Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Automation professional
1. CVMechanical Maintenance Engineer CORIALIS Date: 01/03/2015
1/6
Industrial AutomationProfessional &Planning Engineering
Name Jitendra Kumar Gupta
Nationality Indian
Date of Birth 1961
Years of Experience 26 years
Languages English, French, Arabic, Hindi
PASSPORT NO. & VALIDITY G 3129065 VALID UPTO 30/05/2017
SYNOPSIS
Education: InstrumentationEngineering,ThreeYearsDiplomain Year1982 fromBoard of
Technical Education,Rajasthan withFirstclass.
Training: SAP operationmodule for the maintenance inChambal Fertilizer&Chemical Ltd,Kota
Rajasthan.
Training: Technical training cell member for the all appointed graduate engineers and
technicians experience in teaching and training.
Member for audit team as per norms of ISO 9001, ISO 14001, 18001 & OHSAS
industrial expert.
Key Assignements Complete
Preparation, modification and Studied the control loop, cable schedules, Instrument Hook-ups
and isometricdrawingsof Ammonia,Ureaand Utilitiesplantsforthe calculationof BOQ.
Installationof GASTURBINEOF 2 X 21.7 MW successful commissioning withGE.
Commissioningof UREAPLANTS-I(2 X 1310 MTPD)-SNAMPROGETTI,ITALY
Classification and standardisation of Instrumentation spares inventory items coding and logics
for the computerized inventory system CMMS in order to promote variety reduction and
standardisation inthe nomenclature of equipmentspares atcommon.
Prepared minimum, maximum and order levels of inventory and raise the indents for spare
parts.
In-house auditof warehouseinventory
Major Project During Professional Carrer
1992-93 GE-BHEL Executionof gaspowergenerationproject,Installationand
commissioningof gasturbine 2x20 MW make GE, IndianpartnerBHEL,
Hyderabad.
2. CVMechanical Maintenance Engineer CORIALIS Date: 01/03/2015
2/6
1993-94 SNAMPROGETTI,
ITALY HALDOR
TOPSOE, DENMARK
Work as a team memberforfirsttwoyearsininstallation&
commissioningof NitrogenousUREA (2X 1310 MTPD) & AMMONIA
PLANT(1770 MTPD.
1996-97 Dott Ing Scandura Developmentof Instrumentationworkshop,equippedwithtest
equipment’sfromDottIng Scandura - Italy to maintenance of fieldand
panel electronics&pneumaticInstrumentation.
1999-02 Toyo Engineering
Corporation, JAPAN
Work as a team memberforfirst twoyearsininstallation&
commissioningof NitrogenousUREA PLANT.
2006-07 Yokogawa Up-date of DCS Installedin1992, fromCentumXL to CSfor Ammonia
Functional &operational.All loopsoftware updatingandwhole loop
checkingandtuning.
2007-09 IMACID Morocco Fortunate part of my professional life is on deputation as techno-
commercial engineer in joint venture with TATA & Morocco OCP
government company. Best exposure on techno-commercial part with
European real technology in Electrical & Instrumentation installed on
highlychemical environment.
2010-11 ISO-OHSAS Member for audit team and implementer of critical modifications after
revamp of the plant up to 6200 tons / day safety, health and
environment after approval as per norms of ISO 9001, ISO 14001, 18001
& OHSAS in the various parts of plants instrumentation with the
expertise and experienced technocrats and industrial experts from
variousmanufacturers.
CAREER OBJECTIVES ACHIVEMENTS
A well experienced control & Instrumentation professional and Engineer enriched more than 21 years’
experience in project management, inspection and maintenance role in the Fertilizer industry in INDIA &
aboard. Project management covers a modernization and expansion project of Chambal Fertilizer &
Chemicals Limited, India, consisting of 3300 MTPD ammonia and 6250 MTPD urea granules plant with
both European and Japanese techniques of design. Process automation includes YOKOGAWA,
HONEYWELL withsuccessful andproventechnology.
2 x 21.7 MW gas turbine installations and Modification was with GE version of MARK VI to Mark Vie
plant Revamp. De-Bottle necking to enhance the production capacity by addition of more equipment’s
and automation. Inspection and maintenance experience covers routine jobs planning & maintenance,
Annual turnaroundjobsplanning& execution,Material management,Inspectionof critical instruments.
Working as team member with the procurement division to ordering instrument spares, parts and
consumable materials, and also worked together with the project division for commissioning, Site
acceptance test and be a part of safe successful plant start up team. Providing and reviewing Scope of
work and technical requirement for third party contractor jobs, providing a high reliability and
availabilityof all rotatingequipmentduringsteadystate operation.
3. CVMechanical Maintenance Engineer CORIALIS Date: 01/03/2015
3/6
Excellentmaintenance &repairingknowledge highpressure control looptohighlyhazardous risk
Instrument,pressure vessels,tubular&plate headexchangers,steamdrums,boilers,turbinesand
associatedauxiliaryrotaryequipment’s.
ASSIGNMENT IN ORGANISATIONS
At present, I am working as Dy. Manager Instrumentation with huge fertilizer in private sector M/s
Chambal Fertilisers & Chemicals LIMITED is ISO 9001:2008 (QMS), ISO 14001:2004 (EMS) and OHSAS
18001:2007 certifiedcompany.
