SlideShare a Scribd company logo
1 of 11
Siteand Services-AsanOptionforAffordable Housing
Introduction
Globally, nations are fast urbanizing with urban areas recording high degree of population growth
and increase in their physical dimensions. Uncontrolled rapid growth of urban areas in majority of
developing countries, has led to emergence of large number of physical, social, economic and
environmental problems. Mismatch between demand and supply, has led to shortfall emerging in
many sectors. Besides acute shortage of basic infrastructures, urban areas are facing massive
deficit/shortage of housing to provide adequate, affordable and appropriate shelter to the urban
migrants .Genesis of housing shortage has roots in the fact that majority of the people moving to
the urban areas often lack the necessary resources and capacity to acquire land and construct/rent
appropriate shelter. In addition, designated government agencies and urban local bodies operating
at local level have been found to be lacking in capacity, capability, willingness and resources to
create sufficient housing stock, which are affordable for the poor urban migrants and residents of
urban areas. Combination of these factors has led to proliferation of slums and squatter
settlements in majority of urban areas.
In the face of rapidly growing population and rural-urban migration, uncontrolled, unregulated
and mushroom growth of urban slums have emerged as a critical urban issue. Issue of managing
urban slums has been engaging the attention of various governments in position, at the local, state
and national levels, for finding appropriate solutions to minimize the origin and growth of such
slums; for making cities more clean, green & inclusive and providers of more livable space for
the urban residents, including the poorest of the poor, to lead a dignified life. Accordingly, over
the years, various schemes have been conceptualized, evolved and implemented by the
governments and parastatal agencies, globally and locally, to overcome the problem related to
slums and the housing shortage in the affordable category . Majority of solutions adopted for
resolving these problems, revolved around providing built-up houses to the beneficiaries by the
parastatal agencies. However, providing constructed houses involved large resources and
considerable time taken for construction of houses. Accordingly, supply of built houses was found
to be in both slow and limited, as compared to the large demand for such houses. Moreover,
availability of limited resources and the limitation of capacity of parastatal agencies to deliver
adequate houses has invariably led to aggravation of the problem related to shelter for the lower
strata of economic pyramid. Accordingly, it was thought prudent to look for more feasible,
rational, realistic, cost-effective and time efficient options for increasing the supply of the housing
stock for the urban poor/slum dwellers.
Looking at the failure and inability of the various conventional housing approaches, adopted by
the government and parastatal agencies to address the issue of providing effective and efficient
solution to the housing the slum dwellers including squatters and poor in the urban areas, it was
thought to find an alternate housing scheme which should be more cost-effective, effective and
efficient by involving both beneficiaries and stakeholders in creation of large housing stock.
Considering the entire context and need for involving beneficiaries and using ingenuity and
perseverance of squatters to house themselves, providing sites and services to the beneficiaries,
was considered as the most viable and appropriate answer to the problems of housing the poor
in developing cities. Numerous studies made and analysis carried out by experts and various
national and international educational/professional institutes had revealed that genesis of the rapid
growth and massive development of the squatter settlements lies in the exclusion/non-involvement
of the beneficiaries, high cost of urban land and non- availability of appropriate right to legally
construct house on the land as the prime reason for acute housing shortage and mushroom growth
of slums in urban areas.
Understanding /evaluating ,closely and objectively, the dynamics involved in the development
and expansion of squatter settlements, has led to evolution of large variety of innovative housing
schemes in developing countries. These schemes focused on rationally solving the challenges
posed by the acute shortage of housing besides managing growth of slums ,by creating large
housing stock in the affordable category .For improving the environmental quality and providing
basic infrastructure and services in the slums; sites-and-services" schemes was conceptualized
as one of the sustainable and reliable option, made applicable for such squatter settlements.
Considering the perpetual problem posed by large magnitude of ever growing and mushrooming
of slums on the urban landscape, Site and services has been used, as one of the simple and direct
option ,to minimize growth of slums and resettle the slum dwellers at minimal cost and minimum
effort to the parastatal agencies, by involving the beneficiaries and their resources through a system
of collaborative and mutually supportive approach. Genesis of the massive support to the site
and services scheme was found to be in its capacity to address, effectively and logically, the
critical factors which led to mushrooming of slums in urban areas. Factors involved in origin,
growth and spread of squatter settlements invariably revolved around; high degree of congestion,
unplanned and haphazard development, high cost of land, lack of security of tenure and non-
availability of basic essential services including water supply, sewerage, roads, electricity etc.
However, studies made and analysis carried out indicated that construction of structure, though
slow ,was not the major problem in these slums, because it was undertaken by the individuals
based on availability of resources, materials and capacity to build. Major issue remained the
availability of serviced and developed land along with security of tenure of such land.
Considering the fact that housing remains essentially an individual based activity, accordingly it
was felt that for providing an optimum solution to create large housing stock in affordable
category, beneficiaries should be personally/actively involved by pooling and making available
their resources for the construction of their houses. Accordingly, it was thought prudent that if
government takes on the role of a facilitator instead of being provider ,by making available
appropriate serviced land duly supported with basic infrastructures at reasonable and affordable
price with adequate security of tenure, then it will be possible to minimize the problem of slums
by creating large stock of houses with the active co-operation of beneficiaries. Recognizing that
the vast majority of low income families in the world build their own shelter, which lack basic
hygiene, service, access and electricity, the site and services scheme was considered to be the best
option for supporting the poor to create appropriate shelter in the urban context.
The realization that providing a "complete" serviced house by government agencies is not possible
or simply cannot be afforded by most low-income families also prompted a shift in focus from
supplying a fully serviced house to that of providing only serviced land. The key characteristic of
the approach was the use of the beneficiaries so called sweat equity and other available resources,
both physical, technical and financial, for the actual construction and development of the houses.
Looking at the apparent distinct advantages of the approach, Sites-and-services schemes became
the by-word for solving the problem of squatter settlements. Squatter settlements were and has
always been considered illegal and in order to relocate and rehabilitate the squatters (as a function
of "slum clearance"), plots of land (or sites) with infrastructure on it (or services) were provided,
and the beneficiaries had to build their own houses on such land. There are large variety of sites-
and-services schemes adopted globally by different countries/agencies ranging from the
subdivided plot only, to a serviced plot of land with a "core" house built on it, depending upon the
local conditions and available resources.
As per Wikepedia; Site and services first made applicable on a large scale
in Madras (now Chennai) in 1972 when the World Bank engaged Christopher Charles
Benninger to advise the Madras Metropolitan Development Authority (MMDA) on their housing
sector investment. The approach linked the user group's ability to pay with land prices and the
costs of rudimentary and upgradable infrastructure. The fundamental idea was to market plots with
essential infrastructure at market prices, to avoid the resale of subsidized housing, directed at low-
income groups. The first major scheme planned by Benninger, at Arambakkum in Chennai, created
about 7,000 shelter units, within the paying capacity of the urban poor. Within five years the
MMDA created more than 20,000 units and the approach became a major strategy of the World
Bank to tackle a variety of shelter problems globally. Considering the distinct advantages of the
scheme, the World Bank supported and funded “sites and services” projects globally for adoption
as a mechanism to promote housing for the slum dwellers. Many countries in South America, Asia
and Africa took up this concept, and with the World Bank strongly advocating this approach and
providing key finance for a number of projects, the idea received widespread approval. In India,
scheme was made applicable in 27 major cities between the period spanning between 1977 and
1997.
Sites-and-Services Scheme
Various inputs that go into making of the shelter include; finance, building materials, construction
technology, machinery/equipment and labour. The genesis behind Sites-and-services schemes is
that: low-income people have always been housing themselves both legally and illegally, in most
urban areas of the developing world. Site and Services scheme depart from the earlier housing
schemes, like low-cost housing or subsidized high-rise housing units, undertaken by the
state/parastatal agencies, in the concept and the approach that scheme recognizes the ability,
capacity and capability of the low-income households to build their own house, provided an
opportunity was given through appropriate handholding. Considering the entire gamut, genesis,
scope and approach, "Sites-and-Services" scheme has been defined differently by different
agencies in terms of ; ‘ making provision of plots of land along with a bare minimum of essential
infrastructure needed for habitation either on ownership or land lease tenure basis. It has also been
defined as an approach to bring shelter within the economic reach of the poor. However, the basic
approach and intent of the scheme remains universal with variation in contents of the scheme. The
essential components of site and services scheme are the plot of land, infrastructure (like roads,
water supply, drainage, electricity or a sanitary network), and the house itself.
Basic agenda under the scheme remains, identifying and sourcing appropriate and adequate land
by the State/ Housing Boards/ Development Authorities/ Improvement Trusts/ Urban local
authorities/designated parastatal agencies, in the urban setting or in close vicinity of urban areas,
for housing the urban poor. The land is then planned/designed by undertaking sub-division of
land by the designated agency, based on the area norms approved for each beneficiary. Land is
then planned/designated into land parcels/plots for housing, defining area under roads, open
spaces, public amenities, services etc. needed to serve the number of beneficiaries to be housed .
Normally these areas are planned not based on any norms. In majority of cases, objective remains
to accommodate the maximum number of identified beneficiaries, which invariably lead to high
proportion of land going under plots to be allotted with high population density, with minimum
area allocated to roads, open spaces and supportive amenities and facilities. Basic services of
water supply, sewerage , roads, storm water drainage, electricity etc. are then planned and provided
within the scheme area. In addition, the plots are provided with certain amenities which remain at
variance in various models defined for site and services. Beneficiaries, along with the developed
plots, are given in certain cases construction comprising of foundations and walls up to defined
plinth height along with the provision of toilets enclosed with walls, containing water closet and
tap for sourcing water and bathing. Beneficiaries are also given the rights of connecting the
services provided in the plot with the public services laid in the street. In addition, in certain cases
beneficiaries are also given the standard design of the house to take up the construction on the
plot and to maintain uniformity in the design of the houses to be constructed. The possession of
the developed plot with services is then given to the identified beneficiaries for construction of the
house on the self-help basis. However, no time limit is defined for completing the shelter.
Thus, the sites-and-services approach mandate the role of government agencies only in the
preparation of land parcels or plots with certain basic infrastructure, which is to be sold or leased
