INDIAN RAILWAY
History of Indian Railway
 First Indian Railway line was opened on 16th April
1853.
 The first train consisting of one steam engine and
four coaches , traversed a stretch of 21-miles
between Mumbai(Bombay) and Thane.
 Indian Railway has a glorious past of more than150
years serving the nation.
Features of Indian Railway
Indian Railway has a 3 tier management system.
No strike in last 30 years inspite of 17 lakhs workers.
It runs 12000 trains everyday.
It is largest railway system in World under one
management system.
It carries 1.4 crore passengers and 16
lakh tonnes of goods every day.
Speed of Trains
 Shatabdi max 140kmph.
 Rajdhani max 130kmph.
 Others max 110kmph
About Gorakhpur Railway
Workshop
 Gorakhpur railway establish in 1903 for repair
and overhauling of steam locomotive ,coaches
and wagons.
 In workshop there is different shop for different
process.
 Gorakhpur Railways Station now become world
largest and longest platform (1.34kmlong)
THE SHOP WHICH I HAVE VISITED
MACHINE SHOP:
 HYDRAULIC WHEEL PRESS MACHINE:
 It is used to mounting the shaft and wheel by the
help of hydraulic pressure (72-108 ton or kg/cm^2).
 The machine has the capacity of 500 tonn.
Hydraulic wheel press machine
 Allowance is 0.2- 0.5 mm between shaft diameter and
wheel diameter.
 Lubricant use for this operation is
boil lean seed oil + white lean powder
(100ml+120 gm in ratio)
• lubricant increases the strength and contact between
wheel and shaft .
 To remove the wheel from shaft double pressure is
required .
VIDEO
Axle :
 Total excel size is 2316 mm.
 Disc diameter is 917 to 835 mm
 Area covered on axle by wheel is called axle sheet.
 The wheel in Indian railway first manufacture for Mal
Gari and when it little wear due to break then it used
in superfast and passenger trains.
COMPUTER NUMERIC CONTROL
MACHINE
 In this machine all the data from initial work piece to
final work piece is feed into the computer . And all the
process required in order is fed with the help of
program .
 This is used in railway workshop for tougher and
complex object production.
 In railway shop there is one cnc chucker turret lathe
machine
Lathe machine
Lathe machine is used for cutting,
sanding, knurling, drilling, or
deformation, facing, turning, operation
on shaft.
VERTICAL TURRET LATHE MACHINE
 It is used to make the bore in Rail Wheel.
• The bore diameter of rail wheel 168.778- 177.8 mm.
• Maximum depth of cut of turret lathe is 6 mm.
• Total time for bore is 45-50 minute.
• The disc is made up of gray cast iron.
Vertical
turret
lathe
SHAPER, PLANER AND SLOTTER
MACHINE:
 Shaper: It is horizontal shaping machine and it works
on quick return mechanism. In this tool reciprocate
and work piece stationary.
 Planer: It is used for large production . In this work
piece rotate and tool stationary.
 Slotter: This is vertical shaping machine. The arm
reciprocate in vertical direction. Most part are same as
shaper.
HEAT TREATMENT SHOP
Heat treatment process is employed to get desired
properties in work piece.
In workshop mainly the heat treatment is for
suspension hanger , different processes is used;
 CARBURIZING:
It also referred to as Case Hardening, is a heat
treatment process that produces a surface which is
resistant to wear , while maintaining toughness and
strength of core.
 It is applied after the machining process.
for suspension hanger in Indian railway carburizing
take place for 20-22 hour
Pre heat 5.5 hour temp 950 degree
Hold 15.5 hour temp 950 degree
REFINING:
It remove impurities or unwanted element from a
substance .
It is approx 2.5 hour process and temp required is 860
degree Celsius.
 Hardening
this treatment will result in an improvement of the
mechanical properties as well as an increase in the
level of hardness , producing a tougher , more durable
item.
• alloys are heated above the critical transformation
temp for the material then cooled rapidly to get
stronger structure .
• Tempering
• By changing the structure to keep the martensite
tempering is used.
BOGI
HEARTH
FUNACE
BOGI
HEARTH
FURNACE
BOGI
HEARTH
FURNACE
BOGI
HERATH
FURNACE
BREAKING SYSTEM
The breaks are used on the coaches of
railway train to enable deceleration,
control acceleration or keep them
standing when break is fully applied.
while the basic principal is similar to
road vehicle.
There are two types of breaking
system is used:
o VACCUM BRAKE SYSTEM
oAIR-BRAKE SYSTEM
AIR -BRAKE SYSTEM:
 This is new method of breaking system, which is more
efficient than the vacuum brakes
 It is used first in Rajdhani and Satabadi coaches.
Block diagram of air brake system
Block diagram
 WORKING OF AIR BRAKE SYSTEM:
In this system coaches is provided with twin pipe,brake
pipe and feed pipe . The brake pipe is charged to
5kg/sq cm while the auxiliary reservoir charged by the
feed pipe at 6 kg/sq cm through a choke valve and
choke valve from locomotive .for apply the brake
pressure of break pipe is reduced which in turn to
charge the break cylinder through the distributor valve
to a pressure 3.8 kg/sq cm when the break are released
then the break pipe is charged to 5 kg/sq cm . And this
process take place every time when driver apply the
brake
PASSENGER EMERGENCY
ALARAM DEVICE(PEAD)
 It is fitted in the coach. And it is connected to alarm
chain for actuating passenger emergency valve.
Disc break system
Queries Please?

