3. EDUCATION:
- Jersey Village High School - 3.833 GPA
- Texas Tech University - 141 Credits
towards Bachelors of Science in
Architecture - Still Enrolled with 2.405 GPA
EXPERIENCE:
- Time in Architectural Design - 12 years
- Time in Construction - 2 yr. 7 mo
- Time as a Sole Proprietor - 9 years
SOFTWARE LITERACY:
- AutoCAD 2016
- Revit 2016
- Autodesk Navisworks 2015
- Autodesk Ecotect - Environmental Analysis Software
- Rhinocerous Nubrs Modeling 4
- Adobe Photshop
- Adobe Illustrator
- Google Earth Pro
DESIGN BUILD COORDINATION PROJECTS:
- William & Melissa Banks Residence
- Steve & Carla UpChurch Home Renovation & Addition
- Dr. John Dearing, DVM Lake House
- Eagle Lake H&R Block
- Jeff & Amber Wisdom Home Renovation
- Walton Ranch Camphouse
- Waller Harris ESD 200 Fire Station @ Rolling Hills
- Kinder Morgan Copano Processing Facility Office
- Green Span Profiles Expansion
- Waller Harris ESD 200 Administration Building
- E-Kabel Manufacturing Facility
- E-Kabel American Headquarters
AWARDS:
- Eagle Scout, BSA - 2003
- Venturing Silver Award, BSA - 2006
- Venturing Leadership Award, BSA - 2007
- Sea Scout Quartermaster Award, BSA - 2008
- E2 Employee Excellence Award, Ford Motor Co. - 2013
November 2016
REFERENCES:
Colwell Custom Homes
Dennis Colwell
(713) 299-8004
Dyess Air Force Base
Conda H. Richards
conda.richards@us.af.mil
(325) 696-5620
Gene Messer Ford & Lincoln
Scott Larrentree
slarrentree@genemesser.com
(802) 793-2727
Drymalla Construction Co.
Jody Pepitone
jpepitone@drymalla.com
(281) 630-5544
5. VrSAA
VERONA LAB
VERONA SCHOOL OF ACTING & RE-QUALIFICATION OF PIAZZETTA BRA MOLINARI
The site is located in Piazza Bra Molinari
Located in the North East corner of Verona,
touching the river edge and situated behind
the church of
St. Anastasia.
Just to the left of the major NS axis
Decumano Majore
There is a high amount of pedestrian and
vehicular
circulation down Via Ponte Pietra.
1st Century A.D.
Venetian Age
Rotation of 26.8˚
Overlapping
VERONA LAB
In the Water
Touching the Water
Extensions to the Water
Over the Water
Public Area
Private Area Interaction of Water and Vegetation
6. VrSAA
VERONA LAB
VERONA SCHOOL OF ACTING & RE-QUALIFICATION OF PIAZZETTA BRA MOLINARI
The site is located in Piazza Bra Molinari
Located in the North East corner of Verona,
touching the river edge and situated behind
the church of
St. Anastasia.
Just to the left of the major NS axis
Decumano Majore
There is a high amount of pedestrian and
vehicular
circulation down Via Ponte Pietra.
1st Century A.D.
Venetian Age
Rotation of 26.8˚
Overlapping
VERONA LAB
In the Water
Touching the Water
Extensions to the Water
Over the Water
Public Area
Private Area Interaction of Water and Vegetation
7. EXTRUDED SPACE
BUILDING PLANS
SCALE - 1:200
03
02
01
00
-01
-02
RENDER 1
LOOKING AT SITE AND BUILDING FROM THE EAST SIDE OF PIAZZA BRA MOLINARI
RENDER 2
LOOKING AT BUILDING AND STAGE FROM THE RIVER WALL
VERONA LAB
8. FROM THE EAST
FROM THE SOUTH
FROM THE SOUTHWEST
FROM THE WEST
FROM THE NORTH
LOOKING EAST
LOOKING SOUTH
LOOKING WEST
LOOKING NORTH
STRUCTURE
SPACE
SITE
FOCUS
FEELING
EXPERIENCE
VIEWS ON APPROACH - EXISTING SITE
BUILDING PLANS: BASEMENT 2 - BASEMENT 1 - GROUND FLOOR - 2ND FLOOR - 3RD FLOOR - 4TH FLOOR
SCALE - 1:500
SILHOUETE OF EXISTING SITE AND GREEN SPACE - VIEW FROM ACROSS THE RIVER.