to the intended beneficiaries on a pre-defined price by such authority, with actual house
construction left to the beneficiaries themselves by using their own resources, including informal
finance or family labour and various other types of community participation modes to build their
house. The beneficiaries could also build the house in phases, depending on the availability of
financial and other resources. Basic principle of the development of a squatter settlement remains
development of settlements/houses without involving squatting
Typologies of the Sites and -Services Schemes
Depending on the financial and technical resources available, willingness to take up the scheme;
number of beneficiaries to be catered; inhouse capacity of the implementing agency; ready
availability of appropriate land; capacity of the beneficiaries to pay the cost; making scheme cost-
effective, rational & acceptable; political commitment and time available for implementation, large
variations in the content and scope can be observed in the sites-and-services schemes . This
variation remains the outcome of the juxta- positioning of the need to create a balance between
minimum "acceptable" housing conditions and affordability of the beneficiaries. While following
the basic rule of a plot of land (sites) and essential infrastructure (services), the degree of
participation and inputs of the implementing agency on one hand, and the beneficiaries on the
other, varied greatly. They ranged from an empty plot of land and some services (like water,
electricity and sanitation connections) to the provision of a "core" house (consisting of a toilet and
kitchen only) on the plot of land with attached services.
As per Hari Srinivas in his article, ’Urban Squatters and Slums Sites and Services’, some of the
variations attempted in sites-and-services projects included:
 Utility wall: In certain site and services projects, beneficiaries along with the developed
plots were also given the benefit of a "utility" wall, which was built on the plot providing
access for water, drainage, sewerage and electricity. The beneficiaries were supposed to
build the house around this wall, and utilize the connections from it. Some projects
provided this utility wall in the form of a sanitary core consisting of a bathroom/toilet,
and/or a kitchen.
 Latrine: Due to its critical waste disposal problem, many projects provided a basic latrine
(bathroom and/or toilet) as part of each plot.
 Roof frame: The roof being the costliest component of a house and requires skilled labour
to build, therefore, some projects provided the roof structure on posts, and the beneficiaries
was to build the walls according to their requirements.
 Plinth; In few projects, construction was made up to plinth level by the implementing
agency, which formed the base over which the beneficiaries was to build their house.
 Shell house, core house ; Other variations in these schemes involved construction of the
shell house (which is an incomplete house consisting of a roof and two side walls, but
without front or rear walls) and a core house (consisting of one complete room) by the
parastatal agencies with remaining construction to be completed by the beneficiaries.
Agencies involved
As already explained, schemes remain a joint venture and collaborative approach involving the
beneficiaries living in the slum/squatter settlement and, providers in the shape of parastatal
agencies, entrusted with the task and mandate to implement the scheme. The two key actors in a
sites-and-services project remained- the intended beneficiaries and the implementing agency.
Intended beneficiaries of the project are known to be part of the lower income group of an urban
area – squatters/slum dwellers, who are to be relocated from their original illegal settlement. They
are, primarily and essentially, characterized by low income; informal jobs/irregular employment,
lacking invariably in necessary assets, resources, capacity, employment and income to enable
them to afford a formal house. It was also observed that few of the beneficiaries who were
possessed/armed with basic skills in construction; having financial resources or those who could
manage resources through formal/informal system, were in a position to build their own house,
whereas majority of the beneficiaries having limitation of capacity, resources and willingness
,failed to make bare minimum construction on the site which has led to partial failure and success
of many sites-and-services schemes.
The other major actor in the sites-and-services schemes were the implementing agencies, which in
majority of cases were government department or parastatal agencies including Housing Boards,
State/Local level Urban Development Authorities, Improvement Trusts, Urban Local Bodies etc.
Such agencies undertook the site and services schemes with twin objectives of; fulfilling the
agenda and mandate of the national government to provide housing for all in general and housing
for low-income families in particular in the urban setting and to make the cities slum free by
removing eyesores that squatter settlements depict. In addition to beneficiaries and parastatal
agencies, site and services schemes involved several agencies responsible for making provision
of infrastructure, services and amenities. Number of non-governmental and voluntary
organizations have also known to play critical role in educating, creating awareness about the
various facets of the scheme and involving beneficiaries in planning , designing and implementing
the scheme besides bringing beneficiaries and implementing agencies on the same platform to
make the scheme operational.
Limitations and Way – Forward.
However, despite distinct theoretical and conceptual advantages showcased, Sites-and-services
schemes have also faced considerable opposition and failure in a number of projects. Success in
the scheme were few and failures have been found to be many. Reasons of failure for the scheme
was oversimplification of the entire context of housing and series of assumptions and
misconceptions in the manner in which low-income families house themselves. However, it needs
to be understood and appreciated that housing remains a highly resource intensive, time intensive,
labour intensive and material intensive activity requiring dedicated financial resources, technical
expertise, technical manpower, labour, expert guidance for sourcing materials, planning,
designing and construction of building besides availability of appropriate land for construction of
the shelter. Scheme worked on the simple premise that once the developed land is made available
to the squatters, they shall be able to create an appropriate shelter with the passage of time and
availability of resources without any outside guidance, support and services. It missed the point
that majority of houses constructed in the slums were not only sub-standard but also poor/unsafe
in quality of construction. In majority of cases these houses provided poor quality of human living.
With several assumptions and misconceptions regarding living, working and resources available
with low-income families, sites-and-services projects have been subject to many shortcomings.
These shortcomings have found reflections in terms of; conception, execution, identification of
beneficiaries, capacity of the beneficiaries to construct, resources available, need of the space,
affordability, implementation of the scheme, relation between place of work and place for living,
travel time and cost recovery. Thus, in majority of the cases sites-and-services schemes often
failed to meet its objectives of creating affordable shelter for the urban poor. In majority of cases,
it became an exercise of land speculation. As per Srinivas, scheme in larges number cases have
been rendered unaffordable or inaccessible for the lowest-income groups by cumbersome
bureaucratic procedures, institutional requirements and political interventions. Lack of knowledge
and understanding of the manner of living culture of the beneficiaries, on the part of the agencies
involved in the planning, designing and implementation of the schemes also led to numerous
problems emerging in rational formulation and implementation of the scheme. Unfortunately, in
majority of the cases , site and service schemes were considered as a vote bank besides providing
shelter tot the poor . Some of the constraints in these schemes observed revolved around:
 Wrong Targeting of Beneficiaries; Most of the schemes involving subsidy or making
available facilities in urban setting at lower cost, invariably suffer from wrong targeting of
the beneficiaries, with the result large number of ineligible people also get included as
beneficiaries of the scheme. In majority of cases, it has been observed that eligibility
conditions are so designed that it benefit/focus on a particular group with the connivance
of the officials deputed to enumerate the eligible beneficiaries. With large scale
intervention of the local politicians, prevailing local interests, pressure exerted by the mafia
involved with the development of the squatter colonies, lack of accountability and corrupt
practices prevailing in the official system, large number of ineligible people were
identified and included as beneficiaries. Large number of identified beneficiaries made
site and services schemes either non-starter or led to taking up only limited number of
schemes which were devoid of merits. It also led to large speculative practices in which
plots of land allotted was traded with non-beneficiaries not belonging to the economical
weaker sections of the society.
 Wrong Siting and Location of Scheme: Since the scheme involved making available
developed land by the parastatal agencies, accordingly focus of such agencies was to find
land which was low-cost, so that cost of the scheme could be minimized, irrespective of
suitability of said land for the scheme. Most of these agencies had no technical manpower
to identify suitable land for the scheme. While selecting land for the scheme, studies were
never made, regarding understanding /appreciating the need and requirement of the
beneficiaries for whom scheme was being framed , nor beneficiaries who were to be
housed in the area, were consulted while defining site for the scheme. With high land
costs in urban areas, most sites-and-services schemes were located on the urban fringes,
where land costs were found to be lower. In the process, it led to shifting of the beneficiaries
far away from their place of work, leading to increasing their cost of living due to increases
travel time and cost of transportation to be paid on day to day commutation, between place
of work and place of living. This discourage many beneficiaries to take advantage of such
schemes and in many cases beneficiaries ,who were allotted the developed site either sold
those sites at a premium or abandoned the schemes and returned back to the cities, close
their work places, to create new slums.
 Cumbersome Bureaucratic Procedures: Site and Services Schemes, in majority of cases
have been found to be on the wrong side/suffer , due to large scale intervention and
involvement of bureaucrats and cumbersome procedures involved. Selection procedures,
designed to ascertain that applicant meet eligibility criteria, have been found to be largely
cumbersome, often time-consuming and full of bureaucratic pitfalls, and provide
opportunities for corruption. Besides, for many low-income families, the eligibility criteria
were impossible to meet due to informal sector jobs or low/irregular incomes.
 Delayed Provision of Services: Locating such schemes on the fringe of the city led to
numerous problems of making provision of defined infrastructure on time bound basis,
due to non-existent in the peri-urban area, leading to delay in providing these services and
allotment of serviced plots , besides increasing the cost of development. Lack of co-
ordination and spread of responsibility among multiple agencies involved in making
provision of services and delay in assured flow of funds, further delayed the schemes and
added cost to the beneficiaries. In many cases considerable delay was observed in the
provision of the defined services, even after the land had been allocated to the
beneficiaries for construction of the houses.
 One Solution Fit all Housing Problems; Unfortunately, intent and content of the site and
service scheme is based on a too simplistic assumption that by providing developed land ,
problem of housing the urban poor in urban area will automatically vanish, because slum
dwellers have capacity and competency to build their own shelter, without any outside
guidance and support. Accordingly, it got limited to defining the size of plot/land to be
allotted for construction with the defined infrastructure/ services. However, scheme ignores
large number of factors which need to be considered while evaluating the shelter needed
by the beneficiaries. Housing remains highly personal and individual requirement and
cannot be put into a standard and a straight jacket. Scheme does not take into consideration
factors involving need of the shelter and its size, affordability, capacity to finance the
house and its construction, size of the family, purpose of the beneficiary being in the city
etc. In many cases sites were allotted to beneficiaries who were single/ unmarried, had no
family and did not require such a large shelter, which were either not accepted or sold off