More Related Content

What's hot

A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayGALGOTIAS UNIVERSITY
 
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02Hemant Rawat
 
Roller bearing used in railway coaches
Roller bearing used in railway coachesRoller bearing used in railway coaches
Roller bearing used in railway coachessachin deora
 
Mechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reportMechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reporthmthimanshu
 
summer training ner gorakhpur ppt mechanical workshop
summer training ner gorakhpur ppt mechanical workshopsummer training ner gorakhpur ppt mechanical workshop
summer training ner gorakhpur ppt mechanical workshopavanish chaturvedi
 
swaraj tractor division
swaraj tractor divisionswaraj tractor division
swaraj tractor divisionpradeep rana
 
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)SolidWorks Freelance
 
Nw railway by suresh bose
Nw railway  by suresh boseNw railway  by suresh bose
Nw railway by suresh boseSuresh Bose
 
Presentation on HMT Ltd
Presentation on HMT LtdPresentation on HMT Ltd
Presentation on HMT LtdSanju Masaun
 
Deepnarayan singh ppt
Deepnarayan singh pptDeepnarayan singh ppt
Deepnarayan singh ppt7610036494
 
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJBasic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJAMIT RAJ
 
Basic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training ReportBasic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training ReportAMIT RAJ
 
Usage and maintenance of vertical roller mill
Usage and maintenance of vertical roller millUsage and maintenance of vertical roller mill
Usage and maintenance of vertical roller millZhengzhou
 

What's hot (20)

A presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railwayA presentation on mechanical workshop norh east railway
A presentation on mechanical workshop norh east railway
 
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
Gorakhpurmechanicalworkshopsummertrainingreport 141115125812-conversion-gate02
 
Roller bearing used in railway coaches
Roller bearing used in railway coachesRoller bearing used in railway coaches
Roller bearing used in railway coaches
 
Mechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training reportMechanicaal workshop gorakhpur summer training report
Mechanicaal workshop gorakhpur summer training report
 
RAILWAY PPT
RAILWAY PPTRAILWAY PPT
RAILWAY PPT
 
summer training ner gorakhpur ppt mechanical workshop
summer training ner gorakhpur ppt mechanical workshopsummer training ner gorakhpur ppt mechanical workshop
summer training ner gorakhpur ppt mechanical workshop
 
swaraj tractor division
swaraj tractor divisionswaraj tractor division
swaraj tractor division
 
liluahworkshop
liluahworkshopliluahworkshop
liluahworkshop
 
indutrial training report
indutrial training reportindutrial training report
indutrial training report
 
Training report
Training reportTraining report
Training report
 
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
WAGON REPAIR SHOP ,WEST CENTRAL RAILWAY,KOTA (RAJASTHAN)
 
Nw railway by suresh bose
Nw railway  by suresh boseNw railway  by suresh bose
Nw railway by suresh bose
 
SURFACE MINERS
SURFACE MINERSSURFACE MINERS
SURFACE MINERS
 
Presentation on HMT Ltd
Presentation on HMT LtdPresentation on HMT Ltd
Presentation on HMT Ltd
 
Deepnarayan singh ppt
Deepnarayan singh pptDeepnarayan singh ppt
Deepnarayan singh ppt
 
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJBasic Training Centre lalgarh Bikaner PPT by AMIT RAJ
Basic Training Centre lalgarh Bikaner PPT by AMIT RAJ
 
Bwel presentation
Bwel presentationBwel presentation
Bwel presentation
 
Surface miner
Surface minerSurface miner
Surface miner
 
Basic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training ReportBasic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training Report
 
