Project Scope: Decrease cycle time from Arrival to RME
Doctor (ESI 3-5)
• Project selection approach
1. Identified four potential projects
2. Gathered time stamp data for each potential project
3. Used benchmarks and waste walk to determine
performance gaps
4. Selected this project based on the highest score on the
project selection matrix
• Project targets
▫ Performance gap (1-5): 4 – validated by lean measures
▫ Current median time: 1 hr. and 34 minutes
▫ Goal median time: 37 minutes – based on benchmark
▫ GOAL Median Time BASED ON LEAN SIX
SIGMA MEASURE - 18 minutes
 No Wait time in between steps
 No sitting down or back and forth
 Taking only the value added time with at least
80% efficiency rate.
Current performance gap
(1= gap is small; 5= large gap with ideal performance)
4
Cost to business if NO changes made
(1= low cost; 5=high cost)
4
Impact on customer satisfaction
(1= low impact; 5= high impact)
4
Degree of waste
(1= little or no waste; 5= lots of waste)
4
Customers can be defined
(1= not easily defined; 5=easily to define)
4
Inputs can be identified
(1= hard to identify; 5easy to identify)
4
Outputs can be identified
(1= hard to identify; 5easy to identify)
5
Data is available
(1= difficult to collect or manual; 5easy to obtain,
electronic)
5
Team needed to understand / identify solutions
(1= team NOT needed; 5= team definitely needed)
4
Team has authority to implement solutions
(1= little or no authority; 5= has authority to implement)
4
Manageable project scope
(1= very large scope; 5= contained, narrow scope)
3
Total Score 45
Project Selection Matrix
ICN Desk
(2 mins)
RME
(6 mins)
Vitals
(3 mins)
Triage
(4 mins)
Registration
(3 mins)
Wait Room
Wait Room
Wait Room
Wait Room
8 minutes
13 minutes
45 minutes
10 minutes
The current process from door to doctor takes 1 hour and 34
minutes
Current Patient Flow
Current Metrics
• Total cycle time: 1 hr 34 mins
• Value added time: 13 mins
• Non-value added time: 1 hr 21 mins
• Process cycle efficiency: 13.82%
Key Definitions
• Process cycle efficiency (PCE): the
percentage of value-add time divided by total
time (cycle time)
• Value added time: time associated with work
that is desired by the customer
• Non-value added time: time related to work
not beneficial to customer – by lean standards is
waste in a process
N/A
18.75 %
33.33%
23.08%
11.76%
Efficiency
Process Step
(VA Time)
Wait Time
(NVA Time)
Key Highlights
Value added time
Total cycle time
PCE
ICN Desk
(2 mins)
RME
(6 mins)
Vitals
(3 mins)
Triage
(4 mins)
Registration
(3 mins)
Wait Room
Triage Wait Line
RME Wait Line
Wait Room
15 minutes
The goal of the proposed process is to get from door to doctor
in 37 minutes
Proposed Patient Flow
N/A
100 %
100%
42.86%
21.05%
Registration
(3 Mins)
Efficiency
Process Step
(VA Time)
Wait Time
(NVA Time)
Proposed Metrics- Benchmark
Total cycle time: 37 mins
• Value added time: 18 mins
• Non-value added time: 19 mins
Process cycle efficiency: 48.65%
Proposed Metrics- Ideal – Lean SS Standard
Total cycle time: 18 min
• Value added time: 13 mins
• Non-value added time: 0 to 5 min
Process cycle efficiency: 80% to 100%
Key Proposed Changes
• Patients are pushed to the next step rather than
pulled from the waiting room
• Registration should be a parallel process with the
clinical assessment
• The RME MD/NP does not waste time looking for
the next patient
• Limit microphone usage and time wasted finding
patients/rooms
• Eliminate time wasted for RME orders due to no
quick registration
4 minutes
Key Highlights
DOOR
Security
I
C
N
T7
Q
R
E
G
T4T2T1 T3
D
O
O
R
DOOR
CONCERIGE
Space Flow Assessment -Spaghetti Chart - CURRENT
DOOR
Security
I
C
N
T7
Q
R
E
G
T4T2T1 T3
D
O
O
R
DOOR
QREG
CONCERIGE
NP Designated MSE Designated
MSEDesignated
Qreg Designated
Space Flow Assessment -Spaghetti Chart - PROPOSED
DOOR
Security
T7
R
E
G
T4T2T1 T3
D
O
O
R
DOOR
CONCERIGE
NP Designated MSE Designated
MSEDesignated
Space Flow Assessment -Spaghetti Chart - PROPOSED
ICN/Q-REG
Information Booth
NEXT STEPS
• Analyze the detailed Process Flow (approx 60 steps) with PFS Co-participant, committee and
stakeholders to eliminate waste in the process and implement parallel functions
• Conduct Kaizen events to implement phased changes
Phase I – Registration with clinical functions
Phase II – Physical re-configuration of patient flow
Phase III- Eliminating all the wasted steps in the process