to non-beneficiaries. Accordingly, scheme suffered from being too benevolent in large
number of cases. Scheme also did not take into account realistically the need of the
optimum space required for housing the family. As against a space norm of 300sqft for
the affordable house in case of PMAY-U , the area available in the plotted development
of 25 sq yds was 450 sqft, when the house was built on two levels. In Chandigarh,
beneficiaries have made construction of houses on the allotted site up to four floors ,
leading to a covered are of 900sqft, which remains unrealistic and irrational for such
categories of houses. Scheme needs rationalization based on the need of the beneficiaries
and should offer multiple options instead of one solution fit all problems, which invariable
has led to wastage of precious resources in many cases.
 High Degree of Speculation; Perpetual shortage of developed and legally sanctioned land
in urban areas is seen to commands high premium and accordingly remains both elusive
and expensive. Cost of such land remains positively related to size of the city and location
of the land. Accordingly, in majority of cases, parcels of land allotted in the site and
services , which had good connectivity and were close to the developed area, commanded
good price and were found to be in good demand. This led to high degree of speculation in
such plots which were illegally transferred/sold, in majority of cases to the people
belonging to higher strata, either for construction of the houses or as an investment for
making large profit subsequently. Since, in majority of cases ,land disposal policy adopted
by the development authorities remains only through auction, accordingly getting legally
carved out developed land in the site and services scheme offered best option for such
people to own land for making housing by buying land at a relatively low price. Majority
of houses constructed in such schemes are owned by higher income strata, who bought
these plots illegally. In case of schemes , which were located at far off places initially, came
within the developed area over a period of time, which subsequently led to high demand
of plots in these areas, leading to increasing premium of such plot creating an environment
of illegal transfer of such plots. In either case it defeated the very objective of creating
affordable shelter for housing the poor and minimizing the growth of slums in the urban
spaces.
 Poor Quality of Construction; Since very little control appeared to have been exercised
on the construction and orderly development of the houses in site and services schemes,
accordingly, majority of houses constructed remains beyond the norms of safety and
security of buildings. Since construction of houses require appropriate skill, guidance,
support, supervision, quality of materials and good construction techniques, self-help
method adopted by majority of beneficiaries devoid of good construction practices have
created low quality construction in site and services schemes.
 Planned Slums; Looking at the developed site and services colonies, majority of them
present a picture of chaos and disorder. These schemes display high degree of congestion,
lack of open spaces and absence of basic amenities. Majority of the open spaces planned
and provided within the scheme area for the benefit of the beneficiaries, remain illegally
and unauthorizedly occupied by the new migrants to the city. Lack of maintenance and
upkeep of the services provided has led to its damage and decay. Streets remain occupied
with parked vehicles for which there exists no space. Resident welfare Associations are
conspicuous by their absence. These scheme areas have emerged more as planned slums
replacing the unplanned slums.
 Poor Cost-Recovery: Most sites-and-services schemes have suffered in implementation,
due to poor cost recovery from the beneficiaries. Reasons for such poor cost recovery can
be largely attributed to the fact, that in addition to making lumpsum upfront payment as
part of the cost of the plot; beneficiaries had to pay the monthly instalments ,for the cost
of land allotted on regular basis shortly after moving into the scheme, besides incurring
cost on part construction of the house, irrespective of the fact that he may not have regular
flow of income due to casual nature of employment. In addition, increased transport, water
and electricity costs added to the burden which they might not have had before. However,
poor cost recovery in such schemes can also be attributed to ; delay in making provision
of defined services, inefficient/cumbersome methods of collection , poor record
maintenance system, absence of penalties for non-payment and lack of political and
administrative will to enforce payment(Srinivas).
However, despite limitations and numerous failures, the positive aspect of sites-and-services
schemes that deserves support is its recognition of the ability of people to house themselves, with
a little backing from the government agencies. Thus, the role of the government changed from that
of a "provider" to an "enabler". It also enables parastatal agencies to save scarce resources by
sharing their responsibility of housing with the intended beneficiaries and take up large number of
projects with limited resources. On the part of the beneficiaries, it makes best use of
existing/potential resources, both at the household level as well as the community level. On a large
scale, it enables the low-income families to obtain decent housing and services, at levels that can
be afforded by them. While sites-and-services schemes are not a blanket solution for all ills of low-
income housing, it does provide potential for future housing, making best use of existing resources,
both governmental and household. A number of local conditions and circumstances determine the
type and scale of the scheme to be used. However, the scheme would need change in the approach
and methodology of implementation, in order to make it more rational, objective, effective and
efficient as detailed below;
 Moving from individuals to Groups of Beneficiaries; Limitation of the Site and service
scheme lies in the fact that it is totally focused on capacity, capability and resources of the
individual beneficiary, which remains largely at variance. According individual approach
remains the greatest weakness and limitation of the scheme. Since housing remains largely
a multifaceted activity, accordingly it will be appropriate to shift the focus of the scheme
from individual beneficiary to the group of similarly placed beneficiaries in a given
scheme. This would require co-operative based approach to be adopted for beneficiaries
involved in the scheme so as to pool their resources, knowledge, expertise, labour and
commitment, to create appropriate shelter on a time bound basis.
 Moving from Plotted to Flatted Development; Studies made and analysis carried out of
urban development schemes has shown the plotted development remains highly
inefficient, when compared with the flatted development, in terms of optimum utilization
of available developed land; cost-intensive in terms of making provision and maintenance
of basic services and common amenities ; cost of construction of houses; creating adequate
stock of shelter on time bound; embedding sustainability in the project; promoting social
cohesion and providing appropriate common services required by the community.
Accordingly, considering the larger objectives of the scheme, it will be appropriate to
change the typology of buildings from plotted to flatted development.
 Vesting Land Rights with the Government; Over the years, it has been observed that
majority of the schemes relating to the shelter for the urban poor have failed to meet its
objective, when the land is allotted to the beneficiaries; by giving them the absolute right
to own, use and transfer the land so made available. Accordingly, all schemes embedding
the transfer of land rights to the beneficiaries has led to illegal transfer of such land on
large scale, to the non-beneficiaries belonging to the higher income groups of the society.
Considering the acute shortage of developed land in the urban market coupled with its high
prevailing price, all urban lands are subjected to high degree of speculation and
manipulations, because land is considered as the best option to earn maximum return on
investment made in the urban context. Accordingly, it will require that absolute land rights
should remain vested with the government and never transferred to beneficiaries for
sale/illegal transfer. Such land should be given on lease so that when need arises due to
scarcity of land in subsequent years, the given land can be used for creating larger stock
in the affordable housing category.
 Promoting partnership; In order to make such schemes viable, successful and focused
on creating large housing stock for the weaker sections of the society, it will be desirable
that partnership approach needs to be taken up on a larger platform. Instead of limiting the
partnership between the government and beneficiaries in the present site and services
scheme, it should be extended by including the private sector also in order to synergies
their strength and resources. In this partnership, the contribution of the
government/parastatal agencies shall remain limited to providing developed land with
appropriate sanctions. Beneficiaries will contribute their resources on defined norms
periodically, whereas private sector would put their resources for construction of the
houses, while the funds shall be tied with the identified financial institutions/ banks. In the
other model, private sector can be replaced by an appropriate construction agency
engaged/ managed by the co-operative society formed by the beneficiaries. Making
adequate provision of the retail shops for meeting the day-to-day needs of the beneficiaries,
creation of crèche for the beneficiaries , providing community center and other service
besides opportunities of skilling/gainful employment/carrying out trade, as integral part of
planning, designing and development of the scheme will help in making the project more
viable, self-contained and sustainable.
 Creating Multiple Options for the Shelter; While accepting the basic premise of the
scheme, it will be appropriate that instead of a single option of providing a developed plot
of a standard size to each of the beneficiaries for construction of the house on the plot, it
will be appropriate that before framing the scheme, agencies given the task of
framing/implementing the scheme, should look objectively at the requirement of the
identified beneficiaries in terms of shelter , based on their capacity, need and resources.
This will help in making the scheme more rational and realistic by creating different
options of providing the shelter besides minimizing the element of misuse, abuse and
speculation of the resources and the opportunity being created for the slum dwellers.
 Migrating from Right to Own shelter to Right to Shelter; Concept of ownership
embedded in making provision of the ownership of the shelter for the poor, in the Indian
context, has done greatest damage to achieving the objective of creating shelter for the
poor. For poor household, quality of life has little meaning when compared with the
opportunity of earning large amount of money in a lumpsum manner. Houses/land allotted
by parastatal agencies offer that opportunity to such migrants/poor urban residents, who
are perpetually short on finances. Accordingly, it will be appropriate that government must
move away from the policy of creating ownership of shelter while universally accepting
the right to appropriate shelter for all citizens, including poorest of the poor.
 Appropriate Siting and Planning; In order to make site and services scheme more
realistic, rational, effective and efficient, it will be prudent on the part of agency made
responsible for implementing the scheme, to put in place a group of experts from planning,
architecture, engineering, finance, revenue, services, infrastructure etc., to undertake a
detailed study and analysis for locating suitable land for siting of the project. Selection of
appropriate site remains critical, because large number of site and services projects have
failed to take off and have remained neglected for the simple reason that site selected
was not found to be suitable by the beneficiaries due to various reasons. Selection of site
should not be merely guided by the cost of land or easy availability of land, being a
government land, but should be closely related with the need and requirement of identified
beneficiaries including their place of work, availability of good connectivity and
availability of efficient system of mass transportation for the people who are to be located
in the scheme. In addition to selection of the suitable site for the project, it will be critical
that these sites are appropriately and rationally planned and designed in close consultation
with the identified beneficiaries, because only beneficiaries know what is the best shelter
which suits their culture, living and requirements. However, planning and designing of
the scheme would need the active involvement of the professionals to create appropriate,
affordable, qualitative, cost-effective and livable shelter for the slum dwellers. Planning
and designed must be carried out on the prescribed norms and standards based on premise
to make the project self-contained and self-sustaining.
.

