1. Vinay Kumar Chaurasia - HSE Manager
Vinay Kumar Chaurasia
Idip. Nebosh
QD-SBG Construction
Post box- 19386, Doha Qatar
CP-07B Lusail Project
Doha Qatar
Email- vinay4hse@gmail.com
Mob.- +974 66729066
More than 12 Years of HSE experience in Dubai & Doha Qatar.
Worked with Thermo L.L.C at Dubai Airport, Dubai Contracting
Company for High-rise, Taisei Corporations (SOJV) at NDIA
project Doha Airport, AL Hijaz group Dubai for Pipelines and STP
and TAV Constructions at MTB Abu Dhabi Airport project. Present
work at Lusail city with QD-SBG Construction -CP-07B Lusail
plaza and infrastructure project provides me versatile experience
and ability for managing and leading construction HSE projects in
positive and productive manner to encourage team for achieving
desired goal safely.
Objective Looking forward for an organization that will appreciate my contribution and Reward my efforts,
having a team of professional and quality environment where my knowledge and experience can be
shared and enriched.
Professional HSE Qualification and
certification
Academic Qualification Recognition and Awards
International Diploma NEBOSH
NEBOSH I.G.C
QMS- ISO 9001-2008
IOSH Managing Safely
NASP - (National Association of Safety
Professional) USA
OSHA const. Safety 30 hrs -
Fire Warden
First Aid and CPR
Rigging & Slinging
Bachelor of Science (BSC) Physics,
2001
SSB
University
Diploma in HSE- 2004 from Chandouli
Polytechnic, Varanasi
Diploma in Industrial Safety- from
NILEM Chennai 2010
Autocad 2009, MS Office – Zabeel
Institute Dubai UAE
Lusail Safety Champion 2016
Certificate of Appreciation from
CEO of QD-SBC Construction
Qatar, 2016
Best HSE staff – 2013 at MTB
Abu
Dhabi Airport Project
Communication Skill Hindi, English and Urdu
Personal information Passport details Driving License (LMV)
Date of Birth – 05-07-1978
Marital status- Married
Nationality- Indian
Visa status- Employment (Qatar)
Passport No- J 2055 240
Date of issue- 19-04-2010
Date of expiry- 18-04-2020
Place of issue - Dubai, UAE
DL No. 1588289 (Dubai UAE)
Date of issue – 09-06-2010
Date of expiry- 09-06-2020
Doha Qatar - 27835643727
Date of issue – 11-10-2015
Date of expiry - 10-10-2020
Employment Profile
1-Employer QD-SBG Construction, Doha Qatar – A Joint venture company of
Qatari Diar and Saudi Bin Laden Group as Deputy HSE Manager
since July 2015 till date
Project CP7B-Lusail Plaza Infrastructure, LRT Station, Public Car Parks and Landscape
Client- Parsons Internationa/ Lusail Real Estate Development Company
Consultants – Dorsch Qatar
Responsibility All Health and Safety aspectes related to project Health and Safety
Allocationg and coordination of HSE Staff
Dealing with 120 HSE Staff
Liaise with client consultants
Deals with Subcontractors
Deals with Geotechnical issues related to HSE in deep Excavation
Participation in Logistics and planning
NCRs and correspondences
Followup and participation in HSE inspection and Audits
Incident investigation and Reporting
2-Employer TAV Constructions {(TAV, CCC and Arabtec) TCA JV} (Main Contractor) since June 2013 to June
2015 as HSE Team Leader at Abu Dhabi Intl. Airport Project Midfield Terminal
Building project for Central Process 2 area
Project Abu Dhabi Intl. Airport Main Terminal Building, TCA JV
Consultant – AECOM Middle East Limited
- 1 OF 3
2. Vinay Kumar Chaurasia - HSE Manager
Client – Abu Dhabi Airport Company (ADAC)
Responsibility HSE Team leader (Leading a team of 10 HSE Officers)
All HSE aspects of Central Process -2 area
Formal site safety inspection and liaise with relevant Engineers and Manager for rectification
Weekly toolbox talk and proposing toolbox talk agenda
Trend analysis of incidents and HSE observations
Initial accident/ incident investigation and reporting
Joint HSE inspection
Risk Assessment and review
