SlideShare a Scribd company logo
1 of 31
How to Move a Mountain
The Preparation and Transfer of One Million Volumes to an
Off-Site Storage Facility
Nastia Guimaraes and Jared Collins, University of Notre Dame
NASIG Conference, June 11, 2017
Hesburgh Libraries, University of Notre Dame
● 3.5 million print volumes
● $13 million annual acq budget
● Humanities heavy
● Master renovation plan
● Off-site shared facility
Overview of the Project
● Environmental scan
● Joint library and teaching faculty Task Force report
● Administrative organization of the project
● Multi-phase approach
● Vendor and temp staff
Environmental Scan
● Skype interviews with five libraries
● On-site visits to two facilities
● Final report
● Information about what to avoid and what works well
- home grown IMS
- no duplication
Task Force Report and Criteria for Selection
● Non-currently received print serials
● Monographs with zero circulations and no touches in the last 10 years
● Exclusions
● A whole call number range
● Serial titles duplicated in JSTOR
Management of the Project
● Strategic Initiative
● Full-time Project Manager
● Project teams
- Collections Preparation
- Systems (reporting, IMS)
- Annex facility, ILL and Doc Del services
Project Logistics Breakdown
● 2-phase approach (goal: 1 million volumes)
● Moving vendor
● Temp staff
● Volunteers
Inventory Management System
● Features not available in the vended solution
● Interface with the ILS and the ILL/Doc Del request form
● Clean design, web interface
● Bibliographic info on pull slips
● Code available on GitHub: https://github.com/ndlib/annex-ims
Collections Preparation Team
● Hire 6 limited term “processing assistants”
- each new hire paired with an experienced cataloger
● Equipment
- laptop, mouse, scanner - locked to a three-tiered AV cart
● Shared tools and roles
- Google spreadsheets and structured teamwork
● Matching tasks with individual strengths
- assign roles that build upon expertise and comfort
Workflow, pt.1
● Coordination of work
- daily “scrums” to consider problems and coordinate workflows
● Item reports and formatting
- two types of reports
- five essential sets of information per report
● Item prep and tracking
- color-coding scheme for tracking prep work on spreadsheets
● Pull reports for vendor
- easy to read - no more than 20 title rows per page
- bulky - divide full report into several parts for ease of use
● Global changes
- carefully coordinated batch changes to ensure location accuracy
- items in-transit to the Annex are coded “temporarily unavailable”
Workflow, pt.2
Further Considerations
● “Low hanging fruit” vs “High hanging fruit”
- basic prep work only, primarily barcoding
● Division of labor
- spreadsheet review of titles with multi-parts by cataloging staff volunteers
● Condition review
- string, envelopes and scripted batch insertion of condition notes
● Hire Jared - catalog maintenance specialist
- to handle day-to-day considerations and guide collections prep work
Cataloging Problems, pt.1
● Uncataloged titles
- some titles linked to incorrect bib record
- varying editions cataloged as duplicates
● Title changes
- serial issues linked to wrong bib record
- predecessor/successor title issues bound together
● OCLC copy numbers in bib record wrong or obsolete
- must reconcile to ensure accurate holdings in WorldCat
- and to ensure access to appropriate digital copies via HathiTrust
● Unlinked items
- item record(s) not linked to a holdings record
- if left unlinked, information would not be updated during global changes
● Bound-withs
- distinct titles bound together with multiple barcodes per single volume
- each volume can retain only one barcode at point of ingest
- one barcode retained for first title only; other titles linked to first title by LKR in bib record
● Partially analyzed titles
- serial issues with distinct monographic titles linked to serial record
- distinctive bibliographic information and access points “hidden”, limiting discoverability
- link monograph bib records to corresponding serial item record with LKR
Cataloging Problems, pt.2
Phase 1, pt.1
● Very short, unrealistic timeline
- unrealistic six-month timeline to prepare 450,000 items
● Inexperienced processing assistants
- training needs of new staff and insufficient staffing overall
● Figuring out the new process
- inaccurate catalog records and associated problematic data
- exceptions within the larger categories of the selection criteria
● No review of reports by Collection managers
- no time for bibliographer review
- result: some titles had to be permanently recalled
● Low hanging fruit only
- barcoding and limited catalog maintenance
- over 200,000 items were barcoded; over 400,000 items were prepped and moved
- some items with significant cataloging problems were ingested without remediation
Phase 1, pt.2
Phase 2
● More time for barcoding work, training and comprehensive inventory
- a reasonable deadline allowed for a comprehensive review of transfer reports
● More detailed review of catalog records
- all titles were reviewed for acceptable bib, holdings and items information
● Lessened division of labor
- processing assistants were trained to fix basic cataloging problems during the prep process
● More time for Collection managers to review reports
- bibliographers were able to identify exclusions prior to transfer
Post-ingest Considerations, pt.1
● Storage of problem items
- temporary storage locations for problem item “rejects”
- rejects: problem items that the IMS system or ingest personnel refused to accept
● Ingest rejects: system and personnel
- system rejects: two types
- “barcode not found”: update barcode on item record or link item to proper bib and holding
- “item not marked for Annex”: check to see where item belongs, proceed accordingly
● Complex cataloging problems
- personnel rejects: a variety of cataloging problems missed during the prep process
● Items left behind by the moving vendor
- must search for, gather, transfer and ingest at a later date
- must sort out what was actually left behind from what is or has been missing
● Items to temporarily recall for catalog maintenance
- must recall ingested problem items from storage facility for remediation
Post-ingest Considerations, pt.2
Enduring Commitment, pt.1
● Ongoing annual transfers
- transition from project mode to enduring commitment mode
- yearly transfer goal of 30,000 - 40,000 items
● Design/refine workflows and test efficiencies
- how to most efficiently style book transfers as a daily routine?
- design workflow variations and measure variants
● No moving vendor to pull and move books
- prep staff must now pull books and box them for transfer
- other library units must get involved in the full spectrum transfer
● Rely less on Systems for global changes
- prep staff can make item and holdings updates as part of their daily routine
● Continue working with Systems
- to root-out glitches in the IMS and further enhance the product
● Continue working with Collection Development
- to reduce faculty misconceptions about the true function of off-site storage
Enduring Commitment, pt.2
Lessons Learned
● Start conversations and preparations early
● Hire temp workers
● Establish more straightforward criteria for item selection
● Have selectors review lists before transfer
● Better quality control of the vendor work
Positive Results
● Increased access to materials
● Increased catalog accuracy
● Increased visibility of cataloging staff value
● Increased opportunities for staff cross-training
● Better overall preservation conditions for collections at the Annex
THANK YOU
Nastia Guimaraes
Project Management Librarian
426 Hesburgh Library
University of Notre Dame
o: 574-631-3558
e: aguimara@nd.edu
Jared Collins
Supervisor of Serials, Holdings and
Discovery Quality unit
402AC Hesburgh Library
University of Notre Dame
o: 574-631-6043
e: jcolli14@nd.edu
How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility
How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility
How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility
How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility
How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility
How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility
How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility

More Related Content

Similar to How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility

Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system projecta23ccb
 
Takala 15 10-19 futurelibrariesstreamlining-hpl
Takala 15 10-19 futurelibrariesstreamlining-hplTakala 15 10-19 futurelibrariesstreamlining-hpl
Takala 15 10-19 futurelibrariesstreamlining-hplStephen Abram
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system projectalpha1unity
 
Chapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptxChapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptxAxmedMaxamuudYoonis
 
chapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdfchapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdfAxmedMaxamuud6
 
Production Execution.pptx
Production Execution.pptxProduction Execution.pptx
Production Execution.pptxssuser19ae2e
 
Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxPedroFerreira876615
 
Bolton college presentation
Bolton college presentationBolton college presentation
Bolton college presentationDynistics
 
Software Project Management lecture 12
Software Project Management lecture 12Software Project Management lecture 12
Software Project Management lecture 12Syed Muhammad Hammad
 
Resume_Mrs.Intra Bahisch
Resume_Mrs.Intra BahischResume_Mrs.Intra Bahisch
Resume_Mrs.Intra BahischIntra Kartoon
 
Executive_Present_RayMorrissey-LI
Executive_Present_RayMorrissey-LIExecutive_Present_RayMorrissey-LI
Executive_Present_RayMorrissey-LIRaymond Morrissey
 
Our First Automated Inventory: A Learning Experience
Our First Automated Inventory: A Learning ExperienceOur First Automated Inventory: A Learning Experience
Our First Automated Inventory: A Learning ExperienceJune Power
 
Project Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study GuideProject Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study Guidemsrakesh
 
Project management professional
Project management professionalProject management professional
Project management professionalRaynaITSTEP
 

Similar to How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility (20)

Sadchap03
Sadchap03Sadchap03
Sadchap03
 
module 2 OM.pptx
module 2 OM.pptxmodule 2 OM.pptx
module 2 OM.pptx
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
 
SHeenanR1
SHeenanR1SHeenanR1
SHeenanR1
 
Takala 15 10-19 futurelibrariesstreamlining-hpl
Takala 15 10-19 futurelibrariesstreamlining-hplTakala 15 10-19 futurelibrariesstreamlining-hpl
Takala 15 10-19 futurelibrariesstreamlining-hpl
 
