SlideShare a Scribd company logo
1 of 4
Download to read offline
1307 West Morehead Street - Suite 108 - Charlotte, NC - 28208 - 704.344.0445 - www.insightarch.com
PHASEDKINDERGARTENTHROUGHEIGHTHGRADE
ADAPTABLE SCHOOL PROTOTYPE
The Adaptable School Prototype is a unique opportunity to design, test, and evaluate the
viability of a pre-designed, phased kindergarten through eighth grade school. We invite
you to explore the complete design package provided in this document, ask us questions
concerning the design, cost, or feasibility, and then we in turn will modify the design to
create a school that fits your particular needs.
FEATURE FOCUS:
HUMAN SCALE
From furniture to architectural features, careful
attention is paid to the child’s interaction with
the environment.
VISUAL TRANSPARENCY / SAFETY
Interior classroom windows allow for a visual
connection with the learning commons.
TECHNOLOGY
Technology integration provides a greater
connectivity to classrooms across the globe,
access to new teaching methods, and student
participation opportunities.
DAYLIGHTING
Natural daylight is invited into each and every
classroom which has been proven to improve
student’s test scores.
OUTDOOR FITNESS
Each grade level has direct connectivity to the
outdoors, allowing for active learning and play.
COLLABORATION
Spaces are provided for varying levels of
collaboration including learning commons,
huddle spaces, and a large centralized
commons.
COMMUNITY CONNECTIVITY
The community is invited into the building for
use of the media center/ library, viewing of
the gallery walkway, and to watch after-school
performances.
FLEXIBILITY
Large open spaces such as commons areas
provide multi-functional space while furniture
and partitions allow for smaller groupings.
A R C H I T E C T S
Living Machine
Gallery Walkway
3D Art Display
Administration/ Work Room
Media Center
Guidance
Office
The Social
Commons
Performance
Music Room AThe Arts
Kitchen
Huddle Huddle
Huddle Huddle
Study NookStudy Nook
Learning
Commons
FIRST GRADE
SECOND GRADE
THIRD GRADE
FOURTH GRADE
FIFTH GRADE
Science Flex
Science Flex
Outdoor Learning
Outdoor Learning
The
Galley
KINDERGARTEN
Outdoor
Learning
Learning
Commons
Learning
Commons
Outdoor
Learning
Learning
Commons
Learning
Commons
Tutor Room
Conference
Music
Room B
Learning
Commons
The Kindergarten through Fifth grade Phase I prototype module offers a comprehensive design strategy for
a modest budget. Careful attention is placed on human scale, visual transparency, technology, daylighting,
outdoor fitness, collaboration, community connectivity, and flexibility.
PLAN FEATURES
- A secure entrance with an adminstrative work room
- Guidance office, tutor, and conference room
- An entrance art gallery for 2D, 3D, and mixed media arts
- 3 Specialty classrooms (Arts, Music, Media or Library)
- Six grade levels with 3-4 classrooms to each accommodate between 20-25 students
- Learning commons by grade level which includes lounge or stage space, meeting areas, small group work
space, a wash area for Second through Fifth grade, a storage room, and lockers or cubbies
- Flexible space for a variety of learning opportunities including stages for“campfire”space, small group
meeting areas (Huddle room) for“watering hole”space, and lounge or study nook areas for“cave”spaces
- A large centralized commons area for dining, study, performance, and exercise
- Outdoor learning environments for scientific study, fresh air, and exercise
PHASEI:KINDERGARTEN-FIFTHGRADE
PLAN KEY
Teacher/ Guidance
Specialty Classrooms
Kindergarten and First Grades
Second and Third Grades
Fourth and Fifth Grades
Adaptable Classroom
CLASSROOMS
3 classrooms per grade level
space for 1 additional classroom
per grade level
SIZE
35,000 S.F. (as shown)
40,000 S.F. (total building square
footage to include 4 classrooms
per grade)
STUDENTS
20 students per classroom
360 students @ 3 classrooms
480 students @ 4 classrooms
COST
Base cost at $100 per S.F.
$3,400,000 (total building)
THECOMMONS LEARNINGCOMMONS OUTDOORLEARNING
A R C H I T E C T S
Open To Below
Teacher’s Lounge
Guidance
Office
Manager
Interim
Office
Records Additional
Classroom
Additional
Classroom
Health
Room
Secretary
Office
Assistant
Principal
Principal
Conference
Media Loft
Reception
SIXTH GRADE
SEVENTH GRADEEIGTH GRADE
Learning
Commons
Huddle
Study Nook
Science Flex Science Flex
Huddle
Huddle
P.E. Office
Art Walk
Study Nook
Exercise Room
Fitness Center
Outdoor
Exercise
Tres Ans Cafe
Learning
Commons
Learning
Commons
Science Flex
Science Lab
The Middle School Phase II addition connects directly to the base
prototype and further expands the Charter School programmatic
requirements.
PLAN FEATURES
- A Cafe/ Commons area for dining, study, and group meetings
- An Art Walk corridor for student display
- A Wellness Center which includes a large fitness room, a smaller
exercise (weight and tumble) room, a P.E. Office/ Health room,