Health and Safety risk management
Site audit, observation and inspection
Maintaining effective mode of communication
3-Employer Al Hijaz Group L.L.C Dubai UAE (Main Contractor)
since March 2012 to March 2013 as Site Safety Manager for below mentioned all 3 projects
Projects 1- 1200mm dia. DEWA Water Transmission Pipe Line and associated valve chambers and
shutdown works in Dubai, Civil and Mechanical work
Consultant- NJS Consultants Co. LTD
Clint- Dubai Electricity and Water Authority (DEWA)
2- Waste Water Treatment Plant (WWTP) at Al Ghadeer- Phase-1, Abu Dhabi
Consultant- Dorsch Gruppe and Mott MacDonald, Abu Dhabi
Client- Sorouh
3- Construction work for Sweihan STP capacity upgrade & Tanker discharge facility in Al Saad Al
Ain
Consultant: AECOM Middle East Limited
Client: Abu Dhabi Sewerage Service Company (ADSSC)
Responsibility • Managed and provide all HSE aspect for above mentioned all 3 projects
• Liaise with client consultants and local authority
• Risk Assessment and Environmental impact analysis
• HSE Trainings and Toolbox Talk, Chemical Safety and Training
• HSE Plan and procedure including live sewage line connection
• Weekly Monthly HSE meetings and agenda
• Incident investigation and reporting
• Fire plan and inspection of Fire fighting equipments
• Emergency plan and procedure
• Confined Space work plan and procedure
• Joint and independent site inspection and reporting
4- Employer Taisei& TAV Sky Oryx Joint Venture, Doha Qatar (Main Contractor)
since August 2010 to April 2011 as Sr. ES&H Officer
Project CP- 18, New Doha International Airport Project, Doha Qatar
Consultant: Overseas Bechtel Incorporated (OBI)
Client : (New Doha International Airport) NDIA Steering committee
Responsibility • Accident/ incident investigation and reporting
• Liaise with relevant contractors for remedial action
• Formal and Joint HSE inspection
• Health and Safety risk management
• Site audit, observation and inspection
• Environmental impact analysis
• Managed all HSE aspect for a team of 6 ES&H Officers
• BECHTEL-Hazard School trainer –Demonstration, interview and presentation/training to the Site
Engineers and Supervisors in regards to the hazardous conditions, equipments and activities
5- Employer Dubai Contracting Company L.L.C Dubai UAE (Main Contractor) since October 2007
to July 2010 joined as Sr. Safety Officer and later site Safety Manager till handing
over of the project
Project Sama Tower at Sheikh Zayed Road opposite Dubai world trade center (G, M, B + 50 floors and 11 Floor
Car Parking) Commercial and residential project
- 2 OF 3
3. Vinay Kumar Chaurasia - HSE Manager
Consultant- WS Atkins and Partners Overseas
Client- Hill International
Responsibility • Project HSE Management
• HSE and Emergency plan and procedures, Risk Assessment
• Planned and Conducted Emergency Evacuation drills
• Liaise with client and consultant
• Incident investigation, reporting and liaise with relevant party for remedial action
• Health and Safety Trainings, Toolbox Talk and agenda
• Inspection of Spider style work for facade cleaning
• Site Safety meetings and agenda
6-Employer Thermo L.L.C Dubai UAE (MEP Company ) since July 2003 till July 2007 as
Safety Officer
Project 1- Al-Murooj complex (Rotana hotel & suits apartments and Shopping Center) in Dubai.
2- Dubai Water front Tower Jebel Ali Dubai.
3- Dubai international Airport Expansion Project Phase II, Terminal III.
Responsibility • Formal site inspection and observation
• Work permit
• Toolbox talk , Plant Machinery and Equipments
Reference = Mr. M. Rahman - +974 3327 6325, Mr. Manish Kumar - +974 3396 1596
Mr. Waheed Zia - +971 50 4916 608 Mr. William Bilal - +971 3360 6754
Mr. Stephen Sullivan - +974 7787 6642
Date- Place- Doha Qatar Vinay Kumar
Chaurasia
- 3 OF 3