Managing the information system project
Managing the information system projectManaging the information system project
Managing the information system project
 
Chapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptxChapter 3 Managing Systems Projects .pptx
Chapter 3 Managing Systems Projects .pptx
 
chapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdfchapter03-120827115353-phpapp02.pdf
chapter03-120827115353-phpapp02.pdf
 
Production Execution.pptx
Production Execution.pptxProduction Execution.pptx
Production Execution.pptx
 
Internship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptxInternship Report - Tactical Supply Chain Improvements.pptx
Internship Report - Tactical Supply Chain Improvements.pptx
 
Anurag Sharma - SCM
Anurag Sharma - SCMAnurag Sharma - SCM
Anurag Sharma - SCM
 
Bolton college presentation
Bolton college presentationBolton college presentation
Bolton college presentation
 
Software Project Management lecture 12
Software Project Management lecture 12Software Project Management lecture 12
Software Project Management lecture 12
 
Resume_Mrs.Intra Bahisch
Resume_Mrs.Intra BahischResume_Mrs.Intra Bahisch
Resume_Mrs.Intra Bahisch
 
EpM
EpMEpM
EpM
 
Executive_Present_RayMorrissey-LI
Executive_Present_RayMorrissey-LIExecutive_Present_RayMorrissey-LI
Executive_Present_RayMorrissey-LI
 
Our First Automated Inventory: A Learning Experience
Our First Automated Inventory: A Learning ExperienceOur First Automated Inventory: A Learning Experience
Our First Automated Inventory: A Learning Experience
 
Project Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study GuideProject Management Professional (PMI) Study Guide
Project Management Professional (PMI) Study Guide
 
Scrum artifacts
Scrum artifactsScrum artifacts
Scrum artifacts
 
Project management professional
Project management professionalProject management professional
Project management professional
 

Recently uploaded

CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Alex Marques
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 

Recently uploaded (20)

Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Discover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdfDiscover -CQ Master Class - Rikita Wadhwa.pdf
Discover -CQ Master Class - Rikita Wadhwa.pdf
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024Construction Project Management | Coursera 2024
Construction Project Management | Coursera 2024
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 

How to Move a Mountain: The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility

  • 1. How to Move a Mountain The Preparation and Transfer of One Million Volumes to an Off-Site Storage Facility Nastia Guimaraes and Jared Collins, University of Notre Dame NASIG Conference, June 11, 2017
  • 2. Hesburgh Libraries, University of Notre Dame ● 3.5 million print volumes ● $13 million annual acq budget ● Humanities heavy ● Master renovation plan ● Off-site shared facility
  • 3. Overview of the Project ● Environmental scan ● Joint library and teaching faculty Task Force report ● Administrative organization of the project ● Multi-phase approach ● Vendor and temp staff
  • 4. Environmental Scan ● Skype interviews with five libraries ● On-site visits to two facilities ● Final report ● Information about what to avoid and what works well - home grown IMS - no duplication
  • 5. Task Force Report and Criteria for Selection ● Non-currently received print serials ● Monographs with zero circulations and no touches in the last 10 years ● Exclusions ● A whole call number range ● Serial titles duplicated in JSTOR
  • 6. Management of the Project ● Strategic Initiative ● Full-time Project Manager ● Project teams - Collections Preparation - Systems (reporting, IMS) - Annex facility, ILL and Doc Del services
  • 7. Project Logistics Breakdown ● 2-phase approach (goal: 1 million volumes) ● Moving vendor ● Temp staff ● Volunteers
  • 8. Inventory Management System ● Features not available in the vended solution ● Interface with the ILS and the ILL/Doc Del request form ● Clean design, web interface ● Bibliographic info on pull slips ● Code available on GitHub: https://github.com/ndlib/annex-ims
  • 9. Collections Preparation Team ● Hire 6 limited term “processing assistants” - each new hire paired with an experienced cataloger ● Equipment - laptop, mouse, scanner - locked to a three-tiered AV cart ● Shared tools and roles - Google spreadsheets and structured teamwork ● Matching tasks with individual strengths - assign roles that build upon expertise and comfort
  • 10. Workflow, pt.1 ● Coordination of work - daily “scrums” to consider problems and coordinate workflows ● Item reports and formatting - two types of reports - five essential sets of information per report ● Item prep and tracking - color-coding scheme for tracking prep work on spreadsheets
  • 11. ● Pull reports for vendor - easy to read - no more than 20 title rows per page - bulky - divide full report into several parts for ease of use ● Global changes - carefully coordinated batch changes to ensure location accuracy - items in-transit to the Annex are coded “temporarily unavailable” Workflow, pt.2
  • 12. Further Considerations ● “Low hanging fruit” vs “High hanging fruit” - basic prep work only, primarily barcoding ● Division of labor - spreadsheet review of titles with multi-parts by cataloging staff volunteers ● Condition review - string, envelopes and scripted batch insertion of condition notes ● Hire Jared - catalog maintenance specialist - to handle day-to-day considerations and guide collections prep work
  • 13. Cataloging Problems, pt.1 ● Uncataloged titles - some titles linked to incorrect bib record - varying editions cataloged as duplicates ● Title changes - serial issues linked to wrong bib record - predecessor/successor title issues bound together ● OCLC copy numbers in bib record wrong or obsolete - must reconcile to ensure accurate holdings in WorldCat - and to ensure access to appropriate digital copies via HathiTrust
  • 14. ● Unlinked items - item record(s) not linked to a holdings record - if left unlinked, information would not be updated during global changes ● Bound-withs - distinct titles bound together with multiple barcodes per single volume - each volume can retain only one barcode at point of ingest - one barcode retained for first title only; other titles linked to first title by LKR in bib record ● Partially analyzed titles - serial issues with distinct monographic titles linked to serial record - distinctive bibliographic information and access points “hidden”, limiting discoverability - link monograph bib records to corresponding serial item record with LKR Cataloging Problems, pt.2
  • 15. Phase 1, pt.1 ● Very short, unrealistic timeline - unrealistic six-month timeline to prepare 450,000 items ● Inexperienced processing assistants - training needs of new staff and insufficient staffing overall ● Figuring out the new process - inaccurate catalog records and associated problematic data - exceptions within the larger categories of the selection criteria
  • 16. ● No review of reports by Collection managers - no time for bibliographer review - result: some titles had to be permanently recalled ● Low hanging fruit only - barcoding and limited catalog maintenance - over 200,000 items were barcoded; over 400,000 items were prepped and moved - some items with significant cataloging problems were ingested without remediation Phase 1, pt.2
  • 17. Phase 2 ● More time for barcoding work, training and comprehensive inventory - a reasonable deadline allowed for a comprehensive review of transfer reports ● More detailed review of catalog records - all titles were reviewed for acceptable bib, holdings and items information ● Lessened division of labor - processing assistants were trained to fix basic cataloging problems during the prep process ● More time for Collection managers to review reports - bibliographers were able to identify exclusions prior to transfer
  • 18. Post-ingest Considerations, pt.1 ● Storage of problem items - temporary storage locations for problem item “rejects” - rejects: problem items that the IMS system or ingest personnel refused to accept ● Ingest rejects: system and personnel - system rejects: two types - “barcode not found”: update barcode on item record or link item to proper bib and holding - “item not marked for Annex”: check to see where item belongs, proceed accordingly
  • 19. ● Complex cataloging problems - personnel rejects: a variety of cataloging problems missed during the prep process ● Items left behind by the moving vendor - must search for, gather, transfer and ingest at a later date - must sort out what was actually left behind from what is or has been missing ● Items to temporarily recall for catalog maintenance - must recall ingested problem items from storage facility for remediation Post-ingest Considerations, pt.2
  • 20. Enduring Commitment, pt.1 ● Ongoing annual transfers - transition from project mode to enduring commitment mode - yearly transfer goal of 30,000 - 40,000 items ● Design/refine workflows and test efficiencies - how to most efficiently style book transfers as a daily routine? - design workflow variations and measure variants ● No moving vendor to pull and move books - prep staff must now pull books and box them for transfer - other library units must get involved in the full spectrum transfer
  • 21. ● Rely less on Systems for global changes - prep staff can make item and holdings updates as part of their daily routine ● Continue working with Systems - to root-out glitches in the IMS and further enhance the product ● Continue working with Collection Development - to reduce faculty misconceptions about the true function of off-site storage Enduring Commitment, pt.2
  • 22. Lessons Learned ● Start conversations and preparations early ● Hire temp workers ● Establish more straightforward criteria for item selection ● Have selectors review lists before transfer ● Better quality control of the vendor work
  • 23. Positive Results ● Increased access to materials ● Increased catalog accuracy ● Increased visibility of cataloging staff value ● Increased opportunities for staff cross-training ● Better overall preservation conditions for collections at the Annex
  • 24. THANK YOU Nastia Guimaraes Project Management Librarian 426 Hesburgh Library University of Notre Dame o: 574-631-3558 e: aguimara@nd.edu Jared Collins Supervisor of Serials, Holdings and Discovery Quality unit 402AC Hesburgh Library University of Notre Dame o: 574-631-6043 e: jcolli14@nd.edu