More Related Content

What's hot

Recruitment Aug. 2015
Recruitment Aug. 2015Recruitment Aug. 2015
Recruitment Aug. 2015Ahmed Fathy
 
Key steps in transforming a calibration program slideshare
Key steps in transforming a calibration program slideshareKey steps in transforming a calibration program slideshare
Key steps in transforming a calibration program slideshareJohn Cummins, CPIP
 
Things to keep in mind before starting a test plan
Things to keep in mind before starting a test planThings to keep in mind before starting a test plan
Things to keep in mind before starting a test planNexSoftsys
 
Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2DavidMcLachlan1
 
Lean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean EventLean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean EventStephen Deas
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 materialjeashabab
 
Five Steps For Continuous Improvement of a South Carolina Business Process
Five Steps For Continuous Improvement of a South Carolina Business ProcessFive Steps For Continuous Improvement of a South Carolina Business Process
Five Steps For Continuous Improvement of a South Carolina Business ProcessStephen Deas
 
Big Apple Scrum Day 2015 - Advanced Scrum Metrics Presentation
Big Apple Scrum Day 2015 - Advanced Scrum Metrics PresentationBig Apple Scrum Day 2015 - Advanced Scrum Metrics Presentation
Big Apple Scrum Day 2015 - Advanced Scrum Metrics PresentationJason Tice
 
Process Development And Implementation 777
Process Development And Implementation 777Process Development And Implementation 777
Process Development And Implementation 777swati18
 
A LEAN Six Sixgma Implementation plan
A LEAN Six Sixgma Implementation planA LEAN Six Sixgma Implementation plan
A LEAN Six Sixgma Implementation planMehdi Bouazza
 
Comp10 unit10 lecture_slides
Comp10 unit10 lecture_slidesComp10 unit10 lecture_slides
Comp10 unit10 lecture_slidesCMDLMS
 
Site Overview & 5 S
Site Overview & 5 SSite Overview & 5 S
Site Overview & 5 SJohn Henry
 
Lean six sigma foundations
Lean six sigma foundationsLean six sigma foundations
Lean six sigma foundationsHunterMartin19
 
Problem Solving using Six Sigma
Problem Solving using Six SigmaProblem Solving using Six Sigma
Problem Solving using Six SigmaAjoy Basu, PhD
 

What's hot (19)

Recruitment Aug. 2015
Recruitment Aug. 2015Recruitment Aug. 2015
Recruitment Aug. 2015
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Key steps in transforming a calibration program slideshare
Key steps in transforming a calibration program slideshareKey steps in transforming a calibration program slideshare
Key steps in transforming a calibration program slideshare
 
Things to keep in mind before starting a test plan
Things to keep in mind before starting a test planThings to keep in mind before starting a test plan
Things to keep in mind before starting a test plan
 
Test Metrics and KPIs
Test Metrics and KPIsTest Metrics and KPIs
Test Metrics and KPIs
 
Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2
 
Lean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean EventLean Six Sigma How To Conduct A Lean Event
Lean Six Sigma How To Conduct A Lean Event
 