and access to an outdoor exercise space
- A Science Lab which includes wash sinks and upper level lab
equipment, with direct access to an outdoor courtyard
- Three grade levels with four classrooms each which will
accommodate 20-25 students
- Learning commons by grade level which includes lounge and
meeting areas, a storage room, and lockers
- Flexible space which includes three different sizes of Huddle
rooms, a booth style study nook, and science flex rooms
LEVEL TWO:
The Kindergarten through Fifth grade module has the ability to accommodate
a second story level above the music room, storage, and restrooms. This space
may provide additional classrooms, commons or open media space, two story
atrium, relocation of guidance rooms, a teacher’s lounge, and an administration
wing. Two new stairs and an elevator provide accessibility to the second story.
ADDITIONAL MODULES:
Additional modules may be added to the base prototype upon request.
Options include a Gymnasium which would house concessions, locker rooms,
and PE offices, an Arts Expansion to include practice rooms, separate choral and
instrument rooms, and a black box performance space, or a Theater to include a
stage with fixed seating, formal lobby, ticket sales, practice and dressing rooms,
and prop/ costume storage.
P.E. Office 1 P.E. Office 2
Boy’s Locker Room
Girl’s Locker Room
Storage/ Laundry
Gymnasium
Bleachers
Concessions
PHASEII:MIDDLESCHOOL
EXPANSIONPACK:PROTOTYPEMODULEUPGRADE
PLAN KEY
Teacher/ Guidance
Specialty Classrooms
Sixth Grade
Seventh Grade
Eighth Grade
Administration Offices
CLASSROOMS
4 classrooms per grade level
SIZE
22,000 S.F.
STUDENTS
20 students per classroom
240 students @ 4 classrooms
A R C H I T E C T S
FINANCIALPLAN
The following spreadsheets provide a conceptual proforma and development cost information for the Adaptable School Prototype. This data
is based on the assumption that the first year will provide for 360 students (3 classrooms per grade) while year five will include both phases
that will provide for 720 students in total. Annual revenue is based on revenue projections from LEA 2013-2014 per pupil funding for Charlotte-
Mecklenburg Schools to include state funds, local funds, and federal EC funds.
Insight Architects recognizes that each school will have different needs and requirements based on initial funding available. We have formed
relationships with funding sources which will help to fast track your plan into a reality. In addition, we have the resources to assist in your search
for a new site, for the building or purchase of temporary (modular) structures, or for locating and upfitting an existing temporary space.
Phase One Years 1 and 2 (Estimates Based on Second Year projections)
Charter School Gross Cost Annual Revenue (Year Two): 2015 2016
$3,481,310 (From Application 2nd year Projections) Source: Form 990
Source: NACPS for Same Year Grades Served: K 5
Annual Revenue # Students Annual Lease Total Dev. Costs* Dev. Cost / Pupil
$3,481,310 480 15% of Revenue 522,197$ 5,094,600$ 10,614$
$3,481,310 480 20% of Revenue 696,262$ 6,792,800$ 14,152$
Approx PPR 7,253$
Phase Two Years 3 5 (Estimates Based on provided financial projections)
Charter School Gross Cost Annual Revenue: 2016 2018
Source: Form 990
Annual Revenue # Students Source: NACPS for Same Year Grades Served: K 8
Annual Revenue # Students Annual Lease Total Dev. Costs* Dev. Cost / Pupil
Year Three
$4,105,827 560 15% of Revenue 615,874$ 6,008,527$ 10,730$
$4,105,827 560 20% of Revenue 821,165$ 8,011,370$ 14,306$
Approx PPR 7,332$
Year Four
$4,681,678 640 15% of Revenue 702,252$ 6,851,236$ 10,705$
$4,681,678 640 20% of Revenue 936,336$ 9,134,981$ 14,273$
Approx PPR 7,315$
Year Five
$5,268,759 720 15% of Revenue 790,314$ 7,710,379$ 10,709$
$5,268,759 720 20% of Revenue 1,053,752$ 10,280,505$ 14,278$
Approx PPR 7,318$
*Total Dev. Costs include everything required to complete the project: land/building acquisition, due diligence, legal fees, agent fees, permitting,
construction, interest carry, etc.
Insight will "reverse engineer" what a school can afford based on the school's actual revenue and expenses with an emphasis on design.
Development Cost
Phase One School Year: 2015 2016
3,860,668$ (Based on 20% of Operating Cost Year One (Maximum)) Grades Served: K 5
Item Description Units Cost Cost
1 Land Acquisition Acres 411,308$ Available For Acquisition
2 Real Estate Fees 6.0% 24,678$
3 Inflation 3.5% 99,960$
4 Contingency 5.0% 142,800$
Testing and Misc. 1.5% 42,840$
5 Civil Engineering 1.0% 28,560$
6 Design Fees 6.0% 171,360$
7 Construction Cost $85 /S.F. 33,600 2,856,000$
8 Furnishings/Fixtures/Equipment 3.0% 85,680.00$
9 Utilities Variable 65,000.00$ 65,000.00$
10
11
12
13
14
15
3,860,668$
Year One Cost
Annual Revenue
(Year One)
# Students (Year Two) Annual Lease Total Dev. Costs* Dev. Cost / Pupil
$2,638,123 360 15% of Revenue 395,718$ 3,860,668$ 10,724$
Total
A R C H I T E C T S