More Related Content

Similar to Site and Services- As an Option for Affordable Housing

Creating Places To Age in New Jersey Municipal Best Practices
Creating Places To Age in New Jersey Municipal Best PracticesCreating Places To Age in New Jersey Municipal Best Practices
Creating Places To Age in New Jersey Municipal Best PracticesNew Jersey Future
 
International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)inventionjournals
 
2005 - DTES Housing Plan
2005 - DTES Housing Plan2005 - DTES Housing Plan
2005 - DTES Housing PlanBen Johnson
 
Role of priva sector in making value addition to housing
Role of priva sector in making value addition to  housing  Role of priva sector in making value addition to  housing
Role of priva sector in making value addition to housing JIT KUMAR GUPTA
 
Sustainable communities in brief
Sustainable communities in briefSustainable communities in brief
Sustainable communities in briefSVKM'S IOT DHULE
 
Barbra Kohlo: We Effect work with Housing Cooperatives in Africa
Barbra Kohlo: We Effect work with Housing Cooperatives in AfricaBarbra Kohlo: We Effect work with Housing Cooperatives in Africa
Barbra Kohlo: We Effect work with Housing Cooperatives in Africacooperatives
 
Issue paper - secure tenure in urban slums low-res FINAL
Issue paper - secure tenure in urban slums low-res FINALIssue paper - secure tenure in urban slums low-res FINAL
Issue paper - secure tenure in urban slums low-res FINALAngeli Alba
 
Urban community-based adaptation: opportunities and challenges
Urban community-based adaptation: opportunities and challengesUrban community-based adaptation: opportunities and challenges
Urban community-based adaptation: opportunities and challengesIIED
 
Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...
Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...
Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...CrimsonpublishersCJMI
 
Urban Slum Improvements in Developing Countries: Policy and Strategy
Urban Slum Improvements in Developing Countries: Policy and StrategyUrban Slum Improvements in Developing Countries: Policy and Strategy
Urban Slum Improvements in Developing Countries: Policy and StrategyOswar Mungkasa
 
Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...
Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...
Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...IOSR Journals
 
Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...
Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...
Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...Ericsson
 
Reducing poverty the role of housing in sierra leone
Reducing poverty the role of housing in sierra leoneReducing poverty the role of housing in sierra leone
Reducing poverty the role of housing in sierra leoneRashid Ortole Kargbo
 

Similar to Site and Services- As an Option for Affordable Housing (20)

Creating Places To Age in New Jersey Municipal Best Practices
Creating Places To Age in New Jersey Municipal Best PracticesCreating Places To Age in New Jersey Municipal Best Practices
Creating Places To Age in New Jersey Municipal Best Practices
 
International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)International Journal of Humanities and Social Science Invention (IJHSSI)
International Journal of Humanities and Social Science Invention (IJHSSI)
 
2005 - DTES Housing Plan
2005 - DTES Housing Plan2005 - DTES Housing Plan
2005 - DTES Housing Plan
 
Role of priva sector in making value addition to housing
Role of priva sector in making value addition to  housing  Role of priva sector in making value addition to  housing
Role of priva sector in making value addition to housing
 
Sustainable communities in brief
Sustainable communities in briefSustainable communities in brief
Sustainable communities in brief
 
Barbra Kohlo: We Effect work with Housing Cooperatives in Africa
Barbra Kohlo: We Effect work with Housing Cooperatives in AfricaBarbra Kohlo: We Effect work with Housing Cooperatives in Africa
Barbra Kohlo: We Effect work with Housing Cooperatives in Africa
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPER
 
Issue paper - secure tenure in urban slums low-res FINAL
Issue paper - secure tenure in urban slums low-res FINALIssue paper - secure tenure in urban slums low-res FINAL
Issue paper - secure tenure in urban slums low-res FINAL
 
Measuring housing quality
Measuring housing qualityMeasuring housing quality
Measuring housing quality
 
Urban community-based adaptation: opportunities and challenges
Urban community-based adaptation: opportunities and challengesUrban community-based adaptation: opportunities and challenges
Urban community-based adaptation: opportunities and challenges
 
Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...
Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...
Promotion of Polycentric Settlement (Growth Centre) for Sustainable Developme...
 
HOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPERHOUSING & HOUSING POLICY ,HABITAT III PAPER
HOUSING & HOUSING POLICY ,HABITAT III PAPER
 
op sir.pdf
op sir.pdfop sir.pdf
op sir.pdf
 
Urban Slum Improvements in Developing Countries: Policy and Strategy
Urban Slum Improvements in Developing Countries: Policy and StrategyUrban Slum Improvements in Developing Countries: Policy and Strategy
Urban Slum Improvements in Developing Countries: Policy and Strategy
 
Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...
Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...
Assessment of Mehr Housing Project as an Example of Housing for Low-Income Pe...
 
M012147074
M012147074M012147074
M012147074
 
Role of an NGO in Community Mobilisation in redevelopment of slum
Role of an NGO in Community Mobilisation in redevelopment of slumRole of an NGO in Community Mobilisation in redevelopment of slum
Role of an NGO in Community Mobilisation in redevelopment of slum
 
Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...
Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...
Conference Paper: Citizen Field Engineers: Crowdsourced Maintenance of Connec...
 
Housing and housing policy, HSTU
Housing and housing policy, HSTUHousing and housing policy, HSTU
Housing and housing policy, HSTU
 
Reducing poverty the role of housing in sierra leone
Reducing poverty the role of housing in sierra leoneReducing poverty the role of housing in sierra leone
Reducing poverty the role of housing in sierra leone
 

More from JIT KUMAR GUPTA

Factors Causing Urban Heat Island- 14.4,24.docx
Factors Causing Urban Heat Island- 14.4,24.docxFactors Causing Urban Heat Island- 14.4,24.docx
Factors Causing Urban Heat Island- 14.4,24.docxJIT KUMAR GUPTA
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptJIT KUMAR GUPTA
 
Planning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategiesPlanning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategiesJIT KUMAR GUPTA
 
_Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy...
_Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy..._Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy...
_Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy...JIT KUMAR GUPTA
 
Reviewing, Revising and Redefining Master Plans and Development Plans to Ma...
Reviewing, Revising and  Redefining Master Plans and Development Plans to  Ma...Reviewing, Revising and  Redefining Master Plans and Development Plans to  Ma...
Reviewing, Revising and Redefining Master Plans and Development Plans to Ma...JIT KUMAR GUPTA
 
Rationalizing the Planned Growth of Urban India- paper.docx
Rationalizing the Planned Growth of Urban India- paper.docxRationalizing the Planned Growth of Urban India- paper.docx
Rationalizing the Planned Growth of Urban India- paper.docxJIT KUMAR GUPTA
 
Suggestion and Options for integrating villages. within the framework of the...
Suggestion and Options for  integrating villages. within the framework of the...Suggestion and Options for  integrating villages. within the framework of the...
Suggestion and Options for integrating villages. within the framework of the...JIT KUMAR GUPTA
 
Making cities Climate Responsive and Sustainable
Making cities Climate Responsive and SustainableMaking cities Climate Responsive and Sustainable
Making cities Climate Responsive and SustainableJIT KUMAR GUPTA
 
Managing Planning and Development of Citie- 26-2-24.docx
Managing Planning and  Development of  Citie-  26-2-24.docxManaging Planning and  Development of  Citie-  26-2-24.docx
Managing Planning and Development of Citie- 26-2-24.docxJIT KUMAR GUPTA
 
Agenda, Approach and Options for Rationalising and Redefining Future Indian ...
Agenda, Approach and Options for Rationalising and Redefining Future  Indian ...Agenda, Approach and Options for Rationalising and Redefining Future  Indian ...
Agenda, Approach and Options for Rationalising and Redefining Future Indian ...JIT KUMAR GUPTA
 
-Redefining and Rationalising Development Controls - Copy.docx
-Redefining and Rationalising  Development Controls - Copy.docx-Redefining and Rationalising  Development Controls - Copy.docx
-Redefining and Rationalising Development Controls - Copy.docxJIT KUMAR GUPTA
 
Redefining and Rationalising Development Controls -Issues and Options
Redefining and Rationalising Development Controls -Issues and OptionsRedefining and Rationalising Development Controls -Issues and Options
Redefining and Rationalising Development Controls -Issues and OptionsJIT KUMAR GUPTA
 
Book on-Identifying, Analysing and Planning sites for Architectural Projects
Book on-Identifying, Analysing and Planning sites for Architectural ProjectsBook on-Identifying, Analysing and Planning sites for Architectural Projects
Book on-Identifying, Analysing and Planning sites for Architectural ProjectsJIT KUMAR GUPTA
 
