SlideShare a Scribd company logo
1 of 6
Download to read offline
Curriculum Vitae
Personal Details
DATE of BIRTH 18/08/1971
Name Keith Mc Guigan
Addresss 90 Blackcastle Demesne, Slane Road, Navan, Co Meath.
Tel No. 046 903 1169 / 085 172 7585
E-Mail keithmcguigan21@gmail.com
Key Skills & Attributes
I am a responsible and co-operative person who has a natural ability to organize and prioritize
tasks in order to achieve maximum efficiency for the company. My personal strengths include
loyalty, commitment, reliability and adaptability to change. My previous experiences with my
former employers have taught me the positive values of individual responsibility and teamwork.
I am an excellent timekeeper with a positive attitude, quick and keen learner who enjoys a
challenge
Education & Training
Bachelor of Engineering Technology in Mechanical Engineering - DIT Bolton
Street, Dublin
2012 - May 2015.
 Control Systems and Instrumentation
 Solid Works and CAD
 Mechanics and Materials
 Unit Operations and Process Systems
 Energy System Design and Mathematics
 Engineering Management
 Electronics and Electrotechnoglogy
The idea for my final year project (Control for a Cutting Device), was to design and fit a control system to
a pipe cutting device. This involved the timing of the motor for turning and the opening and closing of a
solenoid valve on the oxyacetylene cutting unit.
The principle idea is to turn a manually operated pipe cutting machine into a machine that has a control
system that is fully automated. This will enable the engineer/operator to carry out other tasks related to
the job in hand, while the cutting device is operating under the control system.
The aims and objectives of the project were to;
 Research: The equipment being modified and investigate current devices on the market
 Design: Select the feasible design to meet the requirements of the project
 Source: Source and cost the most suitable components for the control system
 Assembly ; Build, test control system and evaluate results
The ‘Control System for a Cutting Device’ project has been determined to be a success from the outset.
All aims and objectives have been achieved and working and functional control system is in place.
Engineering Technology – FETAC Level 5 – Cavan Institute, Co. Cavan
2011 - 2012
 IT and CAD
 Engineering Workshop Process and Theory
 Health and Safety at Work
Water Metering System Technician Course – FETAC Chevron Training
2010
 Domestic Plumbing
 Pipe Fitting
 Mechanical meter installation
 5 Steps of Pipe Preparation
 Flush Out
 Install Meter Cartridge
 Remove Meter Cartridge
 Install Restrictor Valve
General Engineering Course, MMA Flat Horizontal – Welding Course – FAS
Training Centre, Coe’s Road, Dundalk.
2010 - 2011
 FETAC Level 5 Mounting of Abrasive Wheels
 EN Certificate in Manual Metal Arc Fillet Welding
 Safe Pass
 FETAC Level 4 Manual Handling
 Precision Measurement and Tooling
Employment History
October 2015 - Present Coffey Construction, Enfield, Co. Meath
Position – Site Engineer
2011 – 2012 Fergus Boyle, Slane Road, Navan, Co. Meath
Position - Part Time casual work
2007 – 2010 Navan Aluminum Ltd, Unit 15 Navan Enterprise Centre, Navan
Position – Fitter/ Foreman
Responsible for the following:
 Working as part of a team on private and commercial properties
 Snagging
 Fitting / Installation of Windows, Doors and Conservatories
 Ensuring all work was completed to a high standard
2004 – 2007 Siac Builing Envelope Ltd, Unit 1 Baldonnell Business Park, Dublin.
Position – Fitter / Snagger Foreman
Key Roles and Responsibilities
The main purpose of my job was representing the company in a professional and proactive
manner at all times.
 Liaising with the contract manager, finishing foreman, project managers and sub-
contractors,
 Supervise and manage all site based operatives when needed to work on snag lists
 Ensuring the following was carried out; safety inductions, method statement and tool
box talks
 Ensure that all works carried out are undertaken with due regard for health and safety
and in a professional manner
 Check that all plant and materials to be used where on site
 Order any additional plant and materials
 Keep site dairy and photographic dairy of all snag work being carried out
 Get all snag work signed off by the contractors finishing foreman.
2003 – 2004 BKNS Ltd, Dublin.
Position – Fitter
Responsible for the following:
 Working as part of a team on private and commercial properties
 Fitting / Installation of Windows, Doors and Conservatories
2000 – 2004 Specialist Cladding Installation Ltd, Lucan, Dublin.
Position – Fitter
Responsible for the following:
 Fitting / Glazing and Cladding Fixing
 Curtin Wall Screens
 Installation of commercial Doors and Windows
 Soffit and fascia
Projects
Projects worked on while working for Siac Builing Envelope Ltd and Specialist Cladding
Installation Ltd.
Phase: Start till Finish
 Connolly Hospital Blanchardstown
 Backweston Laboratories, Celbridge, Co. Kildare
 FAS Tallaght, Co. Dublin
 Garda Ombudsman, Upper Abbey Street, Dublin
Projects snagged on while working for Siac Builing Envelope
Phase: Snag Work
 Backweston Laboratories, Celbridge, Co. Kildare
 Takeda Ireland Ltd, Grange Castle, Co Dublin
 Trinity College Sports Centre and The Naughton Institute, Dublin
 Genzyme Ireland Ltd, Waterford
 Dundalk Institute of Technology
 NUI Galway
 Elan Pharmaceutical Technologies, Athlone
 Apartment complex, Ashtown, Dublin
Facade Systems used
 Stick Curtain Walling
 Unitised Curtain Walling
 Structural Silicone Glazing
 Sloped Glazing Systems
 Architectural Windows
 Brise Soleil
 Rainscreen Cladding
 Installation of commercial Doors and Windows
 Soffit and Fascia
References available on request.