Quality managemnt day 2 material
Quality managemnt day 2 materialQuality managemnt day 2 material
Quality managemnt day 2 material
 
Five Steps For Continuous Improvement of a South Carolina Business Process
Five Steps For Continuous Improvement of a South Carolina Business ProcessFive Steps For Continuous Improvement of a South Carolina Business Process
Five Steps For Continuous Improvement of a South Carolina Business Process
 
Big Apple Scrum Day 2015 - Advanced Scrum Metrics Presentation
Big Apple Scrum Day 2015 - Advanced Scrum Metrics PresentationBig Apple Scrum Day 2015 - Advanced Scrum Metrics Presentation
Big Apple Scrum Day 2015 - Advanced Scrum Metrics Presentation
 
Process Development And Implementation 777
Process Development And Implementation 777Process Development And Implementation 777
Process Development And Implementation 777
 
A LEAN Six Sixgma Implementation plan
A LEAN Six Sixgma Implementation planA LEAN Six Sixgma Implementation plan
A LEAN Six Sixgma Implementation plan
 
Comp10 unit10 lecture_slides
Comp10 unit10 lecture_slidesComp10 unit10 lecture_slides
Comp10 unit10 lecture_slides
 
process groups and knowledge areas
process groups and knowledge areasprocess groups and knowledge areas
process groups and knowledge areas
 
Site Overview & 5 S
Site Overview & 5 SSite Overview & 5 S
Site Overview & 5 S
 
Lean six sigma foundations
Lean six sigma foundationsLean six sigma foundations
Lean six sigma foundations
 
Assessment Audits by WHO
Assessment Audits by WHOAssessment Audits by WHO
Assessment Audits by WHO
 
Problem Solving using Six Sigma
Problem Solving using Six SigmaProblem Solving using Six Sigma
Problem Solving using Six Sigma
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 

Similar to LSS-OVMC

Build a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in HospitalsBuild a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in HospitalsJump Technologies, Inc.
 
Introduction to lean amy hodgkinson & trevor taylor
Introduction to lean   amy hodgkinson & trevor taylorIntroduction to lean   amy hodgkinson & trevor taylor
Introduction to lean amy hodgkinson & trevor taylorNHS Improving Quality
 
Lean presentation amc
Lean presentation amcLean presentation amc
Lean presentation amcWafa AlAhmed
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3dVarmahk
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual ControlVarmahk
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxFaith Youngsville, NC
 
Smart Pharmaceutical Consulting - Lean Manufacturing of Pharmaceuticals
Smart Pharmaceutical Consulting - Lean Manufacturing of PharmaceuticalsSmart Pharmaceutical Consulting - Lean Manufacturing of Pharmaceuticals
Smart Pharmaceutical Consulting - Lean Manufacturing of PharmaceuticalsChristopher Macklin
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de BurgtTEST Huddle
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And SchedulingRicky Smith CMRP, CMRT
 
Process Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptxProcess Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptxJanMohammed3
 
Peeking behind the test: insights and innovations from the Medical Council of...
Peeking behind the test: insights and innovations from the Medical Council of...Peeking behind the test: insights and innovations from the Medical Council of...
Peeking behind the test: insights and innovations from the Medical Council of...MedCouncilCan
 
Leadership institute lean kaizen briefing 8 16 13 handout
Leadership institute lean kaizen briefing 8 16 13 handoutLeadership institute lean kaizen briefing 8 16 13 handout
Leadership institute lean kaizen briefing 8 16 13 handoutmdwallace
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxRoopaDNDandally
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingSafetyChain Software
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxRichardMagbatoc1
 

Similar to LSS-OVMC (20)

Build a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in HospitalsBuild a Lean Six Sigma Process for Inventory Management in Hospitals
Build a Lean Six Sigma Process for Inventory Management in Hospitals
 