7 Leveraging Tourism for Promoting Sustainable Development of Hill States.pdf
7 Leveraging  Tourism for Promoting Sustainable Development of Hill States.pdf7 Leveraging  Tourism for Promoting Sustainable Development of Hill States.pdf
7 Leveraging Tourism for Promoting Sustainable Development of Hill States.pdfJIT KUMAR GUPTA
 
Strategies and Options For Making India Zero Waste Water-26-2-24.pptx
Strategies and Options For Making India Zero Waste Water-26-2-24.pptxStrategies and Options For Making India Zero Waste Water-26-2-24.pptx
Strategies and Options For Making India Zero Waste Water-26-2-24.pptxJIT KUMAR GUPTA
 
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...JIT KUMAR GUPTA
 
Hill Area development- Issues and Options
Hill Area development- Issues and OptionsHill Area development- Issues and Options
Hill Area development- Issues and OptionsJIT KUMAR GUPTA
 
Preface-Making Hill Area Great Place to Live.docx
Preface-Making Hill Area Great Place to Live.docxPreface-Making Hill Area Great Place to Live.docx
Preface-Making Hill Area Great Place to Live.docxJIT KUMAR GUPTA
 
Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.JIT KUMAR GUPTA
 
Options for Making Housing Affordable a distinct Reality
Options for Making Housing Affordable a distinct RealityOptions for Making Housing Affordable a distinct Reality
Options for Making Housing Affordable a distinct RealityJIT KUMAR GUPTA
 

More from JIT KUMAR GUPTA (20)

Factors Causing Urban Heat Island- 14.4,24.docx
Factors Causing Urban Heat Island- 14.4,24.docxFactors Causing Urban Heat Island- 14.4,24.docx
Factors Causing Urban Heat Island- 14.4,24.docx
 
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.pptMaking and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
Making and Unmaking of Chandigarh - A City of Two Plans2-4-24.ppt
 
Planning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategiesPlanning and Designing Green buildings-.issues, options and strategies
Planning and Designing Green buildings-.issues, options and strategies
 
_Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy...
_Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy..._Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy...
_Neighborhood Planning in Capital City of Chandigarh- An Appraisal (2) - Copy...
 
Reviewing, Revising and Redefining Master Plans and Development Plans to Ma...
Reviewing, Revising and  Redefining Master Plans and Development Plans to  Ma...Reviewing, Revising and  Redefining Master Plans and Development Plans to  Ma...
Reviewing, Revising and Redefining Master Plans and Development Plans to Ma...
 
Rationalizing the Planned Growth of Urban India- paper.docx
Rationalizing the Planned Growth of Urban India- paper.docxRationalizing the Planned Growth of Urban India- paper.docx
Rationalizing the Planned Growth of Urban India- paper.docx
 
Suggestion and Options for integrating villages. within the framework of the...
Suggestion and Options for  integrating villages. within the framework of the...Suggestion and Options for  integrating villages. within the framework of the...
Suggestion and Options for integrating villages. within the framework of the...
 
Making cities Climate Responsive and Sustainable
Making cities Climate Responsive and SustainableMaking cities Climate Responsive and Sustainable
Making cities Climate Responsive and Sustainable
 
Managing Planning and Development of Citie- 26-2-24.docx
Managing Planning and  Development of  Citie-  26-2-24.docxManaging Planning and  Development of  Citie-  26-2-24.docx
Managing Planning and Development of Citie- 26-2-24.docx
 
Agenda, Approach and Options for Rationalising and Redefining Future Indian ...
Agenda, Approach and Options for Rationalising and Redefining Future  Indian ...Agenda, Approach and Options for Rationalising and Redefining Future  Indian ...
Agenda, Approach and Options for Rationalising and Redefining Future Indian ...
 
-Redefining and Rationalising Development Controls - Copy.docx
-Redefining and Rationalising  Development Controls - Copy.docx-Redefining and Rationalising  Development Controls - Copy.docx
-Redefining and Rationalising Development Controls - Copy.docx
 
Redefining and Rationalising Development Controls -Issues and Options
Redefining and Rationalising Development Controls -Issues and OptionsRedefining and Rationalising Development Controls -Issues and Options
Redefining and Rationalising Development Controls -Issues and Options
 
Book on-Identifying, Analysing and Planning sites for Architectural Projects
Book on-Identifying, Analysing and Planning sites for Architectural ProjectsBook on-Identifying, Analysing and Planning sites for Architectural Projects
Book on-Identifying, Analysing and Planning sites for Architectural Projects
 
7 Leveraging Tourism for Promoting Sustainable Development of Hill States.pdf
7 Leveraging  Tourism for Promoting Sustainable Development of Hill States.pdf7 Leveraging  Tourism for Promoting Sustainable Development of Hill States.pdf
7 Leveraging Tourism for Promoting Sustainable Development of Hill States.pdf
 
Strategies and Options For Making India Zero Waste Water-26-2-24.pptx
Strategies and Options For Making India Zero Waste Water-26-2-24.pptxStrategies and Options For Making India Zero Waste Water-26-2-24.pptx
Strategies and Options For Making India Zero Waste Water-26-2-24.pptx
 
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...
 
Hill Area development- Issues and Options
Hill Area development- Issues and OptionsHill Area development- Issues and Options
Hill Area development- Issues and Options
 
Preface-Making Hill Area Great Place to Live.docx
Preface-Making Hill Area Great Place to Live.docxPreface-Making Hill Area Great Place to Live.docx
Preface-Making Hill Area Great Place to Live.docx
 
Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.Land Management and sourcing land for sustainable Urban Development.
Land Management and sourcing land for sustainable Urban Development.
 
Options for Making Housing Affordable a distinct Reality
Options for Making Housing Affordable a distinct RealityOptions for Making Housing Affordable a distinct Reality
Options for Making Housing Affordable a distinct Reality
 

Recently uploaded

Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Nehwal
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaonsoniya singh
 
Puravankara Mundhwa Pune E-Brochure.pdf
Puravankara Mundhwa Pune  E-Brochure.pdfPuravankara Mundhwa Pune  E-Brochure.pdf
Puravankara Mundhwa Pune E-Brochure.pdfManishSaxena95
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRasmaqueen5
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruShivaSeo3
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...asmaqueen5
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdfashiyadav24
 
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...gurkirankumar98700
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhiasmaqueen5
 
Sankla East World Hadapsar Pune E-Brochure.pdf
Sankla East World Hadapsar Pune  E-Brochure.pdfSankla East World Hadapsar Pune  E-Brochure.pdf
Sankla East World Hadapsar Pune E-Brochure.pdfManishSaxena95
 
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfkratirudram
 
Raquel Thompson: Combining Creativity with Practicality in Architecture
Raquel Thompson: Combining  Creativity with Practicality in ArchitectureRaquel Thompson: Combining  Creativity with Practicality in Architecture
Raquel Thompson: Combining Creativity with Practicality in ArchitectureRaquel Thompson Barbados
 
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdfAparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdffaheemali990101
 
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfRustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfmonikasharma630
 
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDFMs Riya
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdfManishSaxena95
 
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
 
Puravankara Mundhwa Pune E-Brochure.pdf
Puravankara Mundhwa Pune  E-Brochure.pdfPuravankara Mundhwa Pune  E-Brochure.pdf
Puravankara Mundhwa Pune E-Brochure.pdf
 
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCRGirls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
Girls in Kalyanpuri }Delhi↫8447779280↬Escort Service. In Delhi NCR
 
Premium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road BengaluruPremium Villa Projects in Sarjapur Road Bengaluru
Premium Villa Projects in Sarjapur Road Bengaluru
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
 
Omaxe Dwarka In Delhi E Brochure Pdf
Omaxe Dwarka In Delhi E Brochure     PdfOmaxe Dwarka In Delhi E Brochure     Pdf
Omaxe Dwarka In Delhi E Brochure Pdf
 
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
Telibagh & Call Girls Lucknow - 450+ Call Girl Cash Payment 🎂 8923113531 🎪 Ne...
 
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In DelhiCall Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
Call Girls In Mayur Vihar Delhi ☆↫8447779280 ❤Escorts Service In Delhi
 
Sankla East World Hadapsar Pune E-Brochure.pdf
Sankla East World Hadapsar Pune  E-Brochure.pdfSankla East World Hadapsar Pune  E-Brochure.pdf
Sankla East World Hadapsar Pune E-Brochure.pdf
 
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
Call Girls In Vasant Vihar Delhi 💯Call Us 🔝8264348440🔝
 
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdfThe Omaxe State Dwarka Delhi-broucher.pdf.pdf
The Omaxe State Dwarka Delhi-broucher.pdf.pdf
 
Raquel Thompson: Combining Creativity with Practicality in Architecture
Raquel Thompson: Combining  Creativity with Practicality in ArchitectureRaquel Thompson: Combining  Creativity with Practicality in Architecture
Raquel Thompson: Combining Creativity with Practicality in Architecture
 
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdfAparna Greenscapes Kompally Hyderabad E - Brochure.pdf
Aparna Greenscapes Kompally Hyderabad E - Brochure.pdf
 
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 12 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdfRustomjee Cleon Bandra East, Mumbai - Brochure.pdf
Rustomjee Cleon Bandra East, Mumbai - Brochure.pdf
 
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
 
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdfMagarpatta Nova Elegance Mundhwa Pune  E-Brochure.pdf
Magarpatta Nova Elegance Mundhwa Pune E-Brochure.pdf
 
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Shastri Nagar Delhi reach out to us at 🔝8264348440🔝
 
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Model Town Delhi 💯Call Us 🔝8264348440🔝
 

