Lower Granite Dam
Breach Proposal
Using WinDAM B Software
Summary
This presentation is an alternative to the US Army Corp of Engineers breaching
plan for Lower Granite Dam. This alternate breaching plan can be performed
safely and at a significantly lower cost and while remaining consistent with the
2002 EIS/ROD. The plan described fulfills most of the needs of a supplemented EIS.
o The spillway and turbines can be used to draw the reservoir down without
modification.
o The earthen embankment can be notched with minimal excavation equipment.
o Slow drawdown results in minimal damage to river banks and railroads .
o The remaining embankment can be hydraulically breached in a non-catastrophic
manner with a peak flow of 151k cfs.
o The outflow during the breach will not adversely affect dams downstream.
o The new river channel will be formed with higher spring flows.
WinDAM B Software
Windows Dam Analysis Modules (WinDAM) is software developed for the analysis
of earthen embankments. It was created by the US Department of Agriculture-
Agricultural Research Service, US Department of Agriculture- Natural Resources
Conservation Service, and Kansas State University. Version B, which was used in
this analysis, was released in 2011. The primary functions of WinDAM B are:
●Hydraulically route river flow through, around, and over a single earthen dam.
●Estimate spillway erosion.
●Estimate erosion of the earthen embankment caused by overtopping of the dam
embankment.
Lower Granite Dam Geometry
with notch location
Assumed Dam Fill Properties
 Dam Fill Total Unit Weight= 124 lb/ft3
 Dam Fill Erodibility= 10 (ft/hr)/lb/ft2
 Dam Fill Undrained Shear Strength 2000 lb/ft2
 Dam Fill Critical Shear strength 0.1 lb/ft2
Drawdown Pool Elevation
600
620
640
660
680
700
720
740
0 10 20 30 40 50 60 70 80 90 100 110
Elevatino(feet)
Time (days from start)
Spillway and 1 Turbine
Spillway Crest
4 Turbines
Begin Hydraulic Breach
Dam Breach Hydrograph
Flows of 50k cfs, 120k cfs, 200k cfs
Dam Breach Hydrograph
Close-up of first 30 hours
Maximum flow during breach= 151k cfs
Dam Breach Process
38 minutes into head-cut process
Dam Profile View
Pool
Head-cut initiation
Channel Width
Dam Plan View
Dam Breach Process
60 minutes into head-cut process
Dam Breach Process
90 minutes into head-cut process
Dam Breach Process
165 minutes into head-cut process
Dam Breach Process
180 minutes into head-cut process
Dam Breach Process
Channel Widening Process at 218 minutes
Notch completely breached
Widening begins
Dam Breach Process
Channel Widening Process at 547 hours
Widening complete at 750 feet
Head-cut/Breach Width Progression
50k cfs
120k cfs
200k cfs
Channel Width
 8-9 ft/sec velocities required to cause channel widening using assumed dam
fill properties
 750 foot wide channel requires 200k cfs
 1000 foot wide channel requires ~250k cfs
 1200 foot wide channel requires ~300k cfs
0
20
40
60
80
100
120
140
160
2014 and 2015 Flows at Lower Granite Dam
2014 Flow (x1000cfs) 2015 Flow (x1000cfs)

More Related Content

What's hot

Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Stephen Flood
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingVladimir Popovic
 
Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012Dev Dutt Sharma
 
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...Christian Olele
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyHudbay Minerals Inc.
 
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?Society of Petroleum Engineers
 
Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes Society of Petroleum Engineers
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...John Downs
 
Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Steve Williams
 
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...Society of Petroleum Engineers
 
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetIntegrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetSociety of Petroleum Engineers
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)William Godwin
 
Prospect Presentation Short - Heritage Royalty
Prospect Presentation Short - Heritage RoyaltyProspect Presentation Short - Heritage Royalty
Prospect Presentation Short - Heritage RoyaltyNick Suche
 
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...Mohanned Mahjoup
 
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Stephen Flood
 

What's hot (20)

Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
Use of MIKE 21/3 in the Hydraulic Analysis for the Dublin Port ABR Project - ...
 