SECTION CUTS OF URBAN INFILL DESIGN SOLUTION.
VERONA LAB
9. ARCH 2501: DESIGN STUDIO 2 FINAL. THIS PROJECT WASTO DEVELOP THE DESIGN FOR AN ART MUSEUM
DESIGNS CAME FROM A RANDOM OBJECT THAT REPRESENTED THINGS I AM INTERESTED IN FOR TIME
OUTSIDE OF ARCHITECTURE.
INTERSTITIAL SPACE
10. EXTRUDED SPACE
BUILDING PLANS
SCALE - 1:200
03
02
01
00
-01
-02
RENDER 1
LOOKING AT SITE AND BUILDING FROM THE EAST SIDE OF PIAZZA BRA MOLINARI
RENDER 2
LOOKING AT BUILDING AND STAGE FROM THE RIVER WALL
VERONA LAB
11. FROM THE EAST
FROM THE SOUTH
FROM THE SOUTHWEST
FROM THE WEST
FROM THE NORTH
LOOKING EAST
LOOKING SOUTH
LOOKING WEST
LOOKING NORTH
STRUCTURE
SPACE
SITE
FOCUS
FEELING
EXPERIENCE
VIEWS ON APPROACH - EXISTING SITE
BUILDING PLANS: BASEMENT 2 - BASEMENT 1 - GROUND FLOOR - 2ND FLOOR - 3RD FLOOR - 4TH FLOOR
SCALE - 1:500
SILHOUETE OF EXISTING SITE AND GREEN SPACE - VIEW FROM ACROSS THE RIVER.
SECTION CUTS OF URBAN INFILL DESIGN SOLUTION.
VERONA LAB
12. SPRING 2010. WHILE TAKING FREEHAND
DRAWING 2, WE WERE GIVEN A PROJECT
SPONSORED BY ALDERSON MOTORS TO
CREATE A PIECE OF ARTWORK BASED ON
A CAR. SELECT WORKS OF THE PROJECT
WERE THEN SELECTED TO HANG ON
DISPLAY AT THE FORST FRIDAY ART TRAIL
IN ALDESRON MERCEDES SHOWROOM.
OUT OF ABOUT 125 STUDENTS, CLOSE TO
250 PICES WERE PRODUCED; 70 OF WHICH
WERE CHOSEN TO BE ON DISPLAY FOR THE
EVENING. AFTERWARDS, 22 WERE CHOSEN
BY THE DEALERSHIPS TO BE ON DISPLAY
FOR A YEAR IN THE SHOWROOM.
ABOVE IS THE INITIAL PHOTOGRAPH
THAT I STARTED WITH
TO THE RIGHT, IS THE FINAL
HDR RENDERING THAT I PRODUCED. THIS
PIECE OF ARTWORK IS ON DISPLAY AT
ALDERSON BMW TIL APRIL 2011.
13. BUILDING THE SURF
PRIMARY
SECONDARY
TERTIARY
COMPOSITE
Within this project, I chose to look at the pavillion as a constructed form of
a wave, sandwiched between two boards. This viewport i have chosen to
view this structure in, shows the depth of waves crashing, and rising again.
I started out analyzing the flow paterns of the center structure, as it alows
the viewer to see the depth in the building. I saw the wave patern as
a never ending curve. The brighter area’s are represented by the offset of
six lines, where as the areas in shade are represented by twelve lines offset.
i have then increased the study to add heighth. Then I went in and created
variations in the control points to edit the width, length of the model.
I layed out the orientation of the different pieces like a wave across the
paper beginning with the initial image, moving onto the initial wave patterns
and ending with the final model. I have chosen to keep the initial picture
and the final model as the only pieces in color to increase the viewers
attention to the starting point and the finished product.
TEXAS TECH UNIVERSITY
ARCHITECTURE MEDIA ELECTIVE
WATERCOLOR MEDIA
PRESENTS THE ABILITY
TO RENDER DESIGNS
IN AN ARTISTIC
PRESENTATION.