Ch9 Jit
Ch9 JitCh9 Jit
Ch9 Jit
 
Introduction to lean amy hodgkinson & trevor taylor
Introduction to lean   amy hodgkinson & trevor taylorIntroduction to lean   amy hodgkinson & trevor taylor
Introduction to lean amy hodgkinson & trevor taylor
 
3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
Method Study
Method Study Method Study
Method Study
 
Lean presentation amc
Lean presentation amcLean presentation amc
Lean presentation amc
 
Lean six sigma 3d
Lean six sigma 3dLean six sigma 3d
Lean six sigma 3d
 
Slides 2015 for contact 7
Slides 2015 for contact 7Slides 2015 for contact 7
Slides 2015 for contact 7
 
Workplace management : 5S / Visual Control
Workplace management :  5S / Visual ControlWorkplace management :  5S / Visual Control
Workplace management : 5S / Visual Control
 
the Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptxthe Pragmatic Manager - continuous improvement.pptx
the Pragmatic Manager - continuous improvement.pptx
 
Smart Pharmaceutical Consulting - Lean Manufacturing of Pharmaceuticals
Smart Pharmaceutical Consulting - Lean Manufacturing of PharmaceuticalsSmart Pharmaceutical Consulting - Lean Manufacturing of Pharmaceuticals
Smart Pharmaceutical Consulting - Lean Manufacturing of Pharmaceuticals
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Process Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptxProcess Management by Jan Mohammed.pptx
Process Management by Jan Mohammed.pptx
 
Peeking behind the test: insights and innovations from the Medical Council of...
Peeking behind the test: insights and innovations from the Medical Council of...Peeking behind the test: insights and innovations from the Medical Council of...
Peeking behind the test: insights and innovations from the Medical Council of...
 
Leadership institute lean kaizen briefing 8 16 13 handout
Leadership institute lean kaizen briefing 8 16 13 handoutLeadership institute lean kaizen briefing 8 16 13 handout
Leadership institute lean kaizen briefing 8 16 13 handout
 
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh AroraJIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
JIT & Lean Manufacturing - ADDVALUE - Nilesh Arora
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
 
Proven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error ProofingProven Methods to Abnormality Management and Error Proofing
Proven Methods to Abnormality Management and Error Proofing
 
totalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptxtotalproductivemaintenance-210429042245.pptx
totalproductivemaintenance-210429042245.pptx
 

More from Jordan Kessler

More from Jordan Kessler (9)

Implementing Evidence Based Practice at BJU
Implementing Evidence Based Practice at BJUImplementing Evidence Based Practice at BJU
Implementing Evidence Based Practice at BJU
 
assignment 4
assignment 4assignment 4
assignment 4
 
PNDS
PNDSPNDS
PNDS
 
Kessler Research Issue Brief
Kessler Research Issue BriefKessler Research Issue Brief
Kessler Research Issue Brief
 
AED policy
AED policyAED policy
AED policy
 
CPR presentation
CPR presentationCPR presentation
CPR presentation
 
Food Allergy Guidelines for Nurses
Food Allergy Guidelines for NursesFood Allergy Guidelines for Nurses
Food Allergy Guidelines for Nurses
 
Healthcare Dashboard Group 3
Healthcare Dashboard Group 3Healthcare Dashboard Group 3
Healthcare Dashboard Group 3
 
