INFRASTRUCTURE IMPLEMENTATION
 I led a project team to relocate FMN Enterprise Network Core and Edge/Security Devices to a new
Data Centre. I designed the network topology and developed a project using PMI’s Project
Management Methodologies. The project was highly successfulwith less than 30 minutes downtime
for FMN Enterprise ERP, Email and other local services, while internet downtime was less than four
hours
 Designed a floor plan for FMN’s new Data Centre, designed the network infrastructure and led a team
to implement the design
 I was Team Lead for network infrastructure design and implementation at the new Data Recovery
Centre. The core mandate of the project was implementation of new network edge with full
redundancy and high availability with existing network edge at the Data Centre. The major active
equipment for the project included Cisco 6506-E Core Switch, Cisco ASA 5504, Cisco 3825 ISR,
Cyberoam 750ia and Microsoft FTMG Server
 I Deployed Ciscoworks LMS 4.0 for enterprise network management
 I Worked with the network team to deploy and integrate an enterprise wi-fisolution at the Head Office
and Several FMN Residential Estates
 I Created a detailed and comprehensive network diagram (using Microsoft Visio) of the entire FMN
and Subsidiaries enterprise network infrastructure within the first two months of resumption and
consistently reviewed and enhanced it
 I spearheaded the provisioning and integration of various MPLS VPN links at FMN subsidiaries in
several locations in the country.
 Designed, supervised and delivered most major LAN structured and fiber cabling projects, network
expansion/integration and Data Centre projects; the last major one was the Network and Data Centre
Infrastructure at the new FMN PLC Corporate Head Office commissioned in September 2013.
 I worked with the IT Projects & Network Team to deploy Voice Solutions and Voice VPNs across
FMN PLC Group and Subsidiaries

More Related Content

Similar to INFRASTRUCTURE IMPLEMENTATION AT FMN

Diaa CV Feb 2017 - LinkedIn
Diaa CV Feb 2017 - LinkedInDiaa CV Feb 2017 - LinkedIn
Diaa CV Feb 2017 - LinkedIn
Diaa Algazzar
 
Jeremiah_Goodmancurrentresume
Jeremiah_GoodmancurrentresumeJeremiah_Goodmancurrentresume
Jeremiah_Goodmancurrentresume
Jeremiah Goodman
 
Karen s. brown. professional resume .v2.1
Karen s. brown. professional resume .v2.1Karen s. brown. professional resume .v2.1
Karen s. brown. professional resume .v2.1
Karen Brown
 
CV_Staneslaus_John_Sanjaya_Amin_B1
CV_Staneslaus_John_Sanjaya_Amin_B1CV_Staneslaus_John_Sanjaya_Amin_B1
CV_Staneslaus_John_Sanjaya_Amin_B1
Amin S. John Sanjay
 
SteveWhiteSeptember 2015
SteveWhiteSeptember 2015SteveWhiteSeptember 2015
SteveWhiteSeptember 2015
Steve White
 
Van-Huynh_Resume_WithSummary
Van-Huynh_Resume_WithSummaryVan-Huynh_Resume_WithSummary
Van-Huynh_Resume_WithSummary
Van Huynh
 

Similar to INFRASTRUCTURE IMPLEMENTATION AT FMN (20)

Network security analyst technical resume 2016
Network security analyst   technical resume 2016Network security analyst   technical resume 2016
Network security analyst technical resume 2016
 
Diaa CV Feb 2017 - LinkedIn
Diaa CV Feb 2017 - LinkedInDiaa CV Feb 2017 - LinkedIn
Diaa CV Feb 2017 - LinkedIn
 
Jeremiah_Goodmancurrentresume
Jeremiah_GoodmancurrentresumeJeremiah_Goodmancurrentresume
Jeremiah_Goodmancurrentresume
 
Lalit Sharma
Lalit SharmaLalit Sharma
Lalit Sharma
 
Karen s. brown. professional resume .v2.1
Karen s. brown. professional resume .v2.1Karen s. brown. professional resume .v2.1
Karen s. brown. professional resume .v2.1
 