More Related Content

Similar to Adaptable School Prototype

Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Final grant
Final grantFinal grant
Final grantAGON75
 
Get Rated Outstanding By Ofsted: How Technology Can Help
Get Rated Outstanding By Ofsted: How Technology Can HelpGet Rated Outstanding By Ofsted: How Technology Can Help
Get Rated Outstanding By Ofsted: How Technology Can HelpWebanywhere Ltd
 
Wayside school udl project - jennifer taylor-burton
Wayside school   udl project - jennifer taylor-burtonWayside school   udl project - jennifer taylor-burton
Wayside school udl project - jennifer taylor-burtonjtburton
 
Differentiating instruction presentation 2
Differentiating instruction presentation 2Differentiating instruction presentation 2
Differentiating instruction presentation 2shanonmallory
 
school-tour- Play school in rohini delhi- TSWY School.pdf
school-tour- Play school in rohini delhi- TSWY School.pdfschool-tour- Play school in rohini delhi- TSWY School.pdf
school-tour- Play school in rohini delhi- TSWY School.pdfTSWYRohini
 
Learning spaces
Learning spacesLearning spaces
Learning spacesdtswanson
 
Unschool project report
Unschool project reportUnschool project report
Unschool project reportShubham Moon
 
21st Century School Presentation - Acorn High School
21st Century School Presentation - Acorn High School21st Century School Presentation - Acorn High School
21st Century School Presentation - Acorn High SchoolLisa Nielsen
 
Shs media center_facility_use_plan
Shs media center_facility_use_planShs media center_facility_use_plan
Shs media center_facility_use_planCherelleR
 
Lesson Plan Template – OverviewFor a more detailed explanati.docx
Lesson Plan Template – OverviewFor a more detailed explanati.docxLesson Plan Template – OverviewFor a more detailed explanati.docx
Lesson Plan Template – OverviewFor a more detailed explanati.docxsmile790243
 
EDUHUB DAYS 2016 - Zarina Charlesworth & Natalie Sarrasin
EDUHUB DAYS 2016 - Zarina Charlesworth & Natalie SarrasinEDUHUB DAYS 2016 - Zarina Charlesworth & Natalie Sarrasin
EDUHUB DAYS 2016 - Zarina Charlesworth & Natalie SarrasinNatalie Sarrasin
 
The blended classroom- El aula Semi presencial
The blended classroom- El aula Semi presencialThe blended classroom- El aula Semi presencial
The blended classroom- El aula Semi presencialItslearning México
 
Field Study 1 Episodes 1-6
Field Study 1 Episodes 1-6Field Study 1 Episodes 1-6
Field Study 1 Episodes 1-6kris2solamin
 
Middle school agenda day 3 (2)
Middle school agenda day 3 (2)Middle school agenda day 3 (2)
Middle school agenda day 3 (2)gnonewleaders
 
