ABI is an ISO 9001:2008 certified company operating since 2003. We specialize in Project Management & Technical Recruitment Services for the Oil and Gas industry and our Global Clientele includes companies such as Total, Inpex, Modec, Saipem ENI and TechnipFMC, to name a few.
3. www.abisingapore.com
2
About Us
The Company
ABI Resources & Services Pte Ltd is an ISO 9001:2008
accredited company that has been operating since 2000.
We specialize in Project Management and
technical assistance services for Oil & Gas
Onshore & Offshore projects.
Our Founding Director: Mr Rama Nair has worked in
senior positions for major Oil and Gas projects in more
than 26 countries including 7 years in Aberdeen, Scotland
and in the North Sea. He is instrumental in ABI’s success
and growth in the APAC, EMEA regions.
We have a wide database of experienced professionals in
our project management team from all over the world,
including Regional Candidates and European Expatriates.
4. www.abisingapore.com
3
Why Us?
ABI Strength
Qualified
Talents
Strong
Database
Strict
Interview
Quick
Turn-Around Time
24 to 48 hours
Mobilization Worldwide
Able to provide candidates who are highly qualified with
good experience.
Strong Database in Sourcing and Recruitment of Candidates
Strict Interview Procedure and Referral Checks
Quick Turn-Around Time from receiving requirements to
mobilizing candidates
24 to 48 hours mobilization of designees Worldwide
5. www.abisingapore.com
Expertise & Services
Products
• Oil & Gas Project Management
• Specialized Human Resources for Oil & Gas Projects
• Client / Owner’s Representation and Technical Support
• Third Party Inspection
• Auditing Services
• Specialized NDT Services
• Project General Services – General Logistics,
Work Permit & Relocation assistance
• Material Sourcing & Expediting
• Rope Access Services
• Training & Seminar for Oil & Gas Industries
• Headhunting Services
4
6. www.abisingapore.com
5
ABI has implemented numerous protocols to ensure smooth operation and timely delivery of our services. We are constantly changing our
approach and mindset to keep up with the times and to deliver with confidence.
CV Database
ABI has a vast and evolving CV database, which constitutes a large number of personnel from a broad spectrum of engineering specialties. We
have incorporated highly proficient and customizable database software solutions that allow us to effectively refine our search for the best
people in the industry.
CV Sourcing
ABI acquires global talents using multiple channels and techniques which includes own Database, Job Portals such as Oil & Gas Careers,
Naukri, Monster, Jobs Bank (Singapore Government Portal), Social Networking sites such as Linkedin, OilPro, Twitter, References through Oil
& Gas Associations such as ASME, FPSO Congress, OSEA, SEA, etc., and our Strategic Alliances and Partners across APAC and EMEA
regions.
When fulfilling client requirements, ABI carefully extracts the most relevant requirements from our shortlisted candidates' CVs. Our database
software allows us to rapidly sift through thousands of CVs to find specialists that are tailored to any given client-specific niche of expertise.
Further to this, we also shortlist other candidates who have been acquainted with us on previous projects and are found to be in good standing
with immaculate track records.
Technical Approach
The Process
7. www.abisingapore.com
6
CV Processing
All candidates who submit their CVs to ABI are guided through an online web based form, which is designed to specifically focus on the most
imperative aspects of their background, work experience and specialties. Once the form is completed, the information is stored on our online
server and also through our Cloud recruiting platform such as Google based - Zoho Recruit. We have custom build a web platform that formats
all our CV detail inputs to create a standardized format for submission. This web platform also collates all our CV by disciple and
specializations for an easy search. Every applicant is scrutinized through a stringent declaration of honesty, which is supplemented by
meticulous reference checks and verifications. Applicants that fail these criteria or receive adverse referee reports are excluded immediately.
Interview
Shortlisted candidates are promptly invited to an interview at the ABI premises. Candidates who are overseas and cannot attend in person, are
interviewed face-to-face via webcam. Our interviewers constitute a panel of technical directors and engineering specialists to assess a
candidate's performance, experience, level of expertise, and most importantly attitude.