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - PipelayingMan Made River Project - IV Phase / Ghadames Project - Pipelaying
Man Made River Project - IV Phase / Ghadames Project - Pipelaying
 
Does Heavy Oil Recovery Need Steam?
Does Heavy Oil Recovery Need Steam?Does Heavy Oil Recovery Need Steam?
Does Heavy Oil Recovery Need Steam?
 
Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012Tight Reservoir Technology IUGF 20 1 2012
Tight Reservoir Technology IUGF 20 1 2012
 
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
The Role of Geotechnical Site Investigations of Lekki Toll Road Infrastructur...
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
tight reservoir
tight reservoir tight reservoir
tight reservoir
 
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
Shale Development – Does Cheap Energy Really Mean Flaming Tap Water?
 
2018-2019 SPE Distinguished Lecturers
2018-2019 SPE Distinguished Lecturers 2018-2019 SPE Distinguished Lecturers
2018-2019 SPE Distinguished Lecturers
 
Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes Improving Reservoir Simulation Modeling with Seismic Attributes
Improving Reservoir Simulation Modeling with Seismic Attributes
 
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository25 Basin-Scale Density-Dependent  Groundwater Flow Near a Salt Repository
25 Basin-Scale Density-Dependent Groundwater Flow Near a Salt Repository
 
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...SPE 165151  - The Long-term Production Performance of Deep HPHT Gas Condensat...
SPE 165151 - The Long-term Production Performance of Deep HPHT Gas Condensat...
 
Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009
 
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...Coiled Tubing Real-Time Monitoring:  A New Era of Well Intervention and Worko...
Coiled Tubing Real-Time Monitoring: A New Era of Well Intervention and Worko...
 
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature AssetIntegrated Historical Data Workflow: Maximizing the Value of a Mature Asset
Integrated Historical Data Workflow: Maximizing the Value of a Mature Asset
 
perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)perris dam_Godwin et al AEG conf fnl(3)
perris dam_Godwin et al AEG conf fnl(3)
 
Prospect Presentation Short - Heritage Royalty
Prospect Presentation Short - Heritage RoyaltyProspect Presentation Short - Heritage Royalty
Prospect Presentation Short - Heritage Royalty
 
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
UntitledExcessive Water Production Diagnostic and Control - Case Study Jake O...
 
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
24 Actinide and brine chemistry in salt repositories: Updates from ABC Salt (V)
 
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
Modelling extreme conditions for wave overtopping at Weymouth - Oliver Way (H...
 

Similar to Lower Granite Dam Breach Proposal2

Report work on retaining wall
Report work on retaining wallReport work on retaining wall
Report work on retaining wallvikas Meena
 
Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)Jon Rasmussen
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
Fashkha Springs as a Plaestinian Strategic Water Project
Fashkha Springs as a Plaestinian Strategic Water ProjectFashkha Springs as a Plaestinian Strategic Water Project
Fashkha Springs as a Plaestinian Strategic Water Projectdeeb1972
 
Flood Control Challenges for Large Hydroelectric Reservoirs
Flood Control Challenges for Large Hydroelectric ReservoirsFlood Control Challenges for Large Hydroelectric Reservoirs
Flood Control Challenges for Large Hydroelectric ReservoirsCPWF Mekong
 
Intern PPT Presentation
Intern PPT PresentationIntern PPT Presentation
Intern PPT PresentationGilson Hogan
 
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...Pomcert
 
Ice midlands region warwick, 2010
Ice midlands region warwick, 2010Ice midlands region warwick, 2010
Ice midlands region warwick, 2010Warwick Knowledge
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...Egyptian Engineers Association
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Mazen Alqadi
 
Control Seepage Thought Earth Dams
Control Seepage Thought Earth DamsControl Seepage Thought Earth Dams
Control Seepage Thought Earth DamsAhmed Mansor
 
Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxssuserde6364
 
Flood resilient presentation 05.16.12
Flood resilient presentation 05.16.12Flood resilient presentation 05.16.12
Flood resilient presentation 05.16.12Christopher Hayes
 