Site and Services- As an Option for Affordable Housing

  • 1. Siteand Services-AsanOptionforAffordable Housing Introduction Globally, nations are fast urbanizing with urban areas recording high degree of population growth and increase in their physical dimensions. Uncontrolled rapid growth of urban areas in majority of developing countries, has led to emergence of large number of physical, social, economic and environmental problems. Mismatch between demand and supply, has led to shortfall emerging in many sectors. Besides acute shortage of basic infrastructures, urban areas are facing massive deficit/shortage of housing to provide adequate, affordable and appropriate shelter to the urban migrants .Genesis of housing shortage has roots in the fact that majority of the people moving to the urban areas often lack the necessary resources and capacity to acquire land and construct/rent appropriate shelter. In addition, designated government agencies and urban local bodies operating at local level have been found to be lacking in capacity, capability, willingness and resources to create sufficient housing stock, which are affordable for the poor urban migrants and residents of urban areas. Combination of these factors has led to proliferation of slums and squatter settlements in majority of urban areas. In the face of rapidly growing population and rural-urban migration, uncontrolled, unregulated and mushroom growth of urban slums have emerged as a critical urban issue. Issue of managing urban slums has been engaging the attention of various governments in position, at the local, state and national levels, for finding appropriate solutions to minimize the origin and growth of such slums; for making cities more clean, green & inclusive and providers of more livable space for the urban residents, including the poorest of the poor, to lead a dignified life. Accordingly, over the years, various schemes have been conceptualized, evolved and implemented by the governments and parastatal agencies, globally and locally, to overcome the problem related to slums and the housing shortage in the affordable category . Majority of solutions adopted for resolving these problems, revolved around providing built-up houses to the beneficiaries by the parastatal agencies. However, providing constructed houses involved large resources and considerable time taken for construction of houses. Accordingly, supply of built houses was found to be in both slow and limited, as compared to the large demand for such houses. Moreover, availability of limited resources and the limitation of capacity of parastatal agencies to deliver adequate houses has invariably led to aggravation of the problem related to shelter for the lower strata of economic pyramid. Accordingly, it was thought prudent to look for more feasible, rational, realistic, cost-effective and time efficient options for increasing the supply of the housing stock for the urban poor/slum dwellers. Looking at the failure and inability of the various conventional housing approaches, adopted by the government and parastatal agencies to address the issue of providing effective and efficient solution to the housing the slum dwellers including squatters and poor in the urban areas, it was thought to find an alternate housing scheme which should be more cost-effective, effective and efficient by involving both beneficiaries and stakeholders in creation of large housing stock. Considering the entire context and need for involving beneficiaries and using ingenuity and perseverance of squatters to house themselves, providing sites and services to the beneficiaries,
  • 2. was considered as the most viable and appropriate answer to the problems of housing the poor in developing cities. Numerous studies made and analysis carried out by experts and various national and international educational/professional institutes had revealed that genesis of the rapid growth and massive development of the squatter settlements lies in the exclusion/non-involvement of the beneficiaries, high cost of urban land and non- availability of appropriate right to legally construct house on the land as the prime reason for acute housing shortage and mushroom growth of slums in urban areas. Understanding /evaluating ,closely and objectively, the dynamics involved in the development and expansion of squatter settlements, has led to evolution of large variety of innovative housing schemes in developing countries. These schemes focused on rationally solving the challenges posed by the acute shortage of housing besides managing growth of slums ,by creating large housing stock in the affordable category .For improving the environmental quality and providing basic infrastructure and services in the slums; sites-and-services" schemes was conceptualized as one of the sustainable and reliable option, made applicable for such squatter settlements. Considering the perpetual problem posed by large magnitude of ever growing and mushrooming of slums on the urban landscape, Site and services has been used, as one of the simple and direct option ,to minimize growth of slums and resettle the slum dwellers at minimal cost and minimum effort to the parastatal agencies, by involving the beneficiaries and their resources through a system of collaborative and mutually supportive approach. Genesis of the massive support to the site and services scheme was found to be in its capacity to address, effectively and logically, the critical factors which led to mushrooming of slums in urban areas. Factors involved in origin, growth and spread of squatter settlements invariably revolved around; high degree of congestion, unplanned and haphazard development, high cost of land, lack of security of tenure and non- availability of basic essential services including water supply, sewerage, roads, electricity etc. However, studies made and analysis carried out indicated that construction of structure, though slow ,was not the major problem in these slums, because it was undertaken by the individuals based on availability of resources, materials and capacity to build. Major issue remained the availability of serviced and developed land along with security of tenure of such land. Considering the fact that housing remains essentially an individual based activity, accordingly it was felt that for providing an optimum solution to create large housing stock in affordable category, beneficiaries should be personally/actively involved by pooling and making available their resources for the construction of their houses. Accordingly, it was thought prudent that if government takes on the role of a facilitator instead of being provider ,by making available appropriate serviced land duly supported with basic infrastructures at reasonable and affordable price with adequate security of tenure, then it will be possible to minimize the problem of slums by creating large stock of houses with the active co-operation of beneficiaries. Recognizing that the vast majority of low income families in the world build their own shelter, which lack basic hygiene, service, access and electricity, the site and services scheme was considered to be the best option for supporting the poor to create appropriate shelter in the urban context. The realization that providing a "complete" serviced house by government agencies is not possible or simply cannot be afforded by most low-income families also prompted a shift in focus from supplying a fully serviced house to that of providing only serviced land. The key characteristic of
  • 3. the approach was the use of the beneficiaries so called sweat equity and other available resources, both physical, technical and financial, for the actual construction and development of the houses. Looking at the apparent distinct advantages of the approach, Sites-and-services schemes became the by-word for solving the problem of squatter settlements. Squatter settlements were and has always been considered illegal and in order to relocate and rehabilitate the squatters (as a function of "slum clearance"), plots of land (or sites) with infrastructure on it (or services) were provided, and the beneficiaries had to build their own houses on such land. There are large variety of sites- and-services schemes adopted globally by different countries/agencies ranging from the subdivided plot only, to a serviced plot of land with a "core" house built on it, depending upon the local conditions and available resources. As per Wikepedia; Site and services first made applicable on a large scale in Madras (now Chennai) in 1972 when the World Bank engaged Christopher Charles Benninger to advise the Madras Metropolitan Development Authority (MMDA) on their housing sector investment. The approach linked the user group's ability to pay with land prices and the costs of rudimentary and upgradable infrastructure. The fundamental idea was to market plots with essential infrastructure at market prices, to avoid the resale of subsidized housing, directed at low- income groups. The first major scheme planned by Benninger, at Arambakkum in Chennai, created about 7,000 shelter units, within the paying capacity of the urban poor. Within five years the MMDA created more than 20,000 units and the approach became a major strategy of the World Bank to tackle a variety of shelter problems globally. Considering the distinct advantages of the scheme, the World Bank supported and funded “sites and services” projects globally for adoption as a mechanism to promote housing for the slum dwellers. Many countries in South America, Asia and Africa took up this concept, and with the World Bank strongly advocating this approach and providing key finance for a number of projects, the idea received widespread approval. In India, scheme was made applicable in 27 major cities between the period spanning between 1977 and 1997. Sites-and-Services Scheme Various inputs that go into making of the shelter include; finance, building materials, construction technology, machinery/equipment and labour. The genesis behind Sites-and-services schemes is that: low-income people have always been housing themselves both legally and illegally, in most urban areas of the developing world. Site and Services scheme depart from the earlier housing schemes, like low-cost housing or subsidized high-rise housing units, undertaken by the state/parastatal agencies, in the concept and the approach that scheme recognizes the ability, capacity and capability of the low-income households to build their own house, provided an opportunity was given through appropriate handholding. Considering the entire gamut, genesis, scope and approach, "Sites-and-Services" scheme has been defined differently by different agencies in terms of ; ‘ making provision of plots of land along with a bare minimum of essential infrastructure needed for habitation either on ownership or land lease tenure basis. It has also been defined as an approach to bring shelter within the economic reach of the poor. However, the basic approach and intent of the scheme remains universal with variation in contents of the scheme. The
  • 4. essential components of site and services scheme are the plot of land, infrastructure (like roads, water supply, drainage, electricity or a sanitary network), and the house itself. Basic agenda under the scheme remains, identifying and sourcing appropriate and adequate land by the State/ Housing Boards/ Development Authorities/ Improvement Trusts/ Urban local authorities/designated parastatal agencies, in the urban setting or in close vicinity of urban areas, for housing the urban poor. The land is then planned/designed by undertaking sub-division of land by the designated agency, based on the area norms approved for each beneficiary. Land is then planned/designated into land parcels/plots for housing, defining area under roads, open spaces, public amenities, services etc. needed to serve the number of beneficiaries to be housed . Normally these areas are planned not based on any norms. In majority of cases, objective remains to accommodate the maximum number of identified beneficiaries, which invariably lead to high proportion of land going under plots to be allotted with high population density, with minimum area allocated to roads, open spaces and supportive amenities and facilities. Basic services of water supply, sewerage , roads, storm water drainage, electricity etc. are then planned and provided within the scheme area. In addition, the plots are provided with certain amenities which remain at variance in various models defined for site and services. Beneficiaries, along with the developed plots, are given in certain cases construction comprising of foundations and walls up to defined plinth height along with the provision of toilets enclosed with walls, containing water closet and tap for sourcing water and bathing. Beneficiaries are also given the rights of connecting the services provided in the plot with the public services laid in the street. In addition, in certain cases beneficiaries are also given the standard design of the house to take up the construction on the plot and to maintain uniformity in the design of the houses to be constructed. The possession of the developed plot with services is then given to the identified beneficiaries for construction of the house on the self-help basis. However, no time limit is defined for completing the shelter. Thus, the sites-and-services approach mandate the role of government agencies only in the preparation of land parcels or plots with certain basic infrastructure, which is to be sold or leased to the intended beneficiaries on a pre-defined price by such authority, with actual house construction left to the beneficiaries themselves by using their own resources, including informal finance or family labour and various other types of community participation modes to build their house. The beneficiaries could also build the house in phases, depending on the availability of financial and other resources. Basic principle of the development of a squatter settlement remains development of settlements/houses without involving squatting Typologies of the Sites and -Services Schemes Depending on the financial and technical resources available, willingness to take up the scheme; number of beneficiaries to be catered; inhouse capacity of the implementing agency; ready availability of appropriate land; capacity of the beneficiaries to pay the cost; making scheme cost- effective, rational & acceptable; political commitment and time available for implementation, large variations in the content and scope can be observed in the sites-and-services schemes . This