More Related Content

What's hot

Andrew James Group Intro
Andrew James Group IntroAndrew James Group Intro
Andrew James Group Intromsjcooke
 
L-Con Inc Powerpoint EMAIL 12-3-2014
L-Con Inc Powerpoint EMAIL  12-3-2014L-Con Inc Powerpoint EMAIL  12-3-2014
L-Con Inc Powerpoint EMAIL 12-3-2014Rick Garcia
 
Commercial Presentation - August 2015
Commercial Presentation - August 2015Commercial Presentation - August 2015
Commercial Presentation - August 2015Greg Ganske
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureDoug Olson
 
2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist ory2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist oryEdward Pezzullo
 

What's hot (18)

Lagonegro james-t
Lagonegro james-tLagonegro james-t
Lagonegro james-t
 
Chris Wons Resume
Chris Wons ResumeChris Wons Resume
Chris Wons Resume
 
Millar_CV_WE
Millar_CV_WEMillar_CV_WE
Millar_CV_WE
 
Andrew James Group Intro
Andrew James Group IntroAndrew James Group Intro
Andrew James Group Intro
 
s.n.dubey
s.n.dubeys.n.dubey
s.n.dubey
 
Trevmost updatecv2016
Trevmost updatecv2016Trevmost updatecv2016
Trevmost updatecv2016
 
J Oxley CV
J Oxley CVJ Oxley CV
J Oxley CV
 
Gil Garcia Resume
Gil Garcia ResumeGil Garcia Resume
Gil Garcia Resume
 
L-Con Inc Powerpoint EMAIL 12-3-2014
L-Con Inc Powerpoint EMAIL  12-3-2014L-Con Inc Powerpoint EMAIL  12-3-2014
L-Con Inc Powerpoint EMAIL 12-3-2014
 
Commercial Presentation - August 2015
Commercial Presentation - August 2015Commercial Presentation - August 2015
Commercial Presentation - August 2015
 
Deans Resume
Deans ResumeDeans Resume
Deans Resume
 
Portfolio
PortfolioPortfolio
Portfolio
 
Jason Davenport Resume
Jason Davenport Resume Jason Davenport Resume
Jason Davenport Resume
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete Brochure
 
Resume Eric Pickering
Resume Eric PickeringResume Eric Pickering
Resume Eric Pickering
 
2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist ory2016 Resume and Construction Project Hist ory
2016 Resume and Construction Project Hist ory
 
MIchael CV 2
MIchael CV 2MIchael CV 2
MIchael CV 2
 
MICHAEL HAMILTON 2015 CV
MICHAEL HAMILTON 2015 CVMICHAEL HAMILTON 2015 CV
MICHAEL HAMILTON 2015 CV
 

Viewers also liked (10)

EOLES Project...Teaching Unit experiences
EOLES Project...Teaching Unit experiencesEOLES Project...Teaching Unit experiences
EOLES Project...Teaching Unit experiences
 
旅游目的地推广
旅游目的地推广旅游目的地推广
旅游目的地推广
 
Resume_Rajesh Parate
Resume_Rajesh ParateResume_Rajesh Parate
Resume_Rajesh Parate
 
Web 2.0
Web 2.0Web 2.0
Web 2.0
 
Influence of the students’ learning strategy on the evaluation scores
Influence of the students’ learning strategy on the evaluation scoresInfluence of the students’ learning strategy on the evaluation scores
Influence of the students’ learning strategy on the evaluation scores
 