10-CE 408 Lining &Design of channel.pptx
10-CE 408 Lining &Design of  channel.pptx10-CE 408 Lining &Design of  channel.pptx
10-CE 408 Lining &Design of channel.pptxHuzaifaZafar15
 
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession PipelineMarange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession PipelineAugustine Marume
 

Similar to Lower Granite Dam Breach Proposal2 (20)

Report work on retaining wall
Report work on retaining wallReport work on retaining wall
Report work on retaining wall
 
Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)Flood-Con (Innovative Stormwater Management)
Flood-Con (Innovative Stormwater Management)
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Fashkha Springs as a Plaestinian Strategic Water Project
Fashkha Springs as a Plaestinian Strategic Water ProjectFashkha Springs as a Plaestinian Strategic Water Project
Fashkha Springs as a Plaestinian Strategic Water Project
 
Flood Control Challenges for Large Hydroelectric Reservoirs
Flood Control Challenges for Large Hydroelectric ReservoirsFlood Control Challenges for Large Hydroelectric Reservoirs
Flood Control Challenges for Large Hydroelectric Reservoirs
 
Intern PPT Presentation
Intern PPT PresentationIntern PPT Presentation
Intern PPT Presentation
 
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
 
Ice midlands region warwick, 2010
Ice midlands region warwick, 2010Ice midlands region warwick, 2010
Ice midlands region warwick, 2010
 
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان ...
 
Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111Cdw sed tank_tech_memo1111
Cdw sed tank_tech_memo1111
 
Floating Bridge
Floating BridgeFloating Bridge
Floating Bridge
 
T4501109116
T4501109116T4501109116
T4501109116
 
Control Seepage Thought Earth Dams
Control Seepage Thought Earth DamsControl Seepage Thought Earth Dams
Control Seepage Thought Earth Dams
 
Breakwater construction
Breakwater constructionBreakwater construction
Breakwater construction
 
Turga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptxTurga PSP_Lower Dam.pptx
Turga PSP_Lower Dam.pptx
 
Flood resilient presentation 05.16.12
Flood resilient presentation 05.16.12Flood resilient presentation 05.16.12
Flood resilient presentation 05.16.12
 
Massachusetts' Rivers Response to Tropical Storm Irene
Massachusetts' Rivers Response to Tropical Storm IreneMassachusetts' Rivers Response to Tropical Storm Irene
Massachusetts' Rivers Response to Tropical Storm Irene
 
10-CE 408 Lining &Design of channel.pptx
10-CE 408 Lining &Design of  channel.pptx10-CE 408 Lining &Design of  channel.pptx
10-CE 408 Lining &Design of channel.pptx
 
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession PipelineMarange Resources Water Supply System Design-Odzi to Concession Pipeline
Marange Resources Water Supply System Design-Odzi to Concession Pipeline
 
MANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAMMANAGING A GOLD MINE TAILINGS DAM
MANAGING A GOLD MINE TAILINGS DAM
 

More from JimWaddell4

Breach Brief Feb 2018, NWRR Symposium
Breach Brief Feb 2018, NWRR SymposiumBreach Brief Feb 2018, NWRR Symposium
Breach Brief Feb 2018, NWRR SymposiumJimWaddell4
 
Orca Salmon Dams, Job Fair jw apr 2018
Orca Salmon Dams, Job Fair jw apr 2018Orca Salmon Dams, Job Fair jw apr 2018
Orca Salmon Dams, Job Fair jw apr 2018JimWaddell4
 
Orca Salmon Dams jw jan 2018
Orca Salmon Dams jw jan 2018Orca Salmon Dams jw jan 2018
Orca Salmon Dams jw jan 2018JimWaddell4
 
Orca-Salmon Connection
Orca-Salmon ConnectionOrca-Salmon Connection
Orca-Salmon ConnectionJimWaddell4
 

More from JimWaddell4 (6)

Orcas
OrcasOrcas
Orcas
 
Breach Brief Feb 2018, NWRR Symposium
Breach Brief Feb 2018, NWRR SymposiumBreach Brief Feb 2018, NWRR Symposium
Breach Brief Feb 2018, NWRR Symposium
 