  • 5. variation remains the outcome of the juxta- positioning of the need to create a balance between minimum "acceptable" housing conditions and affordability of the beneficiaries. While following the basic rule of a plot of land (sites) and essential infrastructure (services), the degree of participation and inputs of the implementing agency on one hand, and the beneficiaries on the other, varied greatly. They ranged from an empty plot of land and some services (like water, electricity and sanitation connections) to the provision of a "core" house (consisting of a toilet and kitchen only) on the plot of land with attached services. As per Hari Srinivas in his article, ’Urban Squatters and Slums Sites and Services’, some of the variations attempted in sites-and-services projects included:  Utility wall: In certain site and services projects, beneficiaries along with the developed plots were also given the benefit of a "utility" wall, which was built on the plot providing access for water, drainage, sewerage and electricity. The beneficiaries were supposed to build the house around this wall, and utilize the connections from it. Some projects provided this utility wall in the form of a sanitary core consisting of a bathroom/toilet, and/or a kitchen.  Latrine: Due to its critical waste disposal problem, many projects provided a basic latrine (bathroom and/or toilet) as part of each plot.  Roof frame: The roof being the costliest component of a house and requires skilled labour to build, therefore, some projects provided the roof structure on posts, and the beneficiaries was to build the walls according to their requirements.  Plinth; In few projects, construction was made up to plinth level by the implementing agency, which formed the base over which the beneficiaries was to build their house.  Shell house, core house ; Other variations in these schemes involved construction of the shell house (which is an incomplete house consisting of a roof and two side walls, but without front or rear walls) and a core house (consisting of one complete room) by the parastatal agencies with remaining construction to be completed by the beneficiaries. Agencies involved As already explained, schemes remain a joint venture and collaborative approach involving the beneficiaries living in the slum/squatter settlement and, providers in the shape of parastatal agencies, entrusted with the task and mandate to implement the scheme. The two key actors in a sites-and-services project remained- the intended beneficiaries and the implementing agency. Intended beneficiaries of the project are known to be part of the lower income group of an urban area – squatters/slum dwellers, who are to be relocated from their original illegal settlement. They are, primarily and essentially, characterized by low income; informal jobs/irregular employment, lacking invariably in necessary assets, resources, capacity, employment and income to enable them to afford a formal house. It was also observed that few of the beneficiaries who were possessed/armed with basic skills in construction; having financial resources or those who could manage resources through formal/informal system, were in a position to build their own house, whereas majority of the beneficiaries having limitation of capacity, resources and willingness ,failed to make bare minimum construction on the site which has led to partial failure and success of many sites-and-services schemes.
  • 6. The other major actor in the sites-and-services schemes were the implementing agencies, which in majority of cases were government department or parastatal agencies including Housing Boards, State/Local level Urban Development Authorities, Improvement Trusts, Urban Local Bodies etc. Such agencies undertook the site and services schemes with twin objectives of; fulfilling the agenda and mandate of the national government to provide housing for all in general and housing for low-income families in particular in the urban setting and to make the cities slum free by removing eyesores that squatter settlements depict. In addition to beneficiaries and parastatal agencies, site and services schemes involved several agencies responsible for making provision of infrastructure, services and amenities. Number of non-governmental and voluntary organizations have also known to play critical role in educating, creating awareness about the various facets of the scheme and involving beneficiaries in planning , designing and implementing the scheme besides bringing beneficiaries and implementing agencies on the same platform to make the scheme operational. Limitations and Way – Forward. However, despite distinct theoretical and conceptual advantages showcased, Sites-and-services schemes have also faced considerable opposition and failure in a number of projects. Success in the scheme were few and failures have been found to be many. Reasons of failure for the scheme was oversimplification of the entire context of housing and series of assumptions and misconceptions in the manner in which low-income families house themselves. However, it needs to be understood and appreciated that housing remains a highly resource intensive, time intensive, labour intensive and material intensive activity requiring dedicated financial resources, technical expertise, technical manpower, labour, expert guidance for sourcing materials, planning, designing and construction of building besides availability of appropriate land for construction of the shelter. Scheme worked on the simple premise that once the developed land is made available to the squatters, they shall be able to create an appropriate shelter with the passage of time and availability of resources without any outside guidance, support and services. It missed the point that majority of houses constructed in the slums were not only sub-standard but also poor/unsafe in quality of construction. In majority of cases these houses provided poor quality of human living. With several assumptions and misconceptions regarding living, working and resources available with low-income families, sites-and-services projects have been subject to many shortcomings. These shortcomings have found reflections in terms of; conception, execution, identification of beneficiaries, capacity of the beneficiaries to construct, resources available, need of the space, affordability, implementation of the scheme, relation between place of work and place for living, travel time and cost recovery. Thus, in majority of the cases sites-and-services schemes often failed to meet its objectives of creating affordable shelter for the urban poor. In majority of cases, it became an exercise of land speculation. As per Srinivas, scheme in larges number cases have been rendered unaffordable or inaccessible for the lowest-income groups by cumbersome bureaucratic procedures, institutional requirements and political interventions. Lack of knowledge and understanding of the manner of living culture of the beneficiaries, on the part of the agencies involved in the planning, designing and implementation of the schemes also led to numerous problems emerging in rational formulation and implementation of the scheme. Unfortunately, in majority of the cases , site and service schemes were considered as a vote bank besides providing shelter tot the poor . Some of the constraints in these schemes observed revolved around:
  • 7.  Wrong Targeting of Beneficiaries; Most of the schemes involving subsidy or making available facilities in urban setting at lower cost, invariably suffer from wrong targeting of the beneficiaries, with the result large number of ineligible people also get included as beneficiaries of the scheme. In majority of cases, it has been observed that eligibility conditions are so designed that it benefit/focus on a particular group with the connivance of the officials deputed to enumerate the eligible beneficiaries. With large scale intervention of the local politicians, prevailing local interests, pressure exerted by the mafia involved with the development of the squatter colonies, lack of accountability and corrupt practices prevailing in the official system, large number of ineligible people were identified and included as beneficiaries. Large number of identified beneficiaries made site and services schemes either non-starter or led to taking up only limited number of schemes which were devoid of merits. It also led to large speculative practices in which plots of land allotted was traded with non-beneficiaries not belonging to the economical weaker sections of the society.  Wrong Siting and Location of Scheme: Since the scheme involved making available developed land by the parastatal agencies, accordingly focus of such agencies was to find land which was low-cost, so that cost of the scheme could be minimized, irrespective of suitability of said land for the scheme. Most of these agencies had no technical manpower to identify suitable land for the scheme. While selecting land for the scheme, studies were never made, regarding understanding /appreciating the need and requirement of the beneficiaries for whom scheme was being framed , nor beneficiaries who were to be housed in the area, were consulted while defining site for the scheme. With high land costs in urban areas, most sites-and-services schemes were located on the urban fringes, where land costs were found to be lower. In the process, it led to shifting of the beneficiaries far away from their place of work, leading to increasing their cost of living due to increases travel time and cost of transportation to be paid on day to day commutation, between place of work and place of living. This discourage many beneficiaries to take advantage of such schemes and in many cases beneficiaries ,who were allotted the developed site either sold those sites at a premium or abandoned the schemes and returned back to the cities, close their work places, to create new slums.  Cumbersome Bureaucratic Procedures: Site and Services Schemes, in majority of cases have been found to be on the wrong side/suffer , due to large scale intervention and involvement of bureaucrats and cumbersome procedures involved. Selection procedures, designed to ascertain that applicant meet eligibility criteria, have been found to be largely cumbersome, often time-consuming and full of bureaucratic pitfalls, and provide opportunities for corruption. Besides, for many low-income families, the eligibility criteria were impossible to meet due to informal sector jobs or low/irregular incomes.  Delayed Provision of Services: Locating such schemes on the fringe of the city led to numerous problems of making provision of defined infrastructure on time bound basis, due to non-existent in the peri-urban area, leading to delay in providing these services and allotment of serviced plots , besides increasing the cost of development. Lack of co- ordination and spread of responsibility among multiple agencies involved in making provision of services and delay in assured flow of funds, further delayed the schemes and added cost to the beneficiaries. In many cases considerable delay was observed in the provision of the defined services, even after the land had been allocated to the beneficiaries for construction of the houses.