Shortlisting and Submission
Once the interviews are concluded, ABI conducts it's own internal review by considering candidates' strengths and weaknesses and ultimately
shortlists the most appropriate candidates for client submission.
Technical Approach
The Process
10. www.abisingapore.com
9
Client Project Name Description
FMC Technologies Woodside Xena Project, Australia Provision of MRB Coordinator
Well Persephone Project, Australia Provision of Site QA Lead, MRB Coordinator, Site Welding Inspector and
NACE Level III Inspector and QC Inspector
GWF 2 Project, Perth Australia Provision of Site QA Lead, MRB Coordinator, Site Welding Inspector and
NACE Level III Inspector, QC Inspector and Vendor Inspection
GWF Project, Kencana Lumut Malaysia Provision of 4 x QC Inspector / 1 x Welding Inspector to FMC Malaysia
ENI Jangrik Project, China, United
Kingdom, Indonesia, Poland & Scotland
Provision of NACE Level 3 Coating Inspector, Vendor Inspection, Third
Party Inspectors
NDT Audit for FMC Vendors, Singapore
Malaysia, China, India and Australia
Provision of Third Party NDT Audit for FMC Vendors
Shell Prelude, Singapore, Malaysia &
Australia
Provision of Source Inspectors, Coating Services and QA/QC Services
Himile Gaomi Project, China Provision of Vendor Inspection Services
KEY PROJECTS
OIL & GAS
11. www.abisingapore.com
10
Client Project Name Description
FMC Technologies Sheffield Project, United Kingdom Provision of Source Inspector Services
Hasbah Project, Japan Provision of Third Party Inspectors
Copi Bawal Tree, Indonesia Provision of Welding Inspection Services
Chevron Wheatstone Project, Singapore,
Malaysia, Indonesia
Provision of Source Inspector at Profab / McConnel Dowell Batam, Coating
Services
Shell Gumusut Kakap, Singapore Provision of Project Management Team
CNOOC-LIU HUA 4-1 (Lumut) KTO Provision of QAQC services / Human Resource Services
Ofar Project, Italy Provision of Vendor Inspector
Technip Panyu Project, Malaysia Provision of Umbilical Package Manager - Technip Sub Sea Division /
Panyu Project Sub Sea Division.
KEY PROJECTS
OIL & GAS
12. www.abisingapore.com
11
Client Project Name Description
Total France Vendor Audit To Verify Capability, Strength and Quality Systems
Total E&P Angola Kaombo Project
Singapore, Batam & Karimun
Launched in April 2014, Kaombo is the first project on the ultra-deepwater offshore Block 32,
located off the Angolan coast. Its estimated 660-million-barrel reserves span a distinct system of
reservoirs at water depths reaching 1,950 meters. ABI is one of the few companies awarded
with participation in Total's FPSO Conversion Project - Hull, Topsides, Turret & Integration in
Singapore, Batam and Karimun in Indonesia.
CLOV Project
Angola & Korea
In June 2014, production began on the CLOV project. Located off the coast of Angola, it
comprises four oil fields: Cravo, Lirio, Orquidea and Violeta. In all, its reserves are estimated at
505 million barrels. This is Total’s fourth center of activity on Angola’s deep offshore Block 17.
Total Upstream Nigeria Ltd Egina Project
Korea & China
Began the drilling program on the Egina field in December 2014. This intense project will keep
two rigs busy for a total of 3,000 days. Five out of the planned 44 subsea wells have already
been drilled, at water depths of between 1,400 m and 1,700 m, and 13 more will be completed
when the field comes on stream.
Total E&P Myanmar Yadana Subsidence Project
Seismic Impact Project
Badamyar Project
Myanmar
Present in the Republic of Myanmar since 1992, Total E&P Myanmar (TEPM) is the operator of
the offshore M5 and M6 blocks that cover Yadana gas field, which is in production since 1998.
Gas production from M5 and M6 blocks currently supplies half of all gas consumed by Myanmar
and around 12% of gas consumed by neighbouring Thailand. The Badamyar project involves
the installation of a new wellhead platform connected to the Yadana production facilities, and the
drilling of 4 horizontal wells to develop Badamyar gas field as a satellite of Yadana.