AMIP
AMIPAMIP
AMIP
 
Orca Salmon Dams, Job Fair jw apr 2018
Orca Salmon Dams, Job Fair jw apr 2018Orca Salmon Dams, Job Fair jw apr 2018
Orca Salmon Dams, Job Fair jw apr 2018
 
Orca Salmon Dams jw jan 2018
Orca Salmon Dams jw jan 2018Orca Salmon Dams jw jan 2018
Orca Salmon Dams jw jan 2018
 
Orca-Salmon Connection
Orca-Salmon ConnectionOrca-Salmon Connection
Orca-Salmon Connection
 

Recently uploaded

Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 

Recently uploaded (20)

Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 

Lower Granite Dam Breach Proposal2

  • 1. Lower Granite Dam Breach Proposal Using WinDAM B Software
  • 2. Summary This presentation is an alternative to the US Army Corp of Engineers breaching plan for Lower Granite Dam. This alternate breaching plan can be performed safely and at a significantly lower cost and while remaining consistent with the 2002 EIS/ROD. The plan described fulfills most of the needs of a supplemented EIS. o The spillway and turbines can be used to draw the reservoir down without modification. o The earthen embankment can be notched with minimal excavation equipment. o Slow drawdown results in minimal damage to river banks and railroads . o The remaining embankment can be hydraulically breached in a non-catastrophic manner with a peak flow of 151k cfs. o The outflow during the breach will not adversely affect dams downstream. o The new river channel will be formed with higher spring flows.
  • 3. WinDAM B Software Windows Dam Analysis Modules (WinDAM) is software developed for the analysis of earthen embankments. It was created by the US Department of Agriculture- Agricultural Research Service, US Department of Agriculture- Natural Resources Conservation Service, and Kansas State University. Version B, which was used in this analysis, was released in 2011. The primary functions of WinDAM B are: ●Hydraulically route river flow through, around, and over a single earthen dam. ●Estimate spillway erosion. ●Estimate erosion of the earthen embankment caused by overtopping of the dam embankment.
  • 4. Lower Granite Dam Geometry with notch location
  • 5. Assumed Dam Fill Properties  Dam Fill Total Unit Weight= 124 lb/ft3  Dam Fill Erodibility= 10 (ft/hr)/lb/ft2  Dam Fill Undrained Shear Strength 2000 lb/ft2  Dam Fill Critical Shear strength 0.1 lb/ft2
  • 6. Drawdown Pool Elevation 600 620 640 660 680 700 720 740 0 10 20 30 40 50 60 70 80 90 100 110 Elevatino(feet) Time (days from start) Spillway and 1 Turbine Spillway Crest 4 Turbines Begin Hydraulic Breach
  • 7. Dam Breach Hydrograph Flows of 50k cfs, 120k cfs, 200k cfs
  • 8. Dam Breach Hydrograph Close-up of first 30 hours Maximum flow during breach= 151k cfs
  • 9. Dam Breach Process 38 minutes into head-cut process Dam Profile View Pool Head-cut initiation Channel Width Dam Plan View
  • 10. Dam Breach Process 60 minutes into head-cut process
  • 11. Dam Breach Process 90 minutes into head-cut process
  • 12. Dam Breach Process 165 minutes into head-cut process
  • 13. Dam Breach Process 180 minutes into head-cut process
  • 14. Dam Breach Process Channel Widening Process at 218 minutes Notch completely breached Widening begins
  • 15. Dam Breach Process Channel Widening Process at 547 hours Widening complete at 750 feet
  • 16. Head-cut/Breach Width Progression 50k cfs 120k cfs 200k cfs
  • 17. Channel Width  8-9 ft/sec velocities required to cause channel widening using assumed dam fill properties  750 foot wide channel requires 200k cfs  1000 foot wide channel requires ~250k cfs  1200 foot wide channel requires ~300k cfs 0 20 40 60 80 100 120 140 160 2014 and 2015 Flows at Lower Granite Dam 2014 Flow (x1000cfs) 2015 Flow (x1000cfs)