14. BUILDING THE SURF
PRIMARY
SECONDARY
TERTIARY
COMPOSITE
Within this project, I chose to look at the pavillion as a constructed form of
a wave, sandwiched between two boards. This viewport i have chosen to
view this structure in, shows the depth of waves crashing, and rising again.
I started out analyzing the flow paterns of the center structure, as it alows
the viewer to see the depth in the building. I saw the wave patern as
a never ending curve. The brighter area’s are represented by the offset of
six lines, where as the areas in shade are represented by twelve lines offset.
i have then increased the study to add heighth. Then I went in and created
variations in the control points to edit the width, length of the model.
I layed out the orientation of the different pieces like a wave across the
paper beginning with the initial image, moving onto the initial wave patterns
and ending with the final model. I have chosen to keep the initial picture
and the final model as the only pieces in color to increase the viewers
attention to the starting point and the finished product.
TEXAS TECH UNIVERSITY
ARCHITECTURE MEDIA ELECTIVE
WATERCOLOR MEDIA
PRESENTS THE ABILITY
TO RENDER DESIGNS
IN AN ARTISTIC
PRESENTATION.
19. ARCH 2501: DESIGN STUDIO 2 FINAL. THIS PROJECT WASTO DEVELOP THE DESIGN FOR AN ART MUSEUM
DESIGNS CAME FROM A RANDOM OBJECT THAT REPRESENTED THINGS I AM INTERESTED IN FOR TIME
OUTSIDE OF ARCHITECTURE.
INTERSTITIAL SPACE
20.
21. FLOOR
MATERIAL REMARKSFINISH
4"RUBBERCOVEMOLDING
BASE
2'X2'SUSPACOUSTICALCEILINGTILE
MTRL/FINISH HT.
ROOM FINISH SCHEDULE
WALLS CEILING
H&RBLOCKAPPROVEDTILE
1/2"GYPSUMBOARD-TFT
NAME
DENOTES NORTH, SOUTH, EAST & WEST
REFERENCE FLOOR PLAN FOR COMPASS
N
S
W E
IF FINISH VARIES WITHIN SAME ROOM
LARGE CIRCLE DENOTES UNIFORM FINISH
LOBBY
TAX PRO AREA
PRIVATE OFFICE
KITCHENETTE
BATHROOM
SERVER ROOM
FILE ROOM
CONFERENCE ROOM
DOOR SCHEDULE
REMARKSMK
EL
HARDWAREDR
BUTTS4-1/2X4-1/2
PASSAGE
LOCKSET
CLOSER
PUSH/PULLPLATE
DEADBOLT
STOP
PANICBAR
KICKPLATE
#
DIMENSIONS
SIZE TH'K
(WxH)
FIRE
RATING ACCESS.
HARDWAREBYMANUF
FOAMCOREINSULATION
WEATHERSTRIPPING
THRESHOLD
1
3
4
5
6
7
9
8
SILENCER
ELECTRICOPERATOR
RAINGUARD
EXISTING EXISTING - -
1-3/4" --
1-3/4" --
1-3/4" -
1-3/4"
1-3/4" -
1-3/4" -
-
H&RBLOCKAPPROVEDCARPET
WINDOW SCHEDULE
REMARKSMK
EL
DR
#
DIMENSIONS
SIZE TH'K
(WxH)
FIRE
RATING
1 --
EXISTING STOREFRONT
1-3/4" -
ROOM NM.
PASS THROUGH TO OTHER
PRIVATE OFFICE
BATHROOM
FILE ROOM
SERVER ROOM
LOBBY
PRIVATE OFFICE CLOSET
ACOUSTICALBATT.ININT.WALL
2 1-3/4" - -CONFERENCE ROOM 3'0" X 6'8"
3'0" X 6'8"
3'0" X 6'8"
3'0" X 6'8"
6'0" X 6'8"
-
MARK DESCRIPTION TYPE MFR MODEL
EQUIPMENT SCHEDULE
NOTES: TO BE COMPLETED BY HVAC CONTRACTOR
FAN COOLING HEATING ELEC.