NYC iZone at WNET's Teaching and Learning
NYC iZone at WNET's Teaching and LearningNYC iZone at WNET's Teaching and Learning
NYC iZone at WNET's Teaching and LearningTom Liam Lynch
 

Similar to Adaptable School Prototype (20)

Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Final grant
Final grantFinal grant
Final grant
 
Get Rated Outstanding By Ofsted: How Technology Can Help
Get Rated Outstanding By Ofsted: How Technology Can HelpGet Rated Outstanding By Ofsted: How Technology Can Help
Get Rated Outstanding By Ofsted: How Technology Can Help
 
Wayside school udl project - jennifer taylor-burton
Wayside school   udl project - jennifer taylor-burtonWayside school   udl project - jennifer taylor-burton
Wayside school udl project - jennifer taylor-burton
 
Differentiating instruction presentation 2
Differentiating instruction presentation 2Differentiating instruction presentation 2
Differentiating instruction presentation 2
 
Learning space
Learning spaceLearning space
Learning space
 
school-tour- Play school in rohini delhi- TSWY School.pdf
school-tour- Play school in rohini delhi- TSWY School.pdfschool-tour- Play school in rohini delhi- TSWY School.pdf
school-tour- Play school in rohini delhi- TSWY School.pdf
 
Learning spaces
Learning spacesLearning spaces
Learning spaces
 
Unschool project report
Unschool project reportUnschool project report
Unschool project report
 
21st Century School Presentation - Acorn High School
21st Century School Presentation - Acorn High School21st Century School Presentation - Acorn High School
21st Century School Presentation - Acorn High School
 
Shs media center_facility_use_plan
Shs media center_facility_use_planShs media center_facility_use_plan
Shs media center_facility_use_plan
 
Drop back centers
Drop back centersDrop back centers
Drop back centers
 
Lesson Plan Template – OverviewFor a more detailed explanati.docx
Lesson Plan Template – OverviewFor a more detailed explanati.docxLesson Plan Template – OverviewFor a more detailed explanati.docx
Lesson Plan Template – OverviewFor a more detailed explanati.docx
 
EDUHUB DAYS 2016 - Zarina Charlesworth & Natalie Sarrasin
EDUHUB DAYS 2016 - Zarina Charlesworth & Natalie SarrasinEDUHUB DAYS 2016 - Zarina Charlesworth & Natalie Sarrasin
EDUHUB DAYS 2016 - Zarina Charlesworth & Natalie Sarrasin
 
The blended classroom- El aula Semi presencial
The blended classroom- El aula Semi presencialThe blended classroom- El aula Semi presencial
The blended classroom- El aula Semi presencial
 
Edmentumoverview
EdmentumoverviewEdmentumoverview
Edmentumoverview
 
Field Study 1 Episodes 1-6
Field Study 1 Episodes 1-6Field Study 1 Episodes 1-6
Field Study 1 Episodes 1-6
 
Middle school agenda day 3 (2)
Middle school agenda day 3 (2)Middle school agenda day 3 (2)
Middle school agenda day 3 (2)
 
NYC iZone at WNET's Teaching and Learning
NYC iZone at WNET's Teaching and LearningNYC iZone at WNET's Teaching and Learning
NYC iZone at WNET's Teaching and Learning
 

Recently uploaded

ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxnewslab143
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一A SSS
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 

Recently uploaded (20)

ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
2024新版美国旧金山州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
办理学位证(NTU证书)新加坡南洋理工大学毕业证成绩单原版一比一
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 