La navidad
La navidadLa navidad
La navidad
 
WKU_OCS_CS_
WKU_OCS_CS_WKU_OCS_CS_
WKU_OCS_CS_
 
EveryL app presentation
EveryL app presentationEveryL app presentation
EveryL app presentation
 
Test 7
Test 7Test 7
Test 7
 
Comarch Mobile Insurance DE
Comarch Mobile Insurance DEComarch Mobile Insurance DE
Comarch Mobile Insurance DE
 

Similar to C.V

Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell currentAndrew Mitchell
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CVShane Elcoate
 
C.V - Sean Mc Mahon - 2016
C.V - Sean Mc Mahon - 2016C.V - Sean Mc Mahon - 2016
C.V - Sean Mc Mahon - 2016Sean McMahon
 
Neil Harveyresume.v1
Neil Harveyresume.v1Neil Harveyresume.v1
Neil Harveyresume.v1Neil Harvey
 
Cameron Jefferies CV Aug_2015
Cameron Jefferies CV Aug_2015Cameron Jefferies CV Aug_2015
Cameron Jefferies CV Aug_2015Cameron Jefferies
 
D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician Darren Fountain
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016Michael Nugent
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016Anthony Campbell
 
Kayes Combined CV
Kayes Combined CVKayes Combined CV
Kayes Combined CVKaye Fuller
 
cv-Andrew Smith Feb 15
cv-Andrew Smith Feb 15cv-Andrew Smith Feb 15
cv-Andrew Smith Feb 15Andy Smith
 

Similar to C.V (20)

Jai Townsend - CV
Jai Townsend - CVJai Townsend - CV
Jai Townsend - CV
 
Resume for andy mitchell current
Resume for andy mitchell   currentResume for andy mitchell   current
Resume for andy mitchell current
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
C.V - Sean Mc Mahon - 2016
C.V - Sean Mc Mahon - 2016C.V - Sean Mc Mahon - 2016
C.V - Sean Mc Mahon - 2016
 
Neil Harveyresume.v1
Neil Harveyresume.v1Neil Harveyresume.v1
Neil Harveyresume.v1
 
Gerry_McGee_CV
Gerry_McGee_CVGerry_McGee_CV
Gerry_McGee_CV
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Kieran McCarthy CV
Kieran McCarthy CVKieran McCarthy CV
Kieran McCarthy CV
 
Cameron Jefferies CV Aug_2015
Cameron Jefferies CV Aug_2015Cameron Jefferies CV Aug_2015
Cameron Jefferies CV Aug_2015
 
OJB Resume 2016
OJB Resume 2016OJB Resume 2016
OJB Resume 2016
 
D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician D fountain JIB Time served Maintenance and Installation Electrician
D fountain JIB Time served Maintenance and Installation Electrician
 
QC Field Engineer 2016
QC Field Engineer 2016QC Field Engineer 2016
QC Field Engineer 2016
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016
 
Kumaresan CV
Kumaresan CVKumaresan CV
Kumaresan CV
 
Kayes Combined CV
Kayes Combined CVKayes Combined CV
Kayes Combined CV
 
cv-Andrew Smith Feb 15
cv-Andrew Smith Feb 15cv-Andrew Smith Feb 15
cv-Andrew Smith Feb 15
 
Resume mark shuttleworth
Resume mark shuttleworthResume mark shuttleworth
Resume mark shuttleworth
 
Resume Mark Shuttleworth
Resume Mark ShuttleworthResume Mark Shuttleworth
Resume Mark Shuttleworth
 

