Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Risk Assessment for Sweet but Psycho Music Video
1. RISK ASSESSMENT
Assessor Name
Signature
Jazmin Parker
J.Parker
Date Completed 16/01/2019
Authorised by Name
Signature
Helen Williams
H.Williams
Date Completed 18/01/2019
Situational Hazards Tick Physical/Chemical Hazards Tick Health Hazards Tick
Assaultby person Contact with cold liquid/vapour Diseasecausativeagent
Attacked by animal Contact with cold surface Infection
Breathing compressed gas Contact with hot liquid/vapour Lack of food/water X
Cold environment X Contact with hot surface Lack of oxygen
Crush by load Electric shock X Physical fatigue X
Drowning Explosiveblast Repetitive action
Entanglement in moving machinery Explosivereleaseof stored pressure Static body posture X
High atmospheric pressure Fire X Stress X
Hot environment Hazardous substance Venom poisoning
Intimidation Ionizing radiation
Manual handling X Laser light Environmental Hazards
Object falling,movingor flying X Lightning strike Litter X
Obstruction/exposed feature Noise Nuisancenoise/vibration
Shot by firearm Non-ionizingradiation Physical damage
Slippery surface Stroboscope light Waste substancereleased into air
Trap in moving machinery Workingin confined spaces Waste substancereleased into
water/soil
Trip hazard X Lack of ventilation
Vehicle impact/collision Managerial/Organisational
Hazards
Workingat height Multiplehazards
Severity of Harm Remote
e.g <1 in 1000 chance
Unlikely
e.g. 1 in 200 chance
Possible
e.g 1 in 50 chance
Likely
e.g. 1 in 10 chance
Probable
e.g. >1 in 3 chance
Negligible e.g. small bruise Very Low Very Low Very Low Low Low
Slight e.g. small cut,deep bruise Very Low Very Low Low Low Medium
Moderate e.g. deep cut, torn muscle Very Low Low Medium Medium High
Severe e.g. fractures,loss of
consciousness
Low Medium High High Extremely
High
Very Severe e.g. death, permanent
disability
Low Medium High Extremely High Extremely
High
Project: Sweet but Psycho Music Video
Producer: Jazmin Parker
Team members/cast: Jazmin Parker, Amelia Mather, Phillipa Johnston, Laura
Locations: Marriott Hotel Heathrow, Beaconsfield Services, Mather Household, St Mary’s School Gerrards
Cross, Iver Heath Recreation Grounds
2. RISK ASSESSMENT
Hazards Who Exposed Risk Control Measures Risk
Cold environment Cast and Crew Low Encourage coat wearing
Limited time outside
Car nearby with heating
for warmth in breaks
Very Low
Manual handling Crew Medium Distribute kit among
team members evenly
Handle kit correctly
Camera strap around
neck
Tripods and camera
stands for support
Low
Object falling,
moving or flying
Cast and Crew Low Ensure ring light is on a
stand
Put objects on stable
surface
Very Low
Trip Hazard Cast and Crew Medium Ensure wires are out of
the way
Keep set space tidy
Create clear pathways
for actors
Low
Electric shock Crew Low Ensure safety when
plugging electrics in
Turn socket off before
moving electric kit
Very Low
Fire Cast and Crew Low Ensure fire exit routes
are known in all
locations
Fire alarms in indoor
areas
Very Low
Lack of
food/water
Cast and Crew Medium Stop for lunch and
dinner breaks when
necessary
Carry snacks and water
Low
Physical fatigue Cast and Crew Medium Even working days
Rest breaks between
shoots
Food and water when
necessary
Low
Static body
posture
Cats and Crew Medium Limited shoots to
reduce static time
Rest breaks
Encourage moving
between shoots
Low
Stress Cast and Crew Medium Ensure team is
comfortable
Low
3. RISK ASSESSMENT
Keep to time schedule
Give plenty of time
between locations and
shoots
Litter Cast, Crew and Public Low Dispose of waste
correctly
Recycle plastics
Use litter bins
Keep waste to a
minimum
Very Low