Adaptable School Prototype

  • 1. 1307 West Morehead Street - Suite 108 - Charlotte, NC - 28208 - 704.344.0445 - www.insightarch.com PHASEDKINDERGARTENTHROUGHEIGHTHGRADE ADAPTABLE SCHOOL PROTOTYPE The Adaptable School Prototype is a unique opportunity to design, test, and evaluate the viability of a pre-designed, phased kindergarten through eighth grade school. We invite you to explore the complete design package provided in this document, ask us questions concerning the design, cost, or feasibility, and then we in turn will modify the design to create a school that fits your particular needs. FEATURE FOCUS: HUMAN SCALE From furniture to architectural features, careful attention is paid to the child’s interaction with the environment. VISUAL TRANSPARENCY / SAFETY Interior classroom windows allow for a visual connection with the learning commons. TECHNOLOGY Technology integration provides a greater connectivity to classrooms across the globe, access to new teaching methods, and student participation opportunities. DAYLIGHTING Natural daylight is invited into each and every classroom which has been proven to improve student’s test scores. OUTDOOR FITNESS Each grade level has direct connectivity to the outdoors, allowing for active learning and play. COLLABORATION Spaces are provided for varying levels of collaboration including learning commons, huddle spaces, and a large centralized commons. COMMUNITY CONNECTIVITY The community is invited into the building for use of the media center/ library, viewing of the gallery walkway, and to watch after-school performances. FLEXIBILITY Large open spaces such as commons areas provide multi-functional space while furniture and partitions allow for smaller groupings. A R C H I T E C T S
  • 2. Living Machine Gallery Walkway 3D Art Display Administration/ Work Room Media Center Guidance Office The Social Commons Performance Music Room AThe Arts Kitchen Huddle Huddle Huddle Huddle Study NookStudy Nook Learning Commons FIRST GRADE SECOND GRADE THIRD GRADE FOURTH GRADE FIFTH GRADE Science Flex Science Flex Outdoor Learning Outdoor Learning The Galley KINDERGARTEN Outdoor Learning Learning Commons Learning Commons Outdoor Learning Learning Commons Learning Commons Tutor Room Conference Music Room B Learning Commons The Kindergarten through Fifth grade Phase I prototype module offers a comprehensive design strategy for a modest budget. Careful attention is placed on human scale, visual transparency, technology, daylighting, outdoor fitness, collaboration, community connectivity, and flexibility. PLAN FEATURES - A secure entrance with an adminstrative work room - Guidance office, tutor, and conference room - An entrance art gallery for 2D, 3D, and mixed media arts - 3 Specialty classrooms (Arts, Music, Media or Library) - Six grade levels with 3-4 classrooms to each accommodate between 20-25 students - Learning commons by grade level which includes lounge or stage space, meeting areas, small group work space, a wash area for Second through Fifth grade, a storage room, and lockers or cubbies - Flexible space for a variety of learning opportunities including stages for“campfire”space, small group meeting areas (Huddle room) for“watering hole”space, and lounge or study nook areas for“cave”spaces - A large centralized commons area for dining, study, performance, and exercise - Outdoor learning environments for scientific study, fresh air, and exercise PHASEI:KINDERGARTEN-FIFTHGRADE PLAN KEY Teacher/ Guidance Specialty Classrooms Kindergarten and First Grades Second and Third Grades Fourth and Fifth Grades Adaptable Classroom CLASSROOMS 3 classrooms per grade level space for 1 additional classroom per grade level SIZE 35,000 S.F. (as shown) 40,000 S.F. (total building square footage to include 4 classrooms per grade) STUDENTS 20 students per classroom 360 students @ 3 classrooms 480 students @ 4 classrooms COST Base cost at $100 per S.F. $3,400,000 (total building) THECOMMONS LEARNINGCOMMONS OUTDOORLEARNING A R C H I T E C T S
  • 3. Open To Below Teacher’s Lounge Guidance Office Manager Interim Office Records Additional Classroom Additional Classroom Health Room Secretary Office Assistant Principal Principal Conference Media Loft Reception SIXTH GRADE SEVENTH GRADEEIGTH GRADE Learning Commons Huddle Study Nook Science Flex Science Flex Huddle Huddle P.E. Office Art Walk Study Nook Exercise Room Fitness Center Outdoor Exercise Tres Ans Cafe Learning Commons Learning Commons Science Flex Science Lab The Middle School Phase II addition connects directly to the base prototype and further expands the Charter School programmatic requirements. PLAN FEATURES - A Cafe/ Commons area for dining, study, and group meetings - An Art Walk corridor for student display - A Wellness Center which includes a large fitness room, a smaller exercise (weight and tumble) room, a P.E. Office/ Health room, and access to an