OIL & GAS
KEY PROJECTS
13. www.abisingapore.com
12
Client Project Name Description
INPEX Corporation Ichthys Project
Malaysia & Singapore
Located about 220 kilometres offshore Western Australia, the Ichthys LNG Project is
effectively three mega-projects rolled into one, involving some of the largest offshore
facilities in the industry, and 890 km pipeline uniting them for an operational life of at
least 40 years.
Heerema Marine NSCV/0106-V0119 Project,Singapore Engineering and construction of a new semi-submersible crane vessel (NSCV) with
Jurong Shipyard Pte Ltd, a fully owned subsidiary of Sembcorp Marine.
Pride Mad Dog Project, Malaysia
Kizomba B Tension Leg Platform
(TLP) Project, Malaysia
Mad Dog project is in the U.S. Gulf of Mexico which has been in production since
2005 via a spar facility designed to process 80.000 barrels a day.
ABI supported the project with provision of Project Management Team for Managing
EPC contractor MSE in all Disciplines.
BW Offshore TSB Field Development
Singapore, Malaysia & Indonesia
BW Offshore was awarded with an $875m contract for delivery of the FPSO at the
TSB field complex. The Terang gas field is located at a water depth of about 90m in
the east Java Sea in the Kangean PSC block.
Saipem ENI Erah FPSO Project, Malaysia
Yoho FPSO Falcon, Singapore
Modifications to the existing floating production, storage and offloading (FPSO) unit.
The FPSO Falcon underwent conversion in Singapore and Dubai.
SBM Offshore FPSO - OSX2 Project, Malaysia Project activities for the engineering, procurement, construction, and installation
(EPCI) of FPSO OSX-2.
OIL & GAS
KEY PROJECTS
14. www.abisingapore.com
13
Client Project Name Description
Prosernat Campana Refinery Project, India Provision of Project Management Team of Lead Engineers - Instrumentation,
Piping, Static Equipment, Civil to Overview engineering activities at Contractor's
office for Diesel Hydrotreater Refinery Plant .
Gunashli Project, Singapore Provision of Commissioning team for Compression Station Platform & Skids
Fabrication
Umm Shaif Project, Korea Provision of Project Management team for Fuel Gas Sweetening Unit (FGSU) for
Compression Platform of Hyundai Heavy Industries in Korea.
Exxon Mobil - Hydro C4 Project, France Provision of Project Management team for Hydrogenation of Butene-1 for Exxon
Mobile Singapore at Jurong Refinery.
C2 C3 Project, United Arab Emirates Provision of Project Management Team for Expediting the Delayed delivery /
Carry out modifications on 30 Control valves / FAT and Final Inspection
Maximization of C2 C3 for Gasco, Egypt - 8 Pressure Vessels and 4 Skids
Kharyaga Phase III, Malaysia Provision of Project Management Team for Specialized Electrical &
Instrumentation Services for Fabrication of Skids
Apave International INPEX- Ichthys, Malaysia & Singapore Located about 220 kilometres offshore Western Australia, the Ichthys LNG Project
is effectively three mega-projects rolled into one, involving some of the largest
offshore facilities in the industry, and 890 km pipeline uniting them for an
operational life of at least 40 years.
KEY PROJECTS
OIL & GAS
15. www.abisingapore.com
14
Client Project Name Description
Acergy Dai Hung Tie In & Marri Project, Malaysia Provision of equipment inspection, sea fastening, vessel mobilisation & offshore
support for Dai Hung Tie In & Marri Project.
Kerisi Development Project, Singapore Provision of fabrication, pre-commissioning & loadout Central Processing
Platform and Wellhead Platform in Sembcorp Marine, Singapore.
Acergy Polaris, Malaysia, Malaysia Provision for Supervision, Expediting & Inspection Services on behalf Acergy,
France at Kiswire Sdn Bhd Malaysia for Manufacturing of Anchor Wire Ropes for
Acergy Polaris
KEY PROJECTS
OIL & GAS
16. www.abisingapore.com
15
Client Project Name Description
Tractebel Jakarta High Voltage HV, Indonesia Project including a substation of 500kV, a substation of 150kV, a HV cable of 500
kV and a HV underground cable of 150 kV
Vinh Tan 4 Project, Vietnam Construction of a 2x600 MW capacity Ultrasupercritical Coal Fired power plant
with its ancillary equipment
ASHAKA Project, Nigeria Construction of a 16 MW Coal-Fired Power Plant (Circulating Fluidized Bed
technology) operating in full island mode within the cement factory
SAFI Project, Morocco Ultra-Supercritical Coal-Fired Power Plant of 2x693 MW.