Mike najarian resume
Mike najarian resumeMike najarian resume
Mike najarian resume
 
IanCottonCV
IanCottonCVIanCottonCV
IanCottonCV
 
Yawer Hussain Hameedi-V4.00
Yawer Hussain Hameedi-V4.00Yawer Hussain Hameedi-V4.00
Yawer Hussain Hameedi-V4.00
 
Senior IP Network Engineer
Senior IP Network EngineerSenior IP Network Engineer
Senior IP Network Engineer
 
About Michael Ellowitz
About Michael EllowitzAbout Michael Ellowitz
About Michael Ellowitz
 
DanOlaru-cv-IT
DanOlaru-cv-ITDanOlaru-cv-IT
DanOlaru-cv-IT
 
Building an Enterprise Fiber Network for a Local Government, An Architectural...
Building an Enterprise Fiber Network for a Local Government, An Architectural...Building an Enterprise Fiber Network for a Local Government, An Architectural...
Building an Enterprise Fiber Network for a Local Government, An Architectural...
 
CV_Staneslaus_John_Sanjaya_Amin_B1
CV_Staneslaus_John_Sanjaya_Amin_B1CV_Staneslaus_John_Sanjaya_Amin_B1
CV_Staneslaus_John_Sanjaya_Amin_B1
 
Om_CV
Om_CVOm_CV
Om_CV
 
SteveWhiteSeptember 2015
SteveWhiteSeptember 2015SteveWhiteSeptember 2015
SteveWhiteSeptember 2015
 
Van-Huynh_Resume_WithSummary
Van-Huynh_Resume_WithSummaryVan-Huynh_Resume_WithSummary
Van-Huynh_Resume_WithSummary
 
Billmresume3-2015
Billmresume3-2015Billmresume3-2015
Billmresume3-2015
 
Software installation & solutions | desklinksolutions
Software installation & solutions | desklinksolutionsSoftware installation & solutions | desklinksolutions
Software installation & solutions | desklinksolutions
 
Office Intranet Managed Services
Office Intranet Managed ServicesOffice Intranet Managed Services
Office Intranet Managed Services
 
Desktop Management Services Bhubaneswar
Desktop Management Services BhubaneswarDesktop Management Services Bhubaneswar
Desktop Management Services Bhubaneswar
 

INFRASTRUCTURE IMPLEMENTATION AT FMN

  • 1. INFRASTRUCTURE IMPLEMENTATION  I led a project team to relocate FMN Enterprise Network Core and Edge/Security Devices to a new Data Centre. I designed the network topology and developed a project using PMI’s Project Management Methodologies. The project was highly successfulwith less than 30 minutes downtime for FMN Enterprise ERP, Email and other local services, while internet downtime was less than four hours  Designed a floor plan for FMN’s new Data Centre, designed the network infrastructure and led a team to implement the design  I was Team Lead for network infrastructure design and implementation at the new Data Recovery Centre. The core mandate of the project was implementation of new network edge with full redundancy and high availability with existing network edge at the Data Centre. The major active equipment for the project included Cisco 6506-E Core Switch, Cisco ASA 5504, Cisco 3825 ISR, Cyberoam 750ia and Microsoft FTMG Server  I Deployed Ciscoworks LMS 4.0 for enterprise network management  I Worked with the network team to deploy and integrate an enterprise wi-fisolution at the Head Office and Several FMN Residential Estates  I Created a detailed and comprehensive network diagram (using Microsoft Visio) of the entire FMN and Subsidiaries enterprise network infrastructure within the first two months of resumption and consistently reviewed and enhanced it  I spearheaded the provisioning and integration of various MPLS VPN links at FMN subsidiaries in several locations in the country.  Designed, supervised and delivered most major LAN structured and fiber cabling projects, network expansion/integration and Data Centre projects; the last major one was the Network and Data Centre Infrastructure at the new FMN PLC Corporate Head Office commissioned in September 2013.  I worked with the IT Projects & Network Team to deploy Voice Solutions and Voice VPNs across FMN PLC Group and Subsidiaries