Usage and maintenance of vertical roller mill
Usage and maintenance of vertical roller millUsage and maintenance of vertical roller mill
Usage and maintenance of vertical roller mill
 

Similar to Indianrailwayppt 161011170055 jamshed alam

Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
Shivam pajpati pptx presebntation
Shivam  pajpati pptx presebntationShivam  pajpati pptx presebntation
Shivam pajpati pptx presebntationShivam Prajapati
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training reportJAMSHED ALAM
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016Awanish Kumar
 
Northern railway
Northern railwayNorthern railway
Northern railwaysometech
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway Mohammad Adnan
 
Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Mohamed Riaz
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotiveAbhishek Agarwal
 
Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Abhimanyu Jayakanth
 
coach care complex jaipur ppt
coach care complex jaipur pptcoach care complex jaipur ppt
coach care complex jaipur pptRamsubhash Meena
 
ritesh final project
ritesh final projectritesh final project
ritesh final project901902
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Shikhar Gupta
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training reportKrishna Yadav
 
himachal road transport corporation by sanjeev
himachal road transport corporation by sanjeevhimachal road transport corporation by sanjeev
himachal road transport corporation by sanjeevSanjeev Kumar
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreRao Khola
 
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)Lakhvinder Singh
 
Gorakhpur railway report 2016
Gorakhpur railway report 2016Gorakhpur railway report 2016
Gorakhpur railway report 2016Anurag Upadhyay
 
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...Rohit Raj
 

Similar to Indianrailwayppt 161011170055 jamshed alam (20)

Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Shivam pajpati pptx presebntation
Shivam  pajpati pptx presebntationShivam  pajpati pptx presebntation
Shivam pajpati pptx presebntation
 
Industrial training report
Industrial training reportIndustrial training report
Industrial training report
 
North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016North Western Indian Railway,Jaipur, Rajasthan 2016
North Western Indian Railway,Jaipur, Rajasthan 2016
 
Northern railway
Northern railwayNorthern railway
Northern railway
 
seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway seminar presentation on summer training at indian railway
seminar presentation on summer training at indian railway
 
Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02
 
Presentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel LocomotivePresentaion on BHEL- Diesel Locomotive
Presentaion on BHEL- Diesel Locomotive
 
Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02Presentaion 130807010420-phpapp02
Presentaion 130807010420-phpapp02
 
Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02Indianrailway 131124014609-phpapp02
Indianrailway 131124014609-phpapp02
 
coach care complex jaipur ppt
coach care complex jaipur pptcoach care complex jaipur ppt
coach care complex jaipur ppt
 
ritesh final project
ritesh final projectritesh final project
ritesh final project
 
Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)Project Report (Modern Coach Factory, Raebareli)
Project Report (Modern Coach Factory, Raebareli)
 
indian railway
indian railwayindian railway
indian railway
 
Ne railway gorakhpur summer training report
Ne railway gorakhpur summer training reportNe railway gorakhpur summer training report
Ne railway gorakhpur summer training report
 
himachal road transport corporation by sanjeev
himachal road transport corporation by sanjeevhimachal road transport corporation by sanjeev
himachal road transport corporation by sanjeev
 
Indian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care CentreIndian Railways Training on Coach Care Centre
Indian Railways Training on Coach Care Centre
 
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
D.M.W patiala TRAINING PPT BY Lakhvinder (GNIT)
 
Gorakhpur railway report 2016
Gorakhpur railway report 2016Gorakhpur railway report 2016
Gorakhpur railway report 2016
 
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
Presentation on dragline cat8200 & dumper CAT MT4400 D AC used in sasan coal ...
 

Recently uploaded

Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 

Recently uploaded (20)

Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 

Indianrailwayppt 161011170055 jamshed alam

  • 1. RAIL COACH MECHANICAL DEPARTMENT GORAKHPUR From 23-06-2017 to 21-07-2016 Prepared by: Sandeep Kumar Yadav
  • 3. History of Indian Railway  First Indian Railway line was opened on 16th April 1853.
  • 4.  The first train consisting of one steam engine and four coaches , traversed a stretch of 21-miles between Mumbai(Bombay) and Thane.  Indian Railway has a glorious past of more than150 years serving the nation.
  • 5.
  • 6. Features of Indian Railway Indian Railway has a 3 tier management system. No strike in last 30 years inspite of 17 lakhs workers. It runs 12000 trains everyday. It is largest railway system in World under one management system.
  • 7. It carries 1.4 crore passengers and 16 lakh tonnes of goods every day.
  • 8. Speed of Trains  Shatabdi max 140kmph.  Rajdhani max 130kmph.  Others max 110kmph
  • 9. About Gorakhpur Railway Workshop  Gorakhpur railway establish in 1903 for repair and overhauling of steam locomotive ,coaches and wagons.  In workshop there is different shop for different process.  Gorakhpur Railways Station now become world largest and longest platform (1.34kmlong)
  • 10. THE SHOP WHICH I HAVE VISITED MACHINE SHOP:  HYDRAULIC WHEEL PRESS MACHINE:  It is used to mounting the shaft and wheel by the help of hydraulic pressure (72-108 ton or kg/cm^2).  The machine has the capacity of 500 tonn.
  • 12.
  • 13.  Allowance is 0.2- 0.5 mm between shaft diameter and wheel diameter.  Lubricant use for this operation is boil lean seed oil + white lean powder (100ml+120 gm in ratio) • lubricant increases the strength and contact between wheel and shaft .  To remove the wheel from shaft double pressure is required .
  • 14. VIDEO
  • 16.
  • 17.  Total excel size is 2316 mm.  Disc diameter is 917 to 835 mm  Area covered on axle by wheel is called axle sheet.  The wheel in Indian railway first manufacture for Mal Gari and when it little wear due to break then it used in superfast and passenger trains.
  • 18. COMPUTER NUMERIC CONTROL MACHINE  In this machine all the data from initial work piece to final work piece is feed into the computer . And all the process required in order is fed with the help of program .  This is used in railway workshop for tougher and complex object production.  In railway shop there is one cnc chucker turret lathe machine
  • 20. Lathe machine is used for cutting, sanding, knurling, drilling, or deformation, facing, turning, operation on shaft.
  • 21. VERTICAL TURRET LATHE MACHINE  It is used to make the bore in Rail Wheel. • The bore diameter of rail wheel 168.778- 177.8 mm. • Maximum depth of cut of turret lathe is 6 mm. • Total time for bore is 45-50 minute. • The disc is made up of gray cast iron.
  • 23. SHAPER, PLANER AND SLOTTER MACHINE:  Shaper: It is horizontal shaping machine and it works on quick return mechanism. In this tool reciprocate and work piece stationary.  Planer: It is used for large production . In this work piece rotate and tool stationary.  Slotter: This is vertical shaping machine. The arm reciprocate in vertical direction. Most part are same as shaper.
  • 24. HEAT TREATMENT SHOP Heat treatment process is employed to get desired properties in work piece. In workshop mainly the heat treatment is for suspension hanger , different processes is used;  CARBURIZING: It also referred to as Case Hardening, is a heat treatment process that produces a surface which is resistant to wear , while maintaining toughness and strength of core.
  • 25.  It is applied after the machining process. for suspension hanger in Indian railway carburizing take place for 20-22 hour Pre heat 5.5 hour temp 950 degree Hold 15.5 hour temp 950 degree REFINING: It remove impurities or unwanted element from a substance . It is approx 2.5 hour process and temp required is 860 degree Celsius.
  • 26.  Hardening this treatment will result in an improvement of the mechanical properties as well as an increase in the level of hardness , producing a tougher , more durable item. • alloys are heated above the critical transformation temp for the material then cooled rapidly to get stronger structure . • Tempering • By changing the structure to keep the martensite tempering is used.
  • 27.
  • 32. BREAKING SYSTEM The breaks are used on the coaches of railway train to enable deceleration, control acceleration or keep them standing when break is fully applied. while the basic principal is similar to road vehicle.
  • 33. There are two types of breaking system is used: o VACCUM BRAKE SYSTEM oAIR-BRAKE SYSTEM
  • 34. AIR -BRAKE SYSTEM:  This is new method of breaking system, which is more efficient than the vacuum brakes  It is used first in Rajdhani and Satabadi coaches.
  • 35. Block diagram of air brake system
  • 37.  WORKING OF AIR BRAKE SYSTEM: In this system coaches is provided with twin pipe,brake pipe and feed pipe . The brake pipe is charged to 5kg/sq cm while the auxiliary reservoir charged by the feed pipe at 6 kg/sq cm through a choke valve and choke valve from locomotive .for apply the brake pressure of break pipe is reduced which in turn to charge the break cylinder through the distributor valve to a pressure 3.8 kg/sq cm when the break are released then the break pipe is charged to 5 kg/sq cm . And this process take place every time when driver apply the brake
  • 38. PASSENGER EMERGENCY ALARAM DEVICE(PEAD)  It is fitted in the coach. And it is connected to alarm chain for actuating passenger emergency valve.