SlideShare a Scribd company logo
1 of 2
Download to read offline
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural and Built Environments
Introduction To Drawing (ARC 30103)
Prerequisite: None
Lecturers: Ida Mazlan, Sufina Abu Bakar, Anna Kamelia, Noorul Iffa Mohd Nayan
_____________________________________________________________________
Project 1 (Group)
Drawings
Submission date – 9th Sept 2014
Introduction
“I prefer drawing to talking. Drawings are faster and leave less room for lies. “
Le Corbusier
Objectives of Project
• To introduce drawing as a communication tool in the construction industry.
Learning Outcomes
• Interpret the type of drawing representation used in the construction industry
Tasks
In a group of five or six people, you are required to choose and investigate ONE type drawings from the list
below. You are to study and investigate the use of the drawings as a means of communication. Using the
data gathered, you are to discuss and work as a team to generate a presentation and communicate your
findings to your audience. The data gathered should include types and function of drawings, stages and
examples of drawings used to communicate ideas and presentations.
• Architectural Drawings
• Interior Architecture Drawings
• Planners Drawings
• Product Design Drawings
• Quantity Surveying Drawings
• Landscape Architecture Drawings
• Engineering Drawings
• Mechanical & Electricals Drawings
Submission Requirement
Your team will be communicating and presenting their findings to your audience on Presentation Day.
You are advice to keep the presentation short and simple using any creative medium that best suits the
content and findings for your audience.
Date : 9th Sept 2014
Time : 10.00am – 12.00 pm/ 16:00 pm- 18:00 pm ( 10 mins each group )
Dress Code : Smart Casual
Presentation Flow: According to the posted list
To ensure the span of 4 hours is used wisely, please follow these guidelines on presentation day to
avoid interruptions and delay of time.
1. The whole class presentation will be using ONE laptop throughout all presentation.
2. You are advice to transfer all softcopies of presentation materials prior to class time.
3. For your e-portfolio purposes, each group need to setup and record presentation using their own
camera or ONE camera using different MEMORY CARD.
4. Please print the assessment sheet for each lecturer.
Post Presentation: All videos will be compiled by group leader in a CD with proper CD Casing with
proper information of title, group members name and information, module name and lecturer. CDs must
reach module coordinator by the next class session (16th Sept 2014).

More Related Content

Similar to Drawing_Project1 (AUGUST - BRIEF - UPDATED).pdf

Drawing project1 (august brief - updated)(1)
Drawing project1 (august   brief - updated)(1)Drawing project1 (august   brief - updated)(1)
Drawing project1 (august brief - updated)(1)
Jordon Wong
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
WadeLim
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
Jy Chong
 
Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01
tfkc1212
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
limziahuei
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
Ang Averllen
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
danielsong15
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
kychong1105
 
Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01
Bridget Hsu
 

Similar to Drawing_Project1 (AUGUST - BRIEF - UPDATED).pdf (20)

Drawing project1 (august brief - updated)(1)
Drawing project1 (august   brief - updated)(1)Drawing project1 (august   brief - updated)(1)
Drawing project1 (august brief - updated)(1)
 
Project 1 - Drawing
Project 1 - DrawingProject 1 - Drawing
Project 1 - Drawing
 
ITD project 1
ITD project 1ITD project 1
ITD project 1
 
itd Drawing project1
itd Drawing project1 itd Drawing project1
itd Drawing project1
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
ITD Project 1 Brief
ITD Project 1 BriefITD Project 1 Brief
ITD Project 1 Brief
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01Drawingproject1august brief-updated-141202193914-conversion-gate01
Drawingproject1august brief-updated-141202193914-conversion-gate01
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
ITD 1 PROJECT BRIEF
ITD 1 PROJECT BRIEFITD 1 PROJECT BRIEF
ITD 1 PROJECT BRIEF
 
Itd project 1
Itd project 1Itd project 1
Itd project 1
 
ITD1
ITD1ITD1
ITD1
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
ITD Project 1 - Drawings
ITD Project 1 - DrawingsITD Project 1 - Drawings
ITD Project 1 - Drawings
 
123
123123
123
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Drawing project1 (august brief - updated)
Drawing project1 (august   brief - updated)Drawing project1 (august   brief - updated)
Drawing project1 (august brief - updated)
 
Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01Project 20brief-201-141210205054-conversion-gate01
Project 20brief-201-141210205054-conversion-gate01
 

More from Kai Yun Pang

More from Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 

Drawing_Project1 (AUGUST - BRIEF - UPDATED).pdf

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments Introduction To Drawing (ARC 30103) Prerequisite: None Lecturers: Ida Mazlan, Sufina Abu Bakar, Anna Kamelia, Noorul Iffa Mohd Nayan _____________________________________________________________________ Project 1 (Group) Drawings Submission date – 9th Sept 2014 Introduction “I prefer drawing to talking. Drawings are faster and leave less room for lies. “ Le Corbusier Objectives of Project • To introduce drawing as a communication tool in the construction industry. Learning Outcomes • Interpret the type of drawing representation used in the construction industry Tasks In a group of five or six people, you are required to choose and investigate ONE type drawings from the list below. You are to study and investigate the use of the drawings as a means of communication. Using the data gathered, you are to discuss and work as a team to generate a presentation and communicate your findings to your audience. The data gathered should include types and function of drawings, stages and examples of drawings used to communicate ideas and presentations. • Architectural Drawings • Interior Architecture Drawings • Planners Drawings • Product Design Drawings • Quantity Surveying Drawings • Landscape Architecture Drawings • Engineering Drawings • Mechanical & Electricals Drawings
  • 2. Submission Requirement Your team will be communicating and presenting their findings to your audience on Presentation Day. You are advice to keep the presentation short and simple using any creative medium that best suits the content and findings for your audience. Date : 9th Sept 2014 Time : 10.00am – 12.00 pm/ 16:00 pm- 18:00 pm ( 10 mins each group ) Dress Code : Smart Casual Presentation Flow: According to the posted list To ensure the span of 4 hours is used wisely, please follow these guidelines on presentation day to avoid interruptions and delay of time. 1. The whole class presentation will be using ONE laptop throughout all presentation. 2. You are advice to transfer all softcopies of presentation materials prior to class time. 3. For your e-portfolio purposes, each group need to setup and record presentation using their own camera or ONE camera using different MEMORY CARD. 4. Please print the assessment sheet for each lecturer. Post Presentation: All videos will be compiled by group leader in a CD with proper CD Casing with proper information of title, group members name and information, module name and lecturer. CDs must reach module coordinator by the next class session (16th Sept 2014).