Duba Project, Saudi Arabia Integration of a solar field with a combined-cycle plant. To generate up to 550 MW
from the CCPP and 50 MW from the solar field.
Xe Pian Xe Namnoy Hydroelectric
Power Project, Laos
410MW hydroelectric power project with an annual energy generation of
approximately 1,860GWh.
Rogun Dam Project, Tajikistan 3,600-MWhydroelectric plant with a size of 335-meters-tall on the Vakhsh River in
Pamir.
Mseilha Dam Project, Lebanon Construction of an embankment dam which will create a reservoir of 6.0 hm3 for
the “Lebanese Ministry of Energy and Water”.
Grand Ethiopian Renaissance Dam
Project (GERDP), Ethiopia
Construction of a 160 m high RCC dam, a 50 m high CFRD saddle dam and two
powerhouses totaling 6000 MW of installed power.
KEY PROJECTS
POWER
18. www.abisingapore.com
17
Client Project Name Description
Allstom Mae Moh Power Plant First lignite-fired power plant in Asia operating with ultra-supercritical conditions.
To be completed in 2018. To produce 600 MW of electricity.
Taishan Nuclear Turbine Island Largest nuclear power plant in the World. To build two units, each with a 1,750
MW steam turbine. To use EPR, pressurized water reactor.
Medupi Power Station Unit 6 at the Medupi Power Station to generate capacity of 794 MW.
Tanjung Bin 4 1,000MW Super Critical Coal-Fired power plant unit to increase to capacity of the
plant.
EPR Flamanville Nuclear Power Plant EPR is a third generation pressurized water reactor design. Planned capacity of
1,650 MWe. Estimated cost of €10.5 billion. Start-up in 2018.
KEY PROJECTS
POWER
19. www.abisingapore.com
18
Waste & Water
Treatment
Client Project Name Description
Veolia Khazzan, Oman Capacity of 4,000 m3/day of process water and 2,000 m3/day of drinking water
Sur Desalination Plant, Sharqiyah region,
Oman
Processing over 200,000 m3/ day of seawater
Qarmat Ali Water Treatment Plant, Iraq Handled a flow rate of 206,400 m3/day
Basra Desalination Project, Iraq Desalination project to produce 200,000 cubic meters of drinking water a day.
KEMYA, Kingdom of Saudi Arabia Process Water treatment from KEMYA's Petrochemical plant
Clean Fuels Project, Bahrain Process Water treatment from KNPC's Clean Fuels Project
Suez Michelin's Water Treatment Plant,
Indonesia
Process Water Treatment for Michelin
Oscar Bioenergy JV Project, Hong Kong Organic Waste Treatment Plant
Third Singapore Desalination Plant -
Tuas, Singapore
To produce 30 million gallons of water per day to Singapore's water supply.
KEY PROJECTS
20. www.abisingapore.com
19
Client Project Name Description
Valoriza Agua Sacyr, Oman Desalination plant that will provide 250,000 m3 of water a day
Skikda, Algeria Desalination plant that provide 200,000 m3/day
Hitz – Hitachi Zosen SMART WTE, Malaysia Waste-to-Energy plant with a 600t/day of processed waste & a power output of
18,000kWh
Waste & Water
Treatment
KEY PROJECTS
21. ABI Resources & Services Pte Ltd
B1-01 Tagore Building,
6 Tagore Drive, S787623
SINGAPORE
Tel No: +65 64546066
Fax: +65 64548891
ABI Energy Sdn Bhd
No 93-A Lorong Sanggul 1F
Bandar Puteri, 41200 Klang
Selangor, MALAYSIA
ABI Resources & Services
P.O. Box 14383
Doha, QATAR