CFM TESP HP
NOM
TONS
O/A
CFM
GSH
MBH
GTH
MBH
EDB EWB AMB
MBB
IN
MBH
OUT
KW PH
NOTE
V
EXHAUST FAN CLG. MTD. HAMPTON BAY BPT18-54A-1 140BATH 1
AHU-1
AIR CON. COIL
AIR HANDLER NEW
NEW
3'0" X 6'8"
3'0" X 6'8"
5'0" X 6'8"
-
-
-
-
-
-
-
REMOVE EXISTING DROP CEILING, PAINT EXISTING WOOD
HOLLOW CORE, PAINT
HOLLOW CORE, PAINT
EXISTING STORE FRONT GLASS
12'-10 1/2"
(A8.0)
SEEFLOORFINISHPLAN
PAINT-GLIDDENA1822DESERTCASTLE
PAINT-GLIDDENA0574OAKLEYBROWN
PAINT-GLIDDENA1048BLADE
PAINT-GLIDDENA1964SHADOWPLAY
WORK ROOM
DIRECTION
BASED ON
PLAN VIEW
CONFERENCE ROOM
HOLLOW CORE, PAINT
HOLLOW CORE, PAINT
HOLLOW CORE, PAINT
HOLLOW CORE, PAINT
HOLLOW CORE, PAINT
HOLLOW CORE, PAINT
12'-10 1/2"
12'-10 1/2"
12'-10 1/2"
12'-10 1/2"
12'-10 1/2"
9'-0"
9'-0"
12'-10 1/2"
REMOVE EXISTING DROP CEILING, PAINT EXISTING WOOD
REMOVE EXISTING DROP CEILING, PAINT EXISTING WOOD
REMOVE EXISTING DROP CEILING, PAINT EXISTING WOOD
REMOVE EXISTING DROP CEILING, PAINT EXISTING WOOD
REMOVE EXISTING DROP CEILING, PAINT EXISTING WOOD
REINSTALL EXISTING DROP CEILING AT 9'-0"
REMOVE EXISTING DROP CEILING, PAINT EXISTING WOOD
REINSTALL EXISTING DROP CEILING AT 9'-0"
SCALE
TITLE
APPROVED BY:
REVISION:
DATE:
SHEET NUMBER
Wise Design
° CUSTOM HOMES ° RENOVATIONS ° LIGHT COMMERCIAL °
ENERGY EFFICIENT DESIGN SOLUTIONS SINCE 2007
Wise Design
Specializing in energy
efficient design
713-702-4107
609 North Center Street
Weimar, Texas 78962
jlwisdom89@gmail.com
THESE PLANS
ARE COPYRIGHT OF WISE DESIGN
AND CANNOT BE REPRODUCED IN
ANY WAY WITHOUT THE WRITTEN
CONSENT BY
WISE DESIGN
H&R BLOCK
123 E. MAIN STREET
EAGLE LAKE, TEXAS 77434NO SCALE
SCHEDULES
09.07.2016
A5.0
11/07/2016
1
11/07/2016
22. 3/8" (10 MM)
N.P.S
SUPPLY
WALL
CLEAN
OUT
BRASS
FAUCETSANTIQUEK-118-4
SCALE
TITLE
APPROVED BY:
REVISION:
DATE:
SHEET NUMBER
Wise Design
° CUSTOM HOMES ° RENOVATIONS ° LIGHT COMMERCIAL °
ENERGY EFFICIENT DESIGN SOLUTIONS SINCE 2007
Wise Design
Specializing in energy
efficient design
713-702-4107
609 North Center Street
Weimar, Texas 78962
jlwisdom89@gmail.com
THESE PLANS
ARE COPYRIGHT OF WISE DESIGN
AND CANNOT BE REPRODUCED IN
ANY WAY WITHOUT THE WRITTEN
CONSENT BY
WISE DESIGN
H&R BLOCK
123 E. MAIN STREET
EAGLE LAKE, TEXAS 774341/4"=1'-0"
DETAILS
09.13.2016
A6.0
DETAIL 1DETAIL 2DETAIL 3
DETAIL 4DETAIL 5DETAIL 6