ONSITE PLANTS:
• AMMONIAPLANT-I(1770 MTPD) -HALDOR TOPSOE, DENMARK
• AMMONIAPLANT-II(1520 MTPD) -KELLOGG BROWN ROOT, USA
• UREA PLANTS-I(2 X 1310 MTPD) -SNAMPROGETTI,ITALY
• UREA PLANTS-II(2 X 1310 MTPD) -TEC:ACES, JAPAN
CHAMBAL FERTILISER & CHEMICALS LTD., KOTA (RAJASTHAN)
August 2011 to till date : Manager Planning
March 3, 1992 TO August 2011 DATE: DEPUTY MANAGER (INSTRUMENTATION
ENGINEERING):
Job Responsabilité: Installation, Commission & Maintenance of Instrumentation schèmes of UREA FERTILISER
(6250 TONS.), AMMONIA (3300 TONS.), GAS BASED POWER GENERATION (2 x 21.7 MW) & OTHER
UTILITIES.
Indo Maroc Phosphore S.A (IMACID), Jorf Lasfar, BP.118, EL JADIDA, Morrocco.
I was on deputation from 25TH
June to 16th
July 2009 as techno-commercial expert in the joint-venture of
OCP & TATA with CHAMBAL FERTILISER & CHEMICALS LTD. It is a 4600 tons/Day sulfuric
acid, 1400 tons phosphoric acid plant with steam power generation of 27 MW. I was looking after
Instrumentation and Electrical operations of the company.
MODI ALKALIES & CHEMICAL LTD., ALWAR (RAJASTHAN) DUPTY PLANT
SUPERINENDENT (INSTRUMENTATION): 2 YEARS
Job Responsibility: Project, Planning & Maintenance of CAUSTIC SODA, CAUSTIC FLACKS, LIQUID
CHLORINE, HCL ACID, STABLE BLEECHING POWDER, 60 MW DG POWER GENERATION &
BOTTELING PLANT.
ESTER INDIA LTD., NAINITAL, (U.P.) ASSISTANT ENGINEER (INSTRUMENTS): 4 YEARS
Job Responsibility: Maintenance of PETROCHEMICALS (EG & MEG), POLYSTER CHIPS,
POLYSTER FILAMENT, FILM & OTHER UTILITIES
4. CVMechanical Maintenance Engineer CORIALIS Date: 01/03/2015
4/6
SHRIRAM RAYON`S ( D.C.M. LIMITED ), KOTA ( RAJASTAN) INSTRUMENTATION
SUPERVISOR: 4 YEARS
Job Responsibility: Maintenance Of VISCOSE RAYON ( TYRE CORD ), SULFURIC ACID,
CARBON DI SULPHITE, SODIUM BI CARBONATE, COAL BASED POWER GENERATION
& OTHER UTILITIES.
ACHIVEMENTS AS PROFESSIONAL
organization.
Compilation of action plan according to receive complaints from customers, record and prioritize as per
policy of organization.
nication in tackling with field service engineers to monitor progress as per
approved schedule.
deficiencies.
the Project.
VED
requirements.
team members.
technical and organization problems and maintaining a
steady flow of information and data between the engineering and drafting groups.
Contract
PEP, to the Discipline Work Procedure and Guidelines.
that the Instrument engineering, designing, and drafting activities are carried out within the
established time schedule and budget man-hours allocated for the Job.
shed procedures or to
Contract requirements.
by the instrument engineers, designers, and draftsmen with the cooperation, when deemed necessary, of D.H.
Client's requirements and for their reciprocal consistency.
Reviewing with the Project Engineering Coordinator all the needs and technical aspects which can affect
the schedule of the Job and acting as interface with the other specialty Groups.
5. CVMechanical Maintenance Engineer CORIALIS Date: 01/03/2015
5/6
in due time the required information. -
Review together with the D.H., the Vendor List submitted by Procurement Department.
ocuments and correspondence filed according to the established filing procedure.
tiality on technologies licensed by
Clients or Third Parties.
cooperation, when
deemed necessary, of the D.H.
and enclosed technical documentations.
instrument requisitions. - Give assistance in the preparation of Mechanical Catalogue.
ired, the meeting with the project team, the client and the vendors and informing about
the actions to be taken.
preparing, on monthly basis the progress report.
List.
lso perform the duties of the Instrument Engineers.
Contract.
both for
System and on Contract.
documents as requestedin the Contract Project Execution Plan through the implementation of proper check
lists.
SOFT SKILLS
PERSONAL SKILLS
6. CVMechanical Maintenance Engineer CORIALIS Date: 01/03/2015
6/6
alytical skills.
PERSONAL DETAILS
Father’s Name: Sh. M. L Gupta
Date of birth: 24 Sept 1961
Passport no: G 3129065 VALID UPTO 30/05/2017
Marital status: Married
DECLARATION
I herebydeclare thatthe above informationfurnishedistrue tothe bestof my knowledgeandbelief.
DATE 24 -11-2015
PLACE: Kota Jitendra Kumar Gupta