Kessler_PolicyBrief
Kessler_PolicyBriefKessler_PolicyBrief
Kessler_PolicyBrief
 

LSS-OVMC

  • 1. Olive View Medical Center Emergency Department Lean Six Sigma: Door to RME Cycle Time Jordan Kessler, RN 1/9/2014
  • 2. Project Scope: Decrease cycle time from Arrival to RME Doctor (ESI 3-5) • Project selection approach 1. Identified four potential projects 2. Gathered time stamp data for each potential project 3. Used benchmarks and waste walk to determine performance gaps 4. Selected this project based on the highest score on the project selection matrix • Project targets ▫ Performance gap (1-5): 4 – validated by lean measures ▫ Current median time: 1 hr. and 34 minutes ▫ Goal median time: 37 minutes – based on benchmark ▫ GOAL Median Time BASED ON LEAN SIX SIGMA MEASURE - 18 minutes  No Wait time in between steps  No sitting down or back and forth  Taking only the value added time with at least 80% efficiency rate. Current performance gap (1= gap is small; 5= large gap with ideal performance) 4 Cost to business if NO changes made (1= low cost; 5=high cost) 4 Impact on customer satisfaction (1= low impact; 5= high impact) 4 Degree of waste (1= little or no waste; 5= lots of waste) 4 Customers can be defined (1= not easily defined; 5=easily to define) 4 Inputs can be identified (1= hard to identify; 5easy to identify) 4 Outputs can be identified (1= hard to identify; 5easy to identify) 5 Data is available (1= difficult to collect or manual; 5easy to obtain, electronic) 5 Team needed to understand / identify solutions (1= team NOT needed; 5= team definitely needed) 4 Team has authority to implement solutions (1= little or no authority; 5= has authority to implement) 4 Manageable project scope (1= very large scope; 5= contained, narrow scope) 3 Total Score 45 Project Selection Matrix
  • 3. ICN Desk (2 mins) RME (6 mins) Vitals (3 mins) Triage (4 mins) Registration (3 mins) Wait Room Wait Room Wait Room Wait Room 8 minutes 13 minutes 45 minutes 10 minutes The current process from door to doctor takes 1 hour and 34 minutes Current Patient Flow Current Metrics • Total cycle time: 1 hr 34 mins • Value added time: 13 mins • Non-value added time: 1 hr 21 mins • Process cycle efficiency: 13.82% Key Definitions • Process cycle efficiency (PCE): the percentage of value-add time divided by total time (cycle time) • Value added time: time associated with work that is desired by the customer • Non-value added time: time related to work not beneficial to customer – by lean standards is waste in a process N/A 18.75 % 33.33% 23.08% 11.76% Efficiency Process Step (VA Time) Wait Time (NVA Time) Key Highlights Value added time Total cycle time PCE
  • 4. ICN Desk (2 mins) RME (6 mins) Vitals (3 mins) Triage (4 mins) Registration (3 mins) Wait Room Triage Wait Line RME Wait Line Wait Room 15 minutes The goal of the proposed process is to get from door to doctor in 37 minutes Proposed Patient Flow N/A 100 % 100% 42.86% 21.05% Registration (3 Mins) Efficiency Process Step (VA Time) Wait Time (NVA Time) Proposed Metrics- Benchmark Total cycle time: 37 mins • Value added time: 18 mins • Non-value added time: 19 mins Process cycle efficiency: 48.65% Proposed Metrics- Ideal – Lean SS Standard Total cycle time: 18 min • Value added time: 13 mins • Non-value added time: 0 to 5 min Process cycle efficiency: 80% to 100% Key Proposed Changes • Patients are pushed to the next step rather than pulled from the waiting room • Registration should be a parallel process with the clinical assessment • The RME MD/NP does not waste time looking for the next patient • Limit microphone usage and time wasted finding patients/rooms • Eliminate time wasted for RME orders due to no quick registration 4 minutes Key Highlights
  • 6. DOOR Security I C N T7 Q R E G T4T2T1 T3 D O O R DOOR QREG CONCERIGE NP Designated MSE Designated MSEDesignated Qreg Designated Space Flow Assessment -Spaghetti Chart - PROPOSED
  • 7. DOOR Security T7 R E G T4T2T1 T3 D O O R DOOR CONCERIGE NP Designated MSE Designated MSEDesignated Space Flow Assessment -Spaghetti Chart - PROPOSED ICN/Q-REG Information Booth
  • 8. NEXT STEPS • Analyze the detailed Process Flow (approx 60 steps) with PFS Co-participant, committee and stakeholders to eliminate waste in the process and implement parallel functions • Conduct Kaizen events to implement phased changes Phase I – Registration with clinical functions Phase II – Physical re-configuration of patient flow Phase III- Eliminating all the wasted steps in the process