outdoor exercise space - A Science Lab which includes wash sinks and upper level lab equipment, with direct access to an outdoor courtyard - Three grade levels with four classrooms each which will accommodate 20-25 students - Learning commons by grade level which includes lounge and meeting areas, a storage room, and lockers - Flexible space which includes three different sizes of Huddle rooms, a booth style study nook, and science flex rooms LEVEL TWO: The Kindergarten through Fifth grade module has the ability to accommodate a second story level above the music room, storage, and restrooms. This space may provide additional classrooms, commons or open media space, two story atrium, relocation of guidance rooms, a teacher’s lounge, and an administration wing. Two new stairs and an elevator provide accessibility to the second story. ADDITIONAL MODULES: Additional modules may be added to the base prototype upon request. Options include a Gymnasium which would house concessions, locker rooms, and PE offices, an Arts Expansion to include practice rooms, separate choral and instrument rooms, and a black box performance space, or a Theater to include a stage with fixed seating, formal lobby, ticket sales, practice and dressing rooms, and prop/ costume storage. P.E. Office 1 P.E. Office 2 Boy’s Locker Room Girl’s Locker Room Storage/ Laundry Gymnasium Bleachers Concessions PHASEII:MIDDLESCHOOL EXPANSIONPACK:PROTOTYPEMODULEUPGRADE PLAN KEY Teacher/ Guidance Specialty Classrooms Sixth Grade Seventh Grade Eighth Grade Administration Offices CLASSROOMS 4 classrooms per grade level SIZE 22,000 S.F. STUDENTS 20 students per classroom 240 students @ 4 classrooms A R C H I T E C T S
  • 4. FINANCIALPLAN The following spreadsheets provide a conceptual proforma and development cost information for the Adaptable School Prototype. This data is based on the assumption that the first year will provide for 360 students (3 classrooms per grade) while year five will include both phases that will provide for 720 students in total. Annual revenue is based on revenue projections from LEA 2013-2014 per pupil funding for Charlotte- Mecklenburg Schools to include state funds, local funds, and federal EC funds. Insight Architects recognizes that each school will have different needs and requirements based on initial funding available. We have formed relationships with funding sources which will help to fast track your plan into a reality. In addition, we have the resources to assist in your search for a new site, for the building or purchase of temporary (modular) structures, or for locating and upfitting an existing temporary space. Phase One Years 1 and 2 (Estimates Based on Second Year projections) Charter School Gross Cost Annual Revenue (Year Two): 2015 2016 $3,481,310 (From Application 2nd year Projections) Source: Form 990 Source: NACPS for Same Year Grades Served: K 5 Annual Revenue # Students Annual Lease Total Dev. Costs* Dev. Cost / Pupil $3,481,310 480 15% of Revenue 522,197$ 5,094,600$ 10,614$ $3,481,310 480 20% of Revenue 696,262$ 6,792,800$ 14,152$ Approx PPR 7,253$ Phase Two Years 3 5 (Estimates Based on provided financial projections) Charter School Gross Cost Annual Revenue: 2016 2018 Source: Form 990 Annual Revenue # Students Source: NACPS for Same Year Grades Served: K 8 Annual Revenue # Students Annual Lease Total Dev. Costs* Dev. Cost / Pupil Year Three $4,105,827 560 15% of Revenue 615,874$ 6,008,527$ 10,730$ $4,105,827 560 20% of Revenue 821,165$ 8,011,370$ 14,306$ Approx PPR 7,332$ Year Four $4,681,678 640 15% of Revenue 702,252$ 6,851,236$ 10,705$ $4,681,678 640 20% of Revenue 936,336$ 9,134,981$ 14,273$ Approx PPR 7,315$ Year Five $5,268,759 720 15% of Revenue 790,314$ 7,710,379$ 10,709$ $5,268,759 720 20% of Revenue 1,053,752$ 10,280,505$ 14,278$ Approx PPR 7,318$ *Total Dev. Costs include everything required to complete the project: land/building acquisition, due diligence, legal fees, agent fees, permitting, construction, interest carry, etc. Insight will "reverse engineer" what a school can afford based on the school's actual revenue and expenses with an emphasis on design. Development Cost Phase One School Year: 2015 2016 3,860,668$ (Based on 20% of Operating Cost Year One (Maximum)) Grades Served: K 5 Item Description Units Cost Cost 1 Land Acquisition Acres 411,308$ Available For Acquisition 2 Real Estate Fees 6.0% 24,678$ 3 Inflation 3.5% 99,960$ 4 Contingency 5.0% 142,800$ Testing and Misc. 1.5% 42,840$ 5 Civil Engineering 1.0% 28,560$ 6 Design Fees 6.0% 171,360$ 7 Construction Cost $85 /S.F. 33,600 2,856,000$ 8 Furnishings/Fixtures/Equipment 3.0% 85,680.00$ 9 Utilities Variable 65,000.00$ 65,000.00$ 10 11 12 13 14 15 3,860,668$ Year One Cost Annual Revenue (Year One) # Students (Year Two) Annual Lease Total Dev. Costs* Dev. Cost / Pupil $2,638,123 360 15% of Revenue 395,718$ 3,860,668$ 10,724$ Total A R C H I T E C T S