  • 8.  One Solution Fit all Housing Problems; Unfortunately, intent and content of the site and service scheme is based on a too simplistic assumption that by providing developed land , problem of housing the urban poor in urban area will automatically vanish, because slum dwellers have capacity and competency to build their own shelter, without any outside guidance and support. Accordingly, it got limited to defining the size of plot/land to be allotted for construction with the defined infrastructure/ services. However, scheme ignores large number of factors which need to be considered while evaluating the shelter needed by the beneficiaries. Housing remains highly personal and individual requirement and cannot be put into a standard and a straight jacket. Scheme does not take into consideration factors involving need of the shelter and its size, affordability, capacity to finance the house and its construction, size of the family, purpose of the beneficiary being in the city etc. In many cases sites were allotted to beneficiaries who were single/ unmarried, had no family and did not require such a large shelter, which were either not accepted or sold off to non-beneficiaries. Accordingly, scheme suffered from being too benevolent in large number of cases. Scheme also did not take into account realistically the need of the optimum space required for housing the family. As against a space norm of 300sqft for the affordable house in case of PMAY-U , the area available in the plotted development of 25 sq yds was 450 sqft, when the house was built on two levels. In Chandigarh, beneficiaries have made construction of houses on the allotted site up to four floors , leading to a covered are of 900sqft, which remains unrealistic and irrational for such categories of houses. Scheme needs rationalization based on the need of the beneficiaries and should offer multiple options instead of one solution fit all problems, which invariable has led to wastage of precious resources in many cases.  High Degree of Speculation; Perpetual shortage of developed and legally sanctioned land in urban areas is seen to commands high premium and accordingly remains both elusive and expensive. Cost of such land remains positively related to size of the city and location of the land. Accordingly, in majority of cases, parcels of land allotted in the site and services , which had good connectivity and were close to the developed area, commanded good price and were found to be in good demand. This led to high degree of speculation in such plots which were illegally transferred/sold, in majority of cases to the people belonging to higher strata, either for construction of the houses or as an investment for making large profit subsequently. Since, in majority of cases ,land disposal policy adopted by the development authorities remains only through auction, accordingly getting legally carved out developed land in the site and services scheme offered best option for such people to own land for making housing by buying land at a relatively low price. Majority of houses constructed in such schemes are owned by higher income strata, who bought these plots illegally. In case of schemes , which were located at far off places initially, came within the developed area over a period of time, which subsequently led to high demand of plots in these areas, leading to increasing premium of such plot creating an environment of illegal transfer of such plots. In either case it defeated the very objective of creating affordable shelter for housing the poor and minimizing the growth of slums in the urban spaces.  Poor Quality of Construction; Since very little control appeared to have been exercised on the construction and orderly development of the houses in site and services schemes, accordingly, majority of houses constructed remains beyond the norms of safety and security of buildings. Since construction of houses require appropriate skill, guidance,
  • 9. support, supervision, quality of materials and good construction techniques, self-help method adopted by majority of beneficiaries devoid of good construction practices have created low quality construction in site and services schemes.  Planned Slums; Looking at the developed site and services colonies, majority of them present a picture of chaos and disorder. These schemes display high degree of congestion, lack of open spaces and absence of basic amenities. Majority of the open spaces planned and provided within the scheme area for the benefit of the beneficiaries, remain illegally and unauthorizedly occupied by the new migrants to the city. Lack of maintenance and upkeep of the services provided has led to its damage and decay. Streets remain occupied with parked vehicles for which there exists no space. Resident welfare Associations are conspicuous by their absence. These scheme areas have emerged more as planned slums replacing the unplanned slums.  Poor Cost-Recovery: Most sites-and-services schemes have suffered in implementation, due to poor cost recovery from the beneficiaries. Reasons for such poor cost recovery can be largely attributed to the fact, that in addition to making lumpsum upfront payment as part of the cost of the plot; beneficiaries had to pay the monthly instalments ,for the cost of land allotted on regular basis shortly after moving into the scheme, besides incurring cost on part construction of the house, irrespective of the fact that he may not have regular flow of income due to casual nature of employment. In addition, increased transport, water and electricity costs added to the burden which they might not have had before. However, poor cost recovery in such schemes can also be attributed to ; delay in making provision of defined services, inefficient/cumbersome methods of collection , poor record maintenance system, absence of penalties for non-payment and lack of political and administrative will to enforce payment(Srinivas). However, despite limitations and numerous failures, the positive aspect of sites-and-services schemes that deserves support is its recognition of the ability of people to house themselves, with a little backing from the government agencies. Thus, the role of the government changed from that of a "provider" to an "enabler". It also enables parastatal agencies to save scarce resources by sharing their responsibility of housing with the intended beneficiaries and take up large number of projects with limited resources. On the part of the beneficiaries, it makes best use of existing/potential resources, both at the household level as well as the community level. On a large scale, it enables the low-income families to obtain decent housing and services, at levels that can be afforded by them. While sites-and-services schemes are not a blanket solution for all ills of low- income housing, it does provide potential for future housing, making best use of existing resources, both governmental and household. A number of local conditions and circumstances determine the type and scale of the scheme to be used. However, the scheme would need change in the approach and methodology of implementation, in order to make it more rational, objective, effective and efficient as detailed below;  Moving from individuals to Groups of Beneficiaries; Limitation of the Site and service scheme lies in the fact that it is totally focused on capacity, capability and resources of the individual beneficiary, which remains largely at variance. According individual approach remains the greatest weakness and limitation of the scheme. Since housing remains largely a multifaceted activity, accordingly it will be appropriate to shift the focus of the scheme from individual beneficiary to the group of similarly placed beneficiaries in a given
  • 10. scheme. This would require co-operative based approach to be adopted for beneficiaries involved in the scheme so as to pool their resources, knowledge, expertise, labour and commitment, to create appropriate shelter on a time bound basis.  Moving from Plotted to Flatted Development; Studies made and analysis carried out of urban development schemes has shown the plotted development remains highly inefficient, when compared with the flatted development, in terms of optimum utilization of available developed land; cost-intensive in terms of making provision and maintenance of basic services and common amenities ; cost of construction of houses; creating adequate stock of shelter on time bound; embedding sustainability in the project; promoting social cohesion and providing appropriate common services required by the community. Accordingly, considering the larger objectives of the scheme, it will be appropriate to change the typology of buildings from plotted to flatted development.  Vesting Land Rights with the Government; Over the years, it has been observed that majority of the schemes relating to the shelter for the urban poor have failed to meet its objective, when the land is allotted to the beneficiaries; by giving them the absolute right to own, use and transfer the land so made available. Accordingly, all schemes embedding the transfer of land rights to the beneficiaries has led to illegal transfer of such land on large scale, to the non-beneficiaries belonging to the higher income groups of the society. Considering the acute shortage of developed land in the urban market coupled with its high prevailing price, all urban lands are subjected to high degree of speculation and manipulations, because land is considered as the best option to earn maximum return on investment made in the urban context. Accordingly, it will require that absolute land rights should remain vested with the government and never transferred to beneficiaries for sale/illegal transfer. Such land should be given on lease so that when need arises due to scarcity of land in subsequent years, the given land can be used for creating larger stock in the affordable housing category.  Promoting partnership; In order to make such schemes viable, successful and focused on creating large housing stock for the weaker sections of the society, it will be desirable that partnership approach needs to be taken up on a larger platform. Instead of limiting the partnership between the government and beneficiaries in the present site and services scheme, it should be extended by including the private sector also in order to synergies their strength and resources. In this partnership, the contribution of the government/parastatal agencies shall remain limited to providing developed land with appropriate sanctions. Beneficiaries will contribute their resources on defined norms periodically, whereas private sector would put their resources for construction of the houses, while the funds shall be tied with the identified financial institutions/ banks. In the other model, private sector can be replaced by an appropriate construction agency engaged/ managed by the co-operative society formed by the beneficiaries. Making adequate provision of the retail shops for meeting the day-to-day needs of the beneficiaries, creation of crèche for the beneficiaries , providing community center and other service besides opportunities of skilling/gainful employment/carrying out trade, as integral part of planning, designing and development of the scheme will help in making the project more viable, self-contained and sustainable.  Creating Multiple Options for the Shelter; While accepting the basic premise of the scheme, it will be appropriate that instead of a single option of providing a developed plot of a standard size to each of the beneficiaries for construction of the house on the plot, it
  • 11. will be appropriate that before framing the scheme, agencies given the task of framing/implementing the scheme, should look objectively at the requirement of the identified beneficiaries in terms of shelter , based on their capacity, need and resources. This will help in making the scheme more rational and realistic by creating different options of providing the shelter besides minimizing the element of misuse, abuse and speculation of the resources and the opportunity being created for the slum dwellers.  Migrating from Right to Own shelter to Right to Shelter; Concept of ownership embedded in making provision of the ownership of the shelter for the poor, in the Indian context, has done greatest damage to achieving the objective of creating shelter for the poor. For poor household, quality of life has little meaning when compared with the opportunity of earning large amount of money in a lumpsum manner. Houses/land allotted by parastatal agencies offer that opportunity to such migrants/poor urban residents, who are perpetually short on finances. Accordingly, it will be appropriate that government must move away from the policy of creating ownership of shelter while universally accepting the right to appropriate shelter for all citizens, including poorest of the poor.  Appropriate Siting and Planning; In order to make site and services scheme more realistic, rational, effective and efficient, it will be prudent on the part of agency made responsible for implementing the scheme, to put in place a group of experts from planning, architecture, engineering, finance, revenue, services, infrastructure etc., to undertake a detailed study and analysis for locating suitable land for siting of the project. Selection of appropriate site remains critical, because large number of site and services projects have failed to take off and have remained neglected for the simple reason that site selected was not found to be suitable by the beneficiaries due to various reasons. Selection of site should not be merely guided by the cost of land or easy availability of land, being a government land, but should be closely related with the need and requirement of identified beneficiaries including their place of work, availability of good connectivity and availability of efficient system of mass transportation for the people who are to be located in the scheme. In addition to selection of the suitable site for the project, it will be critical that these sites are appropriately and rationally planned and designed in close consultation with the identified beneficiaries, because only beneficiaries know what is the best shelter which suits their culture, living and requirements. However, planning and designing of the scheme would need the active involvement of the professionals to create appropriate, affordable, qualitative, cost-effective and livable shelter for the slum dwellers. Planning and designed must be carried out on the prescribed norms and standards based on premise to make the project self-contained and self-sustaining. .