C.V

  • 1. Curriculum Vitae Personal Details DATE of BIRTH 18/08/1971 Name Keith Mc Guigan Addresss 90 Blackcastle Demesne, Slane Road, Navan, Co Meath. Tel No. 046 903 1169 / 085 172 7585 E-Mail keithmcguigan21@gmail.com Key Skills & Attributes I am a responsible and co-operative person who has a natural ability to organize and prioritize tasks in order to achieve maximum efficiency for the company. My personal strengths include loyalty, commitment, reliability and adaptability to change. My previous experiences with my former employers have taught me the positive values of individual responsibility and teamwork. I am an excellent timekeeper with a positive attitude, quick and keen learner who enjoys a challenge
  • 2. Education & Training Bachelor of Engineering Technology in Mechanical Engineering - DIT Bolton Street, Dublin 2012 - May 2015.  Control Systems and Instrumentation  Solid Works and CAD  Mechanics and Materials  Unit Operations and Process Systems  Energy System Design and Mathematics  Engineering Management  Electronics and Electrotechnoglogy The idea for my final year project (Control for a Cutting Device), was to design and fit a control system to a pipe cutting device. This involved the timing of the motor for turning and the opening and closing of a solenoid valve on the oxyacetylene cutting unit. The principle idea is to turn a manually operated pipe cutting machine into a machine that has a control system that is fully automated. This will enable the engineer/operator to carry out other tasks related to the job in hand, while the cutting device is operating under the control system. The aims and objectives of the project were to;  Research: The equipment being modified and investigate current devices on the market  Design: Select the feasible design to meet the requirements of the project  Source: Source and cost the most suitable components for the control system  Assembly ; Build, test control system and evaluate results The ‘Control System for a Cutting Device’ project has been determined to be a success from the outset. All aims and objectives have been achieved and working and functional control system is in place.
  • 3. Engineering Technology – FETAC Level 5 – Cavan Institute, Co. Cavan 2011 - 2012  IT and CAD  Engineering Workshop Process and Theory  Health and Safety at Work Water Metering System Technician Course – FETAC Chevron Training 2010  Domestic Plumbing  Pipe Fitting  Mechanical meter installation  5 Steps of Pipe Preparation  Flush Out  Install Meter Cartridge  Remove Meter Cartridge  Install Restrictor Valve General Engineering Course, MMA Flat Horizontal – Welding Course – FAS Training Centre, Coe’s Road, Dundalk. 2010 - 2011  FETAC Level 5 Mounting of Abrasive Wheels  EN Certificate in Manual Metal Arc Fillet Welding  Safe Pass  FETAC Level 4 Manual Handling  Precision Measurement and Tooling
  • 4. Employment History October 2015 - Present Coffey Construction, Enfield, Co. Meath Position – Site Engineer 2011 – 2012 Fergus Boyle, Slane Road, Navan, Co. Meath Position - Part Time casual work 2007 – 2010 Navan Aluminum Ltd, Unit 15 Navan Enterprise Centre, Navan Position – Fitter/ Foreman Responsible for the following:  Working as part of a team on private and commercial properties  Snagging  Fitting / Installation of Windows, Doors and Conservatories  Ensuring all work was completed to a high standard 2004 – 2007 Siac Builing Envelope Ltd, Unit 1 Baldonnell Business Park, Dublin. Position – Fitter / Snagger Foreman Key Roles and Responsibilities The main purpose of my job was representing the company in a professional and proactive manner at all times.  Liaising with the contract manager, finishing foreman, project managers and sub- contractors,  Supervise and manage all site based operatives when needed to work on snag lists  Ensuring the following was carried out; safety inductions, method statement and tool box talks  Ensure that all works carried out are undertaken with due regard for health and safety and in a professional manner  Check that all plant and materials to be used where on site
  • 5.  Order any additional plant and materials  Keep site dairy and photographic dairy of all snag work being carried out  Get all snag work signed off by the contractors finishing foreman. 2003 – 2004 BKNS Ltd, Dublin. Position – Fitter Responsible for the following:  Working as part of a team on private and commercial properties  Fitting / Installation of Windows, Doors and Conservatories 2000 – 2004 Specialist Cladding Installation Ltd, Lucan, Dublin. Position – Fitter Responsible for the following:  Fitting / Glazing and Cladding Fixing  Curtin Wall Screens  Installation of commercial Doors and Windows  Soffit and fascia
  • 6. Projects Projects worked on while working for Siac Builing Envelope Ltd and Specialist Cladding Installation Ltd. Phase: Start till Finish  Connolly Hospital Blanchardstown  Backweston Laboratories, Celbridge, Co. Kildare  FAS Tallaght, Co. Dublin  Garda Ombudsman, Upper Abbey Street, Dublin Projects snagged on while working for Siac Builing Envelope Phase: Snag Work  Backweston Laboratories, Celbridge, Co. Kildare  Takeda Ireland Ltd, Grange Castle, Co Dublin  Trinity College Sports Centre and The Naughton Institute, Dublin  Genzyme Ireland Ltd, Waterford  Dundalk Institute of Technology  NUI Galway  Elan Pharmaceutical Technologies, Athlone  Apartment complex, Ashtown, Dublin Facade Systems used  Stick Curtain Walling  Unitised Curtain Walling  Structural Silicone Glazing  Sloped Glazing Systems  Architectural Windows  Brise Soleil  Rainscreen Cladding  Installation of commercial Doors and Windows  Soffit and Fascia References available on request.