta survey handbook by bock & clark
Alta survey handbook by bock & clarkprattdavid
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTIONReza Bassawon
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTIONReza Bassawon
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILSReza Bassawon
 
STANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USASTANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USAYegor Shulyk
 
Tutorial caesars II
Tutorial caesars IITutorial caesars II
Tutorial caesars IImanuedlf
 
manual stress analysis
manual stress analysismanual stress analysis
manual stress analysisBHARAT BELLAD
 
Safety On Construction site
Safety On Construction siteSafety On Construction site
Safety On Construction sitejexpoz
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load CalculationOrange Slides
 

Viewers also liked (17)

Ch 5 problems
Ch 5 problemsCh 5 problems
Ch 5 problems
 
2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT2878-CC-001 COORDINATED SERVICES LAYOUT
2878-CC-001 COORDINATED SERVICES LAYOUT
 
2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD2878-CR-102 LONG SECTION along ROAD
2878-CR-102 LONG SECTION along ROAD
 
2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS2878-CR-402 FINISHED ROAD LEVELS
2878-CR-402 FINISHED ROAD LEVELS
 
Bagatelle Earthwork
Bagatelle EarthworkBagatelle Earthwork
Bagatelle Earthwork
 
Alta survey handbook by bock & clark
Alta survey handbook by bock & clarkAlta survey handbook by bock & clark
Alta survey handbook by bock & clark
 
2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION2878-CR-305 ROAD STATIONAL CROSS SECTION
2878-CR-305 ROAD STATIONAL CROSS SECTION
 
2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION2878-CR-201 TYPICAL ROAD SECTION
2878-CR-201 TYPICAL ROAD SECTION
 
2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS2878-CD-302 TYPICAL STORMWATER DETAILS
2878-CD-302 TYPICAL STORMWATER DETAILS
 
STANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USASTANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USA
 
Statics Chapter 7
Statics Chapter 7Statics Chapter 7
Statics Chapter 7
 
Tutorial caesars II
Tutorial caesars IITutorial caesars II
Tutorial caesars II
 
manual stress analysis
manual stress analysismanual stress analysis
manual stress analysis
 
Engineering & Design of Pipe Supports
Engineering & Design of Pipe SupportsEngineering & Design of Pipe Supports
Engineering & Design of Pipe Supports
 
Process Plant design fundementals
Process Plant design fundementalsProcess Plant design fundementals
Process Plant design fundementals
 
Safety On Construction site
Safety On Construction siteSafety On Construction site
Safety On Construction site
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load Calculation
 

Similar to Today & Tomorrow Jun 2014

Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copydarren williams
 
Updated CV Roberto_Salvio
Updated CV Roberto_SalvioUpdated CV Roberto_Salvio
Updated CV Roberto_SalvioRobert Salvio
 
CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015jingo allan
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Vertical pump maint. update 1026475[1]
Vertical pump maint. update 1026475[1]Vertical pump maint. update 1026475[1]
Vertical pump maint. update 1026475[1]Roberto Ortega
 
Hydrogen document
Hydrogen documentHydrogen document
Hydrogen documentguestea81c2
 
Raafat C.V October.14
Raafat C.V October.14Raafat C.V October.14
Raafat C.V October.14raafat sayed
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plantRavinder Jangid
 
SpecailtyDrilling_InjectionWellConstruction-v-1
SpecailtyDrilling_InjectionWellConstruction-v-1SpecailtyDrilling_InjectionWellConstruction-v-1
SpecailtyDrilling_InjectionWellConstruction-v-1Tim Oman
 
B.Hickey Confidential Resume
B.Hickey Confidential ResumeB.Hickey Confidential Resume
B.Hickey Confidential ResumeBlake Hickey
 
Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenanceLawrence Kwende
 
OPC Review of the Year
OPC Review of the YearOPC Review of the Year
OPC Review of the YearMikeEllingham
 

Similar to Today & Tomorrow Jun 2014 (20)

Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copy
 
EIOGCPL 160316cvfs
EIOGCPL 160316cvfsEIOGCPL 160316cvfs
EIOGCPL 160316cvfs
 
Zulfiqar - Cv
Zulfiqar - CvZulfiqar - Cv
Zulfiqar - Cv
 
Updated CV Roberto_Salvio
Updated CV Roberto_SalvioUpdated CV Roberto_Salvio
Updated CV Roberto_Salvio
 
Part 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFTPart 2 PDi Business Plan Part 2 DRAFT
Part 2 PDi Business Plan Part 2 DRAFT
 
CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015CURRICULUM VITAE - Allan Jingo november 2015
CURRICULUM VITAE - Allan Jingo november 2015
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Vertical pump maint. update 1026475[1]
Vertical pump maint. update 1026475[1]Vertical pump maint. update 1026475[1]
Vertical pump maint. update 1026475[1]
 
Hydrogen document
Hydrogen documentHydrogen document
Hydrogen document
 
APPLICANT CV
APPLICANT CVAPPLICANT CV
APPLICANT CV
 
JESEDLOPECCV042017
JESEDLOPECCV042017JESEDLOPECCV042017
JESEDLOPECCV042017
 
Raafat C.V October.14
Raafat C.V October.14Raafat C.V October.14
Raafat C.V October.14
 
Flowserve suzhou
Flowserve suzhouFlowserve suzhou
Flowserve suzhou
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plant
 
SpecailtyDrilling_InjectionWellConstruction-v-1
SpecailtyDrilling_InjectionWellConstruction-v-1SpecailtyDrilling_InjectionWellConstruction-v-1
SpecailtyDrilling_InjectionWellConstruction-v-1
 
Wiiliam CV update
Wiiliam CV updateWiiliam CV update
Wiiliam CV update
 
B.Hickey Confidential Resume
B.Hickey Confidential ResumeB.Hickey Confidential Resume
B.Hickey Confidential Resume
 
Pr 1047 well integrity maintenance
Pr 1047 well integrity maintenancePr 1047 well integrity maintenance
Pr 1047 well integrity maintenance
 
OPC Review of the Year
OPC Review of the YearOPC Review of the Year
OPC Review of the Year
 

Today & Tomorrow Jun 2014

  • 1. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 June 2014 / Rev. 0 Today & Tomorrow June 2014
  • 2. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 2 June 2014 / Rev. 0 IPD EPC FM / O&M Construction Fabrication Instant Access (Dealership) QTECH (Trading) Service units Departments Calibration Laboratory Sulaibiya Testing Laboratory Projects Temporary Furniture Unit (PTFU) Temporary Facilities (Office Cabins) Fabrication Workshop Scaffolding Warehousing Welders Training & Certification Accommodation Administration Office Services Business Development Health, Safety & Environment Proposals Contracts Procurement Engineering Project Controls Services Insurance Quality Assurance/ Control Human Resources Information Technology Finance & Accounting Communications Equipment Assets Equipment Operations Operations Organization structured to serve and support operations Kharafi National General Overview
  • 3. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 3 June 2014 / Rev. 0 Business lines Infrastructure Project Development Engineering, Procurement & Construction Construction Facilities Management Fabrication Services § Power § Power § Power § Power § Process Equipment § Water § Water § Desalination Plants § Refineries & Petrochemical Plants § Pressure Vessels § Wastewater § Infrastructure § Processing Plants § Water Distribution § Evaporators § District Cooling § District Cooling § Refineries § Sewage Treatment Plants § Separators § Renewable Energy § Renewable Energy § Gathering Centers § Pumping & Lifting Stations § Modular Skids § Solid Waste Management § Building Services (MEP) § Petrochemical Plants § Industrial Complexes § Pressure Piping § Enhanced Oil Recovery § Social Infrastructure § Pipeline § Commercial Centers § Tanks § Mixed-use Development § Environmental § Enhanced Oil Recovery § Residential Complexes § Columns
  • 4. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 4 June 2014 / Rev. 0 INFRASTRUCTURE PROJECT DEVELOPMENT
  • 5. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 5 June 2014 / Rev. 0 Infrastructure Project Development Wastewater Treatment and Reclamation District Cooling Renewable Energy Solid Waste Management Enhanced Oil Recovery Mixed-use Development BOT (Build-Operate-Transfer) Schemes BOO (Build-Own-Operate) Schemes PPPs (Public-Private-Partnerships) Joint Ventures and Consortia
  • 6. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 6 June 2014 / Rev. 0 Infrastructure Project Development SULAIBIYA WATER AND WASTEWATER TREATMENT AND RECLAMATION PLANT, KUWAIT
  • 7. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 7 June 2014 / Rev. 0 Infrastructure Project Development ABU DHABI SEWAGE TREATMENT PLANT - BOOT PROJECT / ADWEA
  • 8. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 8 June 2014 / Rev. 0 Infrastructure Project Development ABU DHABI SEWAGE TREATMENT PLANT - BOOT PROJECT / ADWEA
  • 9. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 9 June 2014 / Rev. 0 EPC - Engineering, Procurement & Construction § Desalination Plants § Water Treatment § Pipeline & Pumping Stations § Water Distribution Networks § Power Stations § Gas Power Stations § Power Transmission & Distribution § Office & Residential § Commercial Centers § Educational Institutions § Hospitals § Hotels & Resorts § Sewage Treatment Plants § Solid Waste Management § Pumping & Lifting Stations § District Cooling § Industrial Complexes § Airports § Transportation Engineering, Procurement & Construction
  • 10. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 10 June 2014 / Rev. 0 EPC – Power OPEN CYCLE GAS FIRED PLANTS – 2,000 MW, AL SHABAB AND DAMIETTA, EGYPT
  • 11. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 11 June 2014 / Rev. 0 EPC – Power OPEN CYCLE GAS FIRED PLANTS – 1,000 MW, AL SHABAB, EGYPT
  • 12. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 12 June 2014 / Rev. 0 EPC – Power OPEN CYCLE GAS FIRED PLANTS – 1,000 MW, AL SHABAB, EGYPT
  • 13. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 13 June 2014 / Rev. 0 EPC – Power OPEN CYCLE GAS FIRED PLANT – 500 MW, DAMIETTA, EGYPT
  • 14. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 14 June 2014 / Rev. 0 EPC – Water Ardiya Pumping Station, Kuwait Pumping & Lifting Station, Kuwait Saadiyat STP2, Abu Dhabi, UAE
  • 15. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 15 June 2014 / Rev. 0 EPC – Water A7 Pumping Station – Riggai, Kuwait
  • 16. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 16 June 2014 / Rev. 0 EPC – District Cooling AL SOWAH DISTRICT COOLING PLANT (50,000 TR)
  • 17. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 17 June 2014 / Rev. 0 EPC – Central Utility Plants (CUP) SABAH AL SALEM UNIVERSITY PROJECT CENTRAL UTILITY PLANT (CUP 1 & 2), KUWAIT
  • 18. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 18 June 2014 / Rev. 0 EPC – Infrast. & Environ. Dubai International Airport, UAE Marsa Alam International Airport, Egypt Addis Ababa International Airport, Ethiopia § Kuwait International Airport § Dubai International Airport § Addis Ababa International Airport § Marsa Alam International Airport § Jebel Ali International Airport AIRPORTS
  • 19. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 19 June 2014 / Rev. 0 EPC – Infrast. & Environ. AIRPORTS - JEBEL ALI INTERNATIONAL AIRPORT, UAE
  • 20. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 20 June 2014 / Rev. 0 EPC – Infrastructure INFRASTRUCTURE WORKS FOR ADNEC CAPITAL TOWER - UAE
  • 21. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 21 June 2014 / Rev. 0 EPC – Building Services MEP WORKS - AL HAMRA TOWER, KUWAIT
  • 22. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 22 June 2014 / Rev. 0 EPC – Building Services MEP WORKS - AL HAMRA TOWER, KUWAIT
  • 23. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 23 June 2014 / Rev. 0 EPC – Building Services FOUR SEASONS HOTEL, LEBANON ADIA TOWER - ABU DHABI, UAE
  • 24. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 24 June 2014 / Rev. 0 EPC – Building Services MEP WORKS Central Bank of Kuwait HQ, Kuwait Al BabtainTower, Kuwait
  • 25. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 25 June 2014 / Rev. 0 CONSTRUCTION
  • 26. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 26 June 2014 / Rev. 0 Construction – Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
  • 27. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 27 June 2014 / Rev. 0 Construction – Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
  • 28. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 28 June 2014 / Rev. 0 Construction – Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
  • 29. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 29 June 2014 / Rev. 0 Construction – Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
  • 30. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 30 June 2014 / Rev. 0 Construction – Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
  • 31. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 31 June 2014 / Rev. 0 Construction – Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
  • 32. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 32 June 2014 / Rev. 0 Construction – Plants HABSHAN - 5 PROCESS PLANT, JGC-TECNIMONT / GASCO, UAE
  • 33. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 33 June 2014 / Rev. 0 Construction – Plants AROMATIC COMPLEX, TECNIMONT / PIC, KUWAIT
  • 34. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 34 June 2014 / Rev. 0 Construction – Plants AROMATIC COMPLEX, TECNIMONT / PIC, KUWAIT
  • 35. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 35 June 2014 / Rev. 0 Construction – Plants POLYETHYLENE EXPANSION, OLEFINS – II / FLUOR, KUWAIT
  • 36. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 36 June 2014 / Rev. 0 Construction – Plants LARGE SCALE STEAM FLOOD PILOT, JO (KGOC / CHEVRON), KUWAIT
  • 37. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 37 June 2014 / Rev. 0 Construction – Plants ETHYLENE GLYCOL – II, OLEFINS - II, FLUOR, KUWAIT
  • 38. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 38 June 2014 / Rev. 0 Construction – Plants FACILITY UPGRADE (AMALGAMATION PROJECT), KUWAIT
  • 39. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 39 June 2014 / Rev. 0 Construction – Plants FUEL GAS PIPELINE PROJECT (PART A), KUWAIT
  • 40. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 40 June 2014 / Rev. 0 FACILITIES MANAGEMENT / INSTITUTIONAL & COMMERCIAL
  • 41. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 41 June 2014 / Rev. 0 FM – Institutional & Commercial SEIF PALACE, KUWAIT
  • 42. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 42 June 2014 / Rev. 0 FM – Institutional & Commercial BAYAN PALACE, KUWAIT
  • 43. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 43 June 2014 / Rev. 0 FM – Institutional & Commercial ADMINISTRATION BUILDING AT BAYAN PALACE, KUWAIT
  • 44. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 44 June 2014 / Rev. 0 FM – Institutional & Commercial ADMINISTRATION BUILDING AT BAYAN PALACE, KUWAIT
  • 45. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 45 June 2014 / Rev. 0 FM – Institutional & Commercial LIBERATION TOWER, KUWAIT ADIA TOWER - ABU DHABI, UAE
  • 46. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 46 June 2014 / Rev. 0 FM – Institutional & Commercial THE AVENUES, KUWAIT MARINA MALL, KUWAIT
  • 47. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 47 June 2014 / Rev. 0 FM – Institutional & Commercial ARWA PRINTING PRESS, KUWAIT
  • 48. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 48 June 2014 / Rev. 0 FM – Institutional & Commercial LEBANESE UNIVERSITY CAMPUS, BEIRUT
  • 49. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 49 June 2014 / Rev. 0 FACILITIES MANAGEMENT / INDUSTRIAL SERVICES
  • 50. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 50 June 2014 / Rev. 0 § Sewage Treatment Plants § Reclamation Plants § Pumping & Lifting Stations § Water Distribution Network § Storm Water Drain Network § Oil Fields § Gathering Centers § Booster Stations § Refineries § Petrochemical Plants § Pipelines & Well Heads FM - Industrial Services Operation § Power Plants § Diesel Power Plants § Water Desalination Plants FM - Industrial Services Operation
  • 51. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 51 June 2014 / Rev. 0 FM - Industrial Services Operation Kharafi National-Industrial Services is a leading “One Stop Shop for Industrial Maintenance & Value Added Services” in the region.
  • 52. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 52 June 2014 / Rev. 0 FM – Industrial Services MAINTENANCE - OIL & GAS PLANTS
  • 53. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 53 June 2014 / Rev. 0 FM – Industrial Services MAINTENANCE - OIL & GAS PLANTS Tank Roof Replacement Valve Maintenance High pressure Piping Works Hydro jet Cleaning Cable laying & Instr. Works De- Sludging Works
  • 54. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 54 June 2014 / Rev. 0 FM - Upstream PRODUCTION FACILITIES MAINTENANCE, KUWAIT
  • 55. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 55 June 2014 / Rev. 0 FM - Upstream PRODUCTION FACILITIES MAINTENANCE, KUWAIT
  • 56. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 56 June 2014 / Rev. 0 FM - Downstream MINA AL AHMADI REFINERY STEAM FLOOD FACILITIES - JOINT OPERATIONS
  • 57. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 57 June 2014 / Rev. 0 BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE FM – Industrial Services
  • 58. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 58 June 2014 / Rev. 0 BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE FM – Industrial Services
  • 59. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 59 June 2014 / Rev. 0 BOROUGE RUWAIS SHUTDOWN - 2012 FOR FACILITIES 1 & 2, UAE FM – Industrial Services
  • 60. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 60 June 2014 / Rev. 0 FM – Industrial Services SHUTDOWN WORKS - SHUAIBA REFINERY - GRTA, KUWAIT
  • 61. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 61 June 2014 / Rev. 0 FM – Industrial Services O&M - POWER PLANTS
  • 62. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 62 June 2014 / Rev. 0 FM – Industrial Services O&M - POWER PLANTS
  • 63. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 63 June 2014 / Rev. 0 FM – Industrial Services O&M - POWER PLANTS
  • 64. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 64 June 2014 / Rev. 0 FM – Industrial Services O&M - GIS SUBSTATIONS
  • 65. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 65 June 2014 / Rev. 0 FM – Industrial Services OPERATION & MAINTENANCE OF PUMPING & LIFTING STATIONS
  • 66. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 66 June 2014 / Rev. 0 FM – Industrial Services OPERATION & MAINTENANCE OF PUMPING & LIFTING STATIONS
  • 67. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 67 June 2014 / Rev. 0 FM – Industrial Services OPERATION & MAINTENANCE OF SULAIBIYA WWTRP
  • 68. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 68 June 2014 / Rev. 0 FM – Industrial Services OPERATION & MAINTENANCE OF ADWEA WWTP (WATHBA & SAAD), ABU DHABI
  • 69. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 69 June 2014 / Rev. 0 Service Units & Departments Health, Safety & Environment Procurement & Material Control Human Recourses Equipment Operations Quality Assurance / Control Scaffolding Services Project Control Services Calibration Laboratory Engineering Services Camp Facilities ABJ Engineering & Contracting Co. Kuwait ABJ Industries PJSC UAE Gulf National Insulation Systems Kuwait Gulf National Insulation Systems UAE Group Supporting Companies
  • 70. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 70 June 2014 / Rev. 0 § All employees undergo a Safety Induction Training course before they assume their responsibilities. Safety awareness is further intensified by: • Safety Tool Box Talks • Pre-task safety briefing • Job Safety Analysis • Risk Assessments • Confined Space Entry § Rigging, Scaffolding and First Aid training are conducted by Third Party & certified. § With an objective to continual improvement, the safety management system elements are now certified by OHSAS 18001:2007 standard. Health, Safety & Environment
  • 71. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 71 June 2014 / Rev. 0 Health, Safety & Environment
  • 72. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 72 June 2014 / Rev. 0 Human Resources Multinational Workforce is recruited through our existing agencies network world-wide. Interviews and trade tests are conducted and supervised directly by our Project Staff. Candidates are sourced ahead of time, based on project manpower projections. Systematic re-certification of welders at work place to cope with new welding technology. Continuous reassessment of qualification training and skill development programmes for all personnel.
  • 73. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 73 June 2014 / Rev. 0 Human Resources Manpower Summary Total Manpower: 29,579 Directors / Chief Dev. Officer / COO 15 Operations Managers / Project Director 11 Department Managers / Unit Managers / Unit Head 106 Manager of Projects / Snr. Project Managers 37 Projects Managers / Construction Managers 70 Services & Support Staff 1,897 Field Operations (Engineers / Supervisors) 1,189 Foremen 1,063 Skilled Craftsman 8,932 Plant / Equipment / Crane Operators / Drivers 2,031 Trade Helpers 2,046 Labourers 2,280 General Site Services & Warehouse Man 1,185 ABJ Engineering & Cont. Co. - Kuwait 5,548 Kharafi National – UAE 2,102 Kharafi National – Egypt 715 Kharafi National – Lebanon 352 Non Manual: 3,325 Subsidiaries: 8,717 Manual: 17,537
  • 74. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 74 June 2014 / Rev. 0 Note: * We have deployed over 12,000 employees in Habshan-5 Process Plant Project, Abu Dhabi for GASCO, UAE in its peak and the Project has been completed in June, 2013 Human Resources Workforce Growth (2008-2013) 2008 2009 2010 2011 2012 2013 2014 Non-Manual 2,631 3,750 3,814 4,216 4,278 4,327 3,852 Manual 20,250 21,610 27,358 28,929 30,058 30,808 25,727 Total 22,881 25,360 31,172 33,145 34,336 35,135 29,579 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000
  • 75. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 75 June 2014 / Rev. 0 Quality Management System Well established procedures in place for every part of the business and their continuous update with internal auditing to verify the implementation Functional support of Quality Control to projects Establishment of Welding Services Unit, to train welders and develop their skills in anticipation of shortage of trained welders in the region Calibration and Testing Laboratories to ensure that calibration/ testing is done on time and that results of calibration/ testing are accurate Six Sigma program implementation
  • 76. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 76 June 2014 / Rev. 0 Quality Certifications - Organization Quality Management System ISO Certification/ Accreditation: ISO 9001:2008 Quality Management System ISO 17025 General Requirements for the Competence of Testing and Calibration Laboratories.
  • 77. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 77 June 2014 / Rev. 0 Quality Certifications - Fabrication Quality Management System ASME & National Board’s Certification Stamps: ASME Code : U Manufacture of Pressure Vessels – ASME Section VIII Division I ASME Code : U2 Manufacture of Pressure Vessels – ASME Section VIII Division II ASME Code : PP Fabrication and Assembly of Pressure Piping ASME Code : S Manufacture of Power Boilers National Board : R Repair/ Alteration of Pressure Vessels National Board : NB Registered Boilers/ Pressure Vessels
  • 78. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 78 June 2014 / Rev. 0 Quality Management System Quality Control - Overview Quality Control Technical Work Instructions for Piping, Pipeline, Tanks, Welding, Painting , Civil, Electrical and Instrumentation, Operation & Maintenance…..etc. Project Quality Plan, ITPs, and Method Statements Orientations and Trainings QC Module in ERP Oracle Common database for fabrication and field activities Welders Training School & Certifications
  • 79. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 79 June 2014 / Rev. 0 Quality Management System Calibration Laboratory (Calibration & Monitoring of Measuring Equipment) Investment of over KD 2 million in Master Equipment & Instruments Number of Instruments – currently over 6000 Capabilities: Electrical, Mechanical, Linear, Mass, Pressure, Temperature Recent additions § Thermal Imaging Cameras § GPRS [Ground Penetration Radar System] § Moisture & Density Measurement in Soil using Radioactive Gamma rays External Customers § M/s. Siemens, Equate, Schlumberger, Hempel Paints, Hyundai Engineering & Construction Co., SK Engineering…..etc.
  • 80. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 80 June 2014 / Rev. 0 Quality Management System Sulaibiya Testing Laboratory Investment of over KD 300,000/- Equipment Testing Water, Waste water & Sludge samples Checking ~ 87 chemical & microbiological parameters Customer : Sulaibiya Sewage Treatment & Reclamation Plant ISO 17025 accreditation by United Kingdom Accreditation Service - UKAS
  • 81. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 81 June 2014 / Rev. 0 Projects Control Progress Monitoring is Carried out as Follows: Actual returns for quantities installed and man-hours spent are collected daily. Progress verification is carried weekly. Productivity and performance indicators are reported on a weekly and monthly basis. Key Factors to our Cost Control Approach are: Forecast of quantities and man-hours. Forecast of balance commitments for materials and subcontracts. Forecast of staff and indirect costs.
  • 82. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 82 June 2014 / Rev. 0 Engineering Services § Thermoflow § Aspentech § ETap Specialist Design § X Steel § Spoolgen § Autocad,Civil,MEP § Aveva PDMS Process Detail Design § RIPAC § Candy § On Screen Take offs § Acad Take offs Material Take Offs § Materials Data Base § ERP Modules § Primavera Bills of Quantity Tracking Commissioning Support Post Award Detail Design & Engineering Support Pre Award Tendering Support FEED Packages Concept Design Technology Selection ENGINEERING SOFTWARE EMPLOYED ENGINEERING SUPPORT SERVICES § Pipeflow § Ceasar II § Staad III § Robot § Elite § Hass § HVACOMP § HAP § Etab
  • 83. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 83 June 2014 / Rev. 0 Kharafi National follows Integrated Procurement & Materials Management system in line with the ISO 9001 : 2008 requirement covering the following: § Procurement & Material subcontract (Local & Overseas). § Logistics, expediting, Factory Acceptance Test (FAT) & transportation. § Vendor Management (Supplier evaluation, Prequalification and performance measurement). Multinational staff strength over 100 (including experienced Engineers, Supervisors and Buyers.) Procurement
  • 84. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 84 June 2014 / Rev. 0 Over US$ 750 Million worth of materials procured annually. In excess of 30,000 Material Requisition closed annually. Approved supplier strength of over 3,000 (one-third being overseas suppliers). KN adopts structured criteria for evaluating and re-evaluating suppliers based on their ability to supply products that meet the Organization's requirement and Periodic evaluation is conducted on the performance of the suppliers. KN conducts ‘Due Diligence’ on supplier premises as part of the supplier evaluation to enlist them as an approved vendor. Procurement
  • 85. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 85 June 2014 / Rev. 0 Extensive Knowledge of Local and International Markets. Purchase Orders / Subcontracts are awarded to Companies who supply quality products, competitive back to back basis and on time delivery. e-Procurement, utilization of B2B e- markets, Strategic Sourcing & Online negotiations with suppliers. Automated Procurement workflows through Oracle E-Business Suite ERP System. Compliance with the Purchase Order/ project schedule requirements are ensured through expediting/ inspection at manufacturer’s/ supplier’s premises in an orderly & systematic way for highlighting deviations, delay or damages if any, prior to shipment. Procurement
  • 86. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 86 June 2014 / Rev. 0 Procurement Trend Inline with the transformation of KN from a Traditional Contractor to an Operational Investor with EPC , Commissioning and FM capabilities, the Value of Procurement Increased Year on Year with increase in Turnover / Growth of KN
  • 87. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 87 June 2014 / Rev. 0 Serving Warehousing requirements for More than 150 Projects / Cost Centers across diversified business lines in Middle East & Africa. Central Stores in Kuwait with 48,000 Sq Meters of area (Including 17,000 Sq Meters of Closed Stores, 31,000 Sq. Meters of Open Yard) having Heavy duty multi storied racking with State of art modern material handling facilities, Safety and Security systems. In excess of 160,000 items handled across various Projects and we adopt Efficient Codification & Standardization practices. Material Control
  • 88. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 88 June 2014 / Rev. 0 Over US$ 750 Million worth of KN Procured materials handled annually and Over US$ 1 Billion worth of Client Supplied Free Issue Materials handled annually. Total Monthly Receiving Transactions over 5500 and Issues/Transfer Transactions over 4500. Effective utilization of Oracle ERP Inventory Modules with Experienced resources to handle Computerized Transactions & Inventory Management. Utilization of Temperature controlled Stores and importance for material storage & preservation as per manufacturers recommendations. Utilization of Selective Inventory Control / Vendor Managed Inventory / Consigned Stock. Material Control
  • 89. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 89 June 2014 / Rev. 0 Equipment Operations Kharafi National own, manage and operate Equipment fleet in all countries where KN operates, keeping same policy, standard and discipline. Currently equipment in excess of 6,100 construction equipment/plant. Currently more than 2,100 trained, experienced and qualified staff available at the equipment division.
  • 90. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 90 June 2014 / Rev. 0 Equipment Operations
  • 91. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 91 June 2014 / Rev. 0 Equipment Operations
  • 92. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 92 June 2014 / Rev. 0 Equipment Operations
  • 93. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 93 June 2014 / Rev. 0 Equipment Operations
  • 94. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 94 June 2014 / Rev. 0 Scaffolding Services
  • 95. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 95 June 2014 / Rev. 0 Scaffolding Services
  • 96. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 96 June 2014 / Rev. 0 Scaffolding Services Shuaiba Refinery – GRTA, KNPC, Kuwait
  • 97. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 97 June 2014 / Rev. 0 Electrical Laboratory High Voltage Laboratory Fluke Laboratory Pressure Laboratory Capabilities Calibration Laboratory
  • 98. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 98 June 2014 / Rev. 0 Balance Laboratory Chemical Laboratory Temperature Laboratory Dimension & Vibration Laboratory Calibration Laboratory Capabilities
  • 99. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 99 June 2014 / Rev. 0 IR Thermography Inspection Power Quality Analysis Validation of Welding Machines Cable / Pipe Detection Calibration Laboratory Specialized Services
  • 100. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 100 June 2014 / Rev. 0 INFRARED NORMAL LV Fuse Carrier Problem Problem in Pump Coupling Problem in Busbar Termination Calibration Laboratory Thermal imaging camera
  • 101. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 101 June 2014 / Rev. 0 Camp Facilities in Kuwait & UAE Shuaiba Capacity-10,000 Sulaibiya Capacity- 3,500 Mahboula Capacity- 2,400 Amghara Capacity- 500 Abdally Capacity- 1,000 Kuwait Total = 17,400 Al Wathba Abu Dhabi Capacity- 2,200 Al Ain, Abu Dhabi Capacity- 525 Mussafah, Abu Dhabi Capacity- 750 Dubai Investment Park Capacity- 100 UAE Total = 12,375 Saadiyat , Abu Dhabi Capacity- 700 Habshan-Abu Dhabi Capacity- 8,000 Madinet Zayed, Abu Dhabi Capacity- 100
  • 102. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 102 June 2014 / Rev. 0 Camp Facilities – Sulaibiya, Kuwait
  • 103. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 103 June 2014 / Rev. 0 Camp Facilities – Sulaibiya, Kuwait
  • 104. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 104 June 2014 / Rev. 0 Camp Facilities – Sulaibiya, Kuwait
  • 105. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 105 June 2014 / Rev. 0 Camp Facilities – Shuaiba, Kuwait
  • 106. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 106 June 2014 / Rev. 0 Camp Facilities - Habshan, UAE
  • 107. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 107 June 2014 / Rev. 0 Camp Facilities - Habshan, UAE
  • 108. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 108 June 2014 / Rev. 0 Camp Facilities - Habshan, UAE
  • 109. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 109 June 2014 / Rev. 0 Aerial view of Mina Abdullah Facilities ABJ Fabrication Facilities
  • 110. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 110 June 2014 / Rev. 0 ABJ Fabrication Facilities ABJ Engineering & Contracting Company fabricates a wide range of heavy industrial products for the oil and gas, petrochemical, chemical, fertilizer, power, water and related industrial sectors in Kuwait and beyond. The Company designs, manufactures and installs pressure vessels, pressure piping, heavy structural steel works, tanks, modular skids, evaporators, separators and HRSG among a host of customized heavy duty products for large-scale projects in Kuwait and UAE.
  • 111. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 111 June 2014 / Rev. 0 ABJ Fabrication Facilities
  • 112. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 112 June 2014 / Rev. 0 ABJ Fabrication Facilities Strengths Our current manpower is 2,027 skilled labor Our current production covers the fabrication of the following: § Process Equipment § Vessels & Pressure Vessels § Evaporators for MSF Desalination Plants § Skids Mounted Process Modules § Pressure / Process Piping § Structural Steel § High Capacity 24 Hrs radiography vaults for NDT of pipe fabrication. A large number of highly experienced staff in engineering design, production of fabrication drawings in accordance with international codes and standards.
  • 113. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 113 June 2014 / Rev. 0 ABJ Fabrication Facilities Electric Furnace – Temp – 800º C Transportation
  • 114. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 114 June 2014 / Rev. 0 ABJ Fabrication Facilities DESALINATION UNITS
  • 115. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 115 June 2014 / Rev. 0 ABJ Fabrication Facilities SEPARATORS / COLUMNS
  • 116. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 116 June 2014 / Rev. 0 ABJ Fabrication Facilities PRESSURE PIPING
  • 117. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 117 June 2014 / Rev. 0 ABJ Fabrication Facilities MODULAR SKIDS
  • 118. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 118 June 2014 / Rev. 0 Jaber Al Ahmed International Stadium, Kuwait Nelson Mandela Stadium, South Africa ABJ Fabrication Facilities SPORT STADIUMS
  • 119. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 119 June 2014 / Rev. 0 Gulf National Insulation Systems Aromatics Complex Project GNIS is a Specialized Insulation Company set up in 2006 between KN & Riva Mariani Group of Italy. GNIS has a 5,500 m2 capacity set up with MAB Facility. A 1,000 m2 State of the Art, Full Computerized Workshop. Capacity up to 20,000 m2 / month of Fabricated Cladding Materials. 304 + 20 Strong Fully trained and experienced work force.
  • 120. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 120 June 2014 / Rev. 0 Gulf National Insulation Systems
  • 121. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 121 June 2014 / Rev. 0 Ethylene Glycol – 2, Kuwait Ethylene Glycol – 2, Kuwait Gulf National Insulation Systems
  • 122. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 122 June 2014 / Rev. 0 Main Clients References Ministry of Electricity & Water, Kuwait Kuwait Petrochemical Industries Company Ministry of Public Works, Kuwait Kuwait Gulf Oil Company Kuwait National Petroleum Company Saudi Arabian Chevron Inc. Kuwait Oil Company Ansaldo Industrial S.p.A. Equate Petrochemicals, Kuwait International Bechtel Company, Ltd.
  • 123. AWI 106 Att. 8 Rev. 3 02 Jan. 2011 123 June 2014 / Rev. 0 Main Clients References Tecnimont S.p.A., Italy Fluor International Ltd., USA Saipem S.p.A., Italy Kellogg Brown & Root – KBR, USA Fisia, Italy Hyundai Engineering & Construction Co., South Korea Technip, Italy Samsung Corporation, South Korea Foster Wheeler, Italy SK Engineering & Contracting Company, South Korea Petrofac International Ltd., UK Daelim Industrial Company Ltd., South Korea Costain Oil & Gas - UK ABB Lummus Heat Transfer B.V., Netherlands JGC Corporation, Japan Polimex Cekop, Poland Mitsui Engineering & Shipbuilding